CN206941596U CN201720901840.4U CN201720901840U CN206941596U CN 206941596 U CN206941596 U CN 206941596U CN 201720901840 U CN201720901840 U CN 201720901840U CN 206941596 U CN206941596 U CN 206941596U
Authority
CN
China
Prior art keywords
reinforcement cage
steel reinforcement
shoulder pole
hoisting bracket
vertical beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720901840.4U
Other languages
Chinese (zh)
Inventor
李维
王鹏
郭藩威
刘思男
李贻朋
陈龙
宋金菊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 11th Bureau Group Co Ltd
First Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd
Original Assignee
China Railway 11th Bureau Group Co Ltd
First Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 11th Bureau Group Co Ltd, First Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd filed Critical China Railway 11th Bureau Group Co Ltd
Priority to CN201720901840.4U priority Critical patent/CN206941596U/en
Application granted granted Critical
Publication of CN206941596U publication Critical patent/CN206941596U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model provides a kind of shoulder pole boom device for lifting steel reinforcement cage, hoisting bracket including shoulder pole girder, located at shoulder pole girder upper end corner, the shoulder pole girder is welded into a square framework by channel-section steel, including crossbeam, the vertical beam being mutually connected vertically, connect to form square using four diagonal braces between adjacent beams and vertical beam, the hoisting bracket is arranged on the tip position of crossbeam and vertical beam, the hoisting bracket is Heave Here when crane lifts by crane steel reinforcement cage, and the hoisting bracket has the upper hole for hoist of connection crane rope and the lower hole for hoist of connection steel reinforcement cage steel wire rope.The utility model efficiently, can be positioned quickly to decentralization steel reinforcement cage, it is not only convenient and swift, being capable of Reusability, reduce the input of material, the engineering time is saved, accelerating construction progress, construction quality is ensure that, but also there is the advantages of simple in construction, easy to use, is especially suitable for using in steel reinforcement cage spreading decentralization process.

Description

A kind of shoulder pole boom device for lifting steel reinforcement cage
Technical field
Pile foundation construction field is the utility model is related to, specifically a kind of shoulder pole boom device for lifting steel reinforcement cage.
Background technology
With the propulsion of urbanization process, Urban Bridge road carries out Large scale construction.Urban elevated bridge drills Filling pile construction process is mainly:Stake holes is formed in foundation soil by machine drilling means, reinforcing bar is then placed in stake holes Cage, last concrete perfusion.Wherein, during above-mentioned bored pile construction, prior art is pacified by steel reinforcement cage Before putting in stake holes, stake holes shape is treated in the borehole filling pile cage of reinforcement section directly stacking for typically completing colligation at the construction field (site) Into afterwards, steel reinforcement cage is integrally transferred in stake holes using the operating type of " in decentralization splice ", specifically, single-unit drilled Steel reinforcement cage is transferred one by one, and, it is necessary to by the steel reinforcement cage section of rear decentralization and preceding decentralization while single-unit drilling steel reinforcement cage decentralization Steel reinforcement cage section be attached above stake mouth.
At present, just can guarantee that upper and lower in steel reinforcement cage transfers connection procedure, it is necessary to positioned to the steel reinforcement cage of decentralization Stabilization and safety during two section steel reinforcement cage connections.Now in many deep water large-diameter pile foundation engineering constructions, under steel reinforcement cage Orientation problem is lifted when putting connection, typically directly using steel wire rope lifting positioning.Due to the length of deep water large diameter pile foundation steel reinforcement cage Degree length, weight is big, its overall discontinuity during lifting, easily causes reinforcing bar and curves inwardly, and it is difficult connection to cause;In addition, by Bigger in steel reinforcement cage volume and weight, stiffening ring intensity can not meet the requirement of construction, it may appear that flexural deformation, it is easy to make Into connection off normal.For this reason, it may be necessary to a kind of shoulder pole boom device of special lifting steel reinforcement cage is designed, when ensureing steel reinforcement cage decentralization connection Hole position accuracy is higher, and stability is stronger, security is relatively reliable.
The content of the invention
A kind of the defects of the purpose of this utility model is to overcome above-mentioned existing lifting, there is provided shoulder pole for lifting steel reinforcement cage Boom device, the device efficiently, can be positioned quickly to decentralization steel reinforcement cage, while the structure of the device is simple, and stability is high, And the material of lifting makes and very easy to use, section medicine raw material and construction cost, execute-in-place is both facilitated, again Construction speed is improved, while also assures that production safety.
A kind of shoulder pole boom device for lifting steel reinforcement cage, including the lifting branch including shoulder pole girder, located at shoulder pole girder upper end corner Frame, the shoulder pole girder are welded into a square framework by channel-section steel, including crossbeam, the vertical beam being mutually connected vertically, adjacent beams It is connected to form square using four diagonal braces between vertical beam, the hoisting bracket is arranged on the tip position of crossbeam and vertical beam, The hoisting bracket is Heave Here when crane lifts by crane steel reinforcement cage, and the hoisting bracket has the upper lifting of connection crane rope Hole and the lower hole for hoist of connection steel reinforcement cage steel wire rope.
Further, the position of the crossbeam and the vertical beam vertical connection is welded using junction steel plate, spacing steel plate Connect, position that the crossbeam, the vertical beam connect with the diagonal brace is welded using steel plate is strengthened, the crossbeam, described perpendicular Beam is welded with the hoisting bracket using steel plate.
Compared with prior art, the utility model at least has the advantages that:The shoulder pole girder dress of the lifting steel reinforcement cage Put not only it is convenient and swift, can Reusability, reduce the input of material, saved the engineering time, accelerating construction progress, ensure Construction quality, but also with it is simple in construction, easy to use the advantages of, be especially suitable for making in steel reinforcement cage spreading decentralization process With.In addition, when without the lifting of steel reinforcement cage, this device is also used as lifting the device of other equipment.
Brief description of the drawings
Fig. 1 is the shoulder pole boom device elevation that steel reinforcement cage is lifted in the utility model;
Fig. 2 is the shoulder pole boom device top view that steel reinforcement cage is lifted in the utility model;
Fig. 3 is the elevation of the utility model middle cross beam;
Fig. 4 is the elevation of vertical beam in the utility model;
Fig. 5 is the elevation of diagonal brace in the utility model.
Fig. 6 is the elevation of hoisting bracket in the utility model.
In figure:1-crossbeam;2-vertical beam;3-junction steel plate;4-hoisting bracket;5-spacing steel plate;6-strengthen steel plate; 7-diagonal brace;8-go up hole for hoist:9-lower hole for hoist.
Embodiment
Below in conjunction with the accompanying drawing in the utility model, the technical scheme in the utility model is carried out clearly and completely Description.
Fig. 1 and Fig. 2 is refer to, the shoulder pole boom device of the utility model lifting steel reinforcement cage includes shoulder pole girder, located at shoulder pole girder The hoisting bracket 4 of upper end corner, the shoulder pole girder are welded into a square framework, including the horizontal stroke being mutually connected vertically by channel-section steel Beam 1, vertical beam 2, square is formed using four connections of diagonal brace 7 between adjacent beams 1 and vertical beam 2.Crossbeam 1 and 2 vertical phase of vertical beam The position connect is welded using junction steel plate 3, spacing steel plate 5, to prevent lifting from deforming;Crossbeam 1, vertical beam 2 connect with diagonal brace 7 Position welded using steel plate 6 is strengthened, crossbeam 1, vertical beam 2 and hoisting bracket 4 are welded using steel plate, to prevent hoisting bracket Come off.
Fig. 3, Fig. 4, Fig. 5 are refer to, the crossbeam 1, vertical beam 2, diagonal brace 7 are processed welding using channel-section steel.
Fig. 6 is refer to, the hoisting bracket 4 is Heave Here when crane lifts by crane steel reinforcement cage.The hoisting bracket 4, which has, hangs oneself Hole 8, lower hole for hoist 9 are filled, during lifting, the upper hole for hoist 8 of crane rope lifting, lower hole for hoist 9 is connected with steel reinforcement cage by steel wire rope Connect lifting.
After all parts of the utility model embodiment steel reinforcement cage finish according to design requirement, crane uses steel wire rope first The shoulder pole boom device for filling steel reinforcement cage is sling by upper hole for hoist 8, then hole for hoist 9 passes through steel wire rope and steel under shoulder pole girder lower end Lifting point connects on muscle cage, and steel reinforcement cage is slowly sling and moved at hole position by crane, carries out docking decentralization.
It is described above, only specific embodiment of the present utility model, but the scope of protection of the utility model is not limited to It is any to belong to those skilled in the art in the technical scope that the utility model discloses in this, the change that can be readily occurred in Change or replace, should all cover within the scope of protection of the utility model.

Claims (2)

  1. A kind of 1. shoulder pole boom device for lifting steel reinforcement cage, it is characterised in that:Including including shoulder pole girder, located at shoulder pole girder upper end corner Hoisting bracket (4), the shoulder pole girder is welded into a square framework by channel-section steel, including be mutually connected vertically crossbeam (1), Vertical beam (2), formation square, the hoisting bracket (4) are connected using four diagonal braces (7) between adjacent beams (1) and vertical beam (2) Installed in the tip position of crossbeam (1) and vertical beam (2), the Heave Here when hoisting bracket (4) is crane lifting steel reinforcement cage, and institute Stating hoisting bracket (4) has the upper hole for hoist (8) of connection crane rope and connects the lower hole for hoist (9) of steel reinforcement cage steel wire rope.
  2. 2. the shoulder pole boom device of lifting steel reinforcement cage as claimed in claim 1, it is characterised in that:The crossbeam (1) is erected with described The position of beam (2) vertical connection is welded using junction steel plate (3), spacing steel plate (5), the crossbeam (1), the vertical beam (2) position to connect with the diagonal brace (7) is welded using steel plate (6) is strengthened, the crossbeam (1), the vertical beam (2) and institute Hoisting bracket (4) is stated to weld using steel plate.
CN201720901840.4U 2017-07-24 2017-07-24 A kind of shoulder pole boom device for lifting steel reinforcement cage Expired - Fee Related CN206941596U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720901840.4U CN206941596U (en) 2017-07-24 2017-07-24 A kind of shoulder pole boom device for lifting steel reinforcement cage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720901840.4U CN206941596U (en) 2017-07-24 2017-07-24 A kind of shoulder pole boom device for lifting steel reinforcement cage

Publications (1)

Publication Number Publication Date
CN206941596U true CN206941596U (en) 2018-01-30

Family

ID=61371260

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720901840.4U Expired - Fee Related CN206941596U (en) 2017-07-24 2017-07-24 A kind of shoulder pole boom device for lifting steel reinforcement cage

Country Status (1)

Country Link
CN (1) CN206941596U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112647425A (en) * 2020-12-03 2021-04-13 中建六局土木工程有限公司 Integral hoisting construction method for pier stud reinforcement cage
CN116902763A (en) * 2023-08-08 2023-10-20 武汉客车制造股份有限公司 Integral hoisting scheme for overlength and overweight shelter

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112647425A (en) * 2020-12-03 2021-04-13 中建六局土木工程有限公司 Integral hoisting construction method for pier stud reinforcement cage
CN116902763A (en) * 2023-08-08 2023-10-20 武汉客车制造股份有限公司 Integral hoisting scheme for overlength and overweight shelter
CN116902763B (en) * 2023-08-08 2024-04-26 武汉客车制造股份有限公司 Integral hoisting scheme for overlength and overweight shelter

Similar Documents

Publication Publication Date Title
CN101302760A (en) Ultralong overweight concrete filling pile reinforcement type reinforcing steel bar caging
CN203403418U (en) Steel casing double-layer guide frame structure
CN206467667U (en) Suspended net shotcrete building enclosure between a kind of stake of use expansion type fixation reinforced mesh
CN103510541B (en) In a kind of mast-up hole, the device of steel pipe column is installed in lifting
CN110106881A (en) A kind of steel-pipe pile construction guidance locating rack and construction method
CN106869032A (en) Bridge bearing platform beam tying construction method
CN206941596U (en) A kind of shoulder pole boom device for lifting steel reinforcement cage
CN205934735U (en) A operation platform for stretch -draw of cantilever bent cap
CN107227741B (en) Basement supporting construction
CN210438260U (en) Major diameter steel protects a hoisting structure
CN205889488U (en) Steel sleeve box's precast reinforced concrete back cover template and hoist device thereof
CN205934931U (en) Lid is in same direction as foundation ditch structure of digging way of doing things construction
CN104499706A (en) Elevator well template platform and construction method thereof
CN201972095U (en) Chain block lifting platform for thin-walled hollow piers of bridges
CN207863871U (en) A kind of derrick for repairing equipment for petroleum drilling
CN204510221U (en) Rotary marine piling saddle
CN103132508A (en) Pile-filling machine
CN106437158A (en) Material spreader supporting device and method
CN105951683A (en) Construction method for corbel steel reinforcements of gate pier
CN105401581B (en) Reinforcement cage hanging device and reinforcement cage splicing method
CN105544551B (en) A kind of super-long filling pile quickly transfers the construction method of steel reinforcement cage
CN212612488U (en) Movable underwater concrete pouring guide pipe trolley
CN211621558U (en) Bored concrete pile steel reinforcement cage elevation control mounting structure
CN206616552U (en) A kind of support cage assembly of stable spacer bar cage
CN107059872A (en) Oblique cord pile extracting method and oblique cord pile pulling system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180130

CF01 Termination of patent right due to non-payment of annual fee