CN107142956A - A kind of prefabricated assembled elevator basis - Google Patents

A kind of prefabricated assembled elevator basis Download PDF

Info

Publication number
CN107142956A
CN107142956A CN201710586473.8A CN201710586473A CN107142956A CN 107142956 A CN107142956 A CN 107142956A CN 201710586473 A CN201710586473 A CN 201710586473A CN 107142956 A CN107142956 A CN 107142956A
Authority
CN
China
Prior art keywords
bottom plate
framed side
antirust
built
pieces
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710586473.8A
Other languages
Chinese (zh)
Inventor
王伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710586473.8A priority Critical patent/CN107142956A/en
Publication of CN107142956A publication Critical patent/CN107142956A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/44Foundations for machines, engines or ordnance
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

This prefabricated assembled elevator basis, including bottom plate and 4 pieces of framed side wallboards, plate top surface is installed with the two shaft-like built-in fittings of row's antirust close to edge vertically upward, the shaft-like built-in fitting exposed junction of antirust is set up, framed side wallboard bottom surface is reserved with two rows and assigns hole, assigns hole to be adapted with the shaft-like built-in fitting of antirust;During splicing, the shaft-like built-in fitting exposed junction of antirust on bottom plate inserts the assigning in hole of 4 pieces of framed side wallboard bottom surfaces respectively, and 4 pieces of framed side wallboards are fixed on to the top surface surrounding of bottom plate;Piece between bottom plate and framed side wallboard and between adjacent framed side wallboard fills real using microdilatancy waterproof mortar, and is fixed with water-swellable bar at the gap that outside is left after reality is filled;SBS waterproof rolls are finally pasted on the upstream face of spliced bottom plate and 4 pieces of framed side wallboards again.So that traditional brick fetal membrane be built by laying bricks or stones, reinforcing bar colligation, the structure of concrete pouring construction form makes the hardened structure of prefabrication into, and scene splicing is installed, and greatly shortens the engineering time, and site operation time that disturbs residents is few.

Description

A kind of prefabricated assembled elevator basis
Technical field
Field is assembled the present invention relates to elevator, and in particular to a kind of prefabricated assembled elevator basis.
Background technology
In recent years, with the development of society, the living environment of people is also greatly improved, while also having driven Building Trade in China Flourish, cause the high-rise building in city more and more, elevator is vertical as personnel in skyscraper and material The indispensable construction machinery of transport, has been obtained for being widely applied, and elevator basis is the important component of elevator construction, it The safe operation of elevator is directly influenced, therefore the design and construction on elevator basis is particularly important.
Simultaneously as the continuous of room rate is risen now, developer can try one's best the engineering time of compression ultrahigh layer building, because This, be also as supporting high-rise building elevator in this way, and the elevator of traditional construction is basic, be to be built using traditional brick fetal membrane Build, reinforcing bar colligation, concrete pouring construction, construction period is taken around up to 15 days as long as, and its is complicated, and construction is disturbed The people.
Therefore, a kind of prefabricated assembled elevator foundation construction how is designed efficient, simple in construction, and easy for installation disturb residents is lacked Elevator basis, be industry relevant personnel technical problem urgently to be resolved hurrily.
The content of the invention
In order to solve the above technical problems, we have proposed a kind of prefabricated assembled elevator basis, traditional brick fetal membrane is built Build, reinforcing bar colligation, the structure of concrete pouring construction form, make the hardened structure of prefabrication into, scene splicing is installed, greatly contracted Short engineering time, site operation time that disturbs residents is few.
To reach above-mentioned purpose, technical scheme is as follows:
A kind of prefabricated assembled elevator basis, including bottom plate and 4 pieces of framed side wallboards, the plate top surface are vertical close to edge The two shaft-like built-in fittings of row's antirust are installed with upwards, the shaft-like built-in fitting exposed junction of antirust is set up, the framed side wallboard bottom Face is reserved with two rows and assigns hole, it is described assign hole aperture and depth respectively with the shaft-like built-in fitting exposed junction diameter of the antirust Be adapted with height, and on every piece of framed side wallboard bottom surface two rows assign spacing between hole and position also respectively with one side of bottom plate Spacing and position at edge between the two shaft-like built-in fittings of row's antirust is corresponding to the same;
During splicing, the shaft-like built-in fitting exposed junction of antirust on the bottom plate inserts the peace of 4 pieces of framed side wallboard bottom surfaces respectively In jack hole, and 4 pieces of framed side wallboards are fixed on to the top surface surrounding of the bottom plate;It is between the bottom plate and framed side wallboard and described Piece between adjacent framed side wallboard fills real using microdilatancy waterproof mortar, and is fixed with chance at the gap that outside is left after reality is filled Water Expandable strip;SBS waterproof rolls are finally pasted on the upstream face of spliced bottom plate and 4 pieces of framed side wallboards again.
It is preferred that, the bottom plate is reserved with the piling hole driven piles and be adapted with ground, the tapered knot of piling hole Structure, and be gradually reduced from bottom plate backwater towards upstream face.
It is preferred that, arc angling is provided with the inner corner trim between the bottom plate and the framed side wallboard, the arc angling is used The cement mortar of high intensity pours shaping.
It is preferred that, SBS additional waterproof courses are pasted with the arc angling.
It is preferred that, after the bottom plate and 4 pieces of framed side wallboard splicings, the bottom plate and 4 pieces of framed side wallboard outer surfaces are pasted with SBS Waterproof roll.
It is preferred that, the shaft-like built-in fitting of antirust is antirust reinforcing bar or stainless steel solid rod, and antirust reinforcing bar or stainless steel Solid bar surface is by frosting treatment.
By above-mentioned technical proposal, the present invention has the advantages that:
1. compared with about 15 days traditional elevator foundation construction cycles, this prefabricated assembled elevator basic set-up time one It can be completed, and greatly shorten the engineering time.
2. novel in design, simple in construction, construction and installation are convenient, and site operation time that disturbs residents is few.
3. traditional brick fetal membrane is built by laying bricks or stones, reinforcing bar colligation, concrete pouring construction makes prefabrication structural slab, structure into Rationally, scene splicing is installed, and the good purpose of application effect.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the accompanying drawing used required in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is a kind of assembling schematic diagram on prefabricated assembled elevator basis disclosed in the embodiment of the present invention;
Fig. 2 is the structural representation of bottom plate in Fig. 1;
Fig. 3 is the upward view of bottom plate in Fig. 2;
Fig. 4 is the structural representation of framed side wallboard in 1.
Numeral and the corresponding component title represented by letter in figure:
1. the shaft-like built-in fitting 4. of the antirust of 2. framed side wallboard of bottom plate 3. assigns hole
5. hole of driving piles
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
With reference to embodiment and embodiment, the present invention is further detailed explanation.
Embodiment
As shown in Figure 1, Figure 2, Figure 3 and Figure 4, a kind of prefabricated assembled elevator basis, including bottom plate 1 and 4 pieces of framed side wallboards 2, The top surface of bottom plate 1 is installed with the shaft-like built-in fitting 3 of two row's antirusts, the shaft-like built-in fitting 3 of antirust close to edge vertically upward Exposed junction is set up, and the bottom surface of the framed side wallboard 2 is reserved with two rows and assigns hole 4, described to assign the aperture of hole 4 and depth It is adapted respectively with the exposed junction diameter of the shaft-like built-in fitting of the antirust 3 and height, and two rows assign hole on every piece of bottom surface of framed side wallboard 2 Spacing and position between hole 4 spacing also respectively between the shaft-like built-in fitting 3 of row's antirust of 1 one edges of bottom plate two and position It is corresponding to the same;
During splicing, the shaft-like exposed junction of built-in fitting 3 of antirust on the bottom plate 1 inserts 4 pieces of framed side wallboard bottom surfaces respectively Assign in hole 4, and 4 pieces of framed side wallboards 2 are fixed on to the top surface surrounding of the bottom plate 1;The bottom plate 1 and framed side wallboard 2 it Between and the adjacent framed side wallboard 2 between piece fill real using microdilatancy waterproof mortar, and the gap that outside is left after reality is filled Place is fixed with water-swellable bar;SBS waterproof rolls are finally pasted on the upstream face of spliced bottom plate and 4 pieces of framed side wallboards again.
Meanwhile, if the ground on assembling elevator basis needs piling, it is reserved with and is mutually fitted with ground piling on bottom plate 1 The piling hole 5 matched somebody with somebody, the piling tapered structure of hole 5, and be gradually reduced from bottom plate backwater towards upstream face, piling is completed Afterwards, stake holes is filled using the microdilatancy water-proof concrete of high a grade.Inner corner trim between the bottom plate 1 and the framed side wallboard 2 Place is provided with arc angling, and the arc angling pours shaping using the cement mortar of high intensity.It is pasted with the arc angling SBS additional waterproof courses, further to increase waterproof effect.After the bottom plate 1 and 4 pieces of framed side wallboards 2 splice, the bottom plate 1 and 4 pieces The outer surface of framed side wallboard 2 is pasted with SBS waterproof rolls, and water-proofing treatment is carried out again.The shaft-like built-in fitting 3 of antirust is antirust steel Muscle or stainless steel solid rod, and antirust reinforcing bar or stainless steel solid rod surface are by frosting treatment, to increase antirust when ensureing and installing Reinforcing bar or stainless steel solid rod and the frictional force assigned between hole 4 of the bottom surface of framed side wallboard 2.
Certainly, 2 pieces of adjacent framed side wallboards 2 can also be designed to that 2 pieces of L-type framed side wallboards are spelled mutually by 4 pieces of framed side wallboards 2 Connect, be not particularly limited herein, these equally fall within protection scope of the present invention.
It cannot make out in summary, this prefabricated assembled elevator basis is to build traditional brick fetal membrane by laying bricks or stones, reinforcing bar colligation, Concrete pouring construction, makes prefabrication structural slab into, and fabricated structure can equally solve the waterproof problem between gap, its Modern design, rationally, scene splicing is easy for installation for topology layout, and the time that disturbs residents of constructing is few.It was verified that this is prefabricated assembled Elevator basis effect in practical application is very good, can complete within one day during installation, greatly shorten the engineering time, save Many costs of labor.
Above-described is only a kind of basic preferred embodiment of prefabricated assembled elevator of the present invention, it is noted that right For one of ordinary skill in the art, without departing from the concept of the premise of the invention, some deformations can also be made And improvement, these belong to protection scope of the present invention.

Claims (6)

1. a kind of prefabricated assembled elevator basis, it is characterised in that including bottom plate and 4 pieces of framed side wallboards, the plate top surface is close Edge is installed with the two shaft-like built-in fittings of row's antirust vertically upward, and the shaft-like built-in fitting exposed junction of antirust is set up, institute State framed side wallboard bottom surface and be reserved with two rows and assign hole, it is described assign hole aperture and depth respectively with the shaft-like built-in fitting of the antirust Exposed junction diameter and height are adapted, and on every piece of framed side wallboard bottom surface two rows assign spacing between hole and position also respectively with Spacing and position between the shaft-like built-in fitting of row's antirust of one edge of bottom plate two is corresponding to the same;
During splicing, what the shaft-like built-in fitting exposed junction of antirust on the bottom plate inserted 4 pieces of framed side wallboard bottom surfaces respectively assigns hole In hole, and 4 pieces of framed side wallboards are fixed on to the top surface surrounding of the bottom plate;It is between the bottom plate and framed side wallboard and described adjacent Piece between framed side wallboard fills real using microdilatancy waterproof mortar, and it is swollen that chance water is fixed with the gap that outside is left after reality is filled Swollen bar;SBS waterproof rolls are finally pasted on the upstream face of spliced bottom plate and 4 pieces of framed side wallboards again.
2. a kind of prefabricated assembled elevator basis according to claim 1, it is characterised in that the bottom plate is reserved with and ground The piling hole that base piling is adapted, the tapered structure of piling hole, and be gradually reduced from bottom plate backwater towards upstream face.
3. a kind of prefabricated assembled elevator basis according to claim 2, it is characterised in that the bottom plate and the side wall Arc angling is provided with inner corner trim between plate, the arc angling pours shaping using the cement mortar of high intensity.
4. a kind of prefabricated assembled elevator basis according to claim 3, it is characterised in that pasted on the arc angling There are SBS additional waterproof courses.
5. a kind of prefabricated assembled elevator basis according to claim any one of 1-4, it is characterised in that the bottom plate and After 4 pieces of framed side wallboard splicings, the bottom plate and 4 pieces of framed side wallboard outer surfaces are pasted with SBS waterproof rolls.
6. a kind of prefabricated assembled elevator basis according to claim 5, it is characterised in that the shaft-like built-in fitting of antirust For antirust reinforcing bar or stainless steel solid rod, and antirust reinforcing bar or stainless steel solid rod surface are by frosting treatment.
CN201710586473.8A 2017-07-18 2017-07-18 A kind of prefabricated assembled elevator basis Pending CN107142956A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710586473.8A CN107142956A (en) 2017-07-18 2017-07-18 A kind of prefabricated assembled elevator basis

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710586473.8A CN107142956A (en) 2017-07-18 2017-07-18 A kind of prefabricated assembled elevator basis

Publications (1)

Publication Number Publication Date
CN107142956A true CN107142956A (en) 2017-09-08

Family

ID=59776184

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710586473.8A Pending CN107142956A (en) 2017-07-18 2017-07-18 A kind of prefabricated assembled elevator basis

Country Status (1)

Country Link
CN (1) CN107142956A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107882052A (en) * 2017-10-31 2018-04-06 万勇 A kind of prefabricated assembled sinking basis of additional building elevator
CN109811787A (en) * 2019-03-01 2019-05-28 北京筑福国际抗震技术有限责任公司 It is a kind of to use the additional elevator structure of pin-connected panel foundation precast elements and its construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204940328U (en) * 2015-07-17 2016-01-06 深圳供电规划设计院有限公司 A kind of mounted equipment basis
CN205576959U (en) * 2016-04-26 2016-09-14 杭州鲁创屋建材科技有限公司 Light -duty pottery glass siding wall and basic assembly component
CN106436893A (en) * 2016-11-11 2017-02-22 鹤壁东江建筑工业科技有限公司 Fully-prefabricated structure and construction method thereof
JP2017066631A (en) * 2015-09-28 2017-04-06 旭化成ホームズ株式会社 Knockdown form and extension method of anchor bolt of using the same
CN206916767U (en) * 2017-07-18 2018-01-23 王伟 A kind of prefabricated assembled elevator basis

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204940328U (en) * 2015-07-17 2016-01-06 深圳供电规划设计院有限公司 A kind of mounted equipment basis
JP2017066631A (en) * 2015-09-28 2017-04-06 旭化成ホームズ株式会社 Knockdown form and extension method of anchor bolt of using the same
CN205576959U (en) * 2016-04-26 2016-09-14 杭州鲁创屋建材科技有限公司 Light -duty pottery glass siding wall and basic assembly component
CN106436893A (en) * 2016-11-11 2017-02-22 鹤壁东江建筑工业科技有限公司 Fully-prefabricated structure and construction method thereof
CN206916767U (en) * 2017-07-18 2018-01-23 王伟 A kind of prefabricated assembled elevator basis

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107882052A (en) * 2017-10-31 2018-04-06 万勇 A kind of prefabricated assembled sinking basis of additional building elevator
CN107882052B (en) * 2017-10-31 2020-07-14 万勇 Prefabricated assembled foundation that sinks of plus building elevator
CN109811787A (en) * 2019-03-01 2019-05-28 北京筑福国际抗震技术有限责任公司 It is a kind of to use the additional elevator structure of pin-connected panel foundation precast elements and its construction method

Similar Documents

Publication Publication Date Title
CN105951880A (en) Assembled underground structure of precast concrete planks and construction method thereof
CN102587416B (en) Construction method of basement attached lane structure
CN103410332A (en) Concrete hollow block reinforced wall construction technology
CN107558603B (en) Assembled building structure system and construction method thereof
CN105569355B (en) It is a kind of to include the assembly method of prefabricated components modularization house
CN102116061A (en) Masonry construction method for filling wall core pillar, core girder and building blocks into framework structure
CN105862873A (en) Construction method of underground water prevention and exterior wall structures of narrow space of deep foundation pit
CN103046578A (en) Thin wall prefabricated superposed concrete underground continuous wall
CN110295700A (en) Assembled Sloping roof construction method
CN103306497B (en) Shock prevention and strengthening construction method for existing brickwork dwelling house fabricated structure
CN106894538A (en) Filling wall and agent structure concrete integral shaping method
CN105714849A (en) Reverse construction method for adjacent high and low floors (bays) of basement
CN206916767U (en) A kind of prefabricated assembled elevator basis
CN103821263A (en) Precast assembly self-heat preservation concrete shear wall system and construction method thereof
CN105780992A (en) Construction method of orthogonal and ortho-laid steel concrete vierendeel sandwich plate floor
CN107142956A (en) A kind of prefabricated assembled elevator basis
CN106284653A (en) The construction method that a kind of balcony construct capital interspaces in advance
CN207144012U (en) A kind of post-cast strip prefabricated board barricade
CN213174773U (en) Support system is exempted from to tear open type post-cast strip structure
CN203530958U (en) Thin-wall prefabricated overlapped concrete underground diaphragm wall
CN106193120B (en) Basement is encorbelmented, and bottom plate is inverse to make structure and construction method
CN207582763U (en) Two-way close spelling laminated floor slab connecting joint structure with groove type embedded part
RU55388U1 (en) SPATIAL REINFORCED CONCRETE FOUNDATION PLATFORM FOR SMALL-STOREY BUILDINGS FOR CONSTRUCTION IN SPECIAL GROUND CONDITIONS AND SEISMICITY IN ASSEMBLY AND MONOLITHIC OPTIONS
CN103015563B (en) Outer-block inner-masonry building structure system
CN103993672A (en) Tenon type connecting joint structure of low-rise fabricated composite wall house

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170908

WD01 Invention patent application deemed withdrawn after publication