CN205714221U - A kind of Tunnel Second Lining vault is owed to dig place's teeming building structure - Google Patents
A kind of Tunnel Second Lining vault is owed to dig place's teeming building structure Download PDFInfo
- Publication number
- CN205714221U CN205714221U CN201620535197.3U CN201620535197U CN205714221U CN 205714221 U CN205714221 U CN 205714221U CN 201620535197 U CN201620535197 U CN 201620535197U CN 205714221 U CN205714221 U CN 205714221U
- Authority
- CN
- China
- Prior art keywords
- groove
- template
- place
- owed
- pour
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
nullThis utility model relates to a kind of Tunnel Second Lining vault and owes to dig place's teeming building structure,Can effectively solve the problem that the place's of digging casting concrete again owed by vault,Technical scheme is,Including being arranged on the preliminary bracing on country rock surface and being arranged on the secondary lining on preliminary bracing surface,What secondary lining owed that the place of digging has a lower openings pours groove,Pour big up and small down trapezoidal in the cross section of groove,Its infraoral is coated with the template for sealing,Hollow bolt it is provided with in template,Hollow bolt one end is stretched out outside template,The other end stretches into and pours groove and link together with country rock after preliminary bracing,Pour have on the secondary lining at place, groove inclined-plane with pour that groove is connected pour passage,Pour and on the hollow bolt sidewall of groove tip position, have inside and outside through injected hole,This utility model structure hollow anchor pole is as can be used for again reinforcing template while reinforcement,Simultaneously as slip casting passage,Again the concrete compaction after pouring、Without cavity,Reach design strength.
Description
Technical field
This utility model relates to tunnel concrete pouring structure, and particularly a kind of Tunnel Second Lining vault is owed to dig place's teeming
Building structure.
Background technology
At present secondary lining (being called for short two linings) vault owes to dig needs when cutting again casting concrete, concrete chisel removal pattern
The most arbitrarily, vault is the highest, utilizes heavy chassis to support, reserve edge one during casting concrete during formwork reinforcement
Block template is not first installed, and after the concreting at other templates is good, at residue, concrete can only be manually put in by concrete
In template, then lift template and concrete is pressed into two lining gaps.Owing to being vault, masterplate is reinforced to be needed to utilize private station
The steel pipe scaffold system of car or reinforcing shores reinforcing template, and this reinforcement process is set up the most additional due to needs
System and expend substantial amounts of human and material resources, construction period is the longest.One piece of template must be reserved during casting concrete and pour coagulation
Soil, is easily caused concrete leakiness, does not reaches design strength, even causes cavity, does not reaches renovating effect.Therefore, it changes
Enter and innovate imperative.
Summary of the invention
For above-mentioned situation, for overcoming the defect of prior art, the purpose of this utility model is just to provide a kind of tunnel two
Secondary lining cutting vault is owed to dig place's teeming building structure, can effectively solve the problem that the place's of digging casting concrete again owed by vault.
The technical scheme that this utility model solves is, a kind of Tunnel Second Lining vault is owed to dig place's teeming building structure, including
Being arranged on the preliminary bracing on country rock surface and be arranged on the secondary lining on preliminary bracing surface, secondary lining is owed the place of digging and is had bottom
Opening pour groove, pour big up and small down trapezoidal in the cross section of groove, its infraoral is coated with the template for sealing, in template
Being provided with hollow bolt, hollow bolt one end is stretched out outside template, the other end stretch into pour groove and through after preliminary bracing with enclose
Rock links together, pour have on the secondary lining at place, groove inclined-plane with pour that groove is connected pour passage, pour groove top
Inside and outside through injected hole is had on the hollow bolt sidewall of position, portion.
This utility model novel structure is unique, and advantages of simple easily operates, safe and reliable, time saving and energy saving, hollow bolt conduct
Can be used for again reinforcing template while reinforcement, simultaneously as slip casting passage, concrete compaction, nothing after again pouring are empty,
Reach design strength, easy to use, effective, it is the innovation on tunnel concrete pouring structure.
Accompanying drawing explanation
Fig. 1 is sectional view of the present utility model.
Fig. 2 is upward view of the present utility model.
Fig. 3 is the use state diagram after this utility model casting concrete.
Detailed description of the invention
Below in conjunction with accompanying drawing, detailed description of the invention of the present utility model is described in further detail.
Being given by Fig. 1 to Fig. 3, this utility model includes that the preliminary bracing 2 being arranged on country rock 3 surface and the initial stage that is arranged on prop up
Protecting the secondary lining 1 on surface, what secondary lining 1 owed that the place of digging has a lower openings pours groove 4, pour the cross section of groove 4 present big under
Little is trapezoidal, and its infraoral is coated with the template 7 for sealing, and template 7 is provided with hollow bolt 6, and hollow bolt 6 one end is stretched
Going out outside template, the other end stretches into and pours groove and link together with country rock 3 after preliminary bracing 2, pours place, groove 4 inclined-plane
Secondary lining on have with pour that groove is connected pour passage 11, pour and have on the hollow bolt sidewall of groove tip position
Inside and outside through injected hole 6a.
For ensureing using effect, the outer surface of described template 7 is provided with steel pipe 8 in hollow bolt 6 both sides, and steel pipe 8 leads to
Crossing the butterfly card 9 being contained in successively on hollow bolt and clamp nut 10 is pressed on template outer surface, the reassembling type constituting template is solid
Fixed structure;
Being provided with grouted anchor bar 5 in described template 7, grouted anchor bar one end is stretched out outside template, and the other end stretches into and pours
Groove also links together with country rock 3 after preliminary bracing 2;
The outer surface of described template 7 is provided with steel pipe in grouted anchor bar both sides, and steel pipe is by being contained in grouted anchor bar successively
On butterfly card and clamp nut be pressed on template outer surface, constitute the reassembling type fixed structure of template;
The described angle pouring groove 4 hypotenuse and preliminary bracing surface is 55-65 °.
When this utility model uses, cut concrete owing the place of digging, then cut and invade the country rock that two shirt portion are divided, make this portion
Point constitute and up big and down small trapezoidal to pour groove, i.e. breach answers inner wide and outer narrow, pours and digs one on the secondary lining at place, groove inclined-plane
With pour that groove is connected pour passage, pour the square opening that passage is 10cm × 10cm, the finishing of square opening mouth rim is concordant,
Smoother, wall dabbing, then bore one to one by the position of hollow bolt and grouted anchor bar at the country rock pouring groove place
Eye, then installs hollow bolt, and at the injected hole 6a through inside and outside the position of preliminary bracing cuts one of hollow bolt,
Being used as the grouting in later stage, grouting rock bolt, then installation form are installed in both sides, and template covers the infraoral pouring groove, mould
Plate utilizes mounted anchor pole when reinforcing, then carry out conventional reinforcing by butterfly card, nut, steel pipe.Pass through after installing
Pour passage and carry out casting concrete, when finally pouring concrete at reserved passageway, owing to amount of concrete is few, concrete is put
In the template corresponding with pouring channel portal, then lift this template and concrete is pressed into gap, last fixed form,
Completing to seal, concrete strength utilizes hollow bolt after reaching design strength form removal, to Concrete Filled slip casting, finally will
The anchor pole cutting exposing concrete surface is smooth, as it is shown on figure 3, reference 12 is the concrete poured in figure.
Compared with prior art, this utility model novel structure is unique, and advantages of simple easily operates, safe and reliable, time saving and energy saving, pours
Groove is big up and small down, and hypotenuse plays the effect of lifting, and hollow bolt, as can be used for again reinforcing template while reinforcement, is made simultaneously
For slip casting passage, the concrete compaction after again pouring, nothing cavity, reach design strength, easy to use, effective, it is tunnel
Innovation on concrete pouring structure.
Claims (5)
1. Tunnel Second Lining vault is owed to dig place's teeming building structure, including the preliminary bracing (2) being arranged on country rock (3) surface
With the secondary lining (1) being arranged on preliminary bracing surface, it is characterised in that secondary lining (1) is owed the place of digging and had lower openings
Pouring groove (4), pour big up and small down trapezoidal in the cross section of groove (4), its infraoral is coated with the template (7) for sealing, mould
Being provided with hollow bolt (6) on plate (7), hollow bolt (6) one end is stretched out outside template, and the other end stretches into and pours groove and through just
Phase supporting (2) links together with country rock (3) afterwards, pours and has on the secondary lining at groove (4) place, inclined-plane and pour groove and be connected
Logical pours passage (11), pours and has inside and outside through injected hole (6a) on the hollow bolt sidewall of groove tip position.
Tunnel Second Lining vault the most according to claim 1 is owed to dig place's teeming building structure, it is characterised in that described mould
The outer surface of plate (7) is provided with steel pipe (8) in hollow bolt (6) both sides, and steel pipe (8) is by the butterfly being contained on hollow bolt successively
Butterfly card (9) and clamp nut (10) are pressed on template outer surface, constitute the reassembling type fixed structure of template.
Tunnel Second Lining vault the most according to claim 1 is owed to dig place's teeming building structure, it is characterised in that described mould
Being provided with grouted anchor bar (5) on plate (7), grouted anchor bar one end is stretched out outside template, and the other end stretches into and pours groove and through the initial stage
Supporting (2) links together with country rock (3) afterwards.
Tunnel Second Lining vault the most according to claim 3 is owed to dig place's teeming building structure, it is characterised in that described mould
The outer surface of plate (7) is provided with steel pipe in grouted anchor bar both sides, and steel pipe is blocked and tight by the butterfly being contained on grouted anchor bar successively
Gu nut is pressed on template outer surface, constitute the reassembling type fixed structure of template.
Tunnel Second Lining vault the most according to claim 1 is owed to dig place's teeming building structure, it is characterised in that described waters
The angle building groove (4) hypotenuse and preliminary bracing surface is 55-65 °.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620535197.3U CN205714221U (en) | 2016-05-30 | 2016-05-30 | A kind of Tunnel Second Lining vault is owed to dig place's teeming building structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620535197.3U CN205714221U (en) | 2016-05-30 | 2016-05-30 | A kind of Tunnel Second Lining vault is owed to dig place's teeming building structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205714221U true CN205714221U (en) | 2016-11-23 |
Family
ID=57301025
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620535197.3U Expired - Fee Related CN205714221U (en) | 2016-05-30 | 2016-05-30 | A kind of Tunnel Second Lining vault is owed to dig place's teeming building structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205714221U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106522992A (en) * | 2016-11-24 | 2017-03-22 | 中铁隧道集团有限公司 | Concrete lining formwork trolley insertion-type concrete grouting construction method |
CN113338995A (en) * | 2021-05-31 | 2021-09-03 | 北京鸿锐嘉科技发展有限公司 | Anchor rod grouting construction method for existing tunnel |
CN113565465A (en) * | 2021-07-19 | 2021-10-29 | 中铁十九局集团第六工程有限公司 | Filling and pouring device for lining coring hole and construction method thereof |
-
2016
- 2016-05-30 CN CN201620535197.3U patent/CN205714221U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106522992A (en) * | 2016-11-24 | 2017-03-22 | 中铁隧道集团有限公司 | Concrete lining formwork trolley insertion-type concrete grouting construction method |
CN113338995A (en) * | 2021-05-31 | 2021-09-03 | 北京鸿锐嘉科技发展有限公司 | Anchor rod grouting construction method for existing tunnel |
CN113565465A (en) * | 2021-07-19 | 2021-10-29 | 中铁十九局集团第六工程有限公司 | Filling and pouring device for lining coring hole and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209145035U (en) | The node structure blocked when for being in the milk at assembled architecture shear wall installation seam | |
CN207739264U (en) | A kind of Grouting Pipe | |
CN205714221U (en) | A kind of Tunnel Second Lining vault is owed to dig place's teeming building structure | |
CN103726503B (en) | Anchor rod pile reinforcing bearing platform structure used for reinforcing deformed bridge pile and construction method thereof | |
CN103498486B (en) | A kind of sleeve pipe that adopts implements the method for shutoff to ater-casting precipitation pipe well | |
CN208981531U (en) | A kind of prefabricated assembled parapet connection structure | |
CN111119928B (en) | Novel tunnel primary support structure and construction method | |
KR101065555B1 (en) | System preventing non-woven from mortar particles filled up the back space of PCL Precasting Concrete Lining and method constructing the non-woven to PCL | |
CN103741949B (en) | Treatment of juncture between vertical structure and horizontal structure | |
CN106149877B (en) | Concrete frame structure prefabricated post and the docking structure and method at beam slab node | |
CN103741651B (en) | A kind of concrete teeth groove stiling basin and construction method thereof | |
CN206769180U (en) | A kind of shaped steel hole prefabricated section through walls | |
CN110295552A (en) | A kind of gate-type assembled box culvert and construction method | |
CN209538214U (en) | A kind of late poured band structure of outer wall of basement | |
CN111335926A (en) | Tunnel waterproof layer, template trolley and construction method | |
CN110468744A (en) | A kind of channel bridge reinforced construction method | |
CN203514332U (en) | Casing for blocking dewatering tube well of post-cast strip | |
CN107762135A (en) | The construction method of skin scaffold wall connecting piece | |
CN104775429A (en) | Anchor head arranged in concrete faceplate and construction method thereof | |
CN207813015U (en) | Floor slab preformed hole tool-typed formwork support construction | |
CN104295102B (en) | The construction method of steel form fire wall | |
CN207647174U (en) | A kind of reinforced concrete member post-cast strip molding machine | |
KR102105771B1 (en) | Water proofing plate installed with forms | |
CN206591552U (en) | A kind of device for pile foundation repairing and reinforcing | |
CN207392239U (en) | A kind of prefabricated piping lane of two-piece unit formula |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |