CN104295102B CN201410590780.XA CN201410590780A CN104295102B CN 104295102 B CN104295102 B CN 104295102B CN 201410590780 A CN201410590780 A CN 201410590780A CN 104295102 B CN104295102 B CN 104295102B
Authority
CN
China
Prior art keywords
fire wall
steel form
concrete
template
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410590780.XA
Other languages
Chinese (zh)
Other versions
CN104295102A (en
Inventor
苗娥
郑雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuhai Jianan Group Co., Ltd.
Original Assignee
苗娥
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 苗娥 filed Critical 苗娥
Priority to CN201410590780.XA priority Critical patent/CN104295102B/en
Publication of CN104295102A publication Critical patent/CN104295102A/en
Application granted granted Critical
Publication of CN104295102B publication Critical patent/CN104295102B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to the construction method of steel form fire wall, belong to construction method technical field.The construction method of steel form fire wall, comprise the following steps: (1) fire wall basis pours, carry out fire wall steel bar meter, reinforcing bar anchors in fire wall basis, after adhesion of tendon and muscle after injury lattice are tested in management, pours fire wall base concrete, photoelectric measuring level is used during concrete leveling, strict control base concrete surface smoothness, error is less than 2mm, meets levelness and perpendicularity requirement that steel form is installed.The construction method of the steel form fire wall of the present invention, has the advantage that steel form makes precision high, and template plate width is big, decreases the seam of template spelling, and piece is tight, and running pulp, spillage phenomenon will not occur.

Description

The construction method of steel form fire wall
Technical field
The present invention relates to the construction method of steel form fire wall, belong to construction method technical field.
Background technology
It is high that normal wood template fire wall makes finished product, and the wasting of resources is big, and precision and presentation quality are poor, template spelling Seam is many, piece imprecision, is susceptible to running pulp, spillage phenomenon.And plank sheathing strength of parts is relatively low, composite rigidity phase To less, reinforcing difficulty greatly, template is easily deformed, and causes concrete topping uneven.The panel that additionally plank sheathing is combined into is put down Face integral rigidity is told somebody what one's real intentions are, and panel combination becomes formwork load-bearing strength own little, and needs support is reinforced, and is not easy to entirety and hangs Dress.Complicated construction technique, technique progress is relatively slow, and mechanized construction degree is relatively low, and labour intensity is big, and construction efficiency is low.Wood The number of times that template uses is the fewest, has certain loss during processing, and strength of parts is low, poor durability, the number of turnover Few.A set of plank sheathing and reinforced liner can only apply a transformer station, and construction cost increases.
Summary of the invention
It is an object of the invention to solve the weak point that above-mentioned prior art exists, it is provided that a kind of utilization rate is high, cost Low, save that resource, body of wall precision is high, the construction method of the steel form fire wall of appearance looks elegant.
The present invention is achieved by the following technical solutions:
The construction method of steel form fire wall, it is characterized in that and comprises the following steps:
(1) fire wall basis pours
Carrying out fire wall steel bar meter, reinforcing bar anchors in fire wall basis, after adhesion of tendon and muscle after injury lattice are tested in management, pours the fire prevention wall base Plinth concrete, uses photoelectric measuring level, strict control base concrete surface smoothness during concrete leveling, error is less than 2mm, Meet levelness and perpendicularity requirement that steel form is installed;
(2) steel form installs
After steel form is polished with electric polishing machine, twice template of brush is cured, prevents concrete from pasting steel form, causes the demoulding Rear clear-water concrete affects outward appearance, seals with plastic sealing strip, mortar leakage prevention at template interface;
Carry out concrete strength inspection with reisilometer, reach to carry out lower road work during load bearing stength until base concrete intensity Sequence is constructed, and carries out unwrapping wire by design drawing, and when steel form is installed, the line of ink marker of template end opening alignment basis bullet above positions, Behind location, assembly parts each to template are connected firmly, the levelness of laser leveler Control architecture, theodolite Control architecture vertical Degree, two-sided reinforces simultaneously, and steel form is installed at twice, installs 3.1m for the first time, for the second time setting height(from bottom) 3.6m and bearing down on one, coagulation Soil pours the most at twice;
Not in use by conventional steel fastener console mode scaffold, the Special support of steel form field processing and fabricating is directly used to add Solid model plate, and erection construction operating platform, door-type scaffold coordinative construction.
(3) concreting and maintenance
After owner's representative in building site and supervisor's acceptance(check), prepare concreting, strictly control concrete matched Ratio, in work progress, surface layer to be ensured is smooth, is strictly on guard against that leakage is shaken, owed to shake or cross to shake, prevents bubble and voids and pits phenomenon, Fire wall pours at twice, and the height 3.1m of concreting for the first time, second time pours height 3.6m and fire wall bears down on one.Use The mode of water seasoning, if special messenger waters, it is ensured that concrete keeps moistening.
(4) second segment model sheetinstallat concreting.
The construction method of the steel form fire wall of the present invention, has the advantage that
(1) steel form makes precision height, and template plate width is big, decreases the seam of template spelling, and piece is tight, will not occur Running pulp, spillage phenomenon;
(2) steel form rigidity is big, is unlikely to deform, and it is convenient to reinforce, and the xoncrete structure size of template shaping is accurate, closely knit light Clean;
(3) the panel plane integral rigidity that steel form is combined into is strong, and panel combination becomes formwork inherently supporting member, more can Raising integral rigidity is easy to integral hoisting also can make supporting structure simplify.Construction technology is simple, and technique progress is fast, and mechanization is executed Engineering degree is high, and labour intensity is low, accelerates construction speed, improves work efficiency 2 ~ 3 times;
(4) steel form absorption affinity is little, and the demoulding is easy, and concrete negative and positive rounding of angle angle is effective, surface smoothness, perpendicularity Good, concrete uniform color, reach clear water concrete effect;
(5) processing of steel form factory prefabricating, material less investment, be lost less, and service life is long, and strength of parts is high, resistance to Property is good for a long time, and the number of turnover is many.
Accompanying drawing explanation
The construction method block diagram of the steel form fire wall of Fig. 1: the present invention.
Detailed description of the invention
The detailed description of the invention of the present invention given below, is used for being described in further detail the composition of the present invention.
The construction method of steel form fire wall, comprises the following steps:
(1) fire wall basis pours
Carrying out fire wall steel bar meter, reinforcing bar anchors in fire wall basis, after adhesion of tendon and muscle after injury lattice are tested in management, pours the fire prevention wall base Plinth concrete, uses photoelectric measuring level, strict control base concrete surface smoothness during concrete leveling, error is less than 2mm, Meet levelness and perpendicularity requirement that steel form is installed;
(2) steel form installs
After steel form is polished with electric polishing machine, twice template of brush is cured, prevents concrete from pasting steel form, causes the demoulding Rear clear-water concrete affects outward appearance, seals with plastic sealing strip, mortar leakage prevention at template interface;
Carry out concrete strength inspection with reisilometer, reach to carry out lower road during load bearing stength until base concrete intensity Operation is constructed, and carries out unwrapping wire by design drawing, and when steel form is installed, it is fixed that the line of ink marker of template end opening alignment basis bullet above is carried out Position, behind location, assembly parts each to template are connected firmly, the levelness of laser leveler Control architecture, hanging down of theodolite Control architecture Straight degree, two-sided reinforces simultaneously, and steel form is installed at twice, installs 3.1m for the first time, for the second time setting height(from bottom) 3.6m and bearing down on one, mixed Solidifying soil pours the most at twice;
Not in use by conventional steel fastener console mode scaffold, the Special support of steel form field processing and fabricating is directly used to add Solid model plate, and erection construction operating platform, door-type scaffold coordinative construction.
(3) concreting and maintenance
After owner's representative in building site and supervisor's acceptance(check), prepare concreting, strictly control concrete matched Ratio, in work progress, surface layer to be ensured is smooth, is strictly on guard against that leakage is shaken, owed to shake or cross to shake, prevents bubble and voids and pits phenomenon, Fire wall pours at twice, and the height 3.1m of concreting for the first time, second time pours height 3.6m and fire wall bears down on one.Use The mode of water seasoning, if special messenger waters, it is ensured that concrete keeps moistening.
(4) second segment model sheetinstallat concreting.
Depositing of template, it is desirable to job site is carried out rational deployment, cooks up large form storage area, and hangs label mark Show.Template is stacked must be neat, must take anti-skidding, cold-proof, antifreezing measures during the sky construction of rainy day snow.To frost, sleet all should Remove in time.Formwork hoisting to be assumed unified command of, and submits onself to someone's direction, and cooperates, it is ensured that safety construction.Form removable is complete After, clear up mortar, brushing releasing agent in time, accessory is put in order.Avoid tired operation, stop potential safety hazard.
Answering construction party requirement to ensure template vertical lifting, two ends, template upper side frame frame hole are respectively arranged with under a frame hole
The pad of ¢ 18.5 circular hole is rushed, for formwork hoisting in the middle of portion's welding one.Add at 100mm below this frame hole
[8# channel-section steel, ¢ 18.5 circular hole is beaten on the edge of a wing, channel-section steel one end, it is ensured that hang down in the pad hole welded below with frame hole in weldering one
Directly, for Template Location.Another being welded with on these both sides, frame hole strengthens angle.
The R50mm chamfering answering construction party requirement body of wall surrounding is made of one with end mould template.This template in addition at circular arc also There is decorative groove.End mould R50mm chamfering panel is concordant with template decorative groove collar extension.
Speed of perfusion controls within 1m/h.
Template is to the place of drawing, [beating pulling eye ¢ 16.5 circular hole at 10# channel-section steel web, it is right that 2.4 meters of long templates do three joints with single Kerve steel, 0.3 meter of the short channel-section steel in two ends, there is the channel-section steel of 1 meter centre.
The processing of template and reinforcing mode are all designed by construction party requirement, at the scene according to existing during construction and by construction party Field situation additional reinforcement.

Claims (1)

1. the construction method of steel form fire wall, it is characterised in that comprise the following steps:
(1) fire wall basis pours
Carrying out fire wall steel bar meter, reinforcing bar anchors in fire wall basis, after adhesion of tendon and muscle after injury lattice are tested in management, pours fire wall basis and mixes Solidifying soil, uses photoelectric measuring level during concrete leveling, strict control base concrete surface smoothness, error is less than 2mm, meets The levelness of steel form installation and perpendicularity requirement;
(2) steel form installs
After steel form is polished with electric polishing machine, twice template of brush is cured, prevents concrete from pasting steel form, clear after causing the demoulding Water coagulation soil affects outward appearance, seals with plastic sealing strip, mortar leakage prevention at template interface;
Carry out concrete strength inspection with reisilometer, when base concrete intensity reaches energy load bearing stength, carry out next procedure execute Work, carries out unwrapping wire by design drawing, and when steel form is installed, the line of ink marker of template end opening alignment basis bullet above positions, location Assembly parts each to template are connected firmly afterwards, the levelness of laser leveler Control architecture, and the perpendicularity of theodolite Control architecture is double Face reinforces simultaneously, and steel form is installed at twice, installs for the first time 3.1m, for the second time setting height(from bottom) 3.6m and bearing down on one, concrete with Sample pours at twice;
Not in use by conventional steel fastener console mode scaffold, the Special support of steel form field processing and fabricating is directly used to add solid model Plate, and erection construction operating platform, door-type scaffold coordinative construction;
(3) concreting and maintenance
After owner's representative in building site and supervisor's acceptance(check), prepare concreting, strictly control concrete proportioning, execute During work, surface layer to be ensured is smooth, is strictly on guard against that leakage is shaken, owed to shake or cross to shake, prevents bubble and voids and pits phenomenon, fire wall Pouring at twice, the height 3.1m of concreting for the first time, second time pours height 3.6m and fire wall bears down on one;
Use the mode of water seasoning, if special messenger waters, it is ensured that concrete keeps moistening;
(4) second segment model sheetinstallat concreting.
CN201410590780.XA 2014-10-29 2014-10-29 The construction method of steel form fire wall Active CN104295102B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410590780.XA CN104295102B (en) 2014-10-29 2014-10-29 The construction method of steel form fire wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410590780.XA CN104295102B (en) 2014-10-29 2014-10-29 The construction method of steel form fire wall

Publications (2)

Publication Number Publication Date
CN104295102A CN104295102A (en) 2015-01-21
CN104295102B true CN104295102B (en) 2016-07-06

Family

ID=52315025

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410590780.XA Active CN104295102B (en) 2014-10-29 2014-10-29 The construction method of steel form fire wall

Country Status (1)

Country Link
CN (1) CN104295102B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109208891A (en) * 2018-10-12 2019-01-15 四川西南新科电力有限公司 A kind of transformer station's body of wall combined steel and its construction method
CN112064825B (en) * 2020-07-24 2021-09-28 安徽同济建设集团有限责任公司 Construction method of basement stair firewall

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2373259B (en) * 2001-02-09 2004-04-28 C A Group Ltd Apparatus for constructing a firewall, and firewall incorporating such apparatus
US20060042874A1 (en) * 2004-08-24 2006-03-02 Matthew Foster Acoustical and firewall barrier assembly
CN101906877A (en) * 2010-07-20 2010-12-08 天津二十冶建设有限公司 Method for construction of concrete wall by steel mould
CN102767281A (en) * 2012-07-18 2012-11-07 山东电力建设第二工程公司 Construction method and device for concrete fire wall

Also Published As

Publication number Publication date
CN104295102A (en) 2015-01-21

Similar Documents

Publication Publication Date Title
CN204370615U (en) The connected node of assembling combined wall board and girder steel constructs
CN106677440A (en) Roofing parapet water-floating structure and construction method thereof
CN106481090B (en) A kind of Shockproof reinforcing method of existing reinforced concrete concrete frame joint
CN105696744B (en) Steam-pressing aero-concrete integral wall and its production technology
CN104947719A (en) Basement roof post-cast strip hanging support formwork structure and post-cast strip construction method thereof
CN104295102B (en) The construction method of steel form fire wall
CN109024987A (en) Construction method is poured after a kind of toilet shear wall
CN107975651A (en) A kind of method of floor pipeline quick blocking
CN209040349U (en) A kind of ring muscle fastening shear wall structure being easily installed
CN109610509A (en) A kind of the adjustable die system and construction method of pipe gallery automatic control section
CN208441370U (en) One kind being used for parapet of roofing flashing GRC decorative panel and its mounting structure
CN205714221U (en) A kind of Tunnel Second Lining vault is owed to dig place's teeming building structure
CN109869153A (en) The whole of rapid construction vertical shaft lining cutting promotes cantilever form device and construction method
CN209603182U (en) A kind of adjustable die system of pipe gallery automatic control section
CN109469204A (en) Assembled steel reinforced concrete combination frame structure and construction method based on composite beam
CN205502366U (en) Evaporate and press whole wallboard of aerated concrete
CN206873914U (en) A kind of assembly concrete shear wall structure dedicated aluminium alloy template
CN105386447A (en) Construction method for replacement support of post-cast strip in construction site
CN105421780B (en) A kind of construction method of prefabricated concrete structure
CN108396900A (en) A kind of double Shell roof boarding and its construction method
CN108412143A (en) Standard decoration hollow body railing and its construction method after a kind of
CN208702139U (en) A kind of construction template structure of toilet wall
CN208201563U (en) Permeable pavement skeleton and the porous pavement being laid with using the permeable pavement skeleton
CN108081448B (en) Production process of integrally decorated and electromechanical prefabricated GRC formwork structural column
CN206681753U (en) The small abutment wall longitudinal direction construction joint spillage plugging structure of tunnel double-lining

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Miao E

Inventor after: Zheng Lei

Inventor before: Miao E

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20170726

Address after: 519000 Guangdong province Zhuhai Jida Ji Shi Road No. 4

Patentee after: Zhuhai Jianan Group Co., Ltd.

Address before: 264003 Yantai high tech Zone, China Agricultural University, Shandong (Yantai campus)

Patentee before: Miao E

TR01 Transfer of patent right