CN208702139U - A kind of construction template structure of toilet wall - Google Patents

A kind of construction template structure of toilet wall Download PDF

Info

Publication number
CN208702139U
CN208702139U CN201821349297.2U CN201821349297U CN208702139U CN 208702139 U CN208702139 U CN 208702139U CN 201821349297 U CN201821349297 U CN 201821349297U CN 208702139 U CN208702139 U CN 208702139U
Authority
CN
China
Prior art keywords
side wall
template
floor
toilet
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821349297.2U
Other languages
Chinese (zh)
Inventor
刘钊
姚禹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Metallurgical Construction Engineering Group Co Ltd
Original Assignee
China Metallurgical Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Metallurgical Construction Engineering Group Co Ltd filed Critical China Metallurgical Construction Engineering Group Co Ltd
Priority to CN201821349297.2U priority Critical patent/CN208702139U/en
Application granted granted Critical
Publication of CN208702139U publication Critical patent/CN208702139U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a kind of construction template structures of toilet wall, including the side wall template component being fixedly supported on floor, the side wall template component includes the side wall template being located directly opposite in parallel in walling body to be poured two sides, connect the diagonal brace of the split bolt and inclined shore of the side wall template of two sides between side wall template and floor;It is characterized in that, the lower end of the side wall template on the inside of toilet is also connected with internal corner formwork, there are two orthogonal forming surfaces for tool on the internal corner formwork, and one of forming surface is concordant with the forming surface of the side wall template, another forming surface is concordant with the upper surface of floor;The intersection of two forming surfaces of the internal corner formwork is arc-shaped, and with the corner of walling body to be poured to smear arc radius consistent for radius.The utility model have it is reasonable in design, it is easy for construction, can save working procedure, improve the knock-kneed construction quality of shear wall, be conducive to the advantages that improving waterproof performance.

Description

A kind of construction template structure of toilet wall
Technical field
The utility model relates to technical field of building construction, in particular to a kind of construction formwork knot of toilet wall Structure.
Background technique
Underground waterproof, roof waterproof and toilet warterproof are that the emphasis of Construction Quality control, especially toilet are anti- Water not only influences whether the use function of toilet once there is hidden danger, causes inconvenience to life, also will affect neighbourhood It is harmonious.
Since wall is usually that construction is formed again after the completion of ground structure layer, so that the handover position of the two is usual There can be gap, after house is built up, the junction on wall segment and ground can form small crack because of contraction distortion, make At leakage hidden trouble.In addition, the coating on metope can fall because of gravity, and accumulate when to wall brushing water-repellent paint At corner, the coating of accumulation is once excessive, will affect the rate of drying of coating, it is also possible to crack.For this purpose, existing defend The junction on wall and ground usually requires smear arc processing between life, i.e., smears the two junction in the arc-shaped, avoids coating It is accumulated at corner, dry and cracked, raising waterproof performance occurs.But current arc processing of smearing is usually to complete in wall and ground It individually carries out again afterwards, and smears the crack that arc processing not can avoid wall and ground is formed by contraction distortion, however it remains is latent Leakage hidden trouble.
Utility model content
In view of the above shortcomings of the prior art, the technical problem to be solved by the utility model is to how to provide a kind of knot Structure design is rationally, easy for construction, can save working procedure, improves the knock-kneed construction quality of shear wall, is conducive to improve anti- The construction template structure of the toilet wall of aqueous energy.
In order to solve the above-mentioned technical problem, the utility model uses the following technical solution:
A kind of construction template structure of toilet wall, it is described including the side wall template component being fixedly supported on floor Side wall template component includes the side wall template being located directly opposite in parallel in walling body to be poured two sides, connects the side wall template of two sides The diagonal brace of split bolt and inclined shore between side wall template and floor;It is characterized in that, being located at the institute on the inside of toilet The lower end for stating side wall template is also connected with internal corner formwork, and there are two orthogonal forming surfaces for tool on the internal corner formwork, wherein One forming surface is concordant with the forming surface of the side wall template, another forming surface is concordant with the upper surface of floor;The inner corner trim The intersection of two forming surfaces of template is arc-shaped, and with the corner of walling body to be poured to smear arc radius consistent for radius.
Using the above structure, due to the corner of arc radius and walling body to be poured between two forming surfaces of internal corner formwork It is consistent to smear arc radius, so that after the completion of wall pours, so that it may which the circular arc in straight forming corner, the molding inner corner trim of formed by integrally casting are saved It is subsequent to smear arc working procedure, it can to avoid wall and floor from forming crack because of contraction distortion, and can prevent from constructing The artificial destruction of personnel improves the knock-kneed construction quality of shear wall.And arc-shaped corner can also be to avoid coating in corner Dry and cracked, raising waterproof performance occurs for place's accumulation.
It further, further include the horizontal shuttering being fixedly connected on the internal corner formwork, the molding of the horizontal shuttering Down, and it is concordant with the horizontal form face of the internal corner formwork;The plane template is fixed by a pin on floor, makes institute The forming surface for stating horizontal shuttering is close to the upper surface of floor.
Before rear pouring concrete wall, to keep the combination between rear pouring concrete and floor even closer, it usually needs Will first molding floor dabbing, form faying face, the height of faying face will be generally below floor upper surface, and when rear pouring concrete needs It to be filled and led up by pouring.In above structure, since the forming surface of horizontal shuttering and the horizontal form face of internal corner formwork are concordant, Horizontal shuttering is fixed on floor by pin, so that it may the horizontal form face for guaranteeing internal corner formwork and molding floor Upper surface is concordant, is conducive to the Forming Quality of the concrete and floor that pour after improving.
Further, the side wall template, internal corner formwork and horizontal shuttering are the template of aluminum alloy material, include edge The longitudinal rib of length direction setting, the cross rib being arranged in the width direction, and the panel being laid in longitudinal rib and cross rib, the longitudinal rib With the pin hole being placed equidistant with is all had on cross rib;Connect between two neighboring mold using pin and matched arc selling sheet are fixed It connects.
Aluminum alloy mould plate has light-weight, can reuse, utilization rate is higher, easy for installation, can effectively shorten and apply The work period is short.
Further, the side wall template component further includes the back cord being arranged on the outside of the side wall template, described pair of drawing The both ends of bolt extend through the back cord.
Further, one end of the diagonal brace is hinged with fixation steel plate, and the fixation steel plate is fixed by a pin to floor On;The other end of the diagonal brace is fixedly connected with the back cord.
Further, there are two the diagonal braces for setting in the same vertical plane perpendicular to walling body to be poured, wherein one A diagonal brace is connect with the back cord of side wall template upper end, the back cord of another described diagonal brace and side wall template lower end Connection.
Further, the diagonal brace includes the casing for being located at both ends, and the adjusting being connected between two described sleeve pipes Threaded rod, the both ends for adjusting threaded rod are respectively provided with oppositely arranged screw thread, and middle part has vertically disposed torsion bar;Two The inner hole of a described sleeve pipe is respectively provided with the internal screw thread being correspondingly arranged with the adjusting threaded rod.
Further, split bolt equidistant placement in the vertical direction, and the split bolt for being located at bottommost arrives The minimum range of floor is 30cm.
Further, in a vertical direction, the spacing of the two neighboring split bolt is 80cm ~ 100cm.
In conclusion the utility model have it is reasonable in design, it is easy for construction, working procedure can be saved, improvement is cut The knock-kneed construction quality of power wall is conducive to the advantages that improving waterproof performance.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model embodiment.
Fig. 2 is the structural schematic diagram of side wall template and horizontal shuttering in Fig. 1.
Fig. 3 is the structural schematic diagram of internal corner formwork in Fig. 1.
Fig. 4 is the structural schematic diagram of diagonal brace in Fig. 1.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawing.
When it is implemented, as shown in Figure 1, a kind of construction template structure of toilet wall, including it is fixedly supported on floor On side wall template component 1, the side wall template component includes the side wall mould being located directly opposite in parallel in walling body to be poured two sides Plate 11, split bolt 12 and the inclined shore for connecting the side wall template 11 of two sides are oblique between side wall template 11 and floor Support 13;The lower end of the side wall template 11 on the inside of toilet is also connected with internal corner formwork 2, has on the internal corner formwork 2 There are two orthogonal forming surfaces, and one of forming surface is concordant with the forming surface of the side wall template 11, another molding Face is concordant with the upper surface of floor;The intersection of two forming surfaces of the internal corner formwork 2 be it is arc-shaped, and radius with wait pour It is consistent that arc radius is smeared in the corner of wall.It further include the horizontal shuttering 3 being fixedly connected on the internal corner formwork 2, the horizontal mould The molding of plate 3 is face-down, and concordant with the horizontal form face of the internal corner formwork 2;The plane template 3 is fixed by a pin to On floor, the forming surface of the horizontal shuttering 3 is made to be close to the upper surface of floor.
As shown in Figures 2 and 3, the side wall template 11, internal corner formwork 2 and horizontal shuttering 3 are the mould of aluminum alloy material Plate includes the longitudinal rib being arranged along its length, the cross rib being arranged in the width direction, and the face being laid in longitudinal rib and cross rib Plate all has the pin hole being placed equidistant in the longitudinal rib and cross rib;Pin and matched arc are used between two neighboring mold Shape selling sheet is fixedly connected.Aluminum alloy mould plate has light-weight, can reuse, utilization rate is higher, easy for installation, can be effective Shorten short construction period.
When Concrete facts, the side wall template component 1 further includes the back cord 14 that 11 outside of side wall template is arranged in, institute The both ends for stating split bolt 12 extend through the back cord 14.One end of the diagonal brace 13 is hinged with fixation steel plate, the fixation Steel plate is fixed by a pin on floor;The other end of the diagonal brace 13 is fixedly connected with the back cord.Perpendicular to wait pour It is arranged there are two the diagonal brace 13, on one of them described diagonal brace 13 and the side wall template 11 in the same vertical plane of wall The back cord at end connects, another described diagonal brace 13 is connect with the back cord of 11 lower end of side wall template.As shown in figure 4, described oblique Support 13 includes the casing for being located at both ends, and the adjusting threaded rod being connected between two described sleeve pipes, the adjusting threaded rod Both ends be respectively provided with oppositely arranged screw thread, and middle part has vertically disposed torsion bar;The inner hole difference of two described sleeve pipes With the internal screw thread being correspondingly arranged with the adjusting threaded rod.The split bolt 12 equidistant placement in the vertical direction, and be located at The minimum range of the split bolt 12 of bottommost to floor is 30cm, and the spacing of the two neighboring split bolt is 80cm。
When Specific construction, the first surveying setting-out on the floor of pouring molding of the position according to toilet wall determines health Between wall construction area, the floor dabbing of construction area is then formed into dabbing area, sets up above-mentioned construction formwork in dabbing area Structure, while so that horizontal shuttering is stretched out dabbing area, and be fixed by a pin on floor, so that the forming surface of horizontal shuttering is close to building The upper surface of plate;It finally carries out concreting and smashes vibration, the form removal after concrete formation is completed toilet wall and poured Construction.Specifically, dabbing area be lower than 1.5~3cm of floor level, in this way, enable the secondary concrete poured preferably with The floor of pouring molding combines, and improves the intensity of combination.Furthermore it is also possible to by dabbing area towards the direction on the inside of toilet Extend 20~30cm, can both increase the faying face between secondary casting concrete and floor in this way, and improve the intensity of combination, again The arc-shaped corner poured can be made to be located at the medium position of casting concrete, Forming Quality is easier to control, and intensity is more preferable. When it is implemented, when pouring build floor, can also pour to form the groove of 1~2mm in the construction area of toilet wall.This Sample can both reduce subsequent surveying setting-out process, can also save the difficulty of dabbing construction, shorten the time of dabbing construction, Improve construction efficiency.
The above is only the preferred embodiment of the utility model only, is not limitation with the utility model, all at this Made any modifications, equivalent replacements, and improvements etc., should be included in the utility model within the spirit and principle of utility model Protection scope within.

Claims (9)

1. a kind of construction template structure of toilet wall, described including the side wall template component (1) being fixedly supported on floor Side wall template component includes the side wall template (11) being located directly opposite in parallel in walling body to be poured two sides, connects the side wall mould of two sides Diagonal brace (13) of the split bolt (12) and inclined shore of plate (11) between side wall template (11) and floor;Its feature exists In the lower end of the side wall template (11) on the inside of toilet is also connected with internal corner formwork (2), the internal corner formwork (2) There are two orthogonal forming surfaces for upper tool, and one of forming surface is concordant with the forming surface of the side wall template (11), another A forming surface is concordant with the upper surface of floor;The intersection of two forming surfaces of the internal corner formwork (2) is arc-shaped, and radius It is consistent that arc radius is smeared with the corner of walling body to be poured.
2. the construction template structure of toilet wall as described in claim 1, which is characterized in that further include being fixedly connected on institute State the horizontal shuttering (3) on internal corner formwork (2), the molding of the horizontal shuttering (3) is face-down, and with the internal corner formwork (2) Horizontal form face it is concordant;The horizontal shuttering (3) is fixed by a pin on floor, makes the molding of the horizontal shuttering (3) The upper surface of face abutting floor.
3. the construction template structure of toilet wall as claimed in claim 2, which is characterized in that the side wall template (11), Internal corner formwork (2) and horizontal shuttering (3) are the template of aluminum alloy material, include the longitudinal rib being arranged along its length, along width The cross rib of direction setting, and the panel being laid in longitudinal rib and cross rib are spent, all has and is placed equidistant in the longitudinal rib and cross rib Pin hole;It is fixedly connected between two neighboring mold using pin and matched arc selling sheet.
4. the construction template structure of toilet wall as described in claim 1, which is characterized in that the side wall template component It (1) further include the back cord (14) being arranged on the outside of the side wall template (11), the both ends of the split bolt (12) extend through The back cord (14).
5. the construction template structure of toilet wall as claimed in claim 4, which is characterized in that one end of the diagonal brace (13) It is hinged with fixation steel plate, the fixation steel plate is fixed by a pin on floor;The other end and the back of the diagonal brace (13) It is stupefied to be fixedly connected.
6. the construction template structure of toilet wall as claimed in claim 4, which is characterized in that perpendicular to walling body to be poured Same vertical plane in setting there are two the diagonal brace (13), one of them described diagonal brace (13) and the side wall template (11) The back cord of upper end connects, another described diagonal brace (13) connect with the back cord of side wall template (11) lower end.
7. the construction template structure of toilet wall as described in claim 1, which is characterized in that the diagonal brace (13) includes position Casing in both ends, and the adjusting threaded rod being connected between two described sleeve pipes, the both ends difference for adjusting threaded rod With oppositely arranged screw thread, and middle part has vertically disposed torsion bar;The inner hole of two described sleeve pipes be respectively provided with it is described Adjust the internal screw thread that threaded rod is correspondingly arranged.
8. the construction template structure of toilet wall as described in claim 1, which is characterized in that split bolt (12) edge Vertical direction equidistant placement, and the minimum range for being located at the split bolt (12) to the floor of bottommost is 30cm.
9. the construction template structure of toilet wall as claimed in claim 8, which is characterized in that in a vertical direction, adjacent The spacing of two split bolts is 80cm ~ 100cm.
CN201821349297.2U 2018-08-21 2018-08-21 A kind of construction template structure of toilet wall Active CN208702139U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821349297.2U CN208702139U (en) 2018-08-21 2018-08-21 A kind of construction template structure of toilet wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821349297.2U CN208702139U (en) 2018-08-21 2018-08-21 A kind of construction template structure of toilet wall

Publications (1)

Publication Number Publication Date
CN208702139U true CN208702139U (en) 2019-04-05

Family

ID=65943731

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821349297.2U Active CN208702139U (en) 2018-08-21 2018-08-21 A kind of construction template structure of toilet wall

Country Status (1)

Country Link
CN (1) CN208702139U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112323991A (en) * 2020-11-26 2021-02-05 中铁二十局集团第六工程有限公司 Outer wall waterproof structure and construction method
CN113090003A (en) * 2021-03-30 2021-07-09 晟通科技集团有限公司 Anti template and template anti reinforcement frame that floats

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112323991A (en) * 2020-11-26 2021-02-05 中铁二十局集团第六工程有限公司 Outer wall waterproof structure and construction method
CN113090003A (en) * 2021-03-30 2021-07-09 晟通科技集团有限公司 Anti template and template anti reinforcement frame that floats

Similar Documents

Publication Publication Date Title
CN109024987A (en) Construction method is poured after a kind of toilet shear wall
CN103696359B (en) A kind of prefabricated and cast-in-place bridge pier body structure of combining and construction method
CN109057339A (en) A kind of one-time-concreting construction method of the anti-bank in toilet
CN208702139U (en) A kind of construction template structure of toilet wall
CN104372952A (en) Unstressed permeating washing scabbling technology
CN208686088U (en) A kind of reinforcing aluminum alloy mould plate system
CN105780976A (en) Compound concrete shear wall structure and concrete pouring method thereof
CN104790436A (en) High-rise building basement roof settlement post-pouring joint advanced water stop construction method
CN204098486U (en) The concrete of building basement roof ater-casting hangs mould
CN209482709U (en) A kind of in-situ concrete wall subsiding crack typified form
CN209620278U (en) It is a kind of with the anti-bank formwork structure of concrete that can have enough to meet the need reinforcing bar liner
CN218233146U (en) Supporting device for pouring drainage side ditch
CN206279441U (en) A kind of high speed railway box beam bridge floor pre-fabricated electric cables groove
CN109025262A (en) A kind of molding construction method of concrete flanging one-time-concreting
CN206503069U (en) trestle drainage system
CN206503365U (en) A kind of shear wall and filling wall junction aluminum alloy pattern plate erecting device
CN210947661U (en) Installation device of socket type overhanging scaffold
CN108979136A (en) A kind of formed by integrally casting construction template structure of the anti-bank in toilet
CN206956518U (en) A kind of small-sized chamfering formwork of box beam
CN207484981U (en) Secondary structure vertical member concrete construction pours device
CN207277367U (en) Reinforcement of retaining wall structure
CN208034952U (en) A kind of PC production lines cement strike-off stick
CN207244957U (en) A kind of modularization Prefabricated stacking floor for being used to drop plate region
CN205907615U (en) Underwater foundation is template mounting structure for reinforcing construction
CN205776322U (en) A kind of steel tower with novel foundation structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant