CN106522992A - Concrete lining formwork trolley insertion-type concrete grouting construction method - Google Patents
Concrete lining formwork trolley insertion-type concrete grouting construction method Download PDFInfo
- Publication number
- CN106522992A CN106522992A CN201611043321.5A CN201611043321A CN106522992A CN 106522992 A CN106522992 A CN 106522992A CN 201611043321 A CN201611043321 A CN 201611043321A CN 106522992 A CN106522992 A CN 106522992A
- Authority
- CN
- China
- Prior art keywords
- concrete
- template
- inner tube
- construction method
- tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 17
- 238000009415 formwork Methods 0.000 title claims abstract description 12
- 230000010412 perfusion Effects 0.000 claims description 6
- 238000005086 pumping Methods 0.000 claims description 4
- 239000011435 rock Substances 0.000 claims description 4
- 238000007789 sealing Methods 0.000 claims description 4
- 238000000034 method Methods 0.000 abstract description 7
- 201000010099 disease Diseases 0.000 description 3
- 208000037265 diseases, disorders, signs and symptoms Diseases 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000013459 approach Methods 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
The invention provides a concrete lining formwork trolley insertion-type concrete grouting construction method. A traditional arch concrete grouting technological method in tunnel template trolley concrete construction is broken through, and cavities are effectively prevented from being formed in the concrete grouting process. The method is a revolutionary tunnel concrete construction method and a new idea and a new concept of template trolley concrete construction, and tunnel concrete damage can be effectively prevented.
Description
Technical field:
The present invention relates to concrete pouring forms construction field of constructing, inserts more particularly, to a kind of concrete lining formwork jumbo
Formula concrete grouting construction method.
Background technology:
It is well known that current lining construction, using formwork jumbo arch wall lining concrete, concrete perfusion be from down to
On, it is left and right symmetrical, in last tunnel top concrete perfusion, using from top form surfacing opening, headed into by pipeline pumping
Mode carry out top concrete perfusion.As template forms a closed space with country rock, it is not easy to observe its internal filling
Whether note is filled, and judges with filling concrete amount, pressure by rule of thumb entirely.In the concrete that dome portions are fed into, to overcome and fill
The note concrete resistance for bringing and the gravity that newly enters concrete itself, and the factor such as inner chamber pressure resistance.It is easy to top shape
Into cavity, tunnel-liner disease is caused.If because being afraid of that cavity occurs in lining cutting, mandatory increase amount of concrete or raising concrete are defeated
Rated pressure is sent, the template of formwork jumbo can be damaged, template deformation is shone into.If reserving secondary grouting mouth in template, to which
The cavity that concrete is left carries out secondary grouting, can increase by one working procedure, increase cost again.Disease is formed easily, is solved
It is difficult, it is therefore necessary to start to prevent from source, be only the best way.
The content of the invention:
It is above-mentioned in order to overcome the shortcomings of, the invention provides a kind of construction of concrete lining formwork jumbo plug-in type filling concrete
Method.
The technical solution adopted for the present invention to solve the technical problems:
A kind of concrete lining formwork jumbo plug-in type concrete grouting construction method, comprises the steps:
A, in tunnel form chassis vault template highest point, along tunnel longitudinal axis direction, be evenly arranged plug-in type per 3 meters of spacing
Filling concrete mouth, pouring forms chassis concrete to it is lower and on, left and right symmetrical, the position below the template of top has irrigated
Cheng Hou, pumping line are connected with test tube;
B, hydraulic jack rise, and advance inner tube, are inserted into and are close at country rock;
C, concrete are pumped up pipe flow and enter side pipe, afterwards into inner tube, finally deliver in the template of top;
After D, the perfusion of template inner concrete are full, hydraulic jack is recovered to inner tube outside template;
The concrete in stop block closing inner tube on E, outer tube, placement prevent template inner concrete from coming off and forming cavity;
F, closing sealing plate, close the perfusing hole in template;
G, dismantling concrete delivery pump pipe, rinse inner tube, outer tube and side pipe.
There is following superiority due to adopting technical scheme as above, the present invention:
A kind of concrete lining formwork jumbo plug-in type concrete grouting construction method of the present invention, has broken tunnel form
Dome portions filling concrete process traditional in chassis concrete construction, forms empty during effectively preventing filling concrete
Hole, is a kind of reform property tunnel concrete construction method, is a kind of new approaches, the new concept of formwork jumbo concrete construction, energy
It is enough effectively to prevent tunnel concrete disease.
Description of the drawings:
Fig. 1 is the filling concrete schematic diagram of the present invention;
Fig. 2 is the closing schematic diagram of concrete of the present invention;
In figure:1st, inner tube;2nd, outer tube;3rd, stop block;4th, hydraulic jack;5th, side pipe;6th, closed plate;
Specific embodiment:
The present invention can be explained in more detail by example below, the open purpose of the present invention is intended to protect in the scope of the invention
All changes and improvements, the invention is not limited in the following examples;
Perfusing hole is provided with closed plate 6, the template perfusing hole after casting complete on Sealing formboard, and intrusion pipe is by inner tube 1, outer tube 2
Constitute with side pipe 5, inner and outer pipe mutually can slide, and gap very little, 1 bottom of inner tube is connected with hydraulic jack 4, and hydraulic jack 4 can
With drive inner tube 1 move up and down, outer tube 2 is integral with 5 cross weld of side pipe, and is mutually communicated, 1 bottom lateral opening of inner tube and
Outer tube 2, side pipe 5 are open, and concrete energy smoothness passes through, and 2 bottom of outer tube is provided with stop block 3, and stop block 3 includes being welded on
The cross bar of outer pipe bottom and ride on cross bar and the baffle plate in inner tube 1, the side of inner tube 1 is provided with fluting, convenient interior
During moving up and down, stop block 3 can be maintained static pipe 1, prevent coming off for concrete.
Specific work process is as follows:
A kind of concrete lining formwork jumbo plug-in type concrete grouting construction method, comprises the steps:
A, in tunnel form chassis vault template highest point, along tunnel longitudinal axis direction, be evenly arranged plug-in type per 3 meters of spacing
Filling concrete mouth, pouring forms chassis concrete to it is lower and on, left and right symmetrical, the position below the template of top has irrigated
Cheng Hou, pumping line are connected with test tube;
B, hydraulic jack rise, and advance inner tube, are inserted into and are close at country rock;
C, concrete are pumped up pipe flow and enter side pipe, afterwards into inner tube, finally deliver in the template of top;
After D, the perfusion of template inner concrete are full, hydraulic jack is recovered to inner tube outside template;
The concrete in stop block closing inner tube on E, outer tube, placement prevent template inner concrete from coming off and forming cavity;
F, closing sealing plate, close the perfusing hole in template;
G, dismantling concrete delivery pump pipe, rinse inner tube, outer tube and side pipe.
Part is not carefully stated in above content for prior art, therefore is not run business into particular one and stated.
Claims (1)
1. a kind of concrete lining formwork jumbo plug-in type concrete grouting construction method, it is characterised in that:Comprise the steps:
A, in tunnel form chassis vault template highest point, along tunnel longitudinal axis direction, be evenly arranged plug-in type per 3 meters of spacing
Filling concrete mouth, pouring forms chassis concrete to it is lower and on, left and right symmetrical, the position below the template of top has irrigated
Cheng Hou, pumping line are connected with test tube;
B, hydraulic jack rise, and advance inner tube, are inserted into and are close at country rock;
C, concrete are pumped up pipe flow and enter side pipe, afterwards into inner tube, finally deliver in the template of top;
After D, the perfusion of template inner concrete are full, hydraulic jack is recovered to inner tube outside template;
The concrete in stop block closing inner tube on E, outer tube, placement prevent template inner concrete from coming off and forming cavity;
F, closing sealing plate, close the perfusing hole in template;
G, dismantling concrete delivery pump pipe, rinse inner tube, outer tube and side pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611043321.5A CN106522992A (en) | 2016-11-24 | 2016-11-24 | Concrete lining formwork trolley insertion-type concrete grouting construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611043321.5A CN106522992A (en) | 2016-11-24 | 2016-11-24 | Concrete lining formwork trolley insertion-type concrete grouting construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106522992A true CN106522992A (en) | 2017-03-22 |
Family
ID=58357829
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611043321.5A Pending CN106522992A (en) | 2016-11-24 | 2016-11-24 | Concrete lining formwork trolley insertion-type concrete grouting construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106522992A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108533285A (en) * | 2018-02-26 | 2018-09-14 | 龚岗 | Tunnel bolt-spary supports concrete monoblock type pouring forms and construction method |
CN110424985A (en) * | 2019-08-23 | 2019-11-08 | 中铁十一局集团第五工程有限公司 | A kind of anti-forward direction of coming to nothing of tunnel vault concrete is rushed to summit device |
CN111441799A (en) * | 2020-03-06 | 2020-07-24 | 中铁广州工程局集团有限公司 | Tunnel secondary lining vault perfusion device and method |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH02210197A (en) * | 1989-02-09 | 1990-08-21 | Taisei Corp | Shield method and device thereof |
CN103114863A (en) * | 2013-02-28 | 2013-05-22 | 长业建设集团有限公司 | Tunnel secondary lining back arch grouting pipe reserving system |
CN203603930U (en) * | 2013-12-10 | 2014-05-21 | 中铁十局集团有限公司 | Device for preventing tunnel secondary lining vault from disengaging |
CN104295305A (en) * | 2014-02-12 | 2015-01-21 | 齐洪军 | Process for achieving synchronous implementation of lining vault filling grouting and tunnel lining and equipment |
CN104895586A (en) * | 2015-05-27 | 2015-09-09 | 广西交通科学研究院 | Anti-disengaging tunnel secondary lining concrete pouring constructing method and formwork system |
CN105041340A (en) * | 2015-08-12 | 2015-11-11 | 天津矿山工程有限公司 | Structure and construction method for increasing arch crown concrete pouring speed in tunnel engineering |
CN105822325A (en) * | 2016-04-18 | 2016-08-03 | 浙江省交通工程建设集团有限公司 | Tunnel secondary lining arch crown concrete filling machine and construction method thereof |
CN205638482U (en) * | 2016-04-21 | 2016-10-12 | 中铁十二局集团第二工程有限公司 | Be used for tunnel concrete secondary lining to take template slip casting device |
CN106014454A (en) * | 2016-07-11 | 2016-10-12 | 北京鸿锐嘉科技发展有限公司 | Grouting device and grouting technique for tunnel lining vault with mould |
CN205714221U (en) * | 2016-05-30 | 2016-11-23 | 李求寿 | A kind of Tunnel Second Lining vault is owed to dig place's teeming building structure |
-
2016
- 2016-11-24 CN CN201611043321.5A patent/CN106522992A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH02210197A (en) * | 1989-02-09 | 1990-08-21 | Taisei Corp | Shield method and device thereof |
CN103114863A (en) * | 2013-02-28 | 2013-05-22 | 长业建设集团有限公司 | Tunnel secondary lining back arch grouting pipe reserving system |
CN203603930U (en) * | 2013-12-10 | 2014-05-21 | 中铁十局集团有限公司 | Device for preventing tunnel secondary lining vault from disengaging |
CN104295305A (en) * | 2014-02-12 | 2015-01-21 | 齐洪军 | Process for achieving synchronous implementation of lining vault filling grouting and tunnel lining and equipment |
CN104895586A (en) * | 2015-05-27 | 2015-09-09 | 广西交通科学研究院 | Anti-disengaging tunnel secondary lining concrete pouring constructing method and formwork system |
CN105041340A (en) * | 2015-08-12 | 2015-11-11 | 天津矿山工程有限公司 | Structure and construction method for increasing arch crown concrete pouring speed in tunnel engineering |
CN105822325A (en) * | 2016-04-18 | 2016-08-03 | 浙江省交通工程建设集团有限公司 | Tunnel secondary lining arch crown concrete filling machine and construction method thereof |
CN205638482U (en) * | 2016-04-21 | 2016-10-12 | 中铁十二局集团第二工程有限公司 | Be used for tunnel concrete secondary lining to take template slip casting device |
CN205714221U (en) * | 2016-05-30 | 2016-11-23 | 李求寿 | A kind of Tunnel Second Lining vault is owed to dig place's teeming building structure |
CN106014454A (en) * | 2016-07-11 | 2016-10-12 | 北京鸿锐嘉科技发展有限公司 | Grouting device and grouting technique for tunnel lining vault with mould |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108533285A (en) * | 2018-02-26 | 2018-09-14 | 龚岗 | Tunnel bolt-spary supports concrete monoblock type pouring forms and construction method |
CN110424985A (en) * | 2019-08-23 | 2019-11-08 | 中铁十一局集团第五工程有限公司 | A kind of anti-forward direction of coming to nothing of tunnel vault concrete is rushed to summit device |
CN110424985B (en) * | 2019-08-23 | 2024-07-16 | 中铁十一局集团第五工程有限公司 | Tunnel vault concrete anticreep sky forward towards top device |
CN111441799A (en) * | 2020-03-06 | 2020-07-24 | 中铁广州工程局集团有限公司 | Tunnel secondary lining vault perfusion device and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107859036B (en) | A kind of in-situ deposited prefabricated composite structure stake and its construction method suitable for karst region | |
CN106522992A (en) | Concrete lining formwork trolley insertion-type concrete grouting construction method | |
CN102628352B (en) | Multi-section fixed point hydraulic fracturing method | |
CN204253056U (en) | A kind of shield machine export & import reinforcing structure | |
CN103924584B (en) | The construction method of bored pile | |
CN101824917A (en) | Column core concrete lift-up connecting device of steel pipe column | |
CN106835998A (en) | Technique is pushed up on being filled under a kind of CFST Arch Bridge pipe inner concrete | |
CN208456572U (en) | Packaged type hydraulic fracturing and injection hole sealing integrated apparatus | |
CN102865087B (en) | Embedded grout pipe device in lining concrete of chamber and construction method | |
CN105134069B (en) | One kind is related to gas vertical and passes through the anti-well method construction technology in strong rich water rock stratum | |
CN106012974A (en) | Construction method for vertical waterstop cavity die which is provided with reinforced fibers and used for concrete engineering deformation joint | |
CN104196474A (en) | Pre-pouring air lift hole cleaning device of drilled grouting pile and hole cleaning method of pre-pouring air lift hole cleaning device | |
CN202131618U (en) | Seepage-prevention joint device for underground diaphragm wall | |
CN109653225A (en) | Steel sheet-pile cofferdam and its construction method | |
CN104314048B (en) | Manufacturing and construction method of air bag type concrete engineering deformation joint water stop type cavity die | |
CN103375150A (en) | Horizontal well gravel packing tool | |
CN105178451B (en) | The anticorrosion structure and its construction method of the cladding node of assembled architecture outer wall | |
CN210105863U (en) | Adopt cave filling structure | |
CN208533515U (en) | A kind of additional steel pile casting structure of steel reinforcement cage | |
CN104141286A (en) | Construction adit blocking structure | |
CN204976997U (en) | Slip casting device and prefabricated component battery mould | |
CN106013254B (en) | A kind of construction method of the concrete works swaging die with skeleton | |
CN208949889U (en) | Deep basal pit karst base lime rock stratum groundwater treatment system | |
CN207437086U (en) | A kind for the treatment of structures for wind-blown sand tunnel tunnel bottom | |
CN202450511U (en) | Grouting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170322 |