CN111501562A - Cable tower operation platform template separation lift system - Google Patents

Cable tower operation platform template separation lift system Download PDF

Info

Publication number
CN111501562A
CN111501562A CN202010317982.2A CN202010317982A CN111501562A CN 111501562 A CN111501562 A CN 111501562A CN 202010317982 A CN202010317982 A CN 202010317982A CN 111501562 A CN111501562 A CN 111501562A
Authority
CN
China
Prior art keywords
lifting frame
fixedly arranged
operation platform
supporting rod
enclosure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010317982.2A
Other languages
Chinese (zh)
Inventor
李习春
杨天伟
肖广生
何润
汤立强
刘洋
徐锁军
蔡伟敏
龚山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Engineering Co Ltd
CCCC First Highway Xiamen Engineering Co Ltd
Original Assignee
CCCC First Highway Engineering Co Ltd
CCCC First Highway Xiamen Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Engineering Co Ltd, CCCC First Highway Xiamen Engineering Co Ltd filed Critical CCCC First Highway Engineering Co Ltd
Priority to CN202010317982.2A priority Critical patent/CN111501562A/en
Publication of CN111501562A publication Critical patent/CN111501562A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D1/00Rope, cable, or chain winding mechanisms; Capstans
    • B66D1/02Driving gear
    • B66D1/12Driving gear incorporating electric motors
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F3/00Devices, e.g. jacks, adapted for uninterrupted lifting of loads
    • B66F3/24Devices, e.g. jacks, adapted for uninterrupted lifting of loads fluid-pressure operated

Abstract

The application provides a cable tower operation platform template separation lift system, including template system, braced system and protection system. The template system comprises an inner mold and an outer mold, wherein the inner mold and the outer mold are fixedly connected through a split screw; the supporting system comprises a surrounding ring, a lifting frame and a supporting rod, the supporting rod is fixedly arranged in concrete, the lifting frame is fixedly arranged on the surrounding ring, the surrounding ring is sleeved outside the outer die, a center-penetrating jack is arranged on the lifting frame, the center-penetrating jack is in transmission connection with the supporting rod, and the outer die is hung on the lifting frame; the protection system comprises an operation table and guardrails, the operation table is hung below the enclosure, and the guardrails are fixedly arranged on the periphery of the operation table. The whole supporting system can be driven to wholly climb by climbing upwards along the supporting rod through the piercing jack, the next section of steel bar construction procedure is carried out, and the whole construction process is continuous; the construction is carried out in the mode that the die assembly mode is the same as that of a creeping formwork, the sliding and overturning integrated process has the advantage of being combined with the overturning, and the appearance quality the same as that of the overturning formwork can be achieved while the construction speed is equivalent to that of a sliding formwork.

Description

Cable tower operation platform template separation lift system
Technical Field
The application relates to the technical field of high-tower high-pier construction, in particular to a cable tower operation platform template separation lifting system.
Background
At present, with the rapid development of traffic needs and the progressive progress of bridge technology, modern bridges are gradually developed towards large span, and due to structural needs and restrictions of landforms and landforms at bridge positions, bridge piers over hundreds of meters in bridge design and cable towers over hundreds of meters in bridge design are not rarely applied to cable-stayed bridges and suspension bridges, which puts higher requirements on construction technology. The cable tower column with the height is a difficult problem in modern bridge construction in terms of how to achieve high quality, safety and high efficiency of construction.
In the early construction of high pier and high tower, the slip form process and the turnover form process are applied more. The slip-form process has the characteristics of high construction progress, small occupied site, strong structural integrity, good comprehensive environmental and economic benefits and the like, but the pier column is poor in appearance quality during slip-form construction, high in construction organization difficulty and incapable of meeting the requirements of construction difficulty and construction quality at the present stage. In the turnover mold process, a pier body is used as a support main body, an upper layer template is supported on a lower layer template, and the pier body and the lower layer template are circularly and alternately lifted. The construction method has the characteristics of good entity and appearance quality and less investment, but the construction progress is slow, the whole wind resistance is poor, the safety factor is small, and the safety risk is high.
Disclosure of Invention
In order to solve the above technical object, the present application provides a cable tower operation platform template separation lift system, including:
the template system comprises an inner mold and an outer mold, and the inner mold and the outer mold are fixedly connected through a split screw;
the supporting system comprises a surrounding ring, a lifting frame and a supporting rod, wherein the supporting rod is fixedly arranged in concrete, the lifting frame is fixedly arranged on the surrounding ring, the surrounding ring is sleeved on the outer side of the outer die, a center-penetrating jack is arranged on the lifting frame, the center-penetrating jack is in transmission connection with the supporting rod, and the outer die is hung on the lifting frame;
the protection system comprises an operation table and guardrails, the operation table is hung below the enclosure, and the guardrails are fixedly arranged on the periphery of the operation table.
Optionally, the hoisting frame is of an F-shaped structure, the hoisting frame comprises a main beam, a cantilever and a reinforcing rod, the main beam is vertically fixed above the enclosure, the cantilever is fixedly arranged on the upper portion of the main beam, the cantilever extends to the inner side of the enclosure, the reinforcing rod is obliquely fixed between the cantilever and the main beam, and the center-penetrating jack is fixedly arranged on the cantilever.
Optionally, a base plate is laid on the top of the enclosure, and a fence is arranged around the enclosure.
Optionally, a protective net is arranged on the fence.
Optionally, the protection system further comprises a ladder.
Optionally, a spray header is further disposed on the operation table.
By applying the technical scheme, the whole supporting system can be driven to climb upwards along the supporting rod through the penetrating jack, the supporting system does not need to climb after the concrete poured on the upper layer reaches a certain strength, the supporting system can be lifted only after the concrete pouring is finished, the next section of steel bar construction procedure is carried out, the whole construction procedure is continuous and uninterrupted, and no nest work phenomenon exists; adopt single set of template, reduced one set of external mold cost, simultaneously according to inside cavity size, changed inside slipform form, adopt the tower crane cooperation to carry out construction, reduce inside hoist system's expenditure, utilize electric block to carry out the template promotion to the form that the compound die mode is the same with the creeping formwork is under construction, possesses the advantage that the combination integration technology is turned over in the cunning, can accomplish the appearance quality the same with the mould that turns over when guaranteeing construction speed and slipform are equivalent.
Drawings
FIG. 1 is a schematic structural diagram of an embodiment of the present application;
FIG. 2 is a schematic view of the structure of the enclosure of FIG. 1;
fig. 3 is a schematic structural view of the lifting frame in fig. 1.
Detailed Description
As shown in fig. 1-3, the present application provides a cable tower operations platform formwork separation hoist system comprising a formwork system, a support system, and a shield system. The template system comprises an inner mold 8 and an outer mold 9, wherein the inner mold 8 and the outer mold 9 are fixedly connected through a split screw; the supporting system comprises a surrounding ring 1, a lifting frame 4 and a supporting rod 10, wherein the supporting rod 10 is fixedly arranged in concrete 15, the lifting frame 4 is fixedly arranged on the surrounding ring 1, the surrounding ring 1 is sleeved outside an outer die 9, a center-penetrating jack 11 is arranged on the lifting frame 4, the center-penetrating jack 11 is in transmission connection with the supporting rod 10, and the outer die 9 is hung on the lifting frame 4; the protection system comprises an operation platform 6 and guardrails 7, wherein the operation platform 6 is hung below the enclosure 1, and the guardrails 7 are fixedly arranged on the periphery of the operation platform 6.
In this embodiment, hoisting frame 4 is F type structure, and hoisting frame 4 includes girder 12, cantilever 13 and stiffener 14, and girder 12 is vertical to be fixed in enclosure 1 top, and cantilever 13 level sets firmly in the upper portion of girder 12, and cantilever 13 stretches to enclosure 1's inboard, and stiffener 14 slope is fixed between cantilever 13 and girder 12, and center-penetrating jack 11 sets firmly on cantilever 13, and external mold 9 sets firmly in cantilever 13 below.
In this embodiment, a backing plate 2 is laid on the top of the enclosure 1, and a fence 3 is arranged around the enclosure 1.
Optionally, a protective net is provided on the fence 3.
In this embodiment, for the convenience of operation, the protection system further comprises a ladder stand, the ladder stand is located on the outer side of the outer mold, and the ladder stand is fixed between the enclosure 1 and the operation table 6.
In this embodiment, a spray header is further provided on the operation table 6 for performing spray maintenance on the concrete 15.
When the supporting system is used, the whole supporting system can be driven to climb upwards along the supporting rod through the center-penetrating jack, the supporting system does not need to climb after the concrete poured on the upper layer reaches a certain strength, the supporting system can be lifted only after the concrete pouring is finished, the next section of reinforcing steel bar construction procedure is carried out, the whole construction procedure is continuous and uninterrupted, and no nest work phenomenon exists; adopt single set of template, reduced one set of external mold cost, simultaneously according to inside cavity size, changed inside slipform form, adopt the tower crane cooperation to carry out construction, reduce inside hoist system's expenditure, utilize electric block to carry out the template promotion to the form that the compound die mode is the same with the creeping formwork is under construction, possesses the advantage that the combination integration technology is turned over in the cunning, can accomplish the appearance quality the same with the mould that turns over when guaranteeing construction speed and slipform are equivalent.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. A cable tower operation platform template separation lift system, comprising:
the template system comprises an inner mold and an outer mold, and the inner mold and the outer mold are fixedly connected through a split screw;
the supporting system comprises a surrounding ring, a lifting frame and a supporting rod, wherein the supporting rod is fixedly arranged in concrete, the lifting frame is fixedly arranged on the surrounding ring, the surrounding ring is sleeved on the outer side of the outer die, a center-penetrating jack is arranged on the lifting frame, the center-penetrating jack is in transmission connection with the supporting rod, and the outer die is hung on the lifting frame;
the protection system comprises an operation table and guardrails, the operation table is hung below the enclosure, and the guardrails are fixedly arranged on the periphery of the operation table.
2. The cable tower operation platform formwork separation and lifting system of claim 1, wherein the lifting frame is of an F-shaped structure, the lifting frame comprises a main beam, a cantilever and a reinforcing rod, the main beam is vertically fixed above the enclosure, the cantilever is fixedly arranged on the upper portion of the main beam, the cantilever extends to the inner side of the enclosure, the reinforcing rod is obliquely fixed between the cantilever and the main beam, and the center-penetrating jack is fixedly arranged on the cantilever.
3. The cable tower operation platform formwork separation lifting system of claim 1, wherein a backing plate is laid on the top of the enclosure, and a fence is arranged around the enclosure.
4. The cable tower operation platform formwork separation lifting system of claim 3, wherein a protective net is arranged on the fence.
5. The cable tower operation platform form separation lift system of claim 1, wherein the protection system further comprises a ladder.
6. The cable tower operation platform formwork separation lift system of claim 1, wherein a spray header is further provided on the operation table.
CN202010317982.2A 2020-04-21 2020-04-21 Cable tower operation platform template separation lift system Pending CN111501562A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010317982.2A CN111501562A (en) 2020-04-21 2020-04-21 Cable tower operation platform template separation lift system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010317982.2A CN111501562A (en) 2020-04-21 2020-04-21 Cable tower operation platform template separation lift system

Publications (1)

Publication Number Publication Date
CN111501562A true CN111501562A (en) 2020-08-07

Family

ID=71865929

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010317982.2A Pending CN111501562A (en) 2020-04-21 2020-04-21 Cable tower operation platform template separation lift system

Country Status (1)

Country Link
CN (1) CN111501562A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113148893A (en) * 2021-04-17 2021-07-23 中交路桥建设有限公司 Hydraulic jacking load-bearing support and mounting method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113148893A (en) * 2021-04-17 2021-07-23 中交路桥建设有限公司 Hydraulic jacking load-bearing support and mounting method thereof

Similar Documents

Publication Publication Date Title
CN104695337B (en) Self-lifting sliding and turnover construction system and construction method
CN105839536A (en) Construction method of cable-stayed bridge pylon
CN105839543B (en) Bridge High-pier rises outrigger over-form construction technique certainly
CN113235472A (en) Concrete placement platform truck is contained to apron
CN107044090A (en) A kind of construction method of dual deck bridge
CN103290784A (en) Arched beam combination bridge lifting construction method
CN209780230U (en) Construction hydraulic pressure template climbing device
CN114575589B (en) Construction method for electric hoist lifting formwork of steel reinforced concrete structural column
CN208122461U (en) The construction equipment of towering structure
CN106869479A (en) Bailey bracket sliding formwork system construction method
CN111519545A (en) Pier and capping beam integrated construction platform and construction method thereof
CN111501562A (en) Cable tower operation platform template separation lift system
CN112726442A (en) Construction method of large-span thin-wall concrete sound barrier pouring trolley
CN212358013U (en) Cable tower operation platform template separation lift system
CN207727440U (en) Whole self-crawling type integrated platform for bridge tower construction
CN214993219U (en) Concrete placement platform truck is contained to apron
CN114351625B (en) Reinforced concrete flower box guardrail and construction method
CN212426772U (en) Suspended bracket system for cast-in-place bridge deck of steel plate composite beam
CN113502756A (en) Thin-wall pier hydraulic creeping formwork system and construction method thereof
CN107419670A (en) Hybrid structure of arch and beam formula continuous rigid frame bridge winds up walking cradle construction device and method
CN212771954U (en) Pier and bent cap integral type construction platform
CN113373815A (en) Construction method for on-site wet joint of prefabricated bent cap
CN108677750B (en) Assembled railroad bridge rotation construction method
CN219490682U (en) Basket hanging device for prestress construction of light T-pier cantilever cap beam
CN218933831U (en) A construction structures for high mound processing

Legal Events