CN219973299U - A prefabricated basement roof post-pouring belt early closure structure - Google Patents
A prefabricated basement roof post-pouring belt early closure structure Download PDFInfo
- Publication number
- CN219973299U CN219973299U CN202321223992.5U CN202321223992U CN219973299U CN 219973299 U CN219973299 U CN 219973299U CN 202321223992 U CN202321223992 U CN 202321223992U CN 219973299 U CN219973299 U CN 219973299U
- Authority
- CN
- China
- Prior art keywords
- pouring
- post
- prefabricated
- cover plate
- belt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
Description
技术领域Technical field
本实用新型属于建筑结构施工领域,具体涉及一种预制装配式地下室顶板后浇带提前封闭结构。The utility model belongs to the field of building structure construction, and specifically relates to a prefabricated basement roof post-pouring belt early closing structure.
背景技术Background technique
后浇带设置的作用是在建筑施工中为防止现浇钢筋混凝土结构由于自身收缩不均或沉降不均可能产生的有害裂缝。JGJ3-2010《高层建筑混凝土结构技术规程》12.2.3条规定:高层建筑地下室不宜设置变形缝。当地下室长度超过伸缩缝最大间距时,可考虑利用混凝土后期强度,降低水泥用量;也可每隔30m~40m设置贯通顶板、底板及墙板的施工后浇带。通常做法是按照规范每隔一段距离设置一道后浇带,后浇带宽度为800~1000mm,后浇带将地下室分割成若干块,使各区块可以自由伸缩和沉降而不至于破坏地下室结构,待主体结构结顶或施工到一定楼层再浇筑后浇带。The purpose of the post-casting belt is to prevent harmful cracks that may occur in the cast-in-place reinforced concrete structure due to uneven shrinkage or uneven settlement during construction. Article 12.2.3 of JGJ3-2010 "Technical Regulations for Concrete Structures of High-rise Buildings" stipulates that deformation joints should not be installed in the basements of high-rise buildings. When the length of the basement exceeds the maximum spacing between expansion joints, consideration can be given to utilizing the later strength of the concrete to reduce the amount of cement; post-construction pouring strips can also be installed every 30m to 40m through the roof, bottom and wall panels. The usual method is to set up a post-pouring belt at intervals according to the specifications. The width of the post-pouring belt is 800 to 1000mm. The post-pouring belt divides the basement into several blocks so that each block can expand, contract and settle freely without damaging the basement structure. After the main structure is topped or constructed to a certain floor, the post-pouring strip is poured.
现在施工行业工期越来越短,如何合理的利用有限的工期进行多专业穿插配合显得尤为重要,上述施工工序存在以下几点问题,首先地下室施工完成由于存在后浇带,无法进行防水和覆土的施工,影响工程进度;其次,后浇带不封闭,覆土不回填就不能停止基坑降水,大大增加了工程费用;最后,后浇带位置由于未浇筑混凝土,影响工程车辆通行,同时雨水通过后浇带进入地下室,使得地下室积水,施工环境较差。Nowadays, the construction period in the construction industry is getting shorter and shorter. It is particularly important to make reasonable use of the limited construction period for multi-disciplinary interleaving and cooperation. The above construction process has the following problems. First, due to the presence of post-pouring tapes after the basement construction is completed, waterproofing and soil covering cannot be carried out. construction, affecting the progress of the project; secondly, the post-pouring zone is not closed, and the foundation pit cannot be stopped without backfilling, which greatly increases the project cost; finally, because no concrete has been poured in the post-pouring zone, it affects the passage of engineering vehicles, and at the same time, after rainwater passes through The pouring tape entered the basement, causing water to accumulate in the basement and making the construction environment poor.
因此,如何通过新技术、新方法优化施工工序解决上述问题,是目前亟待解决的技术问题。Therefore, how to optimize the construction process through new technologies and new methods to solve the above problems is an urgent technical issue that needs to be solved.
发明内容Contents of the invention
本实用新型的目的在于解决现有施工工序中存在的诸多问题,提供一种预制装配式地下室顶板后浇带提前封闭结构。The purpose of this utility model is to solve many problems existing in the existing construction procedures and provide a prefabricated basement roof post-pouring belt early sealing structure.
为了达到上述目的,本实用新型采用的以下技术方案:In order to achieve the above purpose, the utility model adopts the following technical solutions:
一种预制装配式地下室顶板后浇带提前封闭结构,用于在浇筑混凝土之前对后浇带进行封闭,其包括预制盖板、脚手架、浇筑模板和防水卷材;A prefabricated basement roof post-pouring belt early sealing structure is used to seal the post-pouring belt before concrete is poured, and includes prefabricated cover plates, scaffolding, pouring formwork and waterproof membranes;
所述浇筑模板以横跨后浇带的方式贴合地下室顶板的底部设置,且完全覆盖整条后浇带;所述浇筑模板底部通过脚手架进行支撑;The pouring formwork is arranged to fit the bottom of the basement roof in a manner that spans the post-pouring belt, and completely covers the entire post-pouring belt; the bottom of the pouring formwork is supported by scaffolding;
所述预制盖板以横跨后浇带的方式置于地下室顶板的顶面上,且完全覆盖整条后浇带;预制盖板与后浇带两侧的地下室顶板之间的缝隙通过砂浆进行填缝抹边;The prefabricated cover plate is placed on the top surface of the basement roof across the post-pouring belt and completely covers the entire post-pouring belt; the gap between the prefabricated cover plate and the basement roof on both sides of the post-pouring belt is filled with mortar. Caulking and trimming;
预制盖板中设置有贯通板体的浇筑管,浇筑管的底部出口伸入后浇带内位于浇筑模板上方的混凝土浇筑区域中,浇筑管的顶部入口伸出预制盖板顶面;The precast cover plate is provided with a pouring pipe that penetrates the plate body. The bottom outlet of the pouring pipe extends into the concrete pouring area above the pouring formwork in the back pouring belt. The top entrance of the pouring pipe extends out of the top surface of the precast cover plate;
所述防水卷材连续满铺于所述预制盖板以及两侧地下室顶板的上表面。The waterproofing membrane is continuously spread on the upper surface of the prefabricated cover plate and the basement roof panels on both sides.
作为优选,所述预制盖板为内置受力钢筋的混凝土预制板,且板体中预埋有伸出板体顶部的吊环。Preferably, the prefabricated cover plate is a concrete prefabricated plate with built-in stress-bearing steel bars, and a lifting ring extending out of the top of the plate body is pre-embedded in the plate body.
作为优选,所述吊环至少有两个,对称分布于预制盖板上。Preferably, there are at least two lifting rings, which are symmetrically distributed on the prefabricated cover plate.
作为优选,所述浇筑管顶部连接有延长管,延长管的顶部入口高度高于地下室顶板上的覆土标高。Preferably, an extension pipe is connected to the top of the pouring pipe, and the entrance height of the top of the extension pipe is higher than the elevation of the covering soil on the basement roof.
作为优选,所述延长管的顶部罩有防尘帽。Preferably, the top of the extension tube is covered with a dust cap.
作为优选,所述浇筑管与延长管之间通过螺纹连接。Preferably, the pouring pipe and the extension pipe are connected through threads.
作为优选,所述浇筑管位于预制盖板内部的管段外周设置有止水钢板。Preferably, a water-stop steel plate is provided on the outer periphery of the pipe section of the pouring pipe located inside the prefabricated cover plate.
作为优选,所述止水钢板环绕于浇筑管的外周水平布置。Preferably, the water-stopping steel plate is arranged horizontally around the periphery of the pouring pipe.
作为优选,所述预制盖板两侧与地下室顶板搭接的板边处设有倒角,所述砂浆填充于倒角位置,预制盖板的上表面与嵌缝填充后的砂浆配合形成一个用于铺设防水卷材的连续斜坡。Preferably, there are chamfers on both sides of the prefabricated cover plate where they overlap the basement roof. The mortar is filled in the chamfered position. The upper surface of the prefabricated cover plate cooperates with the mortar after caulking to form a space for use. For laying waterproof membrane on continuous slopes.
作为优选,所述预制盖板沿后浇带方向的两条侧边具有拼接企口,多块预制盖板通过企口连续拼接,覆盖整条后浇带。Preferably, the two sides of the prefabricated cover plate along the direction of the post-pouring belt have splicing tongues and grooves, and multiple prefabricated cover plates are continuously spliced through the tongues and grooves to cover the entire post-pouring belt.
作为优选,所述后浇带内填充有自密实混凝土。Preferably, the post-cast belt is filled with self-compacting concrete.
相对于现有技术而言,本实用新型具有以下有益效果:Compared with the existing technology, the present utility model has the following beneficial effects:
1)本实用新型通过在后浇带处设置预制盖板,可提前施工防水卷材,提前回填覆土,并停止基坑降水,大大缩短的工期,降低了施工成本;1) By arranging prefabricated cover plates at the post-pouring zone, this utility model can construct waterproofing membranes in advance, backfill soil in advance, and stop dewatering of foundation pits, greatly shortening the construction period and reducing construction costs;
2)本实用新型可采用自密实混凝土通过浇筑管浇筑混凝土,大大提高工程质量,减小施工难度;3)预制盖板采用工厂预制现场装配的实施方案,既可以保证施工质量又可以批量化生产,符合建筑工业化的目标。2) This utility model can use self-compacting concrete to pour concrete through a pouring pipe, which greatly improves the quality of the project and reduces the difficulty of construction; 3) The prefabricated cover plate adopts a factory prefabricated on-site assembly implementation plan, which can not only ensure the construction quality but also enable mass production , in line with the goal of construction industrialization.
附图说明Description of the drawings
图1为预制装配式地下室顶板后浇带提前封闭结构剖面示意图。Figure 1 is a schematic cross-sectional view of the prefabricated basement roof post-cast belt with advanced sealing structure.
图2是预制盖板结构平面示意图。Figure 2 is a schematic plan view of the prefabricated cover plate structure.
图3是预制盖板结构1-1剖面示意图。Figure 3 is a schematic cross-sectional view of the prefabricated cover structure 1-1.
图中附图标记为:预制盖板1、受力钢筋101、吊环102、浇筑管103、止水片104、延长管105、防尘帽106、企口107、后浇带2、脚手架3、浇筑模板4、砂浆5、防水卷材6、止水钢板7。The reference numbers in the figure are: prefabricated cover plate 1, stressed steel bar 101, lifting ring 102, pouring pipe 103, water stop sheet 104, extension pipe 105, dust cap 106, tongue and groove 107, post-casting belt 2, scaffolding 3, Pouring formwork 4, mortar 5, waterproof membrane 6, water-stop steel plate 7.
具体实施方式Detailed ways
为使本实用新型的上述目的、特征和优点能够更加明显易懂,下面结合附图对本实用新型的具体实施方式做详细的说明。在下面的描述中阐述了很多具体细节以便于充分理解本实用新型。但是本实用新型能够以很多不同于在此描述的其它方式来实施,本领域技术人员可以在不违背本实用新型内涵的情况下做类似改进,因此本实用新型不受下面公开的具体实施例的限制。本实用新型各个实施例中的技术特征在没有相互冲突的前提下,均可进行相应组合。In order to make the above objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation modes of the present invention will be described in detail below with reference to the accompanying drawings. In the following description, numerous specific details are set forth to facilitate a thorough understanding of the present invention. However, the present utility model can be implemented in many other ways different from those described here. Those skilled in the art can make similar improvements without violating the connotation of the present utility model. Therefore, the present utility model is not limited to the specific embodiments disclosed below. limit. The technical features in each embodiment of the present invention can be combined accordingly as long as there is no conflict with each other.
在本实用新型的描述中,需要理解的是,当一个元件被认为是“连接”另一个元件,可以是直接连接到另一个元件或者是间接连接即存在中间元件。相反,当元件为称作“直接”与另一元件连接时,不存在中间元件。In the description of the present invention, it should be understood that when one element is referred to as being "connected" to another element, it may be directly connected to the other element or indirectly connected through the presence of intermediate elements. In contrast, when an element is said to be "directly" connected to another element, there are no intervening elements present.
在本实用新型的描述中,需要理解的是,术语“第一”、“第二”仅用于区分描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”的特征可以明示或者隐含地包括至少一个该特征。In the description of the present invention, it should be understood that the terms "first" and "second" are only used for the purpose of distinguishing and describing, and cannot be understood as indicating or implying relative importance or implicitly indicating the indicated technical features. quantity. Therefore, features defined as "first" and "second" may explicitly or implicitly include at least one of these features.
本实用新型提供了一种预制装配式地下室顶板后浇带提前封闭结构,该结构可以在浇筑混凝土之前对后浇带进行封闭,从而可提前施工防水卷材,提前回填覆土,并停止基坑降水,缩短工期并降低施工成本。下面对该预制装配式地下室顶板后浇带提前封闭结构的具体形式以及封闭方法进行详细描述。The utility model provides a prefabricated basement roof post-pouring belt early sealing structure. This structure can seal the post-pouring tape before pouring concrete, so that waterproof membranes can be constructed in advance, backfilling soil can be advanced, and foundation pit dewatering can be stopped. , shorten the construction period and reduce construction costs. The specific form and sealing method of the prefabricated basement roof post-cast belt early sealing structure will be described in detail below.
如图1所示,在本实用新型的一个较佳实施例中,该预制装配式地下室顶板后浇带提前封闭结构包括预制盖板1、脚手架3、浇筑模板4和防水卷材6。As shown in Figure 1, in a preferred embodiment of the present invention, the prefabricated basement roof post-pouring belt early sealing structure includes a prefabricated cover plate 1, a scaffolding 3, a pouring formwork 4 and a waterproof membrane 6.
其中,浇筑模板4可采用常规的后浇带浇筑模板,可是木模板或者其他材质的模板。浇筑模板4以横跨后浇带2的方式贴合地下室顶板的底部设置,且完全覆盖整条后浇带2。由于浇筑模板4是贴合在地下室顶板底部的,其下方悬空,因此为了对浇筑模板4形成有效地支撑,可以在后浇带2下方位置搭设脚手架3,利用脚手架3对浇筑模板4底部进行支撑。脚手架3和浇筑模板4的具体形式和设置于常规的后浇带做法一致,此处不再赘述。Among them, the pouring formwork 4 can be a conventional post-casting belt pouring formwork, which can be a wooden formwork or a formwork made of other materials. The pouring formwork 4 is arranged to fit the bottom of the basement roof in a manner that spans the post-pouring strip 2 and completely covers the entire post-pouring strip 2 . Since the pouring formwork 4 is attached to the bottom of the basement roof and is suspended below, in order to effectively support the pouring formwork 4, a scaffolding 3 can be set up below the post-pouring belt 2, and the scaffolding 3 can be used to support the bottom of the pouring formwork 4. . The specific forms of the scaffolding 3 and the pouring formwork 4 are the same as those provided in conventional post-casting strips, and will not be described again here.
常规的后浇带施工工序中,后浇带处往往不封闭,需要在其他工序施工完毕后方可进行混凝土浇筑封闭,从而导致无法进行防水和覆土的施工。在本实用新型中,为了解决该问题,预先在工厂中预制了宽度大于后浇带2宽度的预制盖板1,然后将预制盖板1以横跨后浇带2的方式置于地下室顶板的顶面上,且完全覆盖整条后浇带2。而预制盖板1与后浇带2两侧的地下室顶板之间的缝隙则通过砂浆5进行填缝抹边。由此,后浇带2两侧的地下室顶板、预制盖板1以及浇筑模板4共同围合形成了后浇带2的混凝土浇筑腔。为了保证后续能够将混凝土注入该混凝土浇筑腔,本实用新型在预制盖板1中设置了贯通板体的浇筑管103,浇筑管103的底部出口伸入后浇带2内位于浇筑模板4上方的混凝土浇筑区域中,浇筑管103的顶部入口伸出预制盖板1顶面。防水卷材6连续满铺于所述预制盖板1以及两侧地下室顶板的上表面。In the conventional post-poured belt construction process, the post-poured belt is often not sealed, and concrete pouring and sealing need to be completed after other construction processes are completed, resulting in the inability to carry out waterproofing and soil covering construction. In the present utility model, in order to solve this problem, a prefabricated cover plate 1 with a width larger than the width of the post-pouring belt 2 is prefabricated in the factory, and then the prefabricated cover plate 1 is placed on the basement roof across the post-pouring belt 2 on the top surface, and completely covers the entire post-cast belt 2. The gap between the prefabricated cover plate 1 and the basement roof on both sides of the post-cast belt 2 is filled and edged with mortar 5 . Therefore, the basement roof, the prefabricated cover plate 1 and the pouring formwork 4 on both sides of the post-pouring zone 2 together form a concrete pouring cavity of the post-pouring zone 2 . In order to ensure that concrete can be subsequently injected into the concrete pouring cavity, the present utility model is provided with a pouring pipe 103 that penetrates the plate body in the prefabricated cover plate 1. The bottom outlet of the pouring pipe 103 extends into the back pouring belt 2 and is located above the pouring formwork 4. In the concrete pouring area, the top entrance of the pouring pipe 103 protrudes from the top surface of the prefabricated cover plate 1 . The waterproof membrane 6 is continuously spread on the upper surface of the prefabricated cover 1 and the basement roof on both sides.
因此,由于预制盖板1预先对后浇带2顶部起到了临时封闭的作用,因此即使后浇带2内尚未浇筑混凝土,防水和覆土的施工也可以正常进行。而当需要浇筑后浇带2时,则可以通过浇筑管103向混凝土浇筑区域中灌注混凝土。需要注意的是,由于后浇带2在浇筑混凝土时顶部已经被预制盖板1封闭了,无法进行常规的振捣,因此优选通过浇筑管浇筑自密实混凝土,不需额外振捣工序,以提高工程质量,减小施工难度。Therefore, since the prefabricated cover plate 1 temporarily seals the top of the post-pouring zone 2 in advance, even if concrete has not been poured in the post-pouring zone 2, the construction of waterproofing and soil covering can be carried out normally. When the back pouring belt 2 needs to be poured, concrete can be poured into the concrete pouring area through the pouring pipe 103 . It should be noted that since the top of the post-pouring belt 2 has been closed by the prefabricated cover plate 1 when pouring concrete, conventional vibration cannot be carried out. Therefore, it is preferable to pour self-compacting concrete through a pouring pipe without additional vibration process to improve the Improve project quality and reduce construction difficulty.
另外,作为本实用新型中的一种较佳实现方式,预制盖板1在工厂中预制混凝土预制板时,可预先内置受力钢筋101,以保证板体的结构强度。另外,为了便于施工过程中吊装作业,可以在板体中预埋有伸出板体顶部的吊环102。吊环102优选设置两个或两个以上,对称分布于预制盖板1上。In addition, as a preferred implementation method of the present invention, when the prefabricated cover plate 1 is prefabricated as a concrete prefabricated plate in the factory, the stress-bearing steel bars 101 can be built-in in advance to ensure the structural strength of the plate body. In addition, in order to facilitate hoisting operations during the construction process, lifting rings 102 extending out of the top of the board may be pre-embedded in the board. It is preferable to provide two or more lifting rings 102 symmetrically distributed on the prefabricated cover plate 1 .
另外,由于地下室顶板上方会进行覆土回填作业,因此如果上述浇筑管103的长度不够,可能会导致被埋于覆土中,难以进行后续的混凝土浇筑工序。因此作为本实用新型中的一种较佳实现方式,上述浇筑管103顶部连接有延长管105,且延长管105的顶部入口高度应当高于地下室顶板上的覆土标高。为了便于连接延长管105,可以预先在浇筑管103顶部外攻螺纹,使得浇筑管103与延长管105之间可以通过螺纹连接。当然,除了螺纹连接方式之外,浇筑管103与延长管105之间也可以通过其他的可拆卸式连接方式进行连接,当混凝土浇筑完毕后可以卸下延长管105。In addition, since the covering soil backfilling operation will be performed above the basement roof, if the length of the above-mentioned pouring pipe 103 is not enough, it may be buried in the covering soil, making it difficult to perform the subsequent concrete pouring process. Therefore, as a preferred implementation method of the present invention, an extension pipe 105 is connected to the top of the above-mentioned pouring pipe 103, and the height of the top entrance of the extension pipe 105 should be higher than the elevation of the covering soil on the basement roof. In order to facilitate the connection of the extension pipe 105, external threads can be tapped on the top of the pouring pipe 103 in advance, so that the pouring pipe 103 and the extension pipe 105 can be connected through threads. Of course, in addition to the threaded connection method, the pouring pipe 103 and the extension pipe 105 can also be connected through other detachable connection methods, and the extension pipe 105 can be removed after the concrete is poured.
另外,考虑覆土回填过程中可能会存在尘土进入延长管105的情况,因此延长管105的顶部最好罩有防尘帽106。在覆土回填完毕后进行混凝土浇筑前,再取下防尘帽106,防止施工中杂物进入后浇带。In addition, considering that dust may enter the extension tube 105 during the backfilling process, it is best to cover the top of the extension tube 105 with a dust cap 106 . After the soil backfill is completed and before concrete is poured, the dust cap 106 is removed to prevent debris from entering the post-pouring belt during construction.
另外,作为本实用新型中的一种较佳实现方式,上述浇筑管103位于预制盖板1内部的管段外周还可以设置有止水钢板7,以避免有水通过浇筑管103与预制盖板1混凝土之间的缝隙下渗。上述止水钢板7可以完整环绕于浇筑管103的外周水平布置。In addition, as a preferred implementation method of the present invention, a water-stop steel plate 7 can also be provided around the pipe section of the above-mentioned pouring pipe 103 inside the prefabricated cover plate 1 to prevent water from passing through the pouring pipe 103 and the prefabricated cover plate 1 The gaps between the concrete seep down. The above-mentioned water-stop steel plate 7 can be arranged horizontally around the outer periphery of the pouring pipe 103 completely.
另外,作为本实用新型中的一种较佳实现方式,由于预制盖板1是凸出于地下室顶板的,而预制盖板1和地下室顶板上方需要铺设防水卷材6。为了保证防水卷材6的平整性,预制盖板1两侧与地下室顶板搭接的板边处设有倒角,砂浆5填充于倒角位置,预制盖板1的上表面与嵌缝填充后的砂浆5配合形成一个连续斜坡,防水卷材6铺设于该连续斜坡上,避免出现凹凸不平整的问题。In addition, as a preferred implementation method of the present invention, since the prefabricated cover 1 protrudes from the basement roof, waterproof membrane 6 needs to be laid above the prefabricated cover 1 and the basement roof. In order to ensure the flatness of the waterproof membrane 6, chamfers are provided at the edges of both sides of the prefabricated cover plate 1 that overlap the basement roof. Mortar 5 is filled in the chamfered position. The upper surface of the prefabricated cover plate 1 and the caulking are filled The mortar 5 is combined to form a continuous slope, and the waterproof membrane 6 is laid on the continuous slope to avoid the problem of unevenness.
另外,由于后浇带2往往长度较长,而预制盖板1是提前在工厂中预制的,过长的预制件对运输、吊装都会带来更高的要求。因此作为本实用新型中的一种较佳实现方式,上述预制盖板1可设置成拼接式构件。因此如图2和图3所示,上述预制盖板1沿后浇带2方向的两条侧边可设置有拼接企口,当单块预制盖板1的长度难以完整覆盖整条后浇带2时,可将多块预制盖板1通过企口连续拼接,从而覆盖整条后浇带2。另外,企口搭接位置优选采用砂浆嵌缝,保证密闭性。In addition, since the post-casting belt 2 is often long in length, and the prefabricated cover plate 1 is prefabricated in the factory in advance, excessively long prefabricated parts will bring higher requirements for transportation and hoisting. Therefore, as a preferred implementation method of the present invention, the above-mentioned prefabricated cover plate 1 can be configured as a spliced component. Therefore, as shown in Figures 2 and 3, the two sides of the above-mentioned precast cover plate 1 along the direction of the back pouring belt 2 can be provided with splicing tongues. When the length of a single prefabricated cover plate 1 is difficult to completely cover the entire back pouring belt 2, multiple prefabricated cover plates 1 can be continuously spliced through tongues and grooves to cover the entire post-casting belt 2. In addition, mortar caulking is preferably used at the tongue-and-groove overlapping position to ensure tightness.
上述预制装配式地下室顶板后浇带提前封闭结构施工时,可先在后浇带2位置搭设脚手架3、安装浇筑模板4和止水钢板7,将预制盖板1吊装在后浇带2之上,采用砂浆5填缝抹边,然后铺设防水卷材6,随后回填覆土,等需浇筑后浇带2时通过浇筑孔浇筑混凝土使地下室形成整体结构。When constructing the above-mentioned prefabricated basement roof post-pouring belt to seal the structure in advance, you can first set up scaffolding 3 at the post-pouring belt 2, install the pouring formwork 4 and the water-stop steel plate 7, and hoist the prefabricated cover plate 1 on the post-pouring belt 2 , use mortar 5 to fill the joints and smooth the edges, then lay the waterproof membrane 6, and then backfill the covering soil. When the post-pouring belt 2 needs to be poured, concrete is poured through the pouring holes to form an overall structure of the basement.
以上所述的实施例只是本实用新型的一种较佳的方案,然其并非用以限制本实用新型。有关技术领域的普通技术人员,在不脱离本实用新型的精神和范围的情况下,还可以做出各种变化和变型。因此凡采取等同替换或等效变换的方式所获得的技术方案,均落在本实用新型的保护范围内。The above-described embodiment is only a preferred solution of the present invention, but it is not intended to limit the present invention. Those of ordinary skill in the relevant technical fields can make various changes and modifications without departing from the spirit and scope of the present invention. Therefore, any technical solution obtained by equivalent substitution or equivalent transformation falls within the protection scope of the present utility model.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202321223992.5U CN219973299U (en) | 2023-05-19 | 2023-05-19 | A prefabricated basement roof post-pouring belt early closure structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202321223992.5U CN219973299U (en) | 2023-05-19 | 2023-05-19 | A prefabricated basement roof post-pouring belt early closure structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN219973299U true CN219973299U (en) | 2023-11-07 |
Family
ID=88588622
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202321223992.5U Expired - Fee Related CN219973299U (en) | 2023-05-19 | 2023-05-19 | A prefabricated basement roof post-pouring belt early closure structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN219973299U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117702933A (en) * | 2023-12-13 | 2024-03-15 | 中国一冶集团有限公司 | Post-pouring zone earth covering construction method |
-
2023
- 2023-05-19 CN CN202321223992.5U patent/CN219973299U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117702933A (en) * | 2023-12-13 | 2024-03-15 | 中国一冶集团有限公司 | Post-pouring zone earth covering construction method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN205653820U (en) | Basement post -cast strip advances plugging device | |
| CN102587416B (en) | Construction method of basement attached lane structure | |
| CN212129251U (en) | Advanced sealing structure of post-cast strip subsides | |
| CN201280725Y (en) | Post-casting construction precast slab for basement of buildings | |
| CN107859064B (en) | Waterproof structure for connection of prefabricated pipe gallery and cast-in-situ pipe gallery and construction method | |
| CN109826239B (en) | Basement outer wall post-pouring strip structure and construction method thereof | |
| CN218148527U (en) | Subside post-cast strip structure sealed in advance | |
| CN213174773U (en) | Support system is exempted from to tear open type post-cast strip structure | |
| CN105350581A (en) | Advanced sealing structure for basement top slab settlement post-cast strips | |
| CN207597428U (en) | Prefabricated piping lane is connected waterproof construction with cast-in-place piping lane | |
| CN105839677A (en) | Advanced water prevention construction process for post-cast strip of side wall of basement | |
| CN111456085A (en) | Cast-in-place concrete construction method for pipe gallery segment | |
| CN103410173A (en) | Construction method for vertical post pouring belt plugging of underground structural outer wall | |
| CN209873873U (en) | Prefabricated assembled power pipeline working well | |
| CN210288465U (en) | Assembled retaining wall post-cast strip plugging member | |
| CN210887303U (en) | Superimposed prefabricated integrated pipe gallery structure | |
| CN216787229U (en) | Basement outer wall post-cast strip assembled shutoff steel sheet structure | |
| CN104594388A (en) | Advancing waterstop sedimentation post-cast strip of foundation slab | |
| CN217053814U (en) | A post-casting belt prefabricated cover plate fixing device | |
| CN111472386A (en) | Underground opening plugging structure and underground opening plugging construction method | |
| CN114457852A (en) | Basement exterior wall post-cast strip U-shaped concrete precast slab plugging method | |
| CN108560585B (en) | Fully assembled structure of basement exterior wall and its construction method | |
| CN116837905A (en) | Basement outer wall post-pouring belt anti-seepage cover plate structure and construction method | |
| CN211113774U (en) | Assembled PC basement lateral wall post-cast strip structure | |
| CN108708309A (en) | A kind of the rectangular channel structure and its installation method of precast assembly |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20231107 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |