CN109779247A - The formwork erection device and construction method of steel column cornerite - Google Patents

The formwork erection device and construction method of steel column cornerite Download PDF

Info

Publication number
CN109779247A
CN109779247A CN201910224513.3A CN201910224513A CN109779247A CN 109779247 A CN109779247 A CN 109779247A CN 201910224513 A CN201910224513 A CN 201910224513A CN 109779247 A CN109779247 A CN 109779247A
Authority
CN
China
Prior art keywords
nut
steel column
column
formwork
pair
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910224513.3A
Other languages
Chinese (zh)
Inventor
王代发
张春勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201910224513.3A priority Critical patent/CN109779247A/en
Publication of CN109779247A publication Critical patent/CN109779247A/en
Pending legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

本发明涉及一种钢柱包角的模板支设装置及施工方法。包括柱基础,截面为H形的钢柱安装在柱基础上,柱基础底部四周支设模板,模板外侧设有竖向背楞,钢柱一侧的翼缘板两端分别安装第一、第二U形卡具,第一、第二U形卡具内侧分别安装顶丝,第一U形卡具的外侧设有第一螺母,第一螺母的轴线与顶丝的轴线平行,第二U形卡具的外侧设有第二螺母,第二螺母的轴线与顶丝的轴线垂直;第一对拉螺杆的一端与第一螺母连接,第一对拉螺杆的另一端穿过模板与第一背楞固接,第二对拉螺杆的一端与第二螺母连接,第二对拉螺杆的另一端穿过模板与第二背楞固接。本发明的钢柱包角模板支设装置制作简单,操作方便灵活,以钢柱为中心四周设置拉杆,模板受力均匀。

The invention relates to a formwork supporting device and a construction method for a steel column wrapping angle. Including the column foundation, the H-shaped steel column is installed on the column foundation, the formwork is supported around the bottom of the column foundation, the outer side of the formwork is provided with a vertical back corrugation, and the first and second ends of the flange plate on one side of the steel column are installed respectively. U-shaped clamps, the inner side of the first and second U-shaped clamps are respectively installed with jack screws, the outside of the first U-shaped clamp is provided with a first nut, the axis of the first nut is parallel to the axis of the jack wire, and the second U-shaped clamp is provided with a first nut on the outside. There is a second nut on the outer side of the fixture, and the axis of the second nut is perpendicular to the axis of the jacking screw; one end of the first pair of pulling screws is connected with the first nut, and the other end of the first pair of pulling screws passes through the template and is connected to the first back. One end of the second pair of pulling screws is connected with the second nut, and the other end of the second pair of pulling screws is connected with the second back corrugated through the template. The steel column-enclosed formwork support device of the present invention is simple to manufacture, convenient and flexible to operate, and the steel column is set around the tie rods, so that the formwork is uniformly stressed.

Description

The formwork erection device and construction method of steel column cornerite
Technical field
The present invention relates to construction, the formwork erection device and construction method of specifically a kind of steel column cornerite.
Background technique
It is well known that in building metallurgy industry, almost most of steel-structure factory building pillar is all to weld I-shaped (or H-type) The single limb column or latticed column form of composition, there are many more the suspension columns such as equipment column, steel platform usually to require to carry out packet suspension column (or back-grouting).Usual workshop packet suspension column from -500mm absolute altitude to+150mm or so, thickness between 500 ~ 650mm, and The formwork erection often drilling in ground base inserts reinforcing bar and carrys out fixed form system, then uses scaffold as lateral back cord, diagonal brace It is adjusted and reinforces.Work progress complexity is cumbersome, low efficiency.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of formwork erection device of steel column cornerite and construction method, templates Uniform force, structure are simple.
The technical solution used to solve the technical problems of the present invention is that:
A kind of formwork erection device of steel column cornerite, including column foundation, section are that the steel column of H-shaped is mounted on column foundation, base for post The outside of the surrounding supporting module of plinth bottom, template is equipped with vertical back cord, and the both ends of the flange plate of steel column side are installed respectively The inside of first U-shaped fixture and the second U-shaped fixture, the first U-shaped fixture and the second U-shaped fixture is installed by jackscrew, the first U-shaped card respectively The outside of tool is equipped with the first nut, and the axis of the first nut and the axis of jackscrew are parallel, and the outside of the second U-shaped fixture is equipped with second Nut, the axis of the second nut and the axis of jackscrew are vertical;One end of first Screw arbor with nut at both-ends is connect with the first nut, first pair of drawing The other end of screw rod passes through template and the first back cord is affixed, and one end of the second Screw arbor with nut at both-ends is connect with the second nut, second pair of drawing The other end of screw rod passes through template and the second back cord is affixed.
The present invention by adopting the above technical scheme, compared with prior art, beneficial effect is:
It gathers materials on the spot, production is simple, and it is flexible to operation, a large amount of scaffold tubes and fastener are reduced, is arranged by center surrounding of steel column Pull rod, template uniform force.
Further, prioritization scheme of the invention is:
The two sides of steel column are symmetrical structure.
First back cord includes the first scaffold tubes and the second scaffold tubes being set side by side, and the outer end of the first Screw arbor with nut at both-ends is placed in Between one scaffold tubes and the second scaffold tubes, the first Screw arbor with nut at both-ends is affixed by connector and nut and the first back cord.
A kind of construction method of the formwork erection device of steel column cornerite, includes the following steps,
A, production U-shaped card tool;
B, installation U-shaped card tool
First U-shaped card tool and the second U-shaped card tool, the first Screw arbor with nut at both-ends and second are respectively symmetrically installed on four edges of a wing of steel column The inner end of Screw arbor with nut at both-ends is connected with the first U-shaped card tool and the second U-shaped card tool respectively;
C, formwork erection
According to packet suspension column outer dimension unwrapping wire, surrounding surface drilling installs spacer bar;
D, spelling mould and the installation of template are carried out;
E, formwork reinforcement
When template system after the installation is completed, back cord is installed, the every side in basis is arranged two groups, and back cord bottom, which covers, to be positioned on the outside of template On reinforcing bar, the outer end of the first Screw arbor with nut at both-ends and the second Screw arbor with nut at both-ends passes through connector and the first back cord and the second back cord lock respectively Tightly;
F, suspension column concrete placings
Suspension column concreting is carried out after formwork erection, which finishes, applies for checking and examination qualification.
Detailed description of the invention
Fig. 1 is the top view of the embodiment of the present invention;
Fig. 2 is the A-A view of Fig. 1;
Fig. 3 is the first U-shaped fixture schematic diagram of the embodiment of the present invention;
Fig. 4 is the second U-shaped fixture schematic diagram of the embodiment of the present invention;
In figure: column foundation 1;Concrete packet suspension column 2;First steel column 3;Inter-column connecting rod part 4;First Screw arbor with nut at both-ends 5;First back cord 6; First U-shaped card tool 7;First nut 8;Flitch 9;Spacer bar 10;Template 11;Locking nut 12;" 3 " type card 13;Jackscrew 14;The Two Screw arbor with nut at both-ends 15;Second back cord 16;Second U-shaped card tool 17;First nut 18;Second steel column 19.
Specific embodiment
The present invention is described in detail with reference to the accompanying drawings and examples.
Participate in Fig. 1, Fig. 2, a kind of formwork erection device of steel column cornerite, by column foundation 1, concrete packet suspension column 2, the first steel column 3, Inter-column connecting rod part 4, the first Screw arbor with nut at both-ends 5, the first back cord 6, the first U-shaped card have the 7, first nut 8, flitch 9, spacer bar 10, template 11, locking nut 12,3 type cards 13, jackscrew 14, the second Screw arbor with nut at both-ends 15, the second back cord 16, the second U-shaped card tool 17, First nut 18 and the second steel column 19 are constituted.It is equipped with two steel columns in the present embodiment, is the first steel column 3 and the second steel column respectively 19, intercolumniation connecting rod 4 is installed, the first steel column 3 and the second steel column 19 are mounted on side by side between first steel column 3 and the second steel column 19 On column foundation 1, flitch 9 is installed in the outside of the surrounding installation template 11 of the first steel column 3 and the second steel column 19, template 11, flitch 9 Vertical back cord is installed in outside, and the bottom of back cord is sleeved on spacer bar 10, and positioning bar 10 is inserted into column foundation 1.
First U-shaped fixture 7 and the second U-shaped fixture 17, the first U are installed at the both ends of the flange plate of first steel column, 3 side respectively Shape fixture 7 and the second U-shaped fixture 17 are buckled in respectively on the flange plate of the first steel column 3, the first U-shaped fixture 7 and the second U-shaped fixture 17 It is formed by welding using with a thickness of 10 to 14 millimeters of steel plate strip, headroom is than first in the first U-shaped fixture 7 and the second U-shaped fixture 17 The steel column edge of a wing is 2 to 5 millimeters big, width determines according to actual conditions, general 50 to 200 millimeters.First U-shaped fixture 7 and the second U-shaped Jackscrew 14 is installed in the inside of fixture 17 respectively, and the inside of the first U-shaped fixture 7 and the second U-shaped fixture 17 is machined with open-work respectively, pushes up Silk nut-welding cooperates in the outside of the open-work, jackscrew 14 and jackscrew nut.Shown in first U-shaped fixture 7(Fig. 3) outside welding There is the first nut 8, the axis of the first nut 8 is parallel with the axis of jackscrew 14, the inner end of the first Screw arbor with nut at both-ends 5 and the first nut 8 Connection, the outer end end of the first Screw arbor with nut at both-ends 5 pass through template 11 and connect with the first back cord 6.First back cord 6 by be set side by side first Scaffold tubes 6-1 and the second scaffold tubes 6-2 is constituted, and the outer end of the first Screw arbor with nut at both-ends 5 is placed in the first scaffold tubes 6-1 and the second scaffold tubes Between 6-2, the first Screw arbor with nut at both-ends 5 is fixedly connected by " 3 " type card 13 and locking nut 12 with the first back cord 6.
Shown in second U-shaped fixture 17(Fig. 4) on the outside of be welded with the second nut 18, the axis and jackscrew 14 of the second nut 18 Axis it is vertical;The inner end of second Screw arbor with nut at both-ends 15 is connect with the second nut 18, and the outer end of the second Screw arbor with nut at both-ends 15 passes through template 11 are fixedly connected with the second back cord 16.The two sides of first steel column 3 and the second steel column 19 are symmetrical structure.First Screw arbor with nut at both-ends, 5 He The diameter of second Screw arbor with nut at both-ends 15 is 12 or 14 millimeters.
The construction method of the formwork erection device of above-mentioned steel column cornerite, includes the following steps,
A, production U-shaped card tool
According to the first U-shaped of drawing making fixture 7 and the second U-shaped fixture 17
B, installation U-shaped card tool
First U-shaped card tool 7 and the second U-shaped card tool are respectively symmetrically installed on four edges of a wing of the first steel column 3 and the second steel column 19 17, tighten jackscrew 14, the inner end of the first Screw arbor with nut at both-ends 5 and the second Screw arbor with nut at both-ends 15 is U-shaped with the first U-shaped card tool 7 and second respectively Fixture 17 connects;
C, formwork erection
According to packet suspension column outer dimension unwrapping wire, surrounding surface drilling installs spacer bar 10, as the positioning of template system and perpendicular To the fixed support stress point of steel pipe back cord;
D, spelling mould and the installation of template 11 are carried out;
E, formwork reinforcement
When 11 system of template after the installation is completed, back cord is installed, the every side in basis is arranged two groups, and back cord bottom covers on the outside of template 11 On spacer bar 10, the outer end of the first Screw arbor with nut at both-ends 5 and the second Screw arbor with nut at both-ends 15 pass through respectively 3 " type cards 13 and the first back cord 6 and The locking of second back cord 16;
F, suspension column concrete placings
Suspension column concreting is carried out after template 11, which installs, to be finished and apply for checking and examination qualification.
The foregoing is merely preferably feasible embodiment of the invention, not thereby limiting the scope of the invention, It is all to change with equivalent structure made by description of the invention and accompanying drawing content, it is intended to be included within the scope of the present invention.

Claims (4)

1.一种钢柱包角的模板支设装置,包括柱基础,截面为H形的钢柱安装在柱基础上,柱基础底部的四周支设模板,模板的外侧设有竖向的背楞,其特征在于:钢柱一侧的翼缘板的两端分别安装第一U形卡具和第二U形卡具,第一U形卡具和第二U形卡具的内侧分别安装顶丝,第一U形卡具的外侧设有第一螺母,第一螺母的轴线与顶丝的轴线平行,第二U形卡具的外侧设有第二螺母,第二螺母的轴线与顶丝的轴线垂直;第一对拉螺杆的一端与第一螺母连接,第一对拉螺杆的另一端穿过模板与第一背楞固接,第二对拉螺杆的一端与第二螺母连接,第二对拉螺杆的另一端穿过模板与第二背楞固接。1. A formwork supporting device for wrapping angles of a steel column, comprising a column foundation, a steel column with an H-shaped cross-section is installed on the column foundation, a formwork is supported around the bottom of the column foundation, and a vertical back corrugation is arranged on the outside of the formwork. , it is characterized in that: the two ends of the flange plate on one side of the steel column are respectively installed with the first U-shaped clamp and the second U-shaped clamp, and the inner side of the first U-shaped clamp and the second U-shaped clamp are respectively installed with the top Wire, the outer side of the first U-shaped clamp is provided with a first nut, the axis of the first nut is parallel to the axis of the top wire, the outer side of the second U-shaped clamp is provided with a second nut, and the axis of the second nut is parallel to the top wire The axis of the first pair of pull screws is vertical; one end of the first pair of pull screws is connected with the first nut, the other end of the first pair of pull screws is connected with the first back corrugation through the template, one end of the second pair of pull screws is connected with the second nut, and the second pair of pull screws is connected with the second nut. The other ends of the two pairs of pulling screws pass through the template and are fixedly connected with the second back corrugation. 2.根据权利要求1所述的钢柱包角的模板支设装置,其特征在于:钢柱的两侧为对称结构。2. the formwork supporting device of steel column wrapping angle according to claim 1, is characterized in that: both sides of steel column are symmetrical structure. 3.根据权利要求1所述的钢柱包角的模板支设装置,其特征在于:第一背楞包括并列设置的第一脚手管和第二脚手管,第一对拉螺杆的外端置于第一脚手管和第二脚手管之间,第一对拉螺杆通过连接件和螺母与第一背楞固接。3. the formwork supporting device of steel column wrapping angle according to claim 1, it is characterized in that: the first back corrugation comprises the first scaffolding pipe and the second scaffolding pipe that are arranged side by side, the outer part of the first pair of pulling screws The ends are placed between the first scaffolding tube and the second scaffolding tube, and the first pair of pulling screws are fixedly connected to the first back corrugated through connecting pieces and nuts. 4.一种如权利要求1所述任一项钢柱包角的模板支设装置的施工方法,包括如下步骤,4. a construction method of the formwork support device of any one steel column cladding angle as claimed in claim 1, comprises the steps, A、制作U型卡具;A. Make U-shaped fixtures; B、安装U型卡具;B. Install U-shaped fixture; 在钢柱的四个翼缘上分别对称安装第一U型卡具和第二U型卡具,第一对拉螺杆和第二对拉螺杆的内端分别与第一U型卡具和第二U型卡具连接;The first U-shaped clamp and the second U-shaped clamp are symmetrically installed on the four flanges of the steel column respectively, and the inner ends of the first pair of pull screws and the second pair of pull screws are respectively connected with the first U-shaped clamp and the second U-shaped clamp. Two U-shaped clamp connections; C、模板支设;C, template support; 按照包柱脚外形尺寸放线,四周地面钻孔安装定位钢筋,Set out the line according to the shape and size of the column foot, and install the positioning reinforcement by drilling holes on the surrounding ground. D、进行模板的拼模和安装;D. Make and install the template; E、模板加固E. Formwork reinforcement 当模板系统安装完毕后,模板外侧安装背楞,基础每边各设置两组,背楞底部套在定位钢筋上,第一对拉螺杆和第二对拉螺杆的外端分别通过连接件与第一背楞和第二背楞锁紧;After the installation of the formwork system is completed, the outer side of the formwork is installed with back corrugations, and two sets are installed on each side of the foundation. The bottom of the back corrugations is sleeved on the positioning steel bars. The first back ridge and the second back ridge are locked; F、柱脚砼浇筑F. Concrete pouring at the foot of the column 当模板支设完毕报验合格后进行柱脚混凝土浇筑。When the formwork support is completed and the inspection is passed, the column foot concrete is poured.
CN201910224513.3A 2019-03-23 2019-03-23 The formwork erection device and construction method of steel column cornerite Pending CN109779247A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910224513.3A CN109779247A (en) 2019-03-23 2019-03-23 The formwork erection device and construction method of steel column cornerite

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910224513.3A CN109779247A (en) 2019-03-23 2019-03-23 The formwork erection device and construction method of steel column cornerite

Publications (1)

Publication Number Publication Date
CN109779247A true CN109779247A (en) 2019-05-21

Family

ID=66491339

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910224513.3A Pending CN109779247A (en) 2019-03-23 2019-03-23 The formwork erection device and construction method of steel column cornerite

Country Status (1)

Country Link
CN (1) CN109779247A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110607906A (en) * 2019-10-09 2019-12-24 江苏昊钢建筑科技有限公司 An aluminum alloy template splicing structure
CN113187223A (en) * 2021-04-15 2021-07-30 浙江信宇建设集团有限公司 Template device of mirror surface bare concrete beam column and construction method thereof
CN113417477A (en) * 2021-07-12 2021-09-21 河南省安装集团有限责任公司 Photovoltaic panel stand column position adjusting device and installation adjusting method thereof
CN121161935A (en) * 2025-09-19 2025-12-19 嘉兴恒创电力设计研究院有限公司 Quick-assembly high-ductility concrete-section steel combined exposed column base and construction method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202006017834U1 (en) * 2006-11-21 2007-01-25 Otto Wulff Bauunternehmung Gmbh & Co. Kg Adjustable wall connecting panel for facade, has threaded rod and screw nuts, which are provided for adjustment of distance between brick work, concrete wall and column, where base plate is fastened with grouting anchors at brick work
CN205189390U (en) * 2015-12-14 2016-04-27 山西省工业设备安装有限公司 H shaped steel post operation platform
CN205393883U (en) * 2016-02-26 2016-07-27 中国化学工程第三建设有限公司 H shaped steel equipment fixture
TWM542054U (en) * 2017-01-24 2017-05-21 Cash Box Industrial Co Ltd Moldboard retainer
CN207018638U (en) * 2017-08-07 2018-02-16 中建安装工程有限公司 A kind of mounting fixture for being used to for pipeline to be connected to the dome of i-beam structure
CN108005381A (en) * 2017-12-04 2018-05-08 广东中南建设有限公司 Steel reinforced concrete formwork reinforcement structure and construction method
CN108952135A (en) * 2018-08-22 2018-12-07 中国二冶集团有限公司 The erection method of steel post operation platform fixture and operating platform
CN209704012U (en) * 2019-03-23 2019-11-29 中国二十二冶集团有限公司 Formwork Supporting Device for Steel Column Wrap Angle

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202006017834U1 (en) * 2006-11-21 2007-01-25 Otto Wulff Bauunternehmung Gmbh & Co. Kg Adjustable wall connecting panel for facade, has threaded rod and screw nuts, which are provided for adjustment of distance between brick work, concrete wall and column, where base plate is fastened with grouting anchors at brick work
CN205189390U (en) * 2015-12-14 2016-04-27 山西省工业设备安装有限公司 H shaped steel post operation platform
CN205393883U (en) * 2016-02-26 2016-07-27 中国化学工程第三建设有限公司 H shaped steel equipment fixture
TWM542054U (en) * 2017-01-24 2017-05-21 Cash Box Industrial Co Ltd Moldboard retainer
CN207018638U (en) * 2017-08-07 2018-02-16 中建安装工程有限公司 A kind of mounting fixture for being used to for pipeline to be connected to the dome of i-beam structure
CN108005381A (en) * 2017-12-04 2018-05-08 广东中南建设有限公司 Steel reinforced concrete formwork reinforcement structure and construction method
CN108952135A (en) * 2018-08-22 2018-12-07 中国二冶集团有限公司 The erection method of steel post operation platform fixture and operating platform
CN209704012U (en) * 2019-03-23 2019-11-29 中国二十二冶集团有限公司 Formwork Supporting Device for Steel Column Wrap Angle

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
【日】临时设施工业会: "《模板及支撑工程实务手册》", 地震出版社, pages: 25 - 27 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110607906A (en) * 2019-10-09 2019-12-24 江苏昊钢建筑科技有限公司 An aluminum alloy template splicing structure
CN113187223A (en) * 2021-04-15 2021-07-30 浙江信宇建设集团有限公司 Template device of mirror surface bare concrete beam column and construction method thereof
CN113187223B (en) * 2021-04-15 2022-05-31 浙江信宇建设集团有限公司 Template device of mirror-surface fair-faced concrete beam column and construction method thereof
CN113417477A (en) * 2021-07-12 2021-09-21 河南省安装集团有限责任公司 Photovoltaic panel stand column position adjusting device and installation adjusting method thereof
CN121161935A (en) * 2025-09-19 2025-12-19 嘉兴恒创电力设计研究院有限公司 Quick-assembly high-ductility concrete-section steel combined exposed column base and construction method

Similar Documents

Publication Publication Date Title
CN103452311B (en) A kind of erection method of shaped steel suspended structural support frame
CN103352564B (en) Horizontal structure shuttering system and construction method
CN106759457A (en) The installation method of cantilever design high-accuracy built-in fitting
CN206605172U (en) A kind of steel pipe butt welding of Elements of Space Grid Truss is with adjustable removable apparatus for correcting
CN206625134U (en) A kind of side form frock for cast-in-situ box girder
CN217782879U (en) Adjustable clip supports formula beam type template strutting arrangement
CN211389346U (en) Outer side template structure of large box girder
CN117552345A (en) Formwork support system for large cast-in-place concrete box beams with graduated section supports
CN116397548A (en) Construction Bracket System and Construction Method of Block 0 of Continuous Steel Structure Bridge
CN110593559A (en) A concrete beam formwork support device and its construction technology
CN212452315U (en) Assembly module and modular construction platform
CN119475496A (en) A frame type fixed bracket construction method for mechanical and electrical modular installation
CN220451464U (en) Steel bar truss floor carrier plate positioning device
CN204139622U (en) Adjustable segmented column steel bar positioning fixture
CN116516983B (en) Tide-affected steel-concrete combined inner support for deep foundation pit in river and construction method
CN116104018B (en) Construction method of variable-section special-shaped steel tower crown installation device
CN108797350B (en) Tower column inner and outer stiff skeleton device and construction method thereof
CN209704012U (en) Formwork Supporting Device for Steel Column Wrap Angle
CN217579783U (en) Mounting system of suspension bridge steel pull rod anchoring system
CN118390801A (en) Overhanging inclined column reinforcing structure and construction method
CN118309275A (en) A construction method for quickly realizing accurate positioning of large steel structure columns
CN215200395U (en) Same-abdomen high cross column machining device
CN215889346U (en) Arc-shaped formwork bent frame supporting system
CN213896816U (en) Y-shaped support frame
JP2008502822A (en) Architectural elements and construction methods

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190521