CN204098486U CN201420589295.6U CN201420589295U CN204098486U CN 204098486 U CN204098486 U CN 204098486U CN 201420589295 U CN201420589295 U CN 201420589295U CN 204098486 U CN204098486 U CN 204098486U
Authority
CN
China
Prior art keywords
hangs
ater
casting
template
muscle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420589295.6U
Other languages
Chinese (zh)
Inventor
郭雄伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Bureau Shanghai Corp Ltd
Original Assignee
China Construction Seventh Engineering Bureau Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Bureau Shanghai Corp Ltd filed Critical China Construction Seventh Engineering Bureau Shanghai Corp Ltd
Priority to CN201420589295.6U priority Critical patent/CN204098486U/en
Application granted granted Critical
Publication of CN204098486U publication Critical patent/CN204098486U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of concrete of building basement roof ater-casting and hang mould, this hangs mould and is located at basement roof and need builds ater-casting place, this hangs mould and comprises and hang muscle, lifting rope, brace rod, cushion block and template, and described template is provided with several lifting rope hole, and cushion block is provided with and hangs muscle groove; Described cushion block is symmetrically set in the end face of the basement roof of both sides, ater-casting, template is located at the bottom surface of the basement roof of ater-casting, that hangs that muscle is located at symmetrically arranged cushion block hangs in muscle groove, brace rod is located at bottom template, lifting rope one end and brace rod are twisted together, and the other end passes the lifting rope hole in template and hangs sprain of muscle and tendon and ties.The utility model sets up bracing frame without the need to secondary can complete formwork, has the advantage that structure is simple, save material, save labor.

Description

The concrete of building basement roof ater-casting hangs mould
Technical field
The utility model relates to the mould of field of engineering building concreting, and especially a kind of concrete of building basement roof ater-casting hangs mould.
Background technology
In the construction of building concrete structure, prevent monolithic reinforced concrete structure because autogenous shrinkage is uneven or the uneven issuable harmful cracks of sedimentation, according to designing requirement, stay establish temporary construction to stitch in sole plate, wall, beam relevant position, structure is temporarily divided into some parts, shrink through component inside, water again and smash this constuction joint concrete after the some time, structure being linked to be overall area becomes ater-casting.
In the post empiricism of the basement roof of prior art, according to the technological requirement of ater-casting, need in basement roof concreting final set after about 60 days, namely inside configuration has been shunk, concrete strength is up to standard, just allow to build ater-casting concrete, Problems existing is, due to the restriction of construction period, when building basement roof ater-casting, the bracing frame of basement roof is removed, cause alter-pouring strips mould plate to install, secondary can only be taked to set up bracing frame to solve the support problem of template, not only waste material but also waste time and energy.
Utility model content
The purpose of this utility model is that a kind of concrete of building basement roof ater-casting provided for the deficiencies in the prior art hangs mould, the utility model sets up bracing frame without the need to secondary can complete formwork, has the advantage that structure is simple, save material, save labor.
The concrete technical scheme realizing the utility model object is:
A kind of concrete of building basement roof ater-casting hangs mould, this hangs mould and is located at basement roof and need builds ater-casting place, its feature is that this hangs mould and comprises and hang muscle, lifting rope, brace rod, cushion block and template, described template is rectangular slab, it is longitudinally arranged with several lifting rope hole, hangs muscle and brace rod is reinforcement bar, lifting rope is steel wire rope, cushion block is rectangular block, and its one side is provided with hangs muscle groove;
Described cushion block is symmetrically set in the end face of the basement roof of both sides, ater-casting, template is located at the bottom surface of the basement roof of ater-casting, that hangs that muscle is located at symmetrically arranged cushion block hangs in muscle groove, brace rod is located at bottom template, lifting rope one end and brace rod are twisted together, and the other end passes the lifting rope hole in template and hangs sprain of muscle and tendon and ties.
The utility model sets up bracing frame without the need to secondary can complete formwork, has the advantage that structure is simple, save material, save labor.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation of the utility model cushion block;
Fig. 3 is the structural representation of the utility model template;
Fig. 4 is using state schematic diagram of the present utility model.
Detailed description of the invention
Consult Fig. 1, Fig. 2, Fig. 3, the mould that hangs of the present utility model need build ater-casting place for being located at basement roof 1, this hangs mould and comprises and hang muscle 2, lifting rope 3, brace rod 4, cushion block 5 and template 6, described template 6 is rectangular slab, it is longitudinally arranged with several lifting rope hole 61, hangs muscle 2 and brace rod 4 is reinforcement bar, lifting rope 3 is steel wire rope, cushion block 5 is rectangular block, and its one side is provided with hangs muscle groove 51;
Described cushion block 5 is symmetrically set in the end face of the basement roof 1 of both sides, ater-casting, template 6 is located at the bottom surface of the basement roof 1 of ater-casting, that hangs that muscle 2 is located at symmetrically arranged cushion block 5 hangs in muscle groove 51, brace rod 4 is located at bottom template 6, lifting rope 3 one end and brace rod 4 are twisted together, and the other end passes the lifting rope hole 61 in template 6 and hangs muscle 2 and twists together.
The utility model uses like this:
Consult Fig. 1, Fig. 2, Fig. 3, Fig. 4, before the ater-casting 7 of basement roof 1 is built, the utility model is located at ater-casting 7 place that need build, specifically be implemented as follows, first cushion block 5 is symmetrically set on the end face of basement roof 1 of both sides, ater-casting 7, muscle 2 will be hung and be across ater-casting 7, and be placed in symmetrically arranged two cushion blocks 5 hang in muscle groove 51, brace rod 4 is placed in the bottom of template 6 along the transverse direction of template 6, the two ends of brace rod 4 is made to aim at the lifting rope hole 61 of two horizontally sets, lifting rope 3 one end is passed from the lifting rope hole 61 of template 6 and twists together with brace rod 4, above basement roof 1, the other end of lifting rope 3 is passed through the space of ater-casting 7 by template 6 pull-up, until template 6 touches the bottom surface of basement roof 1, finally by lifting rope 3 with hang muscle 2 and twist together, on the bottom surface being attached to basement roof 1 making template 6 firm, and the bottom of ater-casting 7 is completely closed, it is complete that the utility model concrete hangs installing of mould.
If desired, ater-casting 7 place cloth muscle need be built at basement roof 1, the concreting to ater-casting, maintenance can be implemented, finally the lifting rope 3 that basement roof 1 exposes is wiped out, remove until hang mould.
The utility model technique is simple, and speed of application is fast, especially for the construction of large area ater-casting, avoids the operation that secondary sets up bracing frame, neither affects building structure, can meet again the regulation of job specfication, also has the advantage of saving material, saving labor.

Claims (1)

1. a concrete of building basement roof ater-casting hangs mould, this hangs mould and is located at basement roof (1) and need builds ater-casting place, it is characterized in that this hangs mould and comprises and hang muscle (2), lifting rope (3), brace rod (4), cushion block (5) and template (6), described template (6) is rectangular slab, it is longitudinally arranged with several lifting rope hole (61), hang muscle (2) and brace rod (4) is reinforcement bar, lifting rope (3) is steel wire rope, cushion block (5) is rectangular block, and its one side is provided with hangs muscle groove (51); Described cushion block (5) is symmetrically set in the end face of the basement roof (1) of both sides, ater-casting, template (6) is located at the bottom surface of the basement roof (1) of ater-casting, that hangs that muscle (2) is located at symmetrically arranged cushion block (5) hangs in muscle groove (51), brace rod (4) is located at template (6) bottom, lifting rope (3) one end and brace rod (4) are twisted together, and the other end passes the lifting rope hole (61) in template (6) and hangs muscle (2) and twists together.
CN201420589295.6U 2014-10-13 2014-10-13 The concrete of building basement roof ater-casting hangs mould Expired - Fee Related CN204098486U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420589295.6U CN204098486U (en) 2014-10-13 2014-10-13 The concrete of building basement roof ater-casting hangs mould

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420589295.6U CN204098486U (en) 2014-10-13 2014-10-13 The concrete of building basement roof ater-casting hangs mould

Publications (1)

Publication Number Publication Date
CN204098486U true CN204098486U (en) 2015-01-14

Family

ID=52266924

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420589295.6U Expired - Fee Related CN204098486U (en) 2014-10-13 2014-10-13 The concrete of building basement roof ater-casting hangs mould

Country Status (1)

Country Link
CN (1) CN204098486U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105019645A (en) * 2015-07-28 2015-11-04 上海建工二建集团有限公司 Template system for building concrete structure at earth-taking opening in top-down construction method, and construction method
CN105401718A (en) * 2015-12-09 2016-03-16 苏州金螳螂建筑装饰股份有限公司 Floor hole blockage lifting mold structure
CN108951424A (en) * 2018-07-09 2018-12-07 中国五冶集团有限公司 The formwork support structure and construction method that bridge suspension type pours
CN109025260A (en) * 2018-07-26 2018-12-18 中民筑友科技投资有限公司 A kind of prefabricated floor slab back casting band joint structure and its construction method
CN110242040A (en) * 2019-07-08 2019-09-17 中信国安建工集团有限公司 Construction method based on building post-cast belt
CN114753253A (en) * 2022-03-08 2022-07-15 武汉市市政建设集团有限公司 Prefabricated beam bridge wet joint mold flying device and construction method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105019645A (en) * 2015-07-28 2015-11-04 上海建工二建集团有限公司 Template system for building concrete structure at earth-taking opening in top-down construction method, and construction method
CN105401718A (en) * 2015-12-09 2016-03-16 苏州金螳螂建筑装饰股份有限公司 Floor hole blockage lifting mold structure
CN108951424A (en) * 2018-07-09 2018-12-07 中国五冶集团有限公司 The formwork support structure and construction method that bridge suspension type pours
CN109025260A (en) * 2018-07-26 2018-12-18 中民筑友科技投资有限公司 A kind of prefabricated floor slab back casting band joint structure and its construction method
CN110242040A (en) * 2019-07-08 2019-09-17 中信国安建工集团有限公司 Construction method based on building post-cast belt
CN114753253A (en) * 2022-03-08 2022-07-15 武汉市市政建设集团有限公司 Prefabricated beam bridge wet joint mold flying device and construction method

Similar Documents

Publication Publication Date Title
CN204098486U (en) The concrete of building basement roof ater-casting hangs mould
CN103669655B (en) Deformation joint both walls body concrete pouring construction process
CN104947719A (en) Basement roof post-cast strip hanging support formwork structure and post-cast strip construction method thereof
CN207616844U (en) Foundation platform precast concrete side form and molding machine
CN203429641U (en) Single-side supporting formwork reinforcing structure system for building construction
CN111561061A (en) A prefabricated wall panel, wall structure and construction method thereof
CN108797840A (en) Prefabricated concrete shear force wall assembled connected node
CN205242706U (en) Cast -in -place constructional column of infilled wall and wall body synchronous construction structure between high -rise outer eaves window
CN202509764U (en) Template bracing structure for constructional column
CN203022222U (en) Wholly-cast ring beam of brick-concrete building support
CN109797969B (en) Construction method of post-cast strip tool type advanced formwork lifting system
CN204690801U (en) Formwork erecting structure is hung in basement roof ater-casting
CN204059953U (en) Hang mould prefab form
CN203947493U (en) Assembling type device for detecting manhole
CN206752693U (en) A kind of assembled steel reinforced concrete column of stirrup encryption and post splicing node
CN203668894U (en) Concrete prefabricated form structure allowing rapid installation
CN204626965U (en) For the steel stair template of poured up at a time between architectural stair
CN104295089A (en) Support system of cast-in-place concrete GBF honeycomb core dense-rib floor system
CN203034805U (en) Double-concrete wallboard formwork scissors type support keel system
CN204850139U (en) Prefabricated assembled concrete shear force wall that reinforcing bar dislocation was laid
CN203947419U (en) A kind of high-speed railway bridge pinner template
CN205088634U (en) Berme ditch typical forms
CN203569693U (en) Pre-buried iron part with steel ties arranged on concrete structure
CN104141321A (en) Basement side wall late poured band blocking method and used blocking steel plate
CN208803700U (en) Precast concrete cushion block between sinking

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150114

Termination date: 20161013

CF01 Termination of patent right due to non-payment of annual fee