CN205714221U - A kind of Tunnel Second Lining vault is owed to dig place's teeming building structure - Google Patents

A kind of Tunnel Second Lining vault is owed to dig place's teeming building structure Download PDF

Info

Publication number
CN205714221U
CN205714221U CN201620535197.3U CN201620535197U CN205714221U CN 205714221 U CN205714221 U CN 205714221U CN 201620535197 U CN201620535197 U CN 201620535197U CN 205714221 U CN205714221 U CN 205714221U
Authority
CN
China
Prior art keywords
groove
template
place
owed
pour
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620535197.3U
Other languages
Chinese (zh)
Inventor
李求寿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620535197.3U priority Critical patent/CN205714221U/en
Application granted granted Critical
Publication of CN205714221U publication Critical patent/CN205714221U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

nullThis utility model relates to a kind of Tunnel Second Lining vault and owes to dig place's teeming building structure,Can effectively solve the problem that the place's of digging casting concrete again owed by vault,Technical scheme is,Including being arranged on the preliminary bracing on country rock surface and being arranged on the secondary lining on preliminary bracing surface,What secondary lining owed that the place of digging has a lower openings pours groove,Pour big up and small down trapezoidal in the cross section of groove,Its infraoral is coated with the template for sealing,Hollow bolt it is provided with in template,Hollow bolt one end is stretched out outside template,The other end stretches into and pours groove and link together with country rock after preliminary bracing,Pour have on the secondary lining at place, groove inclined-plane with pour that groove is connected pour passage,Pour and on the hollow bolt sidewall of groove tip position, have inside and outside through injected hole,This utility model structure hollow anchor pole is as can be used for again reinforcing template while reinforcement,Simultaneously as slip casting passage,Again the concrete compaction after pouring、Without cavity,Reach design strength.

Description

A kind of Tunnel Second Lining vault is owed to dig place's teeming building structure
Technical field
This utility model relates to tunnel concrete pouring structure, and particularly a kind of Tunnel Second Lining vault is owed to dig place's teeming Building structure.
Background technology
At present secondary lining (being called for short two linings) vault owes to dig needs when cutting again casting concrete, concrete chisel removal pattern The most arbitrarily, vault is the highest, utilizes heavy chassis to support, reserve edge one during casting concrete during formwork reinforcement Block template is not first installed, and after the concreting at other templates is good, at residue, concrete can only be manually put in by concrete In template, then lift template and concrete is pressed into two lining gaps.Owing to being vault, masterplate is reinforced to be needed to utilize private station The steel pipe scaffold system of car or reinforcing shores reinforcing template, and this reinforcement process is set up the most additional due to needs System and expend substantial amounts of human and material resources, construction period is the longest.One piece of template must be reserved during casting concrete and pour coagulation Soil, is easily caused concrete leakiness, does not reaches design strength, even causes cavity, does not reaches renovating effect.Therefore, it changes Enter and innovate imperative.
Summary of the invention
For above-mentioned situation, for overcoming the defect of prior art, the purpose of this utility model is just to provide a kind of tunnel two Secondary lining cutting vault is owed to dig place's teeming building structure, can effectively solve the problem that the place's of digging casting concrete again owed by vault.
The technical scheme that this utility model solves is, a kind of Tunnel Second Lining vault is owed to dig place's teeming building structure, including Being arranged on the preliminary bracing on country rock surface and be arranged on the secondary lining on preliminary bracing surface, secondary lining is owed the place of digging and is had bottom Opening pour groove, pour big up and small down trapezoidal in the cross section of groove, its infraoral is coated with the template for sealing, in template Being provided with hollow bolt, hollow bolt one end is stretched out outside template, the other end stretch into pour groove and through after preliminary bracing with enclose Rock links together, pour have on the secondary lining at place, groove inclined-plane with pour that groove is connected pour passage, pour groove top Inside and outside through injected hole is had on the hollow bolt sidewall of position, portion.
This utility model novel structure is unique, and advantages of simple easily operates, safe and reliable, time saving and energy saving, hollow bolt conduct Can be used for again reinforcing template while reinforcement, simultaneously as slip casting passage, concrete compaction, nothing after again pouring are empty, Reach design strength, easy to use, effective, it is the innovation on tunnel concrete pouring structure.
Accompanying drawing explanation
Fig. 1 is sectional view of the present utility model.
Fig. 2 is upward view of the present utility model.
Fig. 3 is the use state diagram after this utility model casting concrete.
Detailed description of the invention
Below in conjunction with accompanying drawing, detailed description of the invention of the present utility model is described in further detail.
Being given by Fig. 1 to Fig. 3, this utility model includes that the preliminary bracing 2 being arranged on country rock 3 surface and the initial stage that is arranged on prop up Protecting the secondary lining 1 on surface, what secondary lining 1 owed that the place of digging has a lower openings pours groove 4, pour the cross section of groove 4 present big under Little is trapezoidal, and its infraoral is coated with the template 7 for sealing, and template 7 is provided with hollow bolt 6, and hollow bolt 6 one end is stretched Going out outside template, the other end stretches into and pours groove and link together with country rock 3 after preliminary bracing 2, pours place, groove 4 inclined-plane Secondary lining on have with pour that groove is connected pour passage 11, pour and have on the hollow bolt sidewall of groove tip position Inside and outside through injected hole 6a.
For ensureing using effect, the outer surface of described template 7 is provided with steel pipe 8 in hollow bolt 6 both sides, and steel pipe 8 leads to Crossing the butterfly card 9 being contained in successively on hollow bolt and clamp nut 10 is pressed on template outer surface, the reassembling type constituting template is solid Fixed structure;
Being provided with grouted anchor bar 5 in described template 7, grouted anchor bar one end is stretched out outside template, and the other end stretches into and pours Groove also links together with country rock 3 after preliminary bracing 2;
The outer surface of described template 7 is provided with steel pipe in grouted anchor bar both sides, and steel pipe is by being contained in grouted anchor bar successively On butterfly card and clamp nut be pressed on template outer surface, constitute the reassembling type fixed structure of template;
The described angle pouring groove 4 hypotenuse and preliminary bracing surface is 55-65 °.
When this utility model uses, cut concrete owing the place of digging, then cut and invade the country rock that two shirt portion are divided, make this portion Point constitute and up big and down small trapezoidal to pour groove, i.e. breach answers inner wide and outer narrow, pours and digs one on the secondary lining at place, groove inclined-plane With pour that groove is connected pour passage, pour the square opening that passage is 10cm × 10cm, the finishing of square opening mouth rim is concordant, Smoother, wall dabbing, then bore one to one by the position of hollow bolt and grouted anchor bar at the country rock pouring groove place Eye, then installs hollow bolt, and at the injected hole 6a through inside and outside the position of preliminary bracing cuts one of hollow bolt, Being used as the grouting in later stage, grouting rock bolt, then installation form are installed in both sides, and template covers the infraoral pouring groove, mould Plate utilizes mounted anchor pole when reinforcing, then carry out conventional reinforcing by butterfly card, nut, steel pipe.Pass through after installing Pour passage and carry out casting concrete, when finally pouring concrete at reserved passageway, owing to amount of concrete is few, concrete is put In the template corresponding with pouring channel portal, then lift this template and concrete is pressed into gap, last fixed form, Completing to seal, concrete strength utilizes hollow bolt after reaching design strength form removal, to Concrete Filled slip casting, finally will The anchor pole cutting exposing concrete surface is smooth, as it is shown on figure 3, reference 12 is the concrete poured in figure. Compared with prior art, this utility model novel structure is unique, and advantages of simple easily operates, safe and reliable, time saving and energy saving, pours Groove is big up and small down, and hypotenuse plays the effect of lifting, and hollow bolt, as can be used for again reinforcing template while reinforcement, is made simultaneously For slip casting passage, the concrete compaction after again pouring, nothing cavity, reach design strength, easy to use, effective, it is tunnel Innovation on concrete pouring structure.

Claims (5)

1. Tunnel Second Lining vault is owed to dig place's teeming building structure, including the preliminary bracing (2) being arranged on country rock (3) surface With the secondary lining (1) being arranged on preliminary bracing surface, it is characterised in that secondary lining (1) is owed the place of digging and had lower openings Pouring groove (4), pour big up and small down trapezoidal in the cross section of groove (4), its infraoral is coated with the template (7) for sealing, mould Being provided with hollow bolt (6) on plate (7), hollow bolt (6) one end is stretched out outside template, and the other end stretches into and pours groove and through just Phase supporting (2) links together with country rock (3) afterwards, pours and has on the secondary lining at groove (4) place, inclined-plane and pour groove and be connected Logical pours passage (11), pours and has inside and outside through injected hole (6a) on the hollow bolt sidewall of groove tip position.
Tunnel Second Lining vault the most according to claim 1 is owed to dig place's teeming building structure, it is characterised in that described mould The outer surface of plate (7) is provided with steel pipe (8) in hollow bolt (6) both sides, and steel pipe (8) is by the butterfly being contained on hollow bolt successively Butterfly card (9) and clamp nut (10) are pressed on template outer surface, constitute the reassembling type fixed structure of template.
Tunnel Second Lining vault the most according to claim 1 is owed to dig place's teeming building structure, it is characterised in that described mould Being provided with grouted anchor bar (5) on plate (7), grouted anchor bar one end is stretched out outside template, and the other end stretches into and pours groove and through the initial stage Supporting (2) links together with country rock (3) afterwards.
Tunnel Second Lining vault the most according to claim 3 is owed to dig place's teeming building structure, it is characterised in that described mould The outer surface of plate (7) is provided with steel pipe in grouted anchor bar both sides, and steel pipe is blocked and tight by the butterfly being contained on grouted anchor bar successively Gu nut is pressed on template outer surface, constitute the reassembling type fixed structure of template.
Tunnel Second Lining vault the most according to claim 1 is owed to dig place's teeming building structure, it is characterised in that described waters The angle building groove (4) hypotenuse and preliminary bracing surface is 55-65 °.
CN201620535197.3U 2016-05-30 2016-05-30 A kind of Tunnel Second Lining vault is owed to dig place's teeming building structure Expired - Fee Related CN205714221U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620535197.3U CN205714221U (en) 2016-05-30 2016-05-30 A kind of Tunnel Second Lining vault is owed to dig place's teeming building structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620535197.3U CN205714221U (en) 2016-05-30 2016-05-30 A kind of Tunnel Second Lining vault is owed to dig place's teeming building structure

Publications (1)

Publication Number Publication Date
CN205714221U true CN205714221U (en) 2016-11-23

Family

ID=57301025

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620535197.3U Expired - Fee Related CN205714221U (en) 2016-05-30 2016-05-30 A kind of Tunnel Second Lining vault is owed to dig place's teeming building structure

Country Status (1)

Country Link
CN (1) CN205714221U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106522992A (en) * 2016-11-24 2017-03-22 中铁隧道集团有限公司 Concrete lining formwork trolley insertion-type concrete grouting construction method
CN113338995A (en) * 2021-05-31 2021-09-03 北京鸿锐嘉科技发展有限公司 Anchor rod grouting construction method for existing tunnel
CN113565465A (en) * 2021-07-19 2021-10-29 中铁十九局集团第六工程有限公司 Filling and pouring device for lining coring hole and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106522992A (en) * 2016-11-24 2017-03-22 中铁隧道集团有限公司 Concrete lining formwork trolley insertion-type concrete grouting construction method
CN113338995A (en) * 2021-05-31 2021-09-03 北京鸿锐嘉科技发展有限公司 Anchor rod grouting construction method for existing tunnel
CN113565465A (en) * 2021-07-19 2021-10-29 中铁十九局集团第六工程有限公司 Filling and pouring device for lining coring hole and construction method thereof

Similar Documents

Publication Publication Date Title
CN209145035U (en) The node structure blocked when for being in the milk at assembled architecture shear wall installation seam
CN207739264U (en) A kind of Grouting Pipe
CN205714221U (en) A kind of Tunnel Second Lining vault is owed to dig place's teeming building structure
CN103726503B (en) Anchor rod pile reinforcing bearing platform structure used for reinforcing deformed bridge pile and construction method thereof
CN103498486B (en) A kind of sleeve pipe that adopts implements the method for shutoff to ater-casting precipitation pipe well
CN208981531U (en) A kind of prefabricated assembled parapet connection structure
CN111119928B (en) Novel tunnel primary support structure and construction method
KR101065555B1 (en) System preventing non-woven from mortar particles filled up the back space of PCL Precasting Concrete Lining and method constructing the non-woven to PCL
CN103741949B (en) Treatment of juncture between vertical structure and horizontal structure
CN106149877B (en) Concrete frame structure prefabricated post and the docking structure and method at beam slab node
CN103741651B (en) A kind of concrete teeth groove stiling basin and construction method thereof
CN206769180U (en) A kind of shaped steel hole prefabricated section through walls
CN110295552A (en) A kind of gate-type assembled box culvert and construction method
CN209538214U (en) A kind of late poured band structure of outer wall of basement
CN111335926A (en) Tunnel waterproof layer, template trolley and construction method
CN110468744A (en) A kind of channel bridge reinforced construction method
CN203514332U (en) Casing for blocking dewatering tube well of post-cast strip
CN107762135A (en) The construction method of skin scaffold wall connecting piece
CN104775429A (en) Anchor head arranged in concrete faceplate and construction method thereof
CN207813015U (en) Floor slab preformed hole tool-typed formwork support construction
CN104295102B (en) The construction method of steel form fire wall
CN207647174U (en) A kind of reinforced concrete member post-cast strip molding machine
KR102105771B1 (en) Water proofing plate installed with forms
CN206591552U (en) A kind of device for pile foundation repairing and reinforcing
CN207392239U (en) A kind of prefabricated piping lane of two-piece unit formula

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161123

Termination date: 20170530