CN206279561U - A kind of poured band of outer wall of basement prefab-form system - Google Patents

A kind of poured band of outer wall of basement prefab-form system Download PDF

Info

Publication number
CN206279561U
CN206279561U CN201621357615.0U CN201621357615U CN206279561U CN 206279561 U CN206279561 U CN 206279561U CN 201621357615 U CN201621357615 U CN 201621357615U CN 206279561 U CN206279561 U CN 206279561U
Authority
CN
China
Prior art keywords
basement
baffle plate
wall
precast concrete
concrete baffle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621357615.0U
Other languages
Chinese (zh)
Inventor
贾文月
李明
张敏
吕豪
梁新利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No7 Building Engineering Co Ltd Beijing Urban Construction Group
Original Assignee
No7 Building Engineering Co Ltd Beijing Urban Construction Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No7 Building Engineering Co Ltd Beijing Urban Construction Group filed Critical No7 Building Engineering Co Ltd Beijing Urban Construction Group
Priority to CN201621357615.0U priority Critical patent/CN206279561U/en
Application granted granted Critical
Publication of CN206279561U publication Critical patent/CN206279561U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

A kind of poured band of outer wall of basement prefab-form system, on the post-cast strip between outer wall of basement, the upstream face of post-cast strip is coated with precast concrete baffle plate from bottom to top, and back side is covered with form surfacing;The left and right sides of precast concrete baffle plate and form surfacing is ridden upon on the outer wall of basement on post-cast strip both sides, and the outer side covers of precast concrete baffle plate have waterproof layer, and additional waterproof course and waterproof layer are set in precast concrete baffle plate and outer wall of basement junction;The back side of precast concrete baffle plate is embedded with the exposed steel bar perpendicular to plate face along precast concrete barrier width direction, the afterbody of exposed steel bar is stretched into post-cast strip, its end is welded with sealing harness cord bar, and sealing harness cord bar is fixed after the form surfacing of outer wall of basement back side through fixing by double steel pipe and mountain type card.The features such as the utility model has safety, is applicable, having promote well and practical value, and good economic benefit can be produced after extensive popularization and application.

Description

A kind of poured band of outer wall of basement prefab-form system
Technical field
The utility model is related to outer wall of basement construction field, prefabricated more particularly to a kind of poured band of outer wall of basement Template system.
Background technology
Due to that need to set post-cast strip according to specification, post-cast strip generally requires from basement side wall insertion simultaneously to big basement A period of time could be closed after the completion of agent structure, and construction waterproof is layer simultaneously due to being needed between outer wall of basement and foundation ditch in advance Backfilled, so the basement backfill at post-cast strip needs to be carried out after post-cast strip is closed, the duration is more long.
Outer wall of basement setting post-cast strip quantity is very more, is to ensure that construction speed and early stage civilized construction need, and needs morning Phase carries out fertile groove backfilling of earthwork, can just be carried out after the post-cast strip closing such as typically of outer wall of basement backfill, so to overall work Phase brings adverse effect, so selects effective template way as the key for solving the problems, such as this technology, and existing mould plate technique Cannot realize carrying out backfill in advance, and be unable to reach template paying requirement in advance.
The content of the invention
The purpose of this utility model is to provide a kind of poured band of outer wall of basement prefab-form system, to solve basement knot The technical problem that fertile groove soil side can not backfill in time after the completion of structure;And it is more long to solve the outer wall of basement construction period in the prior art Technical problem, install demand and civilized construction needs in advance to meet alter-pouring strips mould plate.
To achieve the above object, the utility model is adopted the following technical scheme that:
A kind of poured band of outer wall of basement prefab-form system, on the post-cast strip between outer wall of basement, its feature It is:Precast concrete baffle plate is coated with the upstream face of the post-cast strip from bottom to top, back side is covered with form surfacing;
The left and right sides of the precast concrete baffle plate and form surfacing rides upon the outer wall of basement on post-cast strip both sides On, the area coverage that the outer side covers of the precast concrete baffle plate have waterproof layer, the waterproof layer is kept off more than precast concrete The area of plate;Between waterproof layer and precast concrete baffle plate, on the outside of the overlap edge of precast concrete baffle plate and outer wall of basement Additional waterproof course is covered with, the additional waterproof course is covered on precast concrete baffle plate and outer wall of basement simultaneously;
The precast concrete baffle plate is Rectangular Plate Structure, the left and right two that the Rectangular Plate Structure is overlapped with outer wall of basement Side is in slope shape, is embedded with single-layer bidirectional steel bar layer in its plate body, the left and right sides of single-layer bidirectional steel bar layer tilt with it is oblique Domatic side is adapted, the back side of the precast concrete baffle plate along precast concrete barrier width direction be embedded with perpendicular to The exposed steel bar of plate face, the afterbody of the exposed steel bar is stretched into post-cast strip, and its end is welded with sealing harness cord bar, the sealing Harness cord bar is fixed after the form surfacing of outer wall of basement back side through fixing by double steel pipe and mountain type card.
It is further preferred that the precast concrete baffle plate upper and lower end face is respectively equipped with the wedge-shaped protrusion and wedge agreed with mutually Connected in star, contiguous prefabricated concrete baffle plate mutually fits and is laid from bottom to top along post-cast strip successively;Post-cast strip upstream face bottom The upper surface of the precast concrete baffle plate at precast concrete baffle plate lower surface and top is horizontal plane.
Further, upper and lower two end faces of the precast concrete baffle plate are complementary with the angle of back side, the side of left and right two Face is 30 ° with the angle of back side.
Further, upper and lower two end faces of the precast concrete baffle plate are respectively 45 ° and 135 ° with the angle of back side.
Further, the exposed steel bar is L-shaped, and its transverse part is embedded in precast concrete baffle interior, and vertical part is exposed at In post-cast strip.
Further, the exposed steel bar anchors into 90 ~ 110mm of single-layer bidirectional steel bar layer inner side.
Further, the exposed steel bar is the HPB300 reinforcing bars of a diameter of 14mm.
Additionally, the waterproof layer is laid on outer wall of basement, precast concrete baffle plate and prevents by point bonding or empty laid process On water extra play.
It is further preferred that the precast concrete baffle plate thickness 80mm.
The utility model has the characteristics that and beneficial effect compared with prior art:
The purpose of this utility model is to provide a kind of poured band of outer wall of basement prefab-form system, solves basement knot The problem that fertile groove soil side can not backfill in time after the completion of structure, can largely shorten the outer wall of basement construction period and guarantee is applied Work scene civilized construction requirement, it is also possible to reach poured band of outer wall of basement form surfacing and pay effect in advance, and largely Simplify working procedure, save artificial.Meanwhile, remaining concrete can be used to make in basement structure concreting process Make this preformed master, reduce the waste of material.Exposed steel bar in the utility model can serve as suspension ring, first installation to be fixed And the effect of outer wall of basement formwork erection drawknot.
The features such as the utility model has safety, is applicable, having promote well and practical value, after extensive popularization and application Good economic benefit can be produced.
Brief description of the drawings
Fig. 1 is a kind of structural representation of poured band of outer wall of basement prefab-form system of the utility model;
Fig. 2 is a kind of poured band of outer wall of basement prefab-form system facade structures schematic diagram of the utility model;
Fig. 3 is the structural representation of the precast concrete baffle plate that the utility model is related to;
Fig. 4 is the sectional view in Fig. 3 A-A portions.
Reference:1- post-cast strips;11- post-cast strips shear force wall reinforcing steel bar;2- precast concrete baffle plates;21- single-layer bidirectional steel Muscle layer;22- exposed steel bars;3- additional waterproof courses;4- waterproof layers;5- sealing harness cord bars;6- form surfacings;7- double steel pipes.
Specific embodiment
For technological means, character of innovation, reached purpose and effect for realizing the utility model are easy to understand, below The utility model is further illustrated with reference to accompanying drawing.
The embodiment recorded herein is specific specific embodiment of the present utility model, of the present utility model for illustrating Design, is explanatory and exemplary, should not be construed as the limit to the utility model implementation method and the utility model scope System.Except the implementation exception recorded herein, those skilled in the art can also be public based on the application claims and specification institute The content opened includes doing using the embodiment to recording herein using obvious other technical schemes, these technical schemes Go out the technical scheme of any obvious substitutions and modifications.
A kind of poured band of outer wall of basement prefab-form system, on the post-cast strip 1 between outer wall of basement, such as Fig. 1 With shown in 2, be coated with precast concrete baffle plate 2 on the upstream face of post-cast strip 1 from bottom to top, the thickness 80mm of precast concrete baffle plate 2, Back side is covered with form surfacing 6;The left and right sides of precast concrete baffle plate 2 and form surfacing 6 rides upon the both sides of post-cast strip 1 Outer wall of basement on, the outer side covers of precast concrete baffle plate 2 have waterproof layer 4, and the area coverage of waterproof layer 4 is mixed more than prefabricated The area of solidifying soil baffle plate 2;Between waterproof layer 4 and precast concrete baffle plate 2, precast concrete baffle plate 2 and outer wall of basement Overlap edge outside is covered with additional waterproof course 3, and additional waterproof course 3 is covered in precast concrete baffle plate 2 and outer wall of basement simultaneously On, waterproof layer 4 is laid on outer wall of basement, precast concrete baffle plate 2 and additional waterproof course 3 by point bonding or empty laid process.
As shown in Figures 3 and 4, precast concrete baffle plate 2 is Rectangular Plate Structure, Rectangular Plate Structure and outer wall of basement overlap joint Left and right sides are in slope shape, and single-layer bidirectional steel bar layer 21, the left and right two of single-layer bidirectional steel bar layer 21 are embedded with its plate body Side tilts and is adapted with slope shape side, and the back side of precast concrete baffle plate 2 is pre-buried along precast concrete barrier width direction There is the exposed steel bar 22 perpendicular to plate face, the afterbody of exposed steel bar 22 is stretched into post-cast strip, and its end is welded with sealing harness cord bar 5 Connect, exposed steel bar 22 can be the HPB300 reinforcing bars, or the HPB300 reinforcing bars by a diameter of 14mm of a diameter of 14mm 22 L-shaped structures being made, its transverse part is embedded in inside precast concrete baffle plate 2, and vertical part is exposed in post-cast strip 1, exposed steel bar 22 anchor into 90 ~ 110mm of the inner side of single-layer bidirectional steel bar layer 21, and in the first installation process of prefabricated baffle plate, exposed steel bar 22 is poured with after Band shear force wall reinforcing steel bar 11 proceeds next step operation after tentatively fixing.
Sealing harness cord bar 5 passes through double steel pipe 7 and mountain type card through fixing after the form surfacing 6 of outer wall of basement back side It is fixed.As shown in figure 3, the upper and lower end face of precast concrete baffle plate 2 is respectively equipped with the wedge-shaped protrusion and wedge-shaped impression agreed with mutually, phase Adjacent precast concrete baffle plate 2 mutually fits and is laid from bottom to top along post-cast strip 1 successively;The prefabricated of the upstream face bottom of post-cast strip 1 is mixed The upper surface of the precast concrete baffle plate 2 at the solidifying soil lower surface of baffle plate 2 and top is horizontal plane.Precast concrete baffle plate is about 2 Two end faces are complementary with the angle of back side, and the side of left and right two is 30 ° with the angle of back side.Preferably, concrete Native baffle plate about 2 two end faces be respectively 45 ° and 135 ° with the angle of back side.
Preferred embodiment of the present utility model is the foregoing is only, is not used to limit the utility model, it is all in this practicality Within new spirit and principle, any modification, equivalent substitution and improvements made etc. should be included in guarantor of the present utility model Within the scope of shield.

Claims (9)

1. a kind of poured band of outer wall of basement prefab-form system, the post-cast strip between outer wall of basement(1)On, its feature It is:The post-cast strip(1)Upstream face on be coated with precast concrete baffle plate from bottom to top(2), back side is provided with template face Plate(6);
The precast concrete baffle plate(2)And form surfacing(6)The left and right sides ride upon post-cast strip(1)The basement on both sides On exterior wall, the precast concrete baffle plate(2)Outer side covers have waterproof layer(4), the waterproof layer(4)Area coverage be more than Precast concrete baffle plate(2)Area;In waterproof layer(4)With precast concrete baffle plate(2)Between, precast concrete baffle plate(2) Overlap edge outside with outer wall of basement is covered with additional waterproof course(3), the additional waterproof course(3)It is covered in simultaneously prefabricated mixed Solidifying soil baffle plate(2)On outer wall of basement;
The precast concrete baffle plate(2)It is Rectangular Plate Structure, the left and right two that the Rectangular Plate Structure is overlapped with outer wall of basement Side is in slope shape, and single-layer bidirectional steel bar layer is embedded with its plate body(21), single-layer bidirectional steel bar layer(21)The left and right sides Tilt and be adapted with slope shape side, the precast concrete baffle plate(2)Back side along precast concrete barrier width direction It is embedded with the exposed steel bar perpendicular to plate face(22), the exposed steel bar(22)Afterbody stretch into post-cast strip, its end with only Water harness cord bar(5)Welding, the sealing harness cord bar(5)Through the form surfacing fixed in outer wall of basement back side(6)After lead to Cross double steel pipe(7)Fixed with mountain type card.
2. a kind of poured band of outer wall of basement prefab-form system as claimed in claim 1, it is characterised in that:It is described prefabricated mixed Solidifying soil baffle plate(2)Upper and lower end face is respectively equipped with the wedge-shaped protrusion and wedge-shaped impression agreed with mutually, contiguous prefabricated concrete baffle plate(2) Mutually fit successively along post-cast strip(1)Lay from bottom to top;Post-cast strip(1)The precast concrete baffle plate of upstream face bottom(2)Under End face and the precast concrete baffle plate at top(2)Upper surface be horizontal plane.
3. a kind of poured band of outer wall of basement prefab-form system as claimed in claim 2, it is characterised in that:It is described prefabricated mixed Solidifying soil baffle plate(2)Upper and lower two end faces are complementary with the angle of back side, and the side of left and right two is 30 ° with the angle of back side.
4. a kind of poured band of outer wall of basement prefab-form system as claimed in claim 3, it is characterised in that:It is described prefabricated mixed Solidifying soil baffle plate(2)Upper and lower two end faces are respectively 45 ° and 135 ° with the angle of back side.
5. a kind of poured band of outer wall of basement prefab-form system as claimed in claim 1, it is characterised in that:It is described to expose steel Muscle(22)It is L-shaped, its transverse part is embedded in precast concrete baffle plate(2)Inside, vertical part is exposed at post-cast strip(1)It is interior.
6. a kind of poured band of outer wall of basement prefab-form system as claimed in claim 1, it is characterised in that:It is described to expose steel Muscle(22)Anchor into single-layer bidirectional steel bar layer(21)90 ~ 110mm of inner side.
7. a kind of poured band of outer wall of basement prefab-form system as claimed in claim 1, it is characterised in that:It is described to expose steel Muscle(22)It is the HPB300 reinforcing bars of a diameter of 14mm.
8. a kind of poured band of outer wall of basement prefab-form system as claimed in claim 1, it is characterised in that:The waterproof layer (4)Outer wall of basement, precast concrete baffle plate are laid on by a bonding or empty laid process(2)And additional waterproof course(3)On.
9. a kind of poured band of outer wall of basement prefab-form system as described in claim 1 ~ 8 any one, it is characterised in that:
The precast concrete baffle plate(2)Thick 80mm.
CN201621357615.0U 2016-12-12 2016-12-12 A kind of poured band of outer wall of basement prefab-form system Active CN206279561U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621357615.0U CN206279561U (en) 2016-12-12 2016-12-12 A kind of poured band of outer wall of basement prefab-form system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621357615.0U CN206279561U (en) 2016-12-12 2016-12-12 A kind of poured band of outer wall of basement prefab-form system

Publications (1)

Publication Number Publication Date
CN206279561U true CN206279561U (en) 2017-06-27

Family

ID=59075090

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621357615.0U Active CN206279561U (en) 2016-12-12 2016-12-12 A kind of poured band of outer wall of basement prefab-form system

Country Status (1)

Country Link
CN (1) CN206279561U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111926927A (en) * 2020-07-09 2020-11-13 福建建工集团有限责任公司 Underground chamber roof post-cast strip plugging structure and construction method thereof
CN113047460A (en) * 2021-03-29 2021-06-29 中信国安建工集团有限公司 Post-cast strip structure and construction method
CN114635453A (en) * 2022-02-28 2022-06-17 浙江金立建设有限公司 Construction process for post-cast strip variable cross-section prefabricated retaining plate

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111926927A (en) * 2020-07-09 2020-11-13 福建建工集团有限责任公司 Underground chamber roof post-cast strip plugging structure and construction method thereof
CN113047460A (en) * 2021-03-29 2021-06-29 中信国安建工集团有限公司 Post-cast strip structure and construction method
CN113047460B (en) * 2021-03-29 2023-02-03 中信国安建工集团有限公司 Post-cast strip structure and construction method
CN114635453A (en) * 2022-02-28 2022-06-17 浙江金立建设有限公司 Construction process for post-cast strip variable cross-section prefabricated retaining plate

Similar Documents

Publication Publication Date Title
CN105178357B (en) Prefabricated subsurface structure under foundation trench open cutting condition and construction method for prefabricated subsurface structure under foundation trench open cutting condition
CN106013228B (en) A kind of overlapping monoblock type pipe gallery prefabricated assembly structural and its construction method
WO2021223573A1 (en) Construction structure for communication and connection between newly added mined channel and existing station hall layer
WO2017206411A1 (en) Full-prefabricated superimposed assembly-type underground pipe gallery and connection node thereof
CN102168455B (en) Horizontal seam U-shaped closed rib junction structure of assembled shear wall structure
CN105839667B (en) The construction manufacture craft of complete prefabricated overlapping assembled underground pipe gallery
CN206722878U (en) A kind of mining light-duty filling counterfort
CN105862916A (en) Superimposed assembled type underground pipe gallery system and construction and manufacturing process
CN205776348U (en) A kind of overlapping monoblock type pipe gallery prefabricated assembly structural
CN206279561U (en) A kind of poured band of outer wall of basement prefab-form system
CN208280185U (en) A kind of post-cast strip advanced water-stopping construction
CN107338801B (en) Prestressing force assembled Complex retaining wall structure and construction method
CN105019919A (en) Tunnel for transmitting fluid and construction method thereof
CN109797874A (en) A kind of high level Multi-tower post-cast strip advance water stop construction method
CN108560586A (en) Half prefabricated assembled pipe gallery and its construction method
CN205399497U (en) Basement outer wall post -cast strip concrete precast slab
CN112376624A (en) Secondary pouring and retaining advanced water stop structure for basement floor post-cast strip and construction method
CN105756100B (en) Basement post-pouring zone system and preparation method thereof
CN201891133U (en) Manual assembled type self-waterproof late poured band prefabricated slab of basement outer wall
CN106948502A (en) A kind of water-proof top cover and its construction method
CN110593320A (en) Early sealing structure for outer wall post-cast strip and construction method thereof
CN105862912B (en) A kind of agent on crack resistance of concrete sliding pile panelling construction method
CN213417904U (en) Closed basement floor subsides post-cast strip structure in advance
CN110295552A (en) A kind of gate-type assembled box culvert and construction method
CN206693265U (en) A kind of installation node of piping lane

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant