CN101629454A - Bracket concrete construction formwork - Google Patents

Bracket concrete construction formwork Download PDF

Info

Publication number
CN101629454A
CN101629454A CN200810048405A CN200810048405A CN101629454A CN 101629454 A CN101629454 A CN 101629454A CN 200810048405 A CN200810048405 A CN 200810048405A CN 200810048405 A CN200810048405 A CN 200810048405A CN 101629454 A CN101629454 A CN 101629454A
Authority
CN
China
Prior art keywords
bracket
support
panels
fixed
concrete construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200810048405A
Other languages
Chinese (zh)
Inventor
吕芝林
冷向阳
朱峰
彭元平
陈立新
薛伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group Co Ltd
China Gezhouba Group No 5 Engineering Co Ltd
Original Assignee
China Gezhouba Group Co Ltd
China Gezhouba Group No 5 Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group Co Ltd, China Gezhouba Group No 5 Engineering Co Ltd filed Critical China Gezhouba Group Co Ltd
Priority to CN200810048405A priority Critical patent/CN101629454A/en
Publication of CN101629454A publication Critical patent/CN101629454A/en
Pending legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a bracket concrete construction formwork, which is formed by connecting panels and brackets. The panels adopt large steel formworks, the brackets have trapezoidal frame structures, the panels and the trapezoidal brackets on an upper layer are fixed on the panels and the trapezoidal brackets on a lower layer by bolts respectively, a supporting post is embedded in a casting bin on each layer, one end of a pull strip is fixed on the panels, and the other end of the pull strip is fixed on an embedded piece in the casting bin by the supporting post. The bracket concrete construction formwork has the advantages of simple and practical structure, low cost, convenient operation and perfect control.

Description

Bracket concrete construction formwork
[technical field]
The present invention relates to a kind of concrete construction template, particularly a kind of bracket concrete construction formwork that is applicable to the water power construction field.
[background technology]
The construction work especially concrete bracket in the hydroelectric project is the construction part of more complicated always, and these big brackets that cantilever out often are arranged in the riverbed, and the unsettled discrepancy in elevation in bottom is big, and the job practices difficulty of setting up support as employing is very big.Introduce according to " water conservancy and hydropower construction organization design manual (three) " and other interrelated data, the following form of the many employings of bracket concrete template in China's water power construction: interior pull-type, draw lift-type in once used peripheral hardware counterweight of tripod brace type and Three Gorges Projects and the platform.Above template scheme all has its shortcoming that is difficult to overcome, and is big as difficulty of construction, poor stability, and what take is long in time limit, the cost height, its safety and economy, speed of application, construction quality all are difficult to satisfy the requirement of modern project.
[summary of the invention]
The objective of the invention is: a kind of bracket concrete construction formwork that can rapid construction is provided, solve traditional bracket template scheme speed of application slow (must treat concrete reaches 70% above intensity could the form removal construction), consume material many (single outer support or the interior pull-type consumption lot of materials that need), tie rod and screw rod become flexible easily in the process of building, thereby make that concrete quality can not get guaranteeing, operating personnel's safety also can not get the shortcoming that guarantees, reach the quickening speed of application, improve safety, the comfortableness of construction quality and operation, reduce the purpose of construction cost simultaneously.
The object of the present invention is achieved like this: a kind of bracket concrete construction formwork, be formed by connecting by panel and support, panel adopts large-scale steel form, support is the ladder-shaped frame structure, last layer panel and trapezoid support are separately fixed on next deck panels and the trapezoid support by bolt, each layer is built the pre-buried support column of position in storehouse, and tie rod one end is fixed on the panel, and the other end is fixed on the built-in fitting of building in the position in storehouse by support column.
The present invention on the structure design of template and reinforcement measure, adopted a kind of innovation half in draw the construction technology of semi-cantilever, above each layer template of bracket adopts lower floor to water the template outer platform of position in storehouse anchoring as supporting and operating platform, draw force structure in being aided with simultaneously as template, newly placed concrete can innerly draw stressed, just can carry out the dismounting of lower template so two-layer concreting is intact after 2~3 days, so of the present invention simple and practical, have the advantage that cost is low, easy to operate, control is perfect.
[description of drawings]
The present invention will be further described below in conjunction with drawings and Examples.
Fig. 1 is a structural representation of the present invention.
Fig. 2 is the structural representation of bracket first floor construction.
Wherein, Fig. 1 double as Figure of abstract.
[specific embodiment]
As shown in the figure, a kind of bracket concrete construction formwork, be formed by connecting by panel 1 and support 2, panel adopts large-scale steel form, support is the ladder-shaped frame structure, and the last layer trapezoid support is by being bolted to down on one deck trapezoid support, and each layer is built the pre-buried support column 3 of position in storehouse, tie rod 4 one ends are fixed on the panel, and the other end is fixed on the built-in fitting of building in the position in storehouse by support column.
As shown in Figure 2, bracket bottom dam body is built and is preferably adopted DK type dam cantilever form, after dam body is poured into bracket and plays slope point like this, directly utilize the A-frame of its template to make support platform the dismounting of dam cantilever form, otherwise play about 1 meter ironware of wanting pre-buried installation gusseted under the point of slope at bracket.Must be before the bracket construction by pre-buried good steel pipe of design and tie rod reinforcing bar in the storehouse.During the construction of bracket first floor, it is built the position in storehouse height and decides according to the dam body template configuration.General consistent with other template of dam body.
Bracket second layer when construction, treat that first floor concreting carried out later in intact 48 hours.Second layer template is directly installed on the first floor template, adopts bolt to connect between the template.More than each layer template by being bolted to down on one deck template.Its technological process is as follows:
Draw column steel pipe → formwork hoisting → formwork reinforcement → assembling reinforcement in the welding template and be equipped with storehouse → concreting → pre-buried next storehouse Steel-bar Pile → position in storehouse maintenance.
Lower template and tripod are removed: since this process using be outer support and in draw the force mode that is subjected to that combines, newly placed concrete can innerly draw stressed, so two-layer concreting intact after 2~3 days (but lower-layer concrete built preferably completely more than seven days, also can build after 3~4 layers and tear open) just can be carried out the dismounting of lower template.
The present invention is big at xuan-en, hubei Dong Ping power station upstream and downstream, flood discharge hole gate pier bracket and Ethiopia TEKEZE power station Be able to successful Application in the construction of dam bracket, facts have proved, the present invention have easy and simple to handle fast, use safety and comfort, execute The advantage that the working medium amount is good, cost is low.

Claims (1)

1, a kind of bracket concrete construction formwork, it is characterized in that: be formed by connecting by panel (1) and support (2), panel adopts large-scale steel form, support is the ladder-shaped frame structure, last layer panel and trapezoid support are separately fixed on next deck panels and the trapezoid support by bolt, each layer is built the pre-buried support column of position in storehouse (3), and tie rod (4) one ends are fixed on the panel, and the other end is fixed on the built-in fitting of building in the position in storehouse by support column.
CN200810048405A 2008-07-15 2008-07-15 Bracket concrete construction formwork Pending CN101629454A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200810048405A CN101629454A (en) 2008-07-15 2008-07-15 Bracket concrete construction formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200810048405A CN101629454A (en) 2008-07-15 2008-07-15 Bracket concrete construction formwork

Publications (1)

Publication Number Publication Date
CN101629454A true CN101629454A (en) 2010-01-20

Family

ID=41574717

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200810048405A Pending CN101629454A (en) 2008-07-15 2008-07-15 Bracket concrete construction formwork

Country Status (1)

Country Link
CN (1) CN101629454A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103266759A (en) * 2013-05-14 2013-08-28 中国葛洲坝集团股份有限公司 Annular strip bracket concrete template device and bracket concrete templates
CN105350776A (en) * 2015-11-05 2016-02-24 芜湖赛特施工设备有限公司 Support frame for false brackets
CN105951683A (en) * 2016-05-19 2016-09-21 中国葛洲坝集团第工程有限公司 Construction method for corbel steel reinforcements of gate pier
CN113235525A (en) * 2021-05-29 2021-08-10 山东水总有限公司 Concrete arch dam

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103266759A (en) * 2013-05-14 2013-08-28 中国葛洲坝集团股份有限公司 Annular strip bracket concrete template device and bracket concrete templates
CN103266759B (en) * 2013-05-14 2016-04-27 中国葛洲坝集团股份有限公司 Annular strip bracket concrete plate device and template
CN105350776A (en) * 2015-11-05 2016-02-24 芜湖赛特施工设备有限公司 Support frame for false brackets
CN105951683A (en) * 2016-05-19 2016-09-21 中国葛洲坝集团第工程有限公司 Construction method for corbel steel reinforcements of gate pier
CN105951683B (en) * 2016-05-19 2018-03-23 中国葛洲坝集团第一工程有限公司 Gate pier bracket Joint Re-bar Construction
CN113235525A (en) * 2021-05-29 2021-08-10 山东水总有限公司 Concrete arch dam

Similar Documents

Publication Publication Date Title
CN109518605A (en) The telescopic overhanging support of one kind and its installation method
CN201943045U (en) Automatic-moving hydraulic cantilever gantry concrete placement device for wave wall
CN207268073U (en) Novel flexible formwork bearing frame
CN202830776U (en) Bridge variable cross-section rectangular high pier cantilever creeping formwork construction device
CN107905111B (en) A kind of rigid frame-continuous girder end bay construction technology
CN101629454A (en) Bracket concrete construction formwork
CN206428805U (en) A kind of concrete prefabricated balcony of assembled steel
CN202007535U (en) Supporting reinforcing structure
CN205501843U (en) Consolidate rigid framed arch bridge
CN101885208B (en) System for manufacturing novel high-efficiency, energy-saving and environmentally-friendly centrifugal concrete pile
CN201225003Y (en) Bracket concrete construction formwork
CN205712733U (en) Super-section strengthening concrete conversion beam formwork system
CN209338999U (en) A kind of telescopic overhanging support
CN102767162A (en) Concrete double-bracing large-scale mold plate and form stripping and form erecting methods
CN215758859U (en) Prefabricated reinforced concrete sluice chamber structure
CN202672103U (en) Large concrete double-bracing template
CN201339320Y (en) High-altitude overhanging hanging reinforced concrete hanging bracket
CN205224045U (en) Examine and repair gate slot second phase concrete construction device
CN212866013U (en) Detachable support column base
CN203160513U (en) Floorboard
CN210256628U (en) Self-adaptive outer mold system for prefabricating concrete
CN209368694U (en) The universal adaptive adhesion type bracket of bridge cantilever construction zero number section concreting
CN202658579U (en) Concrete double-support large-size template
CN202781420U (en) Multifunctional operation platform for subsection jointing construction of concrete member
CN207392715U (en) A kind of overhanging inclined support structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20100120