CN105951683B - Gate pier bracket Joint Re-bar Construction - Google Patents

Gate pier bracket Joint Re-bar Construction Download PDF

Info

Publication number
CN105951683B
CN105951683B CN201610335602.1A CN201610335602A CN105951683B CN 105951683 B CN105951683 B CN 105951683B CN 201610335602 A CN201610335602 A CN 201610335602A CN 105951683 B CN105951683 B CN 105951683B
Authority
CN
China
Prior art keywords
reinforcing bar
cage body
pier
bracket
gate pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610335602.1A
Other languages
Chinese (zh)
Other versions
CN105951683A (en
Inventor
肖伟明
刘武
徐保峰
陆昌荷
何毅
李新明
刘昌宇
熊建武
胡方华
岳珂珂
黎学皓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group No 1 Engineering Co Ltd
Original Assignee
China Gezhouba Group No 1 Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group No 1 Engineering Co Ltd filed Critical China Gezhouba Group No 1 Engineering Co Ltd
Priority to CN201610335602.1A priority Critical patent/CN105951683B/en
Publication of CN105951683A publication Critical patent/CN105951683A/en
Application granted granted Critical
Publication of CN105951683B publication Critical patent/CN105951683B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/20Movable barrages; Lock or dry-dock gates
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/08Sinking workpieces into water or soil inasmuch as not provided for elsewhere

Abstract

The present invention provides a kind of gate pier bracket Joint Re-bar Construction, comprises the following steps:First, the place beyond gate pier makes reinforcing bar cage body, and inner support is welded in steel reinforcement cage body;2nd, pier concrete is being poured and is being provided for the external support of spacer bar cage body;3rd, poured pier concrete be provided for support bracket bed die overhanging scaffold support meanss;4th, integral hoisting reinforcing bar cage body and it is accurately positioned;5th, other bar constructions are connected shaping to reinforcing bar cage body with gate pier pier shaft;6th, inner support and external support are removed, waits bracket storehouse concreting;Realize that water conservancy project gate pier or so bracket bar one-time is integral prefabricated and lifting construction by above step.By above step, the lifting positioning one-shot forming of reinforcing bar cage body is realized, the construction of reinforcing bar cage body reinforcing bar secondary welding is carried out without rising with pier shaft, avoids construction interference, improve work efficiency, greatly reduce work high above the ground work amount, reduce security risk, good economy performance.

Description

Gate pier bracket Joint Re-bar Construction
Technical field
The present invention relates to hydraulic structure construction field, particularly a kind of gate pier bracket Joint Re-bar Construction.
Background technology
Water conservancy project gate pier bracket has design structure complexity, bar-mat reinforcement intensive, pre-buried as gate pier critical function works Part is more, construction space is narrow and construction precision requires the features such as high, referring to Fig. 7.Traditional bracket reinforcement installation technique is, by list The reinforcing bar of root after reinforcement yard's completion of processing, then is hoisted in the bracket storehouse of high-altitude, bracket steel according to design specification and pattern Muscle with pier shaft rise welded successively, welding direction it is non-horizontal to.The technique that reinforcing bar scene is directly welded is needed in pier shaft Bottom storehouse time can carry out reinforcing bar spreading of increasing after satisfying the requirements is constructed.Due to embedded part, gate pier in bracket sector reinforcing bar, bracket Pier shaft distribution bar in itself and bracket mould plate supporting device are constructed simultaneously together, therefore traditional mounting process can cause process Cross jamming.Reinforcement welding and wear muscle, embedded part construction amount of high-altitude operation it is huge, working procedure is cumbersome, long construction period, work efficiency It is low, and high-altitude pier body construction narrow space, there is also larger security risk.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of gate pier bracket Joint Re-bar Construction, can realize a gate pier left side Smooth location is integral prefabricated under the reinforcing bar cage body pier of right bracket, cage body lifting positioning one-shot forming, is carried out without rising with pier shaft Cage body reinforcing bar secondary welding is constructed, and can be avoided construction interference as far as possible, be improved work efficiency, greatly reduce work high above the ground work amount, drop Lower security risk.
In order to solve the above technical problems, the technical solution adopted in the present invention is:A kind of gate pier bracket Joint Re-bar Construction, Comprise the following steps:
First, the place beyond gate pier makes reinforcing bar cage body, and inner support is welded in steel reinforcement cage body;
2nd, pier concrete is being poured and is being provided for the external support of spacer bar cage body;
3rd, poured pier concrete be provided for support bracket bed die overhanging scaffold support meanss;
4th, integral hoisting reinforcing bar cage body and it is accurately positioned;
5th, other bar constructions are connected shaping to reinforcing bar cage body with gate pier pier shaft;
6th, inner support and external support are removed, waits bracket storehouse concreting;
Realize that water conservancy project gate pier bracket reinforcing bar is integral prefabricated, lifting construction by above step.
In preferable scheme, described inner support and external support are process using channel-section steel.
In preferable scheme, described inner support is welded on inside steel reinforcement cage body, into frame structure, is set at the top of inner support There is hanger.
In preferable scheme, described reinforcing bar cage body upper surface and lower surface are plane, and upper surface and lower surface are mutual Parallel, external support is tilt stand, so that reinforcing bar cage body keeps tilting after integral hoisting, reinforcing bar cage body is cut with scissors close to gate branch One end it is relatively low.
In preferable scheme, control point mark is provided with each angle point and veil of reinforcing bar cage body, with bracket bed die Template sideline, and the reinforcing bar poured on pier concrete are corresponding.
In preferable scheme, described control point is labeled as the steel bar end of " T " font.
In preferable scheme, branch hinge embedded part is fixedly provided with described steel reinforcement cage body.
In preferable scheme, described inner support is provided with the brace that bottom is connected to from top.
In preferable scheme, in step 4, the steel reinforcement cage body weight heart is checked before lifting;
In preferable scheme, in hoisting process, hand fit's crane is hung using guy wire saws to bracket storehouse position Set position;Coordinated manually by total powerstation control, be finely adjusted using external support, bracket bed die and reinforcing bar cage body are measured Review, it is ensured that the exterior contour of reinforcing bar cage body is accurately positioned, and the reinforcing bar of reinforcing bar cage body is accurately positioned and right with gate pier pier shaft reinforcing bar Connect.
In preferable scheme, in step 5, after reinforcing bar cage body is accurately positioned, reinforcing bar cage body and gate pier pier shaft reinforcing bar are carried out Integral solder is constructed, and gate pier pier shaft reinforcing bar is made up of gate pier pier shaft sector distribution bar and other structure reinforcing bars.
A kind of gate pier bracket Joint Re-bar Construction provided by the invention, by carrying out bracket steel in gate pier bottom smooth location Muscle cage body is prefabricated, the channel-section steel inner support being equipped with, is welded as a whole with reinforcing bar cage body, it is ensured that during lifting reinforcing bar cage body It is stable, the lifting positioning one-shot forming of reinforcing bar cage body is realized, the construction of reinforcing bar cage body reinforcing bar secondary welding is carried out without rising with pier shaft; By the hanger welded on channel-section steel inner support, ensure security of the reinforcing bar cage body in transhipment translation and hoisting process;Pass through steel The spacer bar that muscle cage body is set, realize that the exterior contour of reinforcing bar cage body is accurately positioned, reinforcing bar cage body reinforcing bar and other gate pier piers Body bar construction being accurately positioned and docking;By being arranged on external support of the pier shaft on casting concrete face, after lifting Reinforcing bar cage body is accurately positioned and ensures the stabilization of whole reinforcing bar cage body intermediate structure, and ensures the gradient symbol of reinforcing bar cage body Close design requirement;Recycling for material can be achieved by the dismounting of channel-section steel inner support and support arm.Easy construction of the present invention is fast Speed, it can be achieved to complete the left and right bracket steel reinforcement cage body disposable integral hoisting of gate pier, it is workable, can be more in small space The parallel operations face of opening, the work holdup is avoided, avoid construction interference, improve work efficiency, greatly reduce work high above the ground work amount, reduce safety wind Danger, good economy performance.
Brief description of the drawings
The invention will be further described with reference to the accompanying drawings and examples:
Structural representation when Fig. 1 is the lifting of the present invention.
Fig. 2 is the side structure schematic view of the present invention.
Fig. 3 is the structural representation of reinforcing bar cage body and external support in the present invention.
Fig. 4 is the frame structure schematic top plan view of inner support in the present invention.
Fig. 5 is the schematic diagram of external support and gate pier pier shaft reinforcing bar in the present invention.
Fig. 6 is that branch cuts with scissors embedded part and the connection diagram of gate branch hinge in the present invention.
Fig. 7 is the overall structure diagram of gate in the present invention.
In figure:Reinforcing bar cage body 1, inner support 2, external support 3, brace 4, bracket bed die 5, overhanging scaffold support meanss 6, pour pier concrete 7, gate pier pier shaft reinforcing bar 8, branch hinge embedded part 9, gate branch hinge 10, gate 11.
Embodiment
In Fig. 1 ~ 5, a kind of gate pier bracket Joint Re-bar Construction, comprise the following steps:
First, the place beyond gate pier makes reinforcing bar cage body 1, the welding inner support 2 in reinforcing bar cage body 1;Preferably, channel-section steel Inner support 2 is arranged on the middle part of reinforcing bar cage body 1.
Smooth location near steel bar meter area places sleeper neck, and neck is used to be accurately positioned design bracket bottom master Muscle spacing, the bottom layer of the reinforcing steel net of reinforcing bar cage body 1 is laid according to design drawing, while process the inner support 2 of dimension size, preferably Inner support 2 is process using channel-section steel.18# channel-section steels are preferably used in this example, inner support 2 is into frame structure, such as institute in Fig. 1,3,4 Show.Inner support 2 welds with bottom layer of the reinforcing steel net.Preferably, the top of inner support 2 is welded into 4 hangers using round steel, as steel reinforcement cage Body 1 lifts by crane stress action spot, and 3 diameter 20mm brace 4 is respectively welded at the top of inner support 2 to the side bottom of bracket two.It is single Gate pier has a both sides bracket, and the steel reinforcement cage body phase between the bracket of both sides holds together as shown in Fig. 1,3,4.Preferable scheme In, branch hinge embedded part 9 is fixedly provided with described reinforcing bar cage body 1, as shown in Figure 6.
When bracket reinforcing bar cage body 1 is processed, the reinforcement welding of side and top surface is carried out by design drawing, both ends bracket is in gate pier Between horizontal connection reinforcement welding form an entirety, rectangle channel-section steel inner support 2 is set among reinforcing bar cage body 1, it is ensured that steel reinforcement cage Rigidity and stability during handling.Steel plate and branch hinge embedded part 9 are buried by design in the bracket steel reinforcement cage of both ends, branch hinge Embedded part 9 is firm with the integral solder of reinforcing bar cage body 1 using the support of reinforcing bar sample rack.In preferable scheme, at each angle of reinforcing bar cage body 1 Point and veil mark provided with control point, i.e. 1 each angle point of reinforcing bar cage body and each face welding spacer bar, reinforcing bar wire side is pre- by design Stay protective layer thickness, in preferable scheme, described control point is labeled as the steel bar end of " T " font.Thus structure, with and template Sideline, and the reinforcing bar poured on pier concrete 7 are corresponding.Pacify so that gate pier both ends bracket reinforcing bar cage body 1 is realized on level land Dress construction, a welded and installed shaping, manual operation is simple and efficient, and embedded part installation positioning facilitates accurate.
2nd, pier concrete 7 is being poured and is being provided for the external support 3 of spacer bar cage body 1;External support 3 is arranged in lock In pier, lifting positioning and the effect of load-bearing rest for the outline of reinforcing bar cage body 1.Channel-section steel external support 3 is using 18# channel-section steels processing system Make.
In preferable scheme, described reinforcing bar cage body 1 is the structure of similar cuboid, and upper surface and lower surface are flat Face, and upper surface and lower surface are parallel to each other, external support 3 is tilt stand, so that reinforcing bar cage body 1 keeps setting after integral hoisting The angle of inclination of meter, reinforcing bar cage body 1 are relatively low close to one end of gate branch hinge 10.As shown in Fig. 2,7.
3rd, pier concrete 7 is being poured and is provided for supporting the overhanging scaffold support meanss 6 of bracket bed die 5;
Bracket bed die 5 blocks big plane template using gate pier more and employs overhanging scaffold support, obtains overhanging type pin hand Rack supporting device 6.The collateral point of gate pier has more strap form locating cones and B7 bolts.As shown in Fig. 1,2.
4th, integral hoisting reinforcing bar cage body 1 and positioning is accurately lifted using spacer bar;
The reinforcing bar cage body 1 of machine-shaping, is transported through with flat car, and the center of gravity of reinforcing bar cage body 1 is checked before lifting.Will After the reinforcing bar cage body 1 of shaping is transported to construction part, lifting operation is carried out using 100t cranes.In hoisting process, hand fit Crane carries out lifting positioning using guy wire saws to bracket storehouse position.By total powerstation control cooperation manually, outside using channel-section steel Bracket 3 is finely adjusted, and review is measured to bracket bed die 5 and reinforcing bar cage body 1, realizes that the exterior contour of reinforcing bar cage body 1 is accurate Positioning, the reinforcing bar of reinforcing bar cage body are accurately positioned and docked with gate pier pier shaft reinforcing bar 8, as shown in Figure 5.
5th, other bar constructions are connected shaping to reinforcing bar cage body 1 with gate pier pier shaft;
After bracket reinforcing bar cage body 1 is accurately positioned, reinforcing bar cage body 1 and gate pier pier shaft sector distribution bar and other structures are carried out The integral solder of gate pier pier shaft reinforcing bar 8 construction of reinforcing bar composition.So far, the reinforcing bar of reinforcing bar cage body 1 and embedded part realize whole once mountings Shaping.
6th, inner support 2 and external support 3 are removed, waits bracket storehouse concreting;
After the process before the concreting of bracket storehouse is fully completed, inner support 2 and external support 3 are removed, realizes inner support 2 And external support 3 recycles.
Into after bracket storehouse template construction and concreting process.Water conservancy project bracket typically divides multiple liter layer storehouses time just to pour Build and finish, and gate pier or so bracket generally individually construct by a point storehouse, bracket reinforcing bar is low by storehouse time construction, construction efficiency.In the present invention The integrated construction of bracket reinforcing bar cage body 1 shaping after, it is next liter layer storehouse when, the secondary welding without carrying out bracket reinforcing bar again is applied Work, the globality of bracket steel reinforcement cage 1 is ensure that, there is positive role to the stress condition for improving bracket structure.
Realize that the prefabricated integral hoisting of water conservancy project gate pier bracket steel reinforcement cage is constructed by above step.After the completion of pouring and assembling Bracket and gate are referring to shown in Fig. 6,7.
The above embodiments are only the preferred technical solution of the present invention, and are not construed as the limitation for the present invention, this hair Technical characteristic described in bright, on the premise of not conflicting, use can be combined with each other, protection scope of the present invention should be with right It is required that the equivalents of technical characteristic are protection model in the technical scheme recorded, including the technical scheme of claim record Enclose.Equivalent substitution i.e. within this range is improved, also within protection scope of the present invention.

Claims (10)

  1. A kind of 1. gate pier bracket Joint Re-bar Construction, it is characterized in that comprising the following steps:
    First, the place beyond gate pier makes reinforcing bar cage body(1), in reinforcing bar cage body(1)Interior welding inner support(2);
    2nd, pier concrete is being poured(7)It is provided for spacer bar cage body(1)External support(3);
    3rd, pier concrete is being poured(7)It is provided for supporting bracket bed die(5)Overhanging scaffold support meanss(6);
    4th, integral hoisting reinforcing bar cage body(1)And it is accurately positioned;
    5th, reinforcing bar cage body(1)Other bar constructions are connected shaping with gate pier pier shaft;
    6th, inner support is removed(2)And external support(3), wait bracket storehouse concreting;
    Realize that the prefabricated integral hoisting of water conservancy project gate pier bracket steel reinforcement cage is constructed by above step.
  2. 2. a kind of gate pier bracket Joint Re-bar Construction according to claim 1, it is characterized in that:Described inner support(2)With External support(3)It is process using channel-section steel.
  3. 3. a kind of gate pier bracket Joint Re-bar Construction according to claim 1, it is characterized in that:Described inner support(2)Weldering It is connected on reinforcing bar cage body(1)Inside, into frame structure, inner support(2)Top be provided with hanger.
  4. 4. a kind of gate pier bracket Joint Re-bar Construction according to claim 1, it is characterized in that:Described reinforcing bar cage body(1) Upper surface and lower surface are plane, and upper surface and lower surface are parallel to each other, external support(3)For tilt stand, so that reinforcing bar Cage body(1)Keep tilting after integral hoisting, reinforcing bar cage body(1)Close to gate branch hinge(10)One end it is relatively low.
  5. 5. a kind of gate pier bracket Joint Re-bar Construction according to claim 1, it is characterized in that:In reinforcing bar cage body(1)It is each Individual angle point and veil provided with control point mark, with bracket bed die(5)Template sideline, and poured pier concrete(7)On Reinforcing bar it is corresponding.
  6. 6. a kind of gate pier bracket Joint Re-bar Construction according to claim 5, it is characterized in that:Described control point is labeled as The steel bar end of " T " font.
  7. 7. a kind of gate pier bracket Joint Re-bar Construction according to claim 1, it is characterized in that:Described reinforcing bar cage body(1) Inside it is fixedly provided with branch hinge embedded part(9).
  8. 8. a kind of gate pier bracket Joint Re-bar Construction according to claim 1, it is characterized in that:Described inner support(2)If There is the brace that bottom is connected to from top(4).
  9. 9. a kind of gate pier bracket Joint Re-bar Construction according to claim 1, it is characterized in that:It is right before lifting in step 4 Reinforcing bar cage body(1)Center of gravity is checked;
    In hoisting process, hand fit's crane carries out lifting positioning using guy wire saws to bracket storehouse position;Pass through total powerstation Control coordinates manually, utilizes external support(3)It is finely adjusted, to bracket bed die(5)And reinforcing bar cage body(1)Review is measured, really Protect reinforcing bar cage body(1)Exterior contour be accurately positioned, reinforcing bar cage body(1)Reinforcing bar and gate pier pier shaft reinforcing bar(8)Be accurately positioned and Docking.
  10. 10. a kind of gate pier bracket Joint Re-bar Construction according to claim 1, it is characterized in that:In step 5, reinforcing bar cage body (1)After being accurately positioned, reinforcing bar cage body is carried out(1)With gate pier pier shaft reinforcing bar(8)Integral solder construction, gate pier pier shaft reinforcing bar(8) It is made up of gate pier pier shaft sector distribution bar and other structure reinforcing bars.
CN201610335602.1A 2016-05-19 2016-05-19 Gate pier bracket Joint Re-bar Construction Active CN105951683B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610335602.1A CN105951683B (en) 2016-05-19 2016-05-19 Gate pier bracket Joint Re-bar Construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610335602.1A CN105951683B (en) 2016-05-19 2016-05-19 Gate pier bracket Joint Re-bar Construction

Publications (2)

Publication Number Publication Date
CN105951683A CN105951683A (en) 2016-09-21
CN105951683B true CN105951683B (en) 2018-03-23

Family

ID=56913226

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610335602.1A Active CN105951683B (en) 2016-05-19 2016-05-19 Gate pier bracket Joint Re-bar Construction

Country Status (1)

Country Link
CN (1) CN105951683B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110304588B (en) * 2019-07-05 2020-07-24 河南省水利第二工程局 Gate hoisting construction method used in narrow operation space
CN111305166A (en) * 2020-03-25 2020-06-19 中铁二十局集团第六工程有限公司 Construction method for support frame of bracket template for arc door hinge of overflow gate dam
CN113481944B (en) * 2021-07-26 2022-07-15 中国三峡建工(集团)有限公司 Construction method of dam surface hole connection girder supporting structure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2913453Y (en) * 2006-06-30 2007-06-20 北京中水科海利工程技术有限公司 Gate frusta corbel pre-tensioned nondestructive reinforcing structure
CN101629454A (en) * 2008-07-15 2010-01-20 中国葛洲坝集团股份有限公司 Bracket concrete construction formwork
CN102677638A (en) * 2012-05-25 2012-09-19 黄河勘测规划设计有限公司 Disposing and supporting method for top-exposed arc-door hydraulic hoist
CN103276705A (en) * 2013-05-07 2013-09-04 葛洲坝集团第六工程有限公司 Method for blocking diversion tunnel by cast-in-situ reinforced concrete without gate cutoff and blocking reinforcement cage
CA2922284A1 (en) * 2013-08-31 2015-03-05 Henry Obermeyer Abutment plate for water control gate
CN204456014U (en) * 2015-01-06 2015-07-08 中国电建集团华东勘测设计研究院有限公司 A kind of gate pier ruggedized construction

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2913453Y (en) * 2006-06-30 2007-06-20 北京中水科海利工程技术有限公司 Gate frusta corbel pre-tensioned nondestructive reinforcing structure
CN101629454A (en) * 2008-07-15 2010-01-20 中国葛洲坝集团股份有限公司 Bracket concrete construction formwork
CN102677638A (en) * 2012-05-25 2012-09-19 黄河勘测规划设计有限公司 Disposing and supporting method for top-exposed arc-door hydraulic hoist
CN103276705A (en) * 2013-05-07 2013-09-04 葛洲坝集团第六工程有限公司 Method for blocking diversion tunnel by cast-in-situ reinforced concrete without gate cutoff and blocking reinforcement cage
CA2922284A1 (en) * 2013-08-31 2015-03-05 Henry Obermeyer Abutment plate for water control gate
CN204456014U (en) * 2015-01-06 2015-07-08 中国电建集团华东勘测设计研究院有限公司 A kind of gate pier ruggedized construction

Also Published As

Publication number Publication date
CN105951683A (en) 2016-09-21

Similar Documents

Publication Publication Date Title
CN105298100B (en) A kind of cylinder building cast-in-place flare structure of superelevation is encorbelmented the construction method of operation platform
CN105951683B (en) Gate pier bracket Joint Re-bar Construction
CN105220619B (en) A kind of method of quick manufacture two-wire nose circle solid pier
CN105908902A (en) Positioning frame for prefabricated pier column reinforcing bar cages and construction method of pier column reinforcing bar cages
CN108589535A (en) A kind of reinforced concrete box girder construction method
CN205367454U (en) Large -size formwork hoisting machine constructs
CN206941595U (en) Rotary digging stake irrigates concrete catheter connection device
CN207090788U (en) A kind of special tie-beam for being used for two cranes and synchronously lifting
CN207293909U (en) A kind of precast beam reinforced bar skeleton hanging apparatus
CN207497887U (en) A kind of dedicated unit for being used to lift ladle turret
CN205617664U (en) Prefabricated pier stud locating rack for steel reinforcement cage
CN213061742U (en) Integral hoisting device for continuous beam web plate reinforcing steel bars
CN210127053U (en) Concrete lifting device for building construction
CN209227391U (en) Self-propelled bridge-collision-avoidance wall form trolley
CN208219546U (en) A kind of pile cover integral inverted hangs bottom system
CN209923791U (en) Workpiece for cross-line construction of formwork suspension casting combined system
CN206986739U (en) Tilting pier shaft casting system
CN206941596U (en) A kind of shoulder pole boom device for lifting steel reinforcement cage
CN207017652U (en) A kind of wet joint template dismounting construction tool
CN111501562A (en) Cable tower operation platform template separation lift system
CN105569327B (en) A kind of concrete filled steel tube height throws construction frame body and its application method
CN108411847A (en) A kind of pile cover integral inverted hangs bottom system and its application method
CN219952739U (en) Turnover supporting device for binding ultra-deep foundation beam steel bars
CN209620409U (en) A kind of reinforced mesh stirrup
CN108453887A (en) T beam steel cages integrally manufacture mould

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant