CN208034952U - A kind of PC production lines cement strike-off stick - Google Patents
A kind of PC production lines cement strike-off stick Download PDFInfo
- Publication number
- CN208034952U CN208034952U CN201820384511.1U CN201820384511U CN208034952U CN 208034952 U CN208034952 U CN 208034952U CN 201820384511 U CN201820384511 U CN 201820384511U CN 208034952 U CN208034952 U CN 208034952U
- Authority
- CN
- China
- Prior art keywords
- bottom plate
- engaging lug
- top plate
- strike
- cement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model discloses a kind of PC production lines cement strike-off sticks, including top plate, bottom plate, top plate top surface both ends are equipped with mechanical arm connecting seat, the Roof Middle face is equipped with air pump, top plate both ends end is equipped with air pressure telescopic link, the interior boom end of the air pressure telescopic link is equipped with splicing groove deck, the air pressure telescopic link is fixedly connected by hose with the air pump that the Roof Middle face is arranged, the top board undersurface is equipped with engaging lug pedestal, the lower section of the top plate is equipped with bottom plate, the top surface of the bottom plate is equipped with the matched engaging lug of engaging lug pedestal being arranged with the top board undersurface, the bottom plate is hinged by the engaging lug pedestal of engaging lug and top plate bottom on top surface.The utility model is simple in structure, easy to operate, effectively changes the environmental sanitation on casting platform periphery.
Description
Technical field
The utility model belongs to PC production line fabricated assembly overall wall equipment technical fields, and in particular to a kind of PC productions
Line cement strike-off stick.
Background technology
The 1980s, concrete prefabricated element production in China's was in the great development stage, and country is in dwelling construction process
In, use block structure, assembled wallboard structure, large panel structure, cast-in-place concrete structure, cast-in-place concrete hollow floor slab knot
Structure, cast-in-place shear wall structure etc., with Process of Housing Industrialization, steel-concrete combined structure and prefabricated concrete body
It is rapid development of getting back;It takes batch production processing, site-assembled form to carry out construction.With it is current domestic cast-in-place
Construction technology is compared, it, which has, reduces construction site pollution, reduces noise, save a large amount of labours, material tool, shorten construction work
The characteristics of phase, reduction construction cost, while housing development can be promoted to realize the target of " energy saving, section material, water-saving, environmentally friendly ".Pre-
Assembled integral wall processed processing pours when finishing, and needs to pick up strike-off stick by the manipulator on production line, will pour
Slurry level direction after building strikes off, and in existing technology, strike-off stick is all made of the higher steel of hardness or rubber slab has come
At striking off task, the extra mud that pours rear surface is often scraped to the surface of casting platform when striking off, gives the cleaning in later stage
Bring great inconvenience.
Utility model content
The purpose of the utility model is to overcome the deficiencies in the prior art, provide a kind of PC production lines cement strike-off stick.
In order to reach above-mentioned purpose of design, technical solution is used by the utility model:A kind of PC production lines cement is scraped
Tablet, including top plate and bottom plate, top plate top surface both ends are equipped with mechanical arm connecting seat, and the Roof Middle face is equipped with gas
Pump, top plate both ends end are equipped with air pressure telescopic link, and the interior boom end of the air pressure telescopic link is equipped with splicing groove deck,
The air pressure telescopic link is fixedly connected by hose with the air pump that the Roof Middle face is arranged, and the top board undersurface, which is equipped with, to be connected
The lower section of lug pedestal, the top plate is equipped with bottom plate, and the top surface of the bottom plate is equipped with the engaging lug being arranged with the top board undersurface
The matched engaging lug of pedestal, the bottom plate are hinged by the engaging lug pedestal of engaging lug and top plate bottom on top surface.
It is installed with clout storage box in the splicing groove deck.
The bottom plate side is conical design.
The utility model advantageous effect:Bottom plate side is conical design, is assembled after being poured in production work whole
Formula wall upper surface smoothes out, and the mud that extra mud is wiped off, and wiped off while smoothing out will be along the taper of bottom plate side
In clout storage box in face water conservancy diversion to top plate both sides air pressure telescopic link in boom end splicing groove deck, convenient for staff to it
It regularly clears up, effectively changes the cleannes of workshop.The utility model is simple in structure, easy to operate, effectively changes
The environmental sanitation on casting platform periphery is become.
Description of the drawings
Fig. 1 is a kind of PC production lines cement strike-off stick overall schematic of the utility model;
Fig. 2 is a kind of PC production lines cement strike-off stick bottom plate schematic top plan view of the utility model.
Specific implementation mode
Specific embodiment of the present utility model is described in detail below in conjunction with the accompanying drawings.As shown in Figs. 1-2:A kind of PC
Production line cement strike-off stick, including top plate 1, bottom plate 2,1 top surface both ends of the top plate are equipped with mechanical arm connecting seat 3, the top
Air pump 4 is equipped in the middle part of 1 top surface of plate, 1 both ends end of the top plate is equipped with air pressure telescopic link 5, the interior bar of the air pressure telescopic link 5
End is equipped with splicing groove deck 6, and the air pressure telescopic link 5 is solid by the air pump 4 being arranged in the middle part of hose and 1 top surface of the top plate
Fixed connection, 1 bottom surface of the top plate are equipped with engaging lug pedestal 7, and the lower section of the top plate 1 is equipped with bottom plate 2, the top surface of the bottom plate 2
Equipped with the 7 matched engaging lug 8 of engaging lug pedestal being arranged with 1 bottom surface of the top plate, the bottom plate 2 passes through the connection on top surface
Ear 8 and the engaging lug pedestal 7 of 1 bottom of top plate are hinged.
It is installed with clout storage box 9 in the splicing groove deck 6.
1 side of the bottom plate is conical design.
When the utility model is used:In production, by mechanical arm connecting pin and the cement strike-off stick top on PC production lines
The mechanical arm connecting seat 3 at 1 top surface both ends of plate is fixedly connected, and subsequent mechanical arm drives cement strike-off stick to operate the dress to after pouring
Above monoblock type wall, make the mud contacts of bottom plate 2 and assembled integral wall upper surface, control lower roof plate 1 at the far end
5 interior bar of air pressure telescopic link at both ends is stretched out, and the splicing groove deck 6 of interior boom end is contacted with the outer wall of side mould, forms one and half
The cavity opened, after, mechanical arm drives cement strike-off stick to move forward, and bottom plate 2 is by assembled integral wall while mobile
The mud of body upper surface strikes off, due to bottom plate side be conical design, when striking off, assembled integral wall upper surface it is extra
Mud is by the clout storage box in the splicing groove deck 6 that the tapered arm of 2 side of bottom plate flows to boom end in air pressure telescopic link 5
9, then pass through staff's periodic cleaning.
Claims (3)
1. a kind of PC production lines cement strike-off stick, it is characterised in that:Including top plate and bottom plate, top plate top surface both ends are equipped with
Mechanical arm connecting seat, the Roof Middle face are equipped with air pump, and top plate both ends end is equipped with air pressure telescopic link, the gas
The interior boom end of pressure telescopic rod is equipped with splicing groove deck, and the air pressure telescopic link is set by hose and the Roof Middle face
The air pump set is fixedly connected, and the top board undersurface is equipped with engaging lug pedestal, and the lower section of the top plate is equipped with bottom plate, the bottom plate
Top surface is equipped with the matched engaging lug of engaging lug pedestal being arranged with the top board undersurface, and the bottom plate passes through the connection on top surface
Ear and the engaging lug pedestal of top plate bottom are hinged.
2. a kind of PC production lines cement strike-off stick according to claim 1, it is characterised in that:Card in the splicing groove deck
Equipped with clout storage box.
3. a kind of PC production lines cement strike-off stick according to claim 1, it is characterised in that:The bottom plate side is taper
Design.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820384511.1U CN208034952U (en) | 2018-03-21 | 2018-03-21 | A kind of PC production lines cement strike-off stick |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820384511.1U CN208034952U (en) | 2018-03-21 | 2018-03-21 | A kind of PC production lines cement strike-off stick |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208034952U true CN208034952U (en) | 2018-11-02 |
Family
ID=63948826
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820384511.1U Active CN208034952U (en) | 2018-03-21 | 2018-03-21 | A kind of PC production lines cement strike-off stick |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208034952U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110228122A (en) * | 2019-05-22 | 2019-09-13 | 徐州新通预制构件制造有限公司 | Subway segment arc surface floating device |
-
2018
- 2018-03-21 CN CN201820384511.1U patent/CN208034952U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110228122A (en) * | 2019-05-22 | 2019-09-13 | 徐州新通预制构件制造有限公司 | Subway segment arc surface floating device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208396023U (en) | A kind of connecting node of prefabricated component | |
CN208034952U (en) | A kind of PC production lines cement strike-off stick | |
CN106499045A (en) | A kind of prefabricated composite construction parapet and construction method | |
CN203270627U (en) | Construction joint structure of shear wall | |
CN102031876A (en) | Method for newly adding upright column for building | |
CN110344535A (en) | A kind of prefabricated assembled combined wall board and construction method realized concealed beam and exempt from formwork | |
CN208702139U (en) | A kind of construction template structure of toilet wall | |
CN202000368U (en) | Crane foundation in building basement | |
CN209025228U (en) | A kind of shower house water-blocking bank structure | |
CN208034951U (en) | A kind of PC production line cement strike-off sticks with recycling function | |
CN206428805U (en) | A kind of concrete prefabricated balcony of assembled steel | |
CN201056838Y (en) | Detaching-free disposal template | |
CN215889364U (en) | Accurate positioning device for beam and plate reserved vertical hole of construction building | |
CN101629454A (en) | Bracket concrete construction formwork | |
CN201424811Y (en) | Special die for reserving opening on concrete cast-in-situ slab pipeline | |
CN107351233A (en) | A kind of wallboard production mould and wallboard process units | |
CN207189932U (en) | A kind of wallboard production mould and wallboard process units | |
CN205530400U (en) | Batter pile test model steel reinforcement cage cushion inclines | |
CN2404941Y (en) | Permanent forms with water-proof function | |
CN206144132U (en) | Aluminum alloy template assembly system for building | |
CN206616695U (en) | A kind of concrete panel and girt strip floor dry type connecting node | |
CN201818091U (en) | Reinforcing structure of open water pool | |
CN203307962U (en) | Outer wall ring beam of building house | |
CN216007244U (en) | Concrete chute tool type template | |
CN203808030U (en) | Exhaust water pipe structure of hydropower station |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20190617 Address after: 473000 Northeast corner of the intersection of Weishi Road and Zhongjing Road in Lihe Township, Wancheng District, Nanyang City, Henan Province Patentee after: Nanyang Seiko Craftsman Assembly Construction Technology Co., Ltd. Address before: 473000 Weishi Road, Wancheng Eco-Industrial Park, Nanyang City, Henan Province Patentee before: Henan Jinsha Intelligent Assembly Building Technology Co., Ltd. |
|