CN203625942U - Basement outer wall post-cast strip ahead water stopping structure - Google Patents
Basement outer wall post-cast strip ahead water stopping structure Download PDFInfo
- Publication number
- CN203625942U CN203625942U CN201320509945.7U CN201320509945U CN203625942U CN 203625942 U CN203625942 U CN 203625942U CN 201320509945 U CN201320509945 U CN 201320509945U CN 203625942 U CN203625942 U CN 203625942U
- Authority
- CN
- China
- Prior art keywords
- wall
- concrete cover
- basement
- precast concrete
- cast strip
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
A basement outer wall post-cast strip ahead water stopping structure comprises basement outer wall inner side reinforcing steel bars at a post-cast strip opening. The post-cast strip opening is sealed in advance with a prefabricated concrete cover plate. The whole prefabricated concrete cover plate is rectangular. The left and the right of the prefabricated concrete cover plate are respectively in lap joint with the basement outer walls on two sides of the post-cast strip opening. Two-way reinforcement is embedded inside the prefabricated concrete cover plate. Pull rings for hoisting are further pre-embedded into the inner side of the prefabricated concrete cover plate. The basement outer wall post-cast strip ahead water stopping structure is clear in construction, simple to construct and applicable to underground projects such as large basements and underground garages, and smooth outer wall waterproof and backfill subsequent construction before post-cast strip pouring can be guaranteed.
Description
Technical field
The utility model relates to a kind of poured band of outer wall of basement structure.
Background technology
In the in-situ concrete wall construction of building, be the shrinkage stress that reduces to produce due to temperature and the differential settlement solving due to the different generations of superstructure, outer wall of basement generally arranges ater-casting by 30m left and right.Foreign material inevitably can be dropped in ater-casting before sealing, cleaning difficulty, and rainwater and construction water easily enter in basement, affect normal construction; Post-pouring belt of outer wall the normal construction that affects external wall waterproof, outdoor backfill is set, make troubles to the management of job site.
Before building, ater-casting cannot carry out external wall waterproof and the construction of basement backfill without good construction party rule in recent years, particularly in the narrow and small situation that cannot meet execution conditions in construction plant, for reaching management, owner requires duration node, in work progress, need to adopt a kind of new late poured band structure and form of construction work, guarantee carrying out smoothly of work items.
Utility model content
The utility model provides a kind of poured band of outer wall of basement advanced water-stopping structure, solve that the existing basement post-pouring zone construction period is long, operation easier is large, and ater-casting high technical problem of cleaning up cost while building.
The utility model solves the technical scheme that its technical problem adopts:
This poured band of outer wall of basement advanced water-stopping structure, comprise reinforcing bar inside the outer wall of basement at hole, ater-casting place, hole place, described ater-casting is sealed in advance by precast concrete cover, precast concrete cover entirety is rectangle, and its right and left overlaps with the outer wall of basement of both sides, hole, ater-casting respectively; Described precast concrete cover inside is embedded with double-layer double-direction arrangement of reinforcement, and described precast concrete cover inner side is also embedded with the draw ring of lifting use, and the lifting post-tensioning ring that puts in place is connected by reinforcing bar inside the outer wall of basement at iron wire and hole, ater-casting place.
The right and left of described precast concrete cover is than the wide 100~200mm in ater-casting hole.
The outer facade the right and left of described precast concrete cover is ramped shaped.
The outer facade of described precast concrete cover is provided with floated coat.
The outer facade of described precast concrete cover is provided with building waterproof layer.
The beneficial effects of the utility model are as follows:
Late poured band structure of the present utility model adopts precast concrete cover advanced water-stopping, and structure is clear and definite, easy construction.Outer wall of basement waterproofing course, topping and outdoor backfill can integrated constructions, guaranteed outer wall of basement waterproof integral construction quality.In basement, building decorative engineering by laying bricks or stones can synchronously carry out, and has accelerated engineering construction progress.
The utility model has been saved the quadratic cost of base treatment, waterproof and the topping etc. of conventional way after the concreting of ater-casting; simultaneously seal in advance while having avoided conventional unlimited way because rubbish incidental enters the cleaning up cost of interior generation and construction water, rainwater etc. and enter drawing water and cleaning up cost of the indoor generation of basement because of ater-casting, there is good economic benefit.
The social benefit the utlity model has is as follows:
1, external wall waterproof, stemming operation are fulfiled ahead of schedule, the general layout that is conducive to upper body construction completes early, is conducive to on-the-spot civilized construction.
2, basement can be sealed early, avoid the intrusion of rainwater, construction water and foreign material, be conducive to the expansion of indoor engineering and being dried neatly of place.
3, be conducive to the insertion in advance of tube net outside and landscape engineering, meet formation early and the macromarketing plan of Construction unit's sale displaying face.
The utility model is applicable to the underground constructions such as various big basements, underground garage, guaranteed carrying out in advance of external wall waterproof before the sealing of ater-casting, backfill construction, for convenience has been created in follow-up construction.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is further illustrated.
Fig. 1 is the structural representation after the utility model is installed.
Fig. 2 is the structural representation of precast concrete cover.
Reference numeral: reinforcing bar, 9-floated coat inside 1-precast concrete cover, 2-double-layer double-direction arrangement of reinforcement, 3-draw ring, hole, 4-ater-casting, 5-outer wall of basement, 6-iron wire, 7-building waterproof layer, 8-outer wall of basement.
The specific embodiment
Embodiment is referring to shown in Fig. 1,2, this poured band of outer wall of basement advanced water-stopping structure, comprise reinforcing bar 8 inside the outer wall of basement at 4 places, hole, ater-casting, hole place, described ater-casting is sealed in advance by precast concrete cover 1, precast concrete cover 1 entirety is rectangle, and its outer facade the right and left is ramped shaped.Precast concrete cover 1 the right and left overlaps with the outer wall of basement 5 of both sides, hole, ater-casting respectively.The thickness of precast concrete cover 1 can be 80mm, highly can be 600mm, and the right and left is than the wide 150mm in ater-casting hole.Described precast concrete cover 1 inside is embedded with double-layer double-direction arrangement of reinforcement 2, and described precast concrete cover 1 inner side is also embedded with the draw ring 3 of lifting use, and the lifting post-tensioning ring 3 that puts in place is connected by reinforcing bar 8 inside the outer wall of basement at iron wire 6 and 4 places, hole, ater-casting.
Shown in Figure 1, adopt poured band of outer wall of basement advanced water-stopping method of the present utility model as follows:
1, the making of precast concrete cover
Precast concrete cover should be ready to material (template, reinforcing bar, C30 concrete etc.), instrument (vibrator, hand saws, hammer etc.) before making in advance, in manufacturing process, should carry out formwork in strict accordance with design size, adopting HRB400 diameter is 12mm reinforcing bar, spacing is that 120mm × 120mm double-layer double-direction arrangement of reinforcement carries out reinforcement installation, after treating concreting, carry out press polish and receive face processing, and to the maintenance of sprinkling water of concrete prefabricated cover plate.
2, the lifting of precast concrete cover
Precast concrete cover reaches after design strength, adopt tower crane to lift cover plate, treat that prefabricated cover plate reaches ater-casting place it is installed, in installation process, must install in strict accordance with design attitude, precast plate is fixed on the reserved steel bar of position, ater-casting with 12# iron wire.
3, precast concrete cover is fixing
Adopt the reinforcing bar draw ring that is 10mm at each side pre-buried two diameters of precast concrete cover, when installation, inside outer wall of basement outside and outer wall of basement, paste wall and set up single-row of scaffold, meet the normal mounting requirement of precast plate.After, precast concrete cover complete until scaffold building lifting puts in place, reinforcing bar draw ring 12# iron wire is fixed on the reserved steel bar at ater-casting place (forbidding being welded and fixed with the main muscle of exterior wall).
4, the processing of plastering
After concrete prefabricated cover plate installation, arrange bricklayer to adopt the cement mortar processing of plastering to the outer facade of cover plate, after mortar reaches design strength, carry out the follow-up constructions such as waterproof, backfill.
Claims (5)
1. a poured band of outer wall of basement advanced water-stopping structure, comprise reinforcing bar (8) inside the outer wall of basement of locating at hole, ater-casting (4), it is characterized in that: hole place, described ater-casting is sealed in advance by precast concrete cover (1), precast concrete cover (1) entirety is rectangle, and its right and left overlaps with the outer wall of basement (5) of both sides, hole, ater-casting respectively; Described precast concrete cover (1) inside is embedded with double-layer double-direction arrangement of reinforcement (2), described precast concrete cover (1) inner side is also embedded with the draw ring (3) of lifting use, and the lifting reinforcing bar (8) inside the outer wall of basement that post-tensioning ring (3) located with hole, ater-casting (4) by iron wire (6) that puts in place is connected.
2. poured band of outer wall of basement advanced water-stopping structure according to claim 1, is characterized in that: the right and left of described precast concrete cover (1) is than the wide 100~200mm in ater-casting hole.
3. poured band of outer wall of basement advanced water-stopping structure according to claim 1, is characterized in that: the outer facade the right and left of described precast concrete cover (1) is ramped shaped.
4. poured band of outer wall of basement advanced water-stopping structure according to claim 1, is characterized in that: the outer facade of described precast concrete cover (1) is provided with floated coat (9).
5. poured band of outer wall of basement advanced water-stopping structure according to claim 1, is characterized in that: the outer facade of described precast concrete cover (1) is provided with building waterproof layer (7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320509945.7U CN203625942U (en) | 2013-08-21 | 2013-08-21 | Basement outer wall post-cast strip ahead water stopping structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320509945.7U CN203625942U (en) | 2013-08-21 | 2013-08-21 | Basement outer wall post-cast strip ahead water stopping structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203625942U true CN203625942U (en) | 2014-06-04 |
Family
ID=50812434
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320509945.7U Expired - Lifetime CN203625942U (en) | 2013-08-21 | 2013-08-21 | Basement outer wall post-cast strip ahead water stopping structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203625942U (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104594389A (en) * | 2015-01-22 | 2015-05-06 | 甘肃省建设投资(控股)集团总公司 | Post-cast strip external wall plugging structure with elastic water stoppers |
CN106120871A (en) * | 2016-08-24 | 2016-11-16 | 中国人民解放军63926部队 | A kind of poured band of outer wall of basement outboard template and construction method thereof |
CN107386468A (en) * | 2016-05-17 | 2017-11-24 | 五冶集团上海有限公司 | A kind of wall post-cast strip mold method |
CN108842827A (en) * | 2018-08-07 | 2018-11-20 | 广东建星建造集团有限公司 | Sidewall of basement backfill soil structure and sidewall of basement backfill shift to an earlier date construction method |
CN110439036A (en) * | 2019-07-19 | 2019-11-12 | 中国十七冶集团有限公司 | A kind of poured band of outer wall of basement advance water stop construction method |
CN114457852A (en) * | 2022-01-17 | 2022-05-10 | 中国五冶集团有限公司 | Basement exterior wall post-cast strip U-shaped concrete precast slab plugging method |
CN115262750A (en) * | 2022-08-29 | 2022-11-01 | 保定同恒建筑工程有限公司 | Basement outer wall rear pouring belt prefabricated retaining plate installation process |
CN115787744A (en) * | 2022-11-25 | 2023-03-14 | 中国五冶集团有限公司 | Box-type foundation basement advanced water stop structure |
-
2013
- 2013-08-21 CN CN201320509945.7U patent/CN203625942U/en not_active Expired - Lifetime
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104594389A (en) * | 2015-01-22 | 2015-05-06 | 甘肃省建设投资(控股)集团总公司 | Post-cast strip external wall plugging structure with elastic water stoppers |
CN107386468A (en) * | 2016-05-17 | 2017-11-24 | 五冶集团上海有限公司 | A kind of wall post-cast strip mold method |
CN106120871A (en) * | 2016-08-24 | 2016-11-16 | 中国人民解放军63926部队 | A kind of poured band of outer wall of basement outboard template and construction method thereof |
CN108842827A (en) * | 2018-08-07 | 2018-11-20 | 广东建星建造集团有限公司 | Sidewall of basement backfill soil structure and sidewall of basement backfill shift to an earlier date construction method |
CN110439036A (en) * | 2019-07-19 | 2019-11-12 | 中国十七冶集团有限公司 | A kind of poured band of outer wall of basement advance water stop construction method |
CN114457852A (en) * | 2022-01-17 | 2022-05-10 | 中国五冶集团有限公司 | Basement exterior wall post-cast strip U-shaped concrete precast slab plugging method |
CN115262750A (en) * | 2022-08-29 | 2022-11-01 | 保定同恒建筑工程有限公司 | Basement outer wall rear pouring belt prefabricated retaining plate installation process |
CN115787744A (en) * | 2022-11-25 | 2023-03-14 | 中国五冶集团有限公司 | Box-type foundation basement advanced water stop structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203625942U (en) | Basement outer wall post-cast strip ahead water stopping structure | |
CN209723052U (en) | The prefabricated plate advanced water-stopping of poured band of outer wall of basement backfills structure | |
CN202000380U (en) | Basement outer wall post-pouring belt backfill protective plate | |
WO2016062224A1 (en) | Integrated column-equipped heat insulation wallboard, manufacturing and building processes and corollary equipment thereof | |
CN109914644A (en) | A kind of assembled heat insulation masonry wall and preparation method thereof | |
CN207144012U (en) | A kind of post-cast strip prefabricated board barricade | |
CN114457852A (en) | Basement exterior wall post-cast strip U-shaped concrete precast slab plugging method | |
CN102758486B (en) | Anti-seepage method for building engineering | |
CN107476263A (en) | A kind of construction method of prestressed pier anchor cable | |
CN204676607U (en) | Poured band of outer wall of basement plugging structure | |
CN204753783U (en) | Prefabricated concrete rain sewage inspection shaft device | |
CN207469309U (en) | A kind of rectangular prefabricated assembled inspection shaft | |
CN109797988A (en) | A kind of co-layer draining hard-cover precast block toilet of outer wall provided pipe line groove hole | |
CN115387393A (en) | Post-cast strip pre-sealing quick construction method | |
CN103374915B (en) | Continuous closed hanging-upside-down shotcreting supporting system and construction method thereof | |
CN205382727U (en) | Lightweight steel construction house | |
CN113931495A (en) | Precast concrete toilet chassis, manufacturing method and installation method | |
CN107142956A (en) | A kind of prefabricated assembled elevator basis | |
CN102392459A (en) | Construction method for straight manhole | |
CN203373784U (en) | Vertical post-cast strip plugging structure of basement | |
CN203613561U (en) | Post-cast strip prefabricated cover plate | |
CN109281386A (en) | A kind of construction method of the quick partition wall of structure containing water and pipe culvert | |
CN219973299U (en) | Prefabricated assembled basement roof post-cast strip advanced sealing structure | |
CN216130193U (en) | Basement roof subsides post-cast strip enclosed construction in advance | |
CN209339301U (en) | A kind of quick partition wall of structure containing water and pipe culvert |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20140604 |
|
CX01 | Expiry of patent term |