CN205638482U - Be used for tunnel concrete secondary lining to take template slip casting device - Google Patents
Be used for tunnel concrete secondary lining to take template slip casting device Download PDFInfo
- Publication number
- CN205638482U CN205638482U CN201620337561.5U CN201620337561U CN205638482U CN 205638482 U CN205638482 U CN 205638482U CN 201620337561 U CN201620337561 U CN 201620337561U CN 205638482 U CN205638482 U CN 205638482U
- Authority
- CN
- China
- Prior art keywords
- concrete
- tunnel
- pipe
- construction
- slip casting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model relates to a tunnel construction equipment technical field specifically is a be used for tunnel concrete secondary lining to take template slip casting device. Solve two lining concrete arch tops in the current tunnel and taken off the mouth, phenomenons such as hole appear in the side wall, it uses the increase construction material to appear, labor intensity is high, safe risk is high, man -machine cooperation difficulty, low work efficiency, the long scheduling problem of construction cycle, a be used for tunnel concrete secondary lining to take template slip casting device, including the two design steel forms of just being under construction in the tunnel, design steel form top is equipped with the perpendicular injected hole that sets up of a plurality of, pre -buried on the injected hole have a RPC pipe, the inside concrete feeding steel pipe that is equipped with the level setting of design steel form, the RPC pipe is connected with the concrete feeding steel pipe, steel pipe one end is connected with the concrete feeding pump. The utility model discloses make two lining concrete construction and as an organic wholeization of slip casting construction, greatly reduced intensity of labour, practiced thrift the engineering time, guaranteed the entity engineering quality.
Description
Technical field
This utility model relates to constructing tunnel equipment technical field, specifically a kind of for tunnel concrete secondary lining band template grouting device.
Background technology
Serving as a contrast after construction completes a period of time at tunnel concrete two, because of the natural cause such as entity depression, contraction after the concrete formation that pours, tunnel form concrete two serves as a contrast easily occurs that vault comes to nothing, the phenomenons such as hole occurs between abutment wall splash guard and concrete.For improving railway, vcehicular tunnel secondary lining concrete solid quality, avoid because coming to nothing occurs in tunnel vault, the disease problems such as side wall concrete is the closest with splash guard, conventional construction method is after two lining concrete strengths reach design requirement, carries out slip casting operation.This construction method long construction period, and and uneconomical, safety.For meeting rapid construction, the job space narrow in tunnel, machinery uses difficulty, and construction material uses to be increased, and labor intensity is big, and security risk is high, and man-machine cooperation difficulty, work efficiency is low, long construction period, it is impossible to meet the prescription of current rapid construction.
Summary of the invention
In order to solve existing tunnel two, this utility model serves as a contrast that concrete vault comes to nothing, the phenomenons such as hole occurs in abutment wall, occur that construction material uses to increase, labor intensity is big, security risk is high, man-machine cooperation difficulty, the problems such as work efficiency is low, long construction period, it is provided that a kind of for tunnel concrete secondary lining band template grouting device.
This utility model takes techniques below scheme: a kind of for tunnel concrete secondary lining band template grouting device, set shaped steel formwork including tunnel two just construction, set shaped steel formwork top is provided with several vertically disposed injected holes, RPC pipe it is embedded with on injected hole, horizontally disposed concrete conveyance steel pipe it is provided with inside set shaped steel formwork, RPC pipe and concrete conveyance fastener for connection, steel pipe one end is connected with concrete pump.
The position of described RPC pipe is on the vault centrage of set shaped steel formwork, and the RPC pipe of front and back ends is respectively 1m away from set shaped steel formwork front and back ends respectively.Grouting serous fluid can be made to flow to aperture position of coming to nothing equably.
The diameter of described RPC pipe is identical with the diameter of concrete delivery pump pipe.
Treat that two lining concrete pumpings have poured, after concrete is emphasized to reach initial setting strength, before the demoulding 1 ~ 2 hour, carry out slip casting operation, injecting paste material uses high-performance high fluidity microdilatancy and the strongest slow setting filling gravity flow mortar to carry out slip casting operation, formed with two lining concrete and organically combine, solve serosity and the drawback of two linings concrete " two skins " of conventional construction method.
Compared with prior art, this utility model makes two lining concrete constructions integrated with mortar depositing construction, greatly reduces labor intensity, has saved the engineering time, it is ensured that entity project quality.Should be in the slip casting operation after railway, vcehicular tunnel two lining construction, labour force can be greatly reduced, reduce labor intensity, make tunnel concrete entity more complete, closely knit, this utility model simple in construction, make rational in infrastructure, simple to operate, can ensure that construction safety, there is certain promotional value and practical value.
Accompanying drawing explanation
Fig. 1 is this utility model structural representation;
Fig. 2 is this utility model structure front elevation;
Fig. 3 is this utility model structure section figure;
In figure: 1-tunnel double-lining steel form, 2-RPC manages, 3-concrete conveyance steel pipe, 4-concrete pump.
Detailed description of the invention
As shown in Figure 1, 2, 3, a kind of for tunnel concrete secondary lining band template grouting device, set shaped steel formwork 1 including tunnel two just construction, set shaped steel formwork 1 top is provided with 3 vertically disposed injected holes, give on injected hole and bury the RPC pipe 2(of the long 30 ~ 40cm of φ 12.5cm (diameter with concrete delivery pump pipe etc. thick) length of RPC pipe can be determined according to two lining concrete thickness), set shaped steel formwork 1 is internal is provided with horizontally disposed concrete conveyance steel pipe 3, RPC pipe 2 is connected with concrete conveyance steel pipe 3, and steel pipe 3 one end is connected with concrete pump 4.Treat that two lining concrete pumpings have poured, after concrete is emphasized to reach initial setting strength, before the demoulding 1 ~ 2 hour, carry out slip casting operation.
The pre-buried end of described RPC pipe 2 is to be connected smooth and arranged orthogonal with two lined steel templates.
The position of described RPC pipe 2 is on the vault centrage of set shaped steel formwork 1, and the RPC pipe 2 of front and back ends is respectively 1m away from set shaped steel formwork 1 front and back ends respectively.
The diameter of described RPC pipe 2 is identical with the diameter of concrete delivery pump pipe.
Claims (3)
1. one kind is used for tunnel concrete secondary lining band template grouting device, it is characterized in that: include the set shaped steel formwork (1) of tunnel two just construction, set shaped steel formwork (1) top is provided with several vertically disposed injected holes, RPC pipe (2) it is embedded with on injected hole, set shaped steel formwork (1) is internal is provided with horizontally disposed concrete conveyance steel pipe (3), RPC pipe (2) is connected with concrete conveyance steel pipe (3), and steel pipe (3) one end is connected with concrete pump (4).
The most according to claim 1 for tunnel concrete secondary lining band template grouting device, it is characterized in that: the position of described RPC pipe (2) is on the vault centrage away from set shaped steel formwork (1), and RPC pipe (2) of front and back ends is respectively 1m away from set shaped steel formwork (1) front and back ends respectively.
It is the most according to claim 2 for tunnel concrete secondary lining band template grouting device, it is characterised in that: the diameter of described RPC pipe (2) is identical with the diameter of concrete delivery pump pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620337561.5U CN205638482U (en) | 2016-04-21 | 2016-04-21 | Be used for tunnel concrete secondary lining to take template slip casting device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620337561.5U CN205638482U (en) | 2016-04-21 | 2016-04-21 | Be used for tunnel concrete secondary lining to take template slip casting device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205638482U true CN205638482U (en) | 2016-10-12 |
Family
ID=57063320
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620337561.5U Expired - Fee Related CN205638482U (en) | 2016-04-21 | 2016-04-21 | Be used for tunnel concrete secondary lining to take template slip casting device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205638482U (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106522992A (en) * | 2016-11-24 | 2017-03-22 | 中铁隧道集团有限公司 | Concrete lining formwork trolley insertion-type concrete grouting construction method |
CN108286446A (en) * | 2018-02-08 | 2018-07-17 | 中铁二局集团有限公司 | A kind of secondary lining band is molded into slurry monitoring system |
CN108301846A (en) * | 2018-03-21 | 2018-07-20 | 长安大学 | Tunnel-liner vault band is molded into sizing device and its construction |
CN109083658A (en) * | 2018-06-27 | 2018-12-25 | 昆明理工大学 | Using concrete filled steel tube as the Tunnel Second Lining structure and its construction method of skeleton |
CN110005872A (en) * | 2019-04-23 | 2019-07-12 | 河海大学 | A kind of integral pipe and its operating method transported with slip casting |
CN110735651A (en) * | 2019-09-11 | 2020-01-31 | 北京翔鲲水务建设有限公司 | through-hole pipe self-compacting concrete pouring construction method |
CN111894630A (en) * | 2020-06-16 | 2020-11-06 | 神华包神铁路集团有限责任公司 | Clearing structure and treatment method for tunnel brake tip defect |
CN112593978A (en) * | 2020-12-04 | 2021-04-02 | 浙大城市学院 | Secondary lining vault anti-disengaging device and construction method |
-
2016
- 2016-04-21 CN CN201620337561.5U patent/CN205638482U/en not_active Expired - Fee Related
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106522992A (en) * | 2016-11-24 | 2017-03-22 | 中铁隧道集团有限公司 | Concrete lining formwork trolley insertion-type concrete grouting construction method |
CN108286446A (en) * | 2018-02-08 | 2018-07-17 | 中铁二局集团有限公司 | A kind of secondary lining band is molded into slurry monitoring system |
CN108286446B (en) * | 2018-02-08 | 2019-08-13 | 中铁二局集团有限公司 | A kind of secondary lining band is molded into slurry monitoring system |
CN108301846A (en) * | 2018-03-21 | 2018-07-20 | 长安大学 | Tunnel-liner vault band is molded into sizing device and its construction |
CN109083658A (en) * | 2018-06-27 | 2018-12-25 | 昆明理工大学 | Using concrete filled steel tube as the Tunnel Second Lining structure and its construction method of skeleton |
CN110005872A (en) * | 2019-04-23 | 2019-07-12 | 河海大学 | A kind of integral pipe and its operating method transported with slip casting |
CN110005872B (en) * | 2019-04-23 | 2021-01-05 | 河海大学 | Transportation and grouting integrated pipeline and operation method thereof |
CN110735651A (en) * | 2019-09-11 | 2020-01-31 | 北京翔鲲水务建设有限公司 | through-hole pipe self-compacting concrete pouring construction method |
CN110735651B (en) * | 2019-09-11 | 2022-01-28 | 北京清河水利建设集团有限公司 | Self-compacting concrete pouring construction method for through-hole pipe |
CN111894630A (en) * | 2020-06-16 | 2020-11-06 | 神华包神铁路集团有限责任公司 | Clearing structure and treatment method for tunnel brake tip defect |
CN112593978A (en) * | 2020-12-04 | 2021-04-02 | 浙大城市学院 | Secondary lining vault anti-disengaging device and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205638482U (en) | Be used for tunnel concrete secondary lining to take template slip casting device | |
CN106013530B (en) | The reinforcement structure of concrete shear force wall based on 3D printing | |
CN105926803B (en) | A kind of 3D printing reinforced masonry shear wall structure with concave convex texture | |
CN106014446B (en) | A kind of reinforcement means of enhancing high ground stress soft rock stress tunnel inverted arch structural stability | |
CN103628575B (en) | Big discrepancy in elevation variable cross-section concrete structure construction seam and construction method thereof | |
CN106272951A (en) | Assembling die precast concrete wall panel technology | |
CN202544866U (en) | Advance support device for pipe shed of large-span metro tunnel portal | |
CN204552085U (en) | Formwork concreting structure in constructional column top at the bottom of a kind of Vierendeel girder | |
CN105041340A (en) | Structure and construction method for increasing arch crown concrete pouring speed in tunnel engineering | |
CN204327112U (en) | Tunnel outlet advance support system | |
CN204212023U (en) | A kind of spliced steel concrete temporary pavement | |
CN102865087B (en) | Embedded grout pipe device in lining concrete of chamber and construction method | |
CN204941567U (en) | A kind of structure accelerating construction of tunnel vault pouring concrete speed | |
CN207812837U (en) | A kind of distributed shear key suitable for steel column | |
CN205954675U (en) | Prefabricated pipeline concrete buttress | |
CN203769789U (en) | In-hole starting counter force device of shield tunneling machine | |
CN205330170U (en) | A shear wall template support device | |
CN204343297U (en) | The structure of after-pouring beam reserving hole process in a kind of concrete in mass | |
CN108005684A (en) | Separated steel mould trolley and its construction method | |
CN208441871U (en) | A kind of interior formed of large diameter shield tunnel digs station structure | |
CN103967135B (en) | Precast concrete body of wall slip casting slurry outlet plugging device | |
CN206186053U (en) | Arch prefabricated mould | |
CN104775831A (en) | Tunnel secondary lining inverted arch and arch wall combined part short-free side wall arcing construction method | |
CN206513377U (en) | A kind of novel circular tunnel concrete formwork for placing | |
CN205637571U (en) | Do not have outside secret building wall who is detained pipe and pour template |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161012 |
|
CF01 | Termination of patent right due to non-payment of annual fee |