CN208533575U - A kind of pre- closure grouting device of basement roof pouring after settlement - Google Patents

A kind of pre- closure grouting device of basement roof pouring after settlement Download PDF

Info

Publication number
CN208533575U
CN208533575U CN201820737649.5U CN201820737649U CN208533575U CN 208533575 U CN208533575 U CN 208533575U CN 201820737649 U CN201820737649 U CN 201820737649U CN 208533575 U CN208533575 U CN 208533575U
Authority
CN
China
Prior art keywords
grouting
steel pipe
pouring
settlement
waterproof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820737649.5U
Other languages
Chinese (zh)
Inventor
马全丽
张驰浩
任杰
王龙
孙志波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Tianjin Corp Ltd
Original Assignee
MCC Tiangong Group Tianjin Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Tianjin Corp Ltd filed Critical MCC Tiangong Group Tianjin Corp Ltd
Priority to CN201820737649.5U priority Critical patent/CN208533575U/en
Application granted granted Critical
Publication of CN208533575U publication Critical patent/CN208533575U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

A kind of pre- closure grouting device of basement roof pouring after settlement; provisions for grouting includes grouting steel pipe, and grouting lid and protective cover, grouting are covered at the top of grouting steel pipe; protective cover is set to grouting steel pipe lateral wall, and grouting lid and protective cover pass through reinforcing wire and stirrup and fix with grouting steel pipe.Construction procedure includes: that pouring after settlement lower part installs support system;Pouring after settlement reinforcing bar is welded and fixed with provisions for grouting;Prefabricated cover board is installed;Additional waterproof course and waterproof construction;Waterproof protective layer construction;Grouting steel pipe carries out concrete pack;Backfill construction;Pouring after settlement concrete pouring construction;Closure grouting steel pipe waterproof layer and casting concrete are an entirety with the waterproof layer encapsulating constructed in advance.The utility model has the advantages that: the waterproof anti-sundries of provisions for grouting is fallen into, and avoids steel bar corrosion, weakens structural strength, shortens the project cycle, saves job costs.

Description

A kind of pre- closure grouting device of basement roof pouring after settlement
Technical field
The utility model belongs to building engineering construction field, seals in advance more particularly, to a kind of basement roof pouring after settlement Close provisions for grouting.
Background technique
As the area of building construction underground structure continues to increase, depth is constantly deepened, and is also become using post-cast strip design A kind of conventional design means, although post-cast strip can guarantee the construction quality of building construction, because of pouring after settlement coagulation Soil pours must be after main structure completion, and settlement stability can carry out, and basement roof waterproof cannot continuously construct, underground The leakproof of room cannot be guaranteed, and various unfavorable factors will be brought to subsequent construction, construction is seriously affected and is normally carried out, and restrict the duration Progress.Need to develop a kind of device of pre- closure grouting of basement roof pouring after settlement thus, which ensures post-cast strip Concrete quality shortens the construction period, obtains preferable economic benefit and social benefit.
Utility model content
It is simple, easy to operate that problem to be solved in the utility model is to provide a kind of structure, can significantly accelerate to construct into Spend and improve the pre- closure grouting device of basement roof pouring after settlement of construction quality.
In order to solve the above technical problems, the technical solution adopted in the utility model is: being poured after a kind of sedimentation of basement roof With pre- closure grouting device, it is characterised in that: including grouting steel pipe, grouting lid and protective cover, the grouting are covered on the filling Steel pipe top is starched, the protective cover is set to the grouting steel pipe lateral wall, and the grouting lid and the protective cover pass through reinforcing Device is fixed with the grouting steel pipe.
Further, the bracing means includes reinforcing wire and stirrup, and the reinforcing wire is covered or protected around the grouting Shield lateral wall, the reinforcing wire intersection are equipped with stirrup and fasten the reinforcing wire.
Further, the grouting steel pipe uses 300 steel pipe of ¢.
Further, the grouting lid uses iron material matter.
A kind of pre- closed method of basement roof pouring after settlement using above-mentioned provisions for grouting, it is characterised in that: press Following step carries out:
(1) pouring after settlement lower part installs support system;
(2) pouring after settlement formwork ties up muscle brushwork epoxy resin, and pouring after settlement reinforcing bar is welded and fixed with provisions for grouting;
(3) prefabricated cover board is installed on pouring after settlement, is integrally plastered to cover board;
(4) additional waterproof course and waterproof construction;
(5) waterproof protective layer is constructed, and waterproof protective layer uses C20 pea gravel concreten, two-way 6@150 of arrangement of reinforcement;
(6) grouting steel pipe carries out concrete pack;
(7) backfill is constructed;
(8) clear water infiltrates pouring after settlement, carries out pouring after settlement concrete pouring construction;
(9) closure grouting steel pipe waterproof layer and casting concrete are an entirety with the waterproof layer encapsulating constructed in advance.
Further, the grouting steel pipe is encapsulated with having a size of 600mm × 600mm, is highly 500mm, marked as C20's Concrete.
The utility model has the advantages and positive effects of:
1, after pouring after settlement covers closing in advance, waterproof can be done in time using provisions for grouting and complete protective layer, it can It prevents sundries from falling into, rainwater inflow, creates good condition for basement construction, and be avoided that steel bar corrosion, it is strong to weaken structure Degree;
2, it fulfils backfilling of earthwork ahead of schedule, have passed through the soil body again in a natural environment and further settle closely knit, meet It is inserted into the pipeline constructions such as water supply, middle water, heating power, rain dirt draining in advance, avoids the feelings that later period a large amount of cross-operation interact Condition;
3, project duration is scientifically shortened, circulation material rental charge, big machinery usage charges, personnel's wage etc. are reduced Expense brings certain economic benefit and social benefit.
Detailed description of the invention
Fig. 1 is the overall structure diagram of the utility model embodiment
Fig. 2 is the provisions for grouting schematic diagram of the utility model embodiment
In figure: 1, double-pole scaffold 2, provisions for grouting 3, cover board 4, pouring after settlement 5, grouting steel pipe 6, waterproof layer 7, be in the milk lid 8, protective cover 9, reinforcing wire 10, stirrup
Specific embodiment
The utility model embodiment is described further with reference to the accompanying drawing:
As shown in the overall structure device of Fig. 1 the utility model embodiment, a kind of basement roof pouring after settlement seals in advance Provisions for grouting is closed, 4 bottom of pouring after settlement is supported with double-pole scaffold 1, and 4 top of pouring after settlement is equipped with preset cover board 3, cover board 3 surfaces are coated with waterproof layer 6, and the provisions for grouting across prefabricated cover board 3 is equipped in pouring after settlement 2.
As shown in the provisions for grouting of Fig. 2 the utility model embodiment, provisions for grouting includes grouting steel pipe 5, be in the milk lid 7 and guarantor Shield 8, grouting lid 7 are set to 5 top of grouting steel pipe, and protective cover 8 is set to 5 lateral wall of grouting steel pipe, and grouting lid 7 and protective cover 8 are equal It is fixed by bracing means and grouting steel pipe 5.Grouting steel pipe 5 uses 300 steel pipe of ¢, and wall thickness 4mm is highly 2.6m.
Bracing means includes reinforcing wire 9 and stirrup 10, and reinforcing wire 9 is reinforced around grouting lid 7 or 8 lateral wall of protective cover 9 intersections of silk are equipped with stirrup 10 and fasten reinforcing wire 9, and reinforcing wire 9 and stirrup 10 can be good at strengthening the firm of provisions for grouting Property.
The materials such as steel, iron, stainless steel can be used in grouting lid 7, and the utility model embodiment uses iron material matter.
The materials such as steel wire or iron wire can be used in reinforcing wire 9, the device as protection waterproof roll.
Waterproof can be done in time using provisions for grouting and complete protective layer, grouting lid 7 can prevent sundries from falling into, rainwater stream Enter, creates good condition for basement construction, and be avoided that steel bar corrosion, weaken structural strength
A kind of pre- closed method of basement roof pouring after settlement using above-mentioned provisions for grouting, which is characterized in that its It is characterized in that: carrying out in the steps below:
(1) pouring after settlement lower part installs support system, and support system is double-pole scaffold 1, and spacing is in length and breadth for upright bar 600mm, inside upright bar is away from post-cast strip edge 100mm, upright bar free end length≤200mm;Size cross bar step pitch is 1400mm, and No less than 3, bar of sweeping the floor in length and breadth is away from ground 200mm;Flitch cushion block is arranged in bottom of upright rod, in upright bar with it is U-shaped hold 80mm × 100mm flitch holds out against beam bottom.
(2) pouring after settlement formwork ties up muscle brushwork epoxy resin, and pouring after settlement reinforcing bar is welded and fixed with provisions for grouting;
(3) pouring after settlement installs prefabricated cover board, integrally plasters to cover board, and 3 arrangement of reinforcement of cover board is double-layer double-direction 8@ 120,3 length of cover board is set as 1.8m, with a thickness of 200mm, pre-buried 8 reinforcing bar hanging ring;
(4) additional waterproof course and waterproof construction;
(5) waterproof protective layer is constructed, and waterproof protective layer uses C20 pea gravel concreten, two-way 6@150 of arrangement of reinforcement;
(6) grouting steel pipe carries out concrete pack, encapsulates having a size of 600mm × 600mm, is highly 500mm, marked as C20;
(7) backfill is constructed;
(8) clear water infiltrates pouring after settlement, and pouring after settlement concrete pouring construction passes through provisions for grouting using vibrator Lower part probes into post-cast strip vibration compacting magma and receives face;
(9) closure grouting steel pipe waterproof layer and casting concrete are an entirety with the waterproof layer encapsulating constructed in advance.
The utility model has the advantages and positive effects of:
1, after pouring after settlement covers closing in advance, waterproof can be done in time using provisions for grouting and complete protective layer, it can It prevents sundries from falling into, rainwater inflow, creates good condition for basement construction, and be avoided that steel bar corrosion, it is strong to weaken structure Degree;
2, it fulfils backfilling of earthwork ahead of schedule, have passed through the soil body again in a natural environment and further settle closely knit, meet It is inserted into the pipeline constructions such as water supply, middle water, heating power, rain dirt draining in advance, avoids the feelings that later period a large amount of cross-operation interact Condition;
3, project duration is scientifically shortened, circulation material rental charge, big machinery usage charges, personnel's wage etc. are reduced Expense brings certain economic benefit and social benefit.
One embodiment of the utility model is described in detail above, but the content is only the utility model Preferred embodiment should not be considered as limiting the scope of the present invention.It is all to be made according to application scope of the utility model All the changes and improvements etc., should still belong within the patent covering scope of the utility model.

Claims (4)

1. a kind of pre- closure grouting device of basement roof pouring after settlement, it is characterised in that: including grouting steel pipe, grouting lid and Protective cover, the grouting are covered at the top of the grouting steel pipe, and the protective cover is set to the grouting steel pipe lateral wall, the filling Slurry lid and the protective cover pass through bracing means and fix with the grouting steel pipe.
2. the pre- closure grouting device of a kind of basement roof pouring after settlement according to claim 1, it is characterised in that: institute Stating bracing means includes reinforcing wire and stirrup, and the reinforcing wire is covered around the grouting or protective cover lateral wall, the reinforcing Silk intersection is equipped with stirrup and fastens the reinforcing wire.
3. the pre- closure grouting device of a kind of basement roof pouring after settlement according to claim 1, it is characterised in that: institute Grouting steel pipe is stated using 300 steel pipe of ¢.
4. the pre- closure grouting device of a kind of basement roof pouring after settlement according to claim 1, it is characterised in that: institute Grouting lid is stated using iron material matter.
CN201820737649.5U 2018-05-17 2018-05-17 A kind of pre- closure grouting device of basement roof pouring after settlement Active CN208533575U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820737649.5U CN208533575U (en) 2018-05-17 2018-05-17 A kind of pre- closure grouting device of basement roof pouring after settlement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820737649.5U CN208533575U (en) 2018-05-17 2018-05-17 A kind of pre- closure grouting device of basement roof pouring after settlement

Publications (1)

Publication Number Publication Date
CN208533575U true CN208533575U (en) 2019-02-22

Family

ID=65394085

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820737649.5U Active CN208533575U (en) 2018-05-17 2018-05-17 A kind of pre- closure grouting device of basement roof pouring after settlement

Country Status (1)

Country Link
CN (1) CN208533575U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108396783A (en) * 2018-05-17 2018-08-14 中冶天工集团天津有限公司 A kind of pre- closure grouting devices and methods therefor of basement roof pouring after settlement
CN114411817A (en) * 2022-02-16 2022-04-29 中国建筑第八工程局有限公司 Basement roof post-cast strip local advanced sealing structure and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108396783A (en) * 2018-05-17 2018-08-14 中冶天工集团天津有限公司 A kind of pre- closure grouting devices and methods therefor of basement roof pouring after settlement
CN114411817A (en) * 2022-02-16 2022-04-29 中国建筑第八工程局有限公司 Basement roof post-cast strip local advanced sealing structure and construction method thereof
CN114411817B (en) * 2022-02-16 2024-03-12 中国建筑第八工程局有限公司 Basement roof post-pouring strip local advanced sealing structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN207987983U (en) A kind of waterproof construction being used for underground engineering main body construction seam and post-cast strip
CN105804410B (en) Prefabricated concrete structure is vertically connected with dividing storehouse slip casing by pressure method
CN209723052U (en) The prefabricated plate advanced water-stopping of poured band of outer wall of basement backfills structure
CN201280725Y (en) Post-casting construction precast slab for basement of buildings
CN108396783A (en) A kind of pre- closure grouting devices and methods therefor of basement roof pouring after settlement
CN102392549A (en) Construction working method for seamless prestressed-concrete self-waterproof clean water reservoir
CN208533575U (en) A kind of pre- closure grouting device of basement roof pouring after settlement
CN104790436B (en) Basement in high rise building top board pouring after settlement advance water stop construction method
CN108505805A (en) Large-scale cast-in-place pond and its construction method are split in expansion reinforcing band control
CN107806114A (en) Basement roof closes late poured band structure and construction method in advance
CN112832279A (en) Waterproof structure and method for dewatering well of underground foundation pit
CN104805864B (en) The cementing Waterproof Construction Technique that closes of basement top-down method exterior wall tongue and groove and sealing
CN105756100B (en) Basement post-pouring zone system and preparation method thereof
CN204152530U (en) Water burst tunnel tunnel face seepproof screen
CN101761187B (en) Construction separating device for concrete of vertical structure in same wall body with different labels as well as pouring and tamping method thereof
CN104846935B (en) Head-tank treating seepage remodeling method
CN206279561U (en) A kind of poured band of outer wall of basement prefab-form system
CN206267179U (en) A kind of flexible cladding soil nail wall protective slope structure
CN109610665A (en) Oil depot assembled fire wall construction method
CN108442411A (en) A kind of construction method of poured band of outer wall of basement and its building structure
CN205444590U (en) Cast -in -place compound incubation concrete shear force wall
CN107326924A (en) Outer wall of underground structure HCMW engineering methods overlap wall and its construction method
CN207452889U (en) Artificial digging pile assembled retaining wall
CN207920139U (en) A kind of Axial-compression Column of Reinforced Concrete with ruggedized construction
CN106337443A (en) Jointless construction structure combining SCC (self-compacting concrete) and common concrete

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant