CN209723052U - The prefabricated plate advanced water-stopping of poured band of outer wall of basement backfills structure - Google Patents

The prefabricated plate advanced water-stopping of poured band of outer wall of basement backfills structure Download PDF

Info

Publication number
CN209723052U
CN209723052U CN201920292524.0U CN201920292524U CN209723052U CN 209723052 U CN209723052 U CN 209723052U CN 201920292524 U CN201920292524 U CN 201920292524U CN 209723052 U CN209723052 U CN 209723052U
Authority
CN
China
Prior art keywords
basement
wall
post
cast strip
precast slab
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920292524.0U
Other languages
Chinese (zh)
Inventor
翦凝敏
张正财
周昌林
姜朝中
刘义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Construction Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Original Assignee
Construction Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Construction Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd filed Critical Construction Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Priority to CN201920292524.0U priority Critical patent/CN209723052U/en
Application granted granted Critical
Publication of CN209723052U publication Critical patent/CN209723052U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses a kind of prefabricated plate advanced water-stoppings of poured band of outer wall of basement to backfill structure, and the hole of post-cast strip is successively overlapped from bottom to up by several precast slabs to be sealed in advance;Precast concrete intralamellar part is embedded with screw rod, matches on screw rod and is arranged with butterfly button and fastening nut;Precast slab both sides are overlapped with the alien invasion of the outer wall of basement of post-cast strip hole two sides respectively, and screw rod is socketed after pouring with hole by butterfly button and the cross bar for the interior facade for being overlapped on outer wall of basement, it pushes butterfly button mobile by tightening fastening nut, is tightly attached to precast slab and cross bar on outer wall of basement.The utility model avoids steel bar corrosion, basement ponding in post-cast strip caused by the preceding infiltration of basement post-pouring zone closing, improves construction quality, reduces engineering construction difficulty.Meanwhile next procedure construction can be carried out after installing precast slab, reduce the contradiction between process, accelerate speed of application, shortens the duration.

Description

The prefabricated plate advanced water-stopping of poured band of outer wall of basement backfills structure
Technical field
The utility model relates to a kind of prefabricated plate advanced water-stoppings of poured band of outer wall of basement to backfill structure, belong to ground Lower room exterior wall late poured band structure field.
Background technique
During building basement exterior wall cast-in-place concrete structure construction, in order to cut down concrete shrinkage stress, Post-cast strip generally can be all arranged in outer wall of basement.Post-cast strip inevitably falls into sundries before closing, and later period cleaning is difficult, Influence concrete pouring quality;Meanwhile the post-cast strip outer water (construction water, rainwater etc.) of closing cup is easily scurried into basement, Influence normal construction;In addition, post-pouring belt of outer wall restricts and limit the construction workings times such as outdoor water-proof, outdoor backfill, influence Construction speed.
Traditional poured band of outer wall of basement processing mode and expense.240 thick wall bodies are built at post-pouring belt of outer wall, in wall Plastering processing in outer surface can just do waterproof and the construction of masonry process later.But have following hidden danger of quality: 1, outer wall of basement is used 240 building walls, after reaching the post-cast strip concreting time, the unilateral formwork reinforcement difficulty in inside is (with outside without counter brace Part), easily rise mould quality problems, increases manually pick the expense of beating instead.Traditional approach processing cost: 1,240 walls are built Expense (fee of material and labour cost, calculated according to comprehensive unit price): 475 yuan/m3 × 3.9m × 0.24m × (0.8+0.3+0.3) m= 622.44 first;2, basement post-pouring zone external wall plastering expense: 50 Yuan/㎡ × 3.9m × (0.8+0.3+0.3+0.24 × 2) m= 366.6 first;3, consider post-cast strip cleaning (because masonry mortar fall off etc. fall off in post-cast strip and post-cast strip steel bar pollution processing) And unilateral template mounting cost on the inside of the later period: 3 labour cost × 350 yuan/day=1050 yuan.After conventional process outer wall of basement Pouring band to amount to expense is 2039.04 yuan.
Utility model content
Technical problem to be solved by the utility model is: it is advanced to provide a kind of prefabricated plate of poured band of outer wall of basement Sealing backfills structure, to solve difficult existing poured band of outer wall of basement sundries cleaning, infiltration influence pouring quality and process Between contradiction the problem of restricting and extending construction speed.
The technical solution of the utility model is: a kind of prefabricated plate advanced water-stopping backfill knot of poured band of outer wall of basement Structure, comprising: outer wall of basement and the post-cast strip that outer wall of basement is arranged in, the hole of the post-cast strip is by several prefabricated mixed Concrete board successively overlaps seal in advance from bottom to up;The precast concrete intralamellar part is embedded with screw rod, matches on screw rod and is arranged There are butterfly button and fastening nut;The precast slab both sides are outer vertical with the outer wall of basement of post-cast strip hole two sides respectively Face overlap joint, and screw rod is socketed after pouring with hole by butterfly button and the cross bar for the interior facade for being overlapped on outer wall of basement, It pushes butterfly button mobile by tightening fastening nut, is tightly attached to precast slab and cross bar on outer wall of basement.
The upper and lower end parts of the precast slab are respectively equipped with card slot and boss, and contiguous prefabricated concrete slab passes through boss Protrude into clamping in card slot.
Before the hole sealing of post-cast strip, the contact area of contiguous prefabricated concrete slab is pre-coated with ointment, in post-cast strip After the sealing of hole, the seam crossing of contiguous prefabricated concrete slab is coated with grease seal.
Before the hole sealing of post-cast strip, the contact area of the precast slab and outer wall of basement is pre-coated with oil Cream, after the hole sealing of post-cast strip, the seam crossing of the precast slab and outer wall of basement is coated with grease seal.
Pre-buried on the precast slab to be provided with hanging ring, the hanging ring and the screw rod are located at precast concrete The both ends of the surface of plate.
The hanging ring is 2, and the screw rod is 4.
The screw rod is sealing up screw.
Compared with prior art, as follows the advantages of the utility model:
1, conditions to release restricts, the effectively save duration.Using the prefabricated plate in post-cast strip, outer wall of basement waterproof layer, Protective layer and outdoor backfill can integrated construction, the construction for eliminating post-pouring belt of outer wall restricts, and guarantees waterproof integral construction quality, together When basement in other processes can be organized to construct, in addition after outdoor backfill, do not influence adjacent building construction, therefore saved work Phase.
2, effectively save cost.The prefabricated plate production in post-cast strip and installation cost are low, and installation is quick, easy, Strong operability;Closure construction in advance, the problem more than cleaning difficulty, recruitment before reducing post-cast strip closing.It is handled according to this engineering method Basement post-pouring zone required cost: 1611.44 yuan (prefabricated and installation post-cast strip concrete expense: 365 yuan/m3 × (1.2m × 0.6m × 0.08 × 6)=1261.44 yuan;The unilateral template installation in inside: 1 labour cost × 350 yuan/day=350 yuan), using this Engineering method processing poured band of outer wall of basement amounts to expense and is.
, can be 427.6 yuan of direct saving expense from the point of view of a poured band of outer wall of basement, it in addition shortens the construction period up to 10 days (conventional construction method spends the time: 1., which build 240 walls, needs 3 days, and point 3 masonry, building height daily by code requirement is 1.5m;2. cannot plaster immediately after building, 2 progress of plastering point need 3 days;3. can be applied after plastering mortar reaches intensity Brush water-repellent paint, this area generally consider 5 days.And this engineering method install after directly can brush water-repellent paint, installation only need just Calculate 1 day.To sum up save 10 days durations).
3, it improves quality and eliminates safe hidden trouble.It is anti-that outer wall of basement can be carried out in time after the completion of outer wall of basement construction Water, outdoor backfilling of earthwork reduce the probability for generating structural cracks because of day and night temperature due to basement structure exposure for a long time, eliminate Deep basal pit bring security risk.
4, the prefabricated plate in post-cast strip is able to achieve efficient, volume production.The routinely reserved setting of size substantially of post-cast strip size, Efficient, volume production can be able to achieve using the prefabricated plate technique in post-cast strip.
In summary, the utility model avoids reinforcing bar rust in post-cast strip caused by the preceding infiltration of basement post-pouring zone closing Erosion, basement ponding, improve construction quality, reduce engineering construction difficulty.Meanwhile the prefabricated plate in post-cast strip installs After can carry out next procedure construction, reduce the contradiction between process, greatly accelerate speed of application, shorten the duration, be Construction unit and unit in charge of construction all bring considerable economic benefit.
The utility model is suitable for the construction of skyscraper, large public building basement (garage) post-pouring belt of outer wall, The basement engineering of backfilling of earthwork need to be carried out immediately suitable for that must stay to set post-cast strip but construct because of adjacent building, while being suitable for applying Work narrow field, duration need to tightly carry out the interspersed engineering of the subsequent handlings such as indoor masonry.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the main view of precast slab;
Fig. 3 is the left view of precast slab;
Fig. 4 is the right view of precast slab;
Fig. 5 is the top view of precast slab;
In figure: 1 outer wall of basement, 2 post-cast strips, 3 precast slabs, 4 screw rods, 5 cross bars, 6 butterfly buttons, 7 fastening nuts, 8 sealing pieces, 9 hanging rings, 10 boss, 11 card slots.
Specific embodiment
With reference to the accompanying drawing and utility model is described further in specific embodiment:
Referring to figs. 1 to Fig. 5, returned according to a kind of prefabricated plate advanced water-stopping of poured band of outer wall of basement of the utility model Fill out structure, comprising: outer wall of basement 1 and the post-cast strip 2 that outer wall of basement 1 is arranged in, the hole of post-cast strip is by several prefabricated Concrete slab 3 successively overlaps from bottom to up to be sealed in advance, usual precast slab 3 generally rectangle.
Screw rod 4 is embedded with inside precast slab 3, with butterfly button 6 and fastening nut 7 is arranged on screw rod 4, i.e., Butterfly button 6 and fastening nut 7 are successively socketed on screw rod 4, and fastening nut 7 is in 4 outer end of screw rod.Preferably, screw rod 4 is 4, it is embedded in precast slab 3 respectively up and down at different location.
When installation, alien invasion of 3 both sides of precast slab respectively with the outer wall of basement 1 of 2 hole two sides of post-cast strip is taken It connects, and screw rod 4 is buckleing 6 sockets of cross bar 5 with the interior facade for being overlapped on outer wall of basement 1 by butterfly after pouring 2 hole of band, I.e. butterfly button 6 and cross bar 5 are socketed, and the both ends of the cross bar 5 interior facade with the outer wall of basement 1 of 2 hole two sides of post-cast strip respectively Overlap joint pushes butterfly button 6 mobile, precast slab 3 and cross bar 5 can be made to be tightly attached to underground by tightening fastening nut 7 at this time Two facades of room exterior wall 1 are completed to fix.Preferably, screw rod 4 is sealing up screw, and sealing piece 8 is equipped on sealing up screw, can be with Play sealing effect.
It is pre-buried on precast slab 3 to be provided with hanging ring 9, hanging ring 9 and spiral shell in order to facilitate the overlap joint of precast slab 3 Bar 4 is located at the both ends of the surface of precast slab 3, so can assist lifting by tower crane in overlap joint, improve installation effectiveness. The quantity of hanging ring 9 can be set as needed, and conventional is 2.
Be respectively equipped with card slot 11 and boss 10 in the upper and lower end parts of precast slab 3, when overlap joint adjacent precast concrete Plate 3 is protruded by boss 10 and realizes clamping in card slot 11, to improve water-stagnating effect, and is convenient for subsequent water-proofing treatment.
Before the hole sealing of post-cast strip 2, the contact area of contiguous prefabricated concrete slab 3 is pre-coated with ointment, in post-cast strip 2 Hole sealing after, the seam crossing of contiguous prefabricated concrete slab 3 is coated with grease seal.
Before the hole sealing of post-cast strip 2, the contact area of precast slab 3 and outer wall of basement 1 is pre-coated with ointment, After the hole sealing of post-cast strip 2, the seam crossing of precast slab 3 and outer wall of basement 1 is coated with grease seal.
Using the prefabricated plate advanced water-stopping earth-filling method of the poured band of outer wall of basement of the utility model are as follows: according to rear Band design and construction drawing is poured, the prefabricated plate construction drawing in post-cast strip is designed, the prefabricated plate in post-cast strip is made, to underground After room external wall construction is complete, the prefabricated plate installation in post-cast strip is carried out, the subsequent works such as external wall waterproof, backfilling of earthwork are then carried out Make.The specific method is as follows:
1, rear pouring belt precast concrete plate 3 is designed.For example, considering according to post empiricism design drawing and live material Post-cast strip width design value is 800mm, basement post-pouring zone height is 3.9m, all precast slabs (3) use C14@150 Single-layer bidirectional arrangement of reinforcement, using C30 concrete, it is manually installed and transport etc. composite factors.3 ruler of primary election rear pouring belt precast concrete plate Very little (length × wide × plate thickness) is as follows: 900mm × 1000mm × 100mm;900mm×1000mm×80mm;900mm×1000mm× 70mm;600mm×1000mm×80mm;600mm×1200mm×90mm;Finally determine best rear pouring belt precast concrete plate 3 Having a size of 600mm × 1200mm × 90mm.
2, rear pouring belt precast concrete plate 3 is made.According to 3 construction drawing of rear pouring belt precast concrete plate, made under room temperature Rear pouring belt precast concrete plate 3 controls prefabricated board reinforcing bar grade, quantity spacing, thickness of protection tier in manufacturing process;Control Prefabricated plate thickness and vibration compacting situation;Control 3 built-in fitting of rear pouring belt precast concrete plate (hanging ring 9 and sealing up screw 4) quantity And situation;The rear pouring belt precast concrete plate 3 made carries out sprinkling maintenance (covering film) in 7 days, in curing period Forbid that there is a phenomenon where trample and impact wreckage rear pouring belt precast concrete plate 3.It is arranged around 3 laydown area of precast slab and mentions Awake board draws warning tape.
3, poured band of outer wall of basement is cleared up.Concrete slag at poured band of outer wall of basement 2 and laitance are rejected to closely knit Then structure is rinsed with water clean.
4, the transport of rear pouring belt precast concrete plate 3 and installation.In a pre-installation, in post-cast strip two sides, bullet sets vertical 20mm control Line and structure 1m horizontal line, it is ensured that installation dimension is correct;Transport and installation: worker binds rope in rear pouring belt precast concrete It on 3 hanging ring 9 of plate, assists lifting using live tower crane, slowly puts down rear pouring belt precast concrete plate 3(caution area from post-cast strip top Point 3 front and back sides of rear pouring belt precast concrete plate), pay attention in decentralization process about 3 tip interface of rear pouring belt precast concrete plate with Sealing up screw 4 is not damaged, and after placing suitable position, overturning precast slab 3 makes seal ring towards on the inside of basement, And sealing up screw 4 is avoided into reinforcing bar at post-cast strip, and it being passed through out of its interval, this is sure not to collide in the process damages seal ring, The prefabricated plate in post-cast strip is temporarily fixed at outside basement post-pouring zone by worker by tightening fastening nut 7 in basement room On wall, backfill terminates to remove at post-cast strip 2.3 erection sequence of rear pouring belt precast concrete plate: carry out from the bottom up by Block installation.
5, seam crossing detailed treatment.Installation front and back, rear pouring belt precast concrete plate 3 and outer wall of basement seam crossing and after pour Seam crossing is handled using ointment between band precast slab 3, it is ensured that the ointment cementation of fissures is closely knit, exhaustive (processing 2).
6, waterproof construction.After the completion of seam detailed treatment, start to carry out waterproof construction at poured band of outer wall of basement, after making It pours waterproof at band and waterproof forms unified entirety around it, reach advanced water-stopping effect.
It, cannot the above content is specific preferred embodiment further detailed description of the utility model is combined Assert that the specific implementation of the utility model is only limited to these instructions.For the ordinary skill of the utility model technical field For personnel, without departing from the concept of the premise utility, a number of simple deductions or replacements can also be made, should all regard To belong to the protection scope of the utility model.

Claims (7)

1. a kind of prefabricated plate advanced water-stopping of poured band of outer wall of basement backfills structure, comprising: outer wall of basement (1), with And setting is in the post-cast strip (2) of outer wall of basement (1), it is characterised in that: the hole of the post-cast strip (2) is by several concretes Native plate (3) successively overlaps from bottom to up to be sealed in advance;Screw rod (4) are embedded with inside the precast slab (3), in screw rod (4) match on and be arranged with butterfly button (6) and fastening nut (7);Precast slab (3) both sides respectively with post-cast strip (2) hole The alien invasion overlap joint of the outer wall of basement (1) of mouth two sides, and screw rod (4) by butterfly button (6) and is taken behind post-cast strip (2) hole Cross bar (5) socket in the interior facade of outer wall of basement (1) is connect, pushes butterfly button (6) mobile by tightening fastening nut (7), It is tightly attached to precast slab (3) and cross bar (5) on outer wall of basement (1).
2. the prefabricated plate advanced water-stopping of poured band of outer wall of basement according to claim 1 backfills structure, feature Be: the upper and lower end parts of the precast slab (3) are respectively equipped with card slot (11) and boss (10), contiguous prefabricated concrete slab (3) clamping in card slot (11) is protruded by boss (10).
3. the prefabricated plate advanced water-stopping of poured band of outer wall of basement according to claim 2 backfills structure, feature Be: before the hole sealing of post-cast strip (2), the contact area of contiguous prefabricated concrete slab (3) is pre-coated with ointment, in post-cast strip (2) after hole sealing, the seam crossing of contiguous prefabricated concrete slab (3) is coated with grease seal.
4. the prefabricated plate advanced water-stopping of poured band of outer wall of basement according to claim 1 backfills structure, feature Be: before the hole sealing of post-cast strip (2), the contact area of the precast slab (3) and outer wall of basement (1) is precoated There is ointment, after the hole sealing of post-cast strip (2), the precast slab (3) and the seam crossing of outer wall of basement (1) are coated with Grease seal.
5. the prefabricated plate advanced water-stopping of poured band of outer wall of basement according to claim 1 backfills structure, feature Be: pre-buried on the precast slab (3) to be provided with hanging ring (9), the hanging ring (9) is located at the screw rod (4) The both ends of the surface of precast slab (3).
6. the prefabricated plate advanced water-stopping of poured band of outer wall of basement according to claim 5 backfills structure, feature Be: the hanging ring (9) is 2, and the screw rod (4) is 4.
7. the prefabricated plate advanced water-stopping of poured band of outer wall of basement according to claim 1 backfills structure, feature Be: the screw rod (4) is sealing up screw (4).
CN201920292524.0U 2019-03-08 2019-03-08 The prefabricated plate advanced water-stopping of poured band of outer wall of basement backfills structure Active CN209723052U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920292524.0U CN209723052U (en) 2019-03-08 2019-03-08 The prefabricated plate advanced water-stopping of poured band of outer wall of basement backfills structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920292524.0U CN209723052U (en) 2019-03-08 2019-03-08 The prefabricated plate advanced water-stopping of poured band of outer wall of basement backfills structure

Publications (1)

Publication Number Publication Date
CN209723052U true CN209723052U (en) 2019-12-03

Family

ID=68685595

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920292524.0U Active CN209723052U (en) 2019-03-08 2019-03-08 The prefabricated plate advanced water-stopping of poured band of outer wall of basement backfills structure

Country Status (1)

Country Link
CN (1) CN209723052U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112112295A (en) * 2020-09-08 2020-12-22 中建四局第五建筑工程有限公司 Reinforcing construction method for post-cast strip of post-sealed outer wall
CN112411772A (en) * 2020-10-24 2021-02-26 北京中易房建筑工程有限公司 Structure and construction method of basement outer wall post-cast strip
CN112411771A (en) * 2020-10-24 2021-02-26 北京中易房建筑工程有限公司 Steel plate mounting structure of basement outer wall post-cast strip and construction method
CN113047460A (en) * 2021-03-29 2021-06-29 中信国安建工集团有限公司 Post-cast strip structure and construction method
CN113944240A (en) * 2021-09-24 2022-01-18 上海宝冶集团有限公司 Fixed prefabricated structure for sealing basement outer wall post-cast strip in advance and construction method thereof
CN115045402A (en) * 2022-05-29 2022-09-13 五冶集团上海有限公司 Method for sealing mold in advance of outer wall post-cast strip

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112112295A (en) * 2020-09-08 2020-12-22 中建四局第五建筑工程有限公司 Reinforcing construction method for post-cast strip of post-sealed outer wall
CN112411772A (en) * 2020-10-24 2021-02-26 北京中易房建筑工程有限公司 Structure and construction method of basement outer wall post-cast strip
CN112411771A (en) * 2020-10-24 2021-02-26 北京中易房建筑工程有限公司 Steel plate mounting structure of basement outer wall post-cast strip and construction method
CN112411772B (en) * 2020-10-24 2022-05-27 北京中易房建筑工程有限公司 Structure and construction method of basement outer wall post-cast strip
CN113047460A (en) * 2021-03-29 2021-06-29 中信国安建工集团有限公司 Post-cast strip structure and construction method
CN113047460B (en) * 2021-03-29 2023-02-03 中信国安建工集团有限公司 Post-cast strip structure and construction method
CN113944240A (en) * 2021-09-24 2022-01-18 上海宝冶集团有限公司 Fixed prefabricated structure for sealing basement outer wall post-cast strip in advance and construction method thereof
CN115045402A (en) * 2022-05-29 2022-09-13 五冶集团上海有限公司 Method for sealing mold in advance of outer wall post-cast strip

Similar Documents

Publication Publication Date Title
CN209723052U (en) The prefabricated plate advanced water-stopping of poured band of outer wall of basement backfills structure
CN101831985B (en) Precast concrete wallboard and preparation method thereof
CN101818539B (en) Assembled integral building and construction method thereof
CN104746639B (en) A kind of installation method that the prefabricated window that floats is installed in composite wallboard
CN101818541B (en) Precast composite wallboard with door/window holes and manufacturing method thereof
CN201687125U (en) Precast concrete wallboard
CN203625942U (en) Basement outer wall post-cast strip ahead water stopping structure
CN104947719B (en) The rear pouring tape construction method of formwork erecting structure is hung in basement roof post-cast strip
CN205653820U (en) Basement post -cast strip advances plugging device
CN201280725Y (en) Post-casting construction precast slab for basement of buildings
CN103410173A (en) Construction method for vertical post pouring belt plugging of underground structural outer wall
CN201738494U (en) Prefabricated composite wall slab with door/window opening
CN106978823A (en) Outer wall of basement advanced water-stop post-pouring zone construction method
CN110439036A (en) A kind of poured band of outer wall of basement advance water stop construction method
CN111456104A (en) Outer wall post-cast strip advanced sealing and finalizing combined type prefabricated cover plate
CN104790436A (en) High-rise building basement roof settlement post-pouring joint advanced water stop construction method
CN104805864B (en) The cementing Waterproof Construction Technique that closes of basement top-down method exterior wall tongue and groove and sealing
CN108396783A (en) A kind of pre- closure grouting devices and methods therefor of basement roof pouring after settlement
CN209989847U (en) Shear force wall post-cast strip prefabricated plate closing device
CN208533575U (en) A kind of pre- closure grouting device of basement roof pouring after settlement
CN115387393A (en) Post-cast strip pre-sealing quick construction method
CN204690801U (en) Formwork erecting structure is hung in basement roof ater-casting
CN103410172A (en) Construction method for post pouring belt plugging of underground structural roof plate
CN217758964U (en) Basement outer wall post-cast strip closed structure
CN108589793A (en) A kind of poured band of outer wall of basement postposition assembled advance water stop construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant