The construction method of steel form fire wall Download PDFInfo
- Publication number
- CN104295102B CN104295102B CN201410590780.XA CN201410590780A CN104295102B CN 104295102 B CN104295102 B CN 104295102B CN 201410590780 A CN201410590780 A CN 201410590780A CN 104295102 B CN104295102 B CN 104295102B
- Authority
- CN
- China
- Prior art keywords
- fire wall
- steel form
- concrete
- template
- construction method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The present invention relates to the construction method of steel form fire wall, belong to construction method technical field.The construction method of steel form fire wall, comprise the following steps: (1) fire wall basis pours, carry out fire wall steel bar meter, reinforcing bar anchors in fire wall basis, after adhesion of tendon and muscle after injury lattice are tested in management, pours fire wall base concrete, photoelectric measuring level is used during concrete leveling, strict control base concrete surface smoothness, error is less than 2mm, meets levelness and perpendicularity requirement that steel form is installed.The construction method of the steel form fire wall of the present invention, has the advantage that steel form makes precision high, and template plate width is big, decreases the seam of template spelling, and piece is tight, and running pulp, spillage phenomenon will not occur.
Description
Technical field
The present invention relates to the construction method of steel form fire wall, belong to construction method technical field.
Background technology
It is high that normal wood template fire wall makes finished product, and the wasting of resources is big, and precision and presentation quality are poor, template spelling
Seam is many, piece imprecision, is susceptible to running pulp, spillage phenomenon.And plank sheathing strength of parts is relatively low, composite rigidity phase
To less, reinforcing difficulty greatly, template is easily deformed, and causes concrete topping uneven.The panel that additionally plank sheathing is combined into is put down
Face integral rigidity is told somebody what one's real intentions are, and panel combination becomes formwork load-bearing strength own little, and needs support is reinforced, and is not easy to entirety and hangs
Dress.Complicated construction technique, technique progress is relatively slow, and mechanized construction degree is relatively low, and labour intensity is big, and construction efficiency is low.Wood
The number of times that template uses is the fewest, has certain loss during processing, and strength of parts is low, poor durability, the number of turnover
Few.A set of plank sheathing and reinforced liner can only apply a transformer station, and construction cost increases.
Summary of the invention
It is an object of the invention to solve the weak point that above-mentioned prior art exists, it is provided that a kind of utilization rate is high, cost
Low, save that resource, body of wall precision is high, the construction method of the steel form fire wall of appearance looks elegant.
The present invention is achieved by the following technical solutions:
The construction method of steel form fire wall, it is characterized in that and comprises the following steps:
(1) fire wall basis pours
Carrying out fire wall steel bar meter, reinforcing bar anchors in fire wall basis, after adhesion of tendon and muscle after injury lattice are tested in management, pours the fire prevention wall base
Plinth concrete, uses photoelectric measuring level, strict control base concrete surface smoothness during concrete leveling, error is less than 2mm,
Meet levelness and perpendicularity requirement that steel form is installed;
(2) steel form installs
After steel form is polished with electric polishing machine, twice template of brush is cured, prevents concrete from pasting steel form, causes the demoulding
Rear clear-water concrete affects outward appearance, seals with plastic sealing strip, mortar leakage prevention at template interface;
Carry out concrete strength inspection with reisilometer, reach to carry out lower road work during load bearing stength until base concrete intensity
Sequence is constructed, and carries out unwrapping wire by design drawing, and when steel form is installed, the line of ink marker of template end opening alignment basis bullet above positions,
Behind location, assembly parts each to template are connected firmly, the levelness of laser leveler Control architecture, theodolite Control architecture vertical
Degree, two-sided reinforces simultaneously, and steel form is installed at twice, installs 3.1m for the first time, for the second time setting height(from bottom) 3.6m and bearing down on one, coagulation
Soil pours the most at twice;
Not in use by conventional steel fastener console mode scaffold, the Special support of steel form field processing and fabricating is directly used to add
Solid model plate, and erection construction operating platform, door-type scaffold coordinative construction.
(3) concreting and maintenance
After owner's representative in building site and supervisor's acceptance(check), prepare concreting, strictly control concrete matched
Ratio, in work progress, surface layer to be ensured is smooth, is strictly on guard against that leakage is shaken, owed to shake or cross to shake, prevents bubble and voids and pits phenomenon,
Fire wall pours at twice, and the height 3.1m of concreting for the first time, second time pours height 3.6m and fire wall bears down on one.Use
The mode of water seasoning, if special messenger waters, it is ensured that concrete keeps moistening.
(4) second segment model sheetinstallat concreting.
The construction method of the steel form fire wall of the present invention, has the advantage that
(1) steel form makes precision height, and template plate width is big, decreases the seam of template spelling, and piece is tight, will not occur
Running pulp, spillage phenomenon;
(2) steel form rigidity is big, is unlikely to deform, and it is convenient to reinforce, and the xoncrete structure size of template shaping is accurate, closely knit light
Clean;
(3) the panel plane integral rigidity that steel form is combined into is strong, and panel combination becomes formwork inherently supporting member, more can
Raising integral rigidity is easy to integral hoisting also can make supporting structure simplify.Construction technology is simple, and technique progress is fast, and mechanization is executed
Engineering degree is high, and labour intensity is low, accelerates construction speed, improves work efficiency 2 ~ 3 times;
(4) steel form absorption affinity is little, and the demoulding is easy, and concrete negative and positive rounding of angle angle is effective, surface smoothness, perpendicularity
Good, concrete uniform color, reach clear water concrete effect;
(5) processing of steel form factory prefabricating, material less investment, be lost less, and service life is long, and strength of parts is high, resistance to
Property is good for a long time, and the number of turnover is many.
Accompanying drawing explanation
The construction method block diagram of the steel form fire wall of Fig. 1: the present invention.
Detailed description of the invention
The detailed description of the invention of the present invention given below, is used for being described in further detail the composition of the present invention.
The construction method of steel form fire wall, comprises the following steps:
(1) fire wall basis pours
Carrying out fire wall steel bar meter, reinforcing bar anchors in fire wall basis, after adhesion of tendon and muscle after injury lattice are tested in management, pours the fire prevention wall base
Plinth concrete, uses photoelectric measuring level, strict control base concrete surface smoothness during concrete leveling, error is less than 2mm,
Meet levelness and perpendicularity requirement that steel form is installed;
(2) steel form installs
After steel form is polished with electric polishing machine, twice template of brush is cured, prevents concrete from pasting steel form, causes the demoulding
Rear clear-water concrete affects outward appearance, seals with plastic sealing strip, mortar leakage prevention at template interface;
Carry out concrete strength inspection with reisilometer, reach to carry out lower road during load bearing stength until base concrete intensity
Operation is constructed, and carries out unwrapping wire by design drawing, and when steel form is installed, it is fixed that the line of ink marker of template end opening alignment basis bullet above is carried out
Position, behind location, assembly parts each to template are connected firmly, the levelness of laser leveler Control architecture, hanging down of theodolite Control architecture
Straight degree, two-sided reinforces simultaneously, and steel form is installed at twice, installs 3.1m for the first time, for the second time setting height(from bottom) 3.6m and bearing down on one, mixed
Solidifying soil pours the most at twice;
Not in use by conventional steel fastener console mode scaffold, the Special support of steel form field processing and fabricating is directly used to add
Solid model plate, and erection construction operating platform, door-type scaffold coordinative construction.
(3) concreting and maintenance
After owner's representative in building site and supervisor's acceptance(check), prepare concreting, strictly control concrete matched
Ratio, in work progress, surface layer to be ensured is smooth, is strictly on guard against that leakage is shaken, owed to shake or cross to shake, prevents bubble and voids and pits phenomenon,
Fire wall pours at twice, and the height 3.1m of concreting for the first time, second time pours height 3.6m and fire wall bears down on one.Use
The mode of water seasoning, if special messenger waters, it is ensured that concrete keeps moistening.
(4) second segment model sheetinstallat concreting.
Depositing of template, it is desirable to job site is carried out rational deployment, cooks up large form storage area, and hangs label mark
Show.Template is stacked must be neat, must take anti-skidding, cold-proof, antifreezing measures during the sky construction of rainy day snow.To frost, sleet all should
Remove in time.Formwork hoisting to be assumed unified command of, and submits onself to someone's direction, and cooperates, it is ensured that safety construction.Form removable is complete
After, clear up mortar, brushing releasing agent in time, accessory is put in order.Avoid tired operation, stop potential safety hazard.
Answering construction party requirement to ensure template vertical lifting, two ends, template upper side frame frame hole are respectively arranged with under a frame hole
The pad of ¢ 18.5 circular hole is rushed, for formwork hoisting in the middle of portion's welding one.Add at 100mm below this frame hole
[8# channel-section steel, ¢ 18.5 circular hole is beaten on the edge of a wing, channel-section steel one end, it is ensured that hang down in the pad hole welded below with frame hole in weldering one
Directly, for Template Location.Another being welded with on these both sides, frame hole strengthens angle.
The R50mm chamfering answering construction party requirement body of wall surrounding is made of one with end mould template.This template in addition at circular arc also
There is decorative groove.End mould R50mm chamfering panel is concordant with template decorative groove collar extension.
Speed of perfusion controls within 1m/h.
Template is to the place of drawing, [beating pulling eye ¢ 16.5 circular hole at 10# channel-section steel web, it is right that 2.4 meters of long templates do three joints with single
Kerve steel, 0.3 meter of the short channel-section steel in two ends, there is the channel-section steel of 1 meter centre.
The processing of template and reinforcing mode are all designed by construction party requirement, at the scene according to existing during construction and by construction party
Field situation additional reinforcement.
Claims (1)
1. the construction method of steel form fire wall, it is characterised in that comprise the following steps:
(1) fire wall basis pours
Carrying out fire wall steel bar meter, reinforcing bar anchors in fire wall basis, after adhesion of tendon and muscle after injury lattice are tested in management, pours fire wall basis and mixes
Solidifying soil, uses photoelectric measuring level during concrete leveling, strict control base concrete surface smoothness, error is less than 2mm, meets
The levelness of steel form installation and perpendicularity requirement;
(2) steel form installs
After steel form is polished with electric polishing machine, twice template of brush is cured, prevents concrete from pasting steel form, clear after causing the demoulding
Water coagulation soil affects outward appearance, seals with plastic sealing strip, mortar leakage prevention at template interface;
Carry out concrete strength inspection with reisilometer, when base concrete intensity reaches energy load bearing stength, carry out next procedure execute
Work, carries out unwrapping wire by design drawing, and when steel form is installed, the line of ink marker of template end opening alignment basis bullet above positions, location
Assembly parts each to template are connected firmly afterwards, the levelness of laser leveler Control architecture, and the perpendicularity of theodolite Control architecture is double
Face reinforces simultaneously, and steel form is installed at twice, installs for the first time 3.1m, for the second time setting height(from bottom) 3.6m and bearing down on one, concrete with
Sample pours at twice;
Not in use by conventional steel fastener console mode scaffold, the Special support of steel form field processing and fabricating is directly used to add solid model
Plate, and erection construction operating platform, door-type scaffold coordinative construction;
(3) concreting and maintenance
After owner's representative in building site and supervisor's acceptance(check), prepare concreting, strictly control concrete proportioning, execute
During work, surface layer to be ensured is smooth, is strictly on guard against that leakage is shaken, owed to shake or cross to shake, prevents bubble and voids and pits phenomenon, fire wall
Pouring at twice, the height 3.1m of concreting for the first time, second time pours height 3.6m and fire wall bears down on one;
Use the mode of water seasoning, if special messenger waters, it is ensured that concrete keeps moistening;
(4) second segment model sheetinstallat concreting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410590780.XA CN104295102B (en) | 2014-10-29 | 2014-10-29 | The construction method of steel form fire wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410590780.XA CN104295102B (en) | 2014-10-29 | 2014-10-29 | The construction method of steel form fire wall |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104295102A CN104295102A (en) | 2015-01-21 |
CN104295102B true CN104295102B (en) | 2016-07-06 |
Family
ID=52315025
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410590780.XA Active CN104295102B (en) | 2014-10-29 | 2014-10-29 | The construction method of steel form fire wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104295102B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109208891A (en) * | 2018-10-12 | 2019-01-15 | 四川西南新科电力有限公司 | A kind of transformer station's body of wall combined steel and its construction method |
CN112064825B (en) * | 2020-07-24 | 2021-09-28 | 安徽同济建设集团有限责任公司 | Construction method of basement stair firewall |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2373259B (en) * | 2001-02-09 | 2004-04-28 | C A Group Ltd | Apparatus for constructing a firewall, and firewall incorporating such apparatus |
US20060042874A1 (en) * | 2004-08-24 | 2006-03-02 | Matthew Foster | Acoustical and firewall barrier assembly |
CN101906877A (en) * | 2010-07-20 | 2010-12-08 | 天津二十冶建设有限公司 | Method for construction of concrete wall by steel mould |
CN102767281A (en) * | 2012-07-18 | 2012-11-07 | 山东电力建设第二工程公司 | Construction method and device for concrete fire wall |
-
2014
- 2014-10-29 CN CN201410590780.XA patent/CN104295102B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN104295102A (en) | 2015-01-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204370615U (en) | The connected node of assembling combined wall board and girder steel constructs | |
CN106677440A (en) | Roofing parapet water-floating structure and construction method thereof | |
CN106481090B (en) | A kind of Shockproof reinforcing method of existing reinforced concrete concrete frame joint | |
CN105696744B (en) | Steam-pressing aero-concrete integral wall and its production technology | |
CN104947719A (en) | Basement roof post-cast strip hanging support formwork structure and post-cast strip construction method thereof | |
CN104295102B (en) | The construction method of steel form fire wall | |
CN109024987A (en) | Construction method is poured after a kind of toilet shear wall | |
CN107975651A (en) | A kind of method of floor pipeline quick blocking | |
CN209040349U (en) | A kind of ring muscle fastening shear wall structure being easily installed | |
CN109610509A (en) | A kind of the adjustable die system and construction method of pipe gallery automatic control section | |
CN208441370U (en) | One kind being used for parapet of roofing flashing GRC decorative panel and its mounting structure | |
CN205714221U (en) | A kind of Tunnel Second Lining vault is owed to dig place's teeming building structure | |
CN109869153A (en) | The whole of rapid construction vertical shaft lining cutting promotes cantilever form device and construction method | |
CN209603182U (en) | A kind of adjustable die system of pipe gallery automatic control section | |
CN109469204A (en) | Assembled steel reinforced concrete combination frame structure and construction method based on composite beam | |
CN205502366U (en) | Evaporate and press whole wallboard of aerated concrete | |
CN206873914U (en) | A kind of assembly concrete shear wall structure dedicated aluminium alloy template | |
CN105386447A (en) | Construction method for replacement support of post-cast strip in construction site | |
CN105421780B (en) | A kind of construction method of prefabricated concrete structure | |
CN108396900A (en) | A kind of double Shell roof boarding and its construction method | |
CN108412143A (en) | Standard decoration hollow body railing and its construction method after a kind of | |
CN208702139U (en) | A kind of construction template structure of toilet wall | |
CN208201563U (en) | Permeable pavement skeleton and the porous pavement being laid with using the permeable pavement skeleton | |
CN108081448B (en) | Production process of integrally decorated and electromechanical prefabricated GRC formwork structural column | |
CN206681753U (en) | The small abutment wall longitudinal direction construction joint spillage plugging structure of tunnel double-lining |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Miao E Inventor after: Zheng Lei Inventor before: Miao E |
|
COR | Change of bibliographic data | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20170726 Address after: 519000 Guangdong province Zhuhai Jida Ji Shi Road No. 4 Patentee after: Zhuhai Jianan Group Co., Ltd. Address before: 264003 Yantai high tech Zone, China Agricultural University, Shandong (Yantai campus) Patentee before: Miao E |
|
TR01 | Transfer of patent right |