CN102398305B - Method for producing precast concrete piles - Google Patents

Method for producing precast concrete piles Download PDF

Info

Publication number
CN102398305B
CN102398305B CN201010604071.4A CN201010604071A CN102398305B CN 102398305 B CN102398305 B CN 102398305B CN 201010604071 A CN201010604071 A CN 201010604071A CN 102398305 B CN102398305 B CN 102398305B
Authority
CN
China
Prior art keywords
precast concrete
mould
concrete pile
die
steel reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201010604071.4A
Other languages
Chinese (zh)
Other versions
CN102398305A (en
Inventor
俞晓东
谢建富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NINGBO YIZHONG CONCRETE PILE CO LTD
Original Assignee
NINGBO YIZHONG CONCRETE PILE CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=45881154&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=CN102398305(B) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by NINGBO YIZHONG CONCRETE PILE CO LTD filed Critical NINGBO YIZHONG CONCRETE PILE CO LTD
Priority to CN201010604071.4A priority Critical patent/CN102398305B/en
Publication of CN102398305A publication Critical patent/CN102398305A/en
Application granted granted Critical
Publication of CN102398305B publication Critical patent/CN102398305B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention relates to a method for producing precast concrete piles, which comprises the following main steps of: manufacturing a reinforcement cage; placing the reinforcement cage into a die; pouring concrete into the die; centrifugally rotating; and carrying out steam curing. The method is characterized in that the die with the length of over 20 meters is adopted in the method; two or a plurality of precast concrete piles can be simultaneously produced by one die; upper and lower half dies of the die have a transporting mode of transversely moving in parallel in the direction vertical to the axis of a crane beam of a plant in the production process; and centrifugal equipment and a curing tank are transversely arranged in parallel in the direction vertical to the axis of the crane beam of the plant. Due to the adoption of the transverse flow production scheme of the long die, the production effect can be multiplied, the space occupied by the plant is greatly reduced, a great amount of lands are saved, the working efficiency is improved, and the production quality can be ensured.

Description

A kind of production method of precast concrete pile
Technical field
The present invention relates to a kind of method of the 20 meters of above horizontal flowing water work production of long mould precast concrete piles.
Background technology
In foundation engineering, often need to use all kinds of centrifugal concrete piles, and the manufacture method of existing centrifugal concrete pile is to adopt the rigidity mould that is less than 15 meters, a mould once also can only be manufactured a more than 10 meters centrifugal concrete pile. and according to prestress high intensity concrete square pile production method described in the patent No. 200710068545.6, be also that general tubular pile centrifugal technique simply develops, above-mentioned common technique, there is very many latent defects, hanging as frequent in pile body, dew stone, remaining slurry are stayed in a hole, main muscle off normal, packing is inadequate, the serious fatal problem waiting of interior layering.And production efficiency is low, waste mass energy, production line takies a large amount of soils, does not meet national industry development policies, labor strength is large and dangerous.
Summary of the invention
For the deficiencies in the prior art, the invention provides a kind of production method of brand-new, efficient, safe precast concrete pile.
To achieve these goals, the technical solution used in the present invention is:
1, a kind of production method of precast concrete pile, its key step comprises: make steel reinforcement cage, steel reinforcement cage is put into precast concrete pile die, in mould, inject concrete, mould is inserted and on centrifugation apparatus, carried out centrifugal rotation, at curing pool, carry out steam curing, the demoulding is also taken out the concrete-pile of moulding; It is characterized in that: described precast concrete pile die is 20 meters of above long moulds, a mould can be produced branched precast concrete pile simultaneously, on mould, female die transportation is in process of production with perpendicular to the horizontal parallel of factory building crane beam axis direction, described centrifugation apparatus, curing pool are laterally arranged in parallel perpendicular to factory building crane beam axis direction, go out a track and are positioned at Chai Zhuan district.Adopt the beneficial effect of this scheme to be, a mould can be produced branched precast concrete pile simultaneously, has improved greatly production efficiency; Adopt transverse shifting, laterally, after continuous productive process, the space that can reduce factory building, can make steel reinforcement cage operation area be arranged in one across in factory building, makes process layout more reasonable, thereby saves a large amount of soils, increases work efficiency, and production safety is orderly.
2, a production method for precast concrete pile, wherein the internal diameter of prefabricated concrete pipe pile mould is 300 millimeters~600 millimeters.
3, a production method for precast concrete pile, production stage specifically comprises:
A, making precast concrete pile cages;
B, ready two or more steel reinforcement cages are loaded onto to end plate by intermediate joint device, join end to end and connect, be yi word pattern;
C, precast concrete pile die is taken apart as upper and lower half module with wind big gun; Upper mold section is winched on the clean-up frame in patrix clearing zone with crane, the two or more steel reinforcement cages that simultaneously step b connected winch in female die, then at the two ends of mould, load onto precast concrete pile end plate, anchor plate, stretch board, stretching support board;
D, the female die that installs steel reinforcement cage is winched on flat car by crane;
E, the concrete preparing is injected to the female die that installs steel reinforcement cage by feeding hopper;
F, upper mold section and female die are closed up, die bolt is screwed and put in place with wind big gun;
G, by the steel reinforcement cage after jack pair matched moulds, carry out prestressing force stretching, be stretched to the numerical value that meets national standard;
H, mould good prestressed stretch-draw is winched to High Rotation Speed on centrifugation apparatus with crane;
I, the pulp-water in mould is toppled over out;
J, mould is winched in curing pool together with concrete-pile, carry out steam curing;
K, mould is taken apart with wind big gun, two in same mould or branched precast concrete pile are carried out to stripping operation, remove intermediate joint device, by the dolly in Chu Zhuan district, be transported to a stockyard, then carry out next step circulation and produce.
4, above-mentioned crane, when handling mould and steel reinforcement cage, adopts the mode of multiple spot lifting, to coordinate the long mould of precast concrete pile.Can avoid like this in handling process because of mould and steel reinforcement cage is long damages or be out of shape.
5, the two ends of described centrifugation apparatus respectively arrange a motor, and can guarantee like this has sufficient power after long mould is placed on centrifugation apparatus, and guarantee that long both mold ends is stressed evenly synchronous.
6, a kind of production method of precast concrete pile, production technology described in it in factory building arrange comprise steel reinforcement cage processing district 1 and successively adjacent steel reinforcement cage stockyard 2, go out a track 3, Chai Zhuan district 4, curing pool 5, patrix clearing zone 6, centrifugation apparatus 7, feeding zone 8, remaining slurry retracting device 13, hauling operation crane 14 and the crane beam 15 between stretched zone 9, mixing plant 10, concrete ferry-boat transportation system 11, the dull and stereotyped track 12 of feeding, patrix district and centrifugal district and main building connect across precast concrete pile stockyard 16.The beneficial effect of this layout is, can make to produce more orderly, can coordinate long mould and horizontal flowing water layout, greatly enhances productivity, disorderly and unsystematic or grow potential safety hazard in avoiding producing.
Accompanying drawing explanation
Fig. 1 is one embodiment of the invention production technology arrangement schematic diagram;
Fig. 2 is that two steel reinforcement cages are loaded onto end plate by the intermediate joint device map interlinking that joins end to end;
Fig. 3 be crane when handling mould and steel reinforcement cage, adopt the schematic diagram of multiple spot lifting;
Fig. 4 is transportation moving direction in process of production of female die and centrifugation apparatus on mould, curing pool arranged direction schematic diagram.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the present invention is further detailed explanation, first, complete the technology arrangement in factory building, comprise muscle cage processing district 1 and successively adjacent steel reinforcement cage stockyard 2, go out a track 3, Chai Zhuan district 4, curing pool 5, patrix clearing zone 6, centrifugation apparatus 7, feeding zone 8, remaining slurry retracting device 13, hauling operation crane 14 and the crane beam 15 between stretched zone 9, mixing plant 10, concrete ferry-boat transportation system 11, the dull and stereotyped track 12 of feeding, patrix district and centrifugal district and main building connect across precast concrete pile stockyard 16.Centrifugation apparatus 7, curing pool 5, hauling operation crane (14) are laterally arranged in parallel perpendicular to factory building crane beam axis direction.Mould adopts the long mould of 26 meters, can pack the steel reinforcement cage of two 13 meters into simultaneously, and the internal diameter of mould is 500 millimeters.
Concrete production procedure and method are as follows:
The first step: process various stake type end plates by national standard and atlas requirement.
Second step: make concrete pile reinforcement cage in steel reinforcement cage processing district 1, with prestressed steel bar as the main muscle of skeleton, rod iron two button head machine upsetting essence being cut according to certain length goes out also larger than rod iron diameter, the head of likeness in form cap, then with seam welder, stirrup is welded on rod iron, pile tube stirrup curl, the stirrup of square pile also need be before welding, by certain thrust on welding machine, four angles is pressed into and is squarely welded again;
The 3rd step: in steel reinforcement cage stockyard 2, two of junctions end plate in the middle of two steel reinforcement cages of ready in-line are installed, two of middle junctions end plate, except loading onto steel reinforcement cage, also needs to load onto pile tube or square pile intermediate joint device;
The 4th step: with the crane 14 that is connected with long mould special hanger, will be with Special-purpose hanger ear length mold hoisting to form removal district 4, this mould is upper female die, then with concrete-pile form removal wind gun carriage windward big gun, mould is taken apart, with the crane 14 that is connected with long mould special hanger, the steel reinforcement cage of the end plate installing is winched in the mould form removal district 4 from reinforcing bar stockyard 2, then pile tube and square pile grouting anchor plate, grouting stretch board, grouting stretching support board are installed in mould; At the two ends of mould, load onto precast concrete pile end plate.
The 5th step: the steel reinforcement cage of the prestressed anchor fixing apparatus installing is transported to the flat car on feeding zone 8 by being connected with the crane of special hanger;
The 6th step: in control room and mixer shell mixing concrete special equipment 10, carry out shell mixing concrete preparation, the shell mixing concrete of mixing is put into feeding hopper by ferry bus in ferry-boat transportation system 11 and prepare feeding;
The 7th step: open to feeding hopper and carry out feeding loading and transporting mould flat car in feeding zone 8, cover the upper mold section that hang and that cleared up from patrix clearing zone 6 by feeding good concrete female die, with special matched moulds wind gun carriage, die bolt is screwed and put in place;
The 8th step: carry out prestressing force stretching by the steel reinforcement cage after the jack pair matched moulds in stretched zone 9, while being stretched to the numerical value that meets national standard, lock by locking device;
The 9th step: mould good prestressed stretch-draw is winched in centrifugal district 7 on centrifugation apparatus with special hanger, carry out the ultrahigh speed running of 35~45 G acceleration of gravity; This centrifugation apparatus is that Gu Te respectively arranges 1 motor at two of centrifugation apparatus in order to coordinate long mould, and adopts touch screen and continuous speed regulation system automatically to control;
The tenth step: centrifugal good mold hoisting, to the remaining slurry retracting device 13 on limit, centrifugal district, is toppled over out by pulp-water, in order to recycling;
The 11 step: the mould that remaining slurry has been toppled over winches in steam-cured pond 5 by special hanger, and curing pool is provided with Full-automatic steam cycle maintenance system of centrifugal concrete pile, carries out full-automatic steam maintenance, and according to different situations, thermostat temperature is set to 80~92 ℃;
The 12 step: will winch to Chai Zhuan district 4 through the steam-cured centrifugal concrete pile band mould of certain hour, utilize form removal wind gun carriage to carry out form removal, and finished product is hung out with disposable two with special hanger, by go out in a track 3 go out a dolly be transported to a stockyard 16 then carry out next circulation produce.

Claims (6)

1. the production method of a precast concrete pile, its key step comprises: make steel reinforcement cage, steel reinforcement cage is put into precast concrete pile die, in mould, inject concrete, mould is inserted and on centrifugation apparatus, carried out centrifugal rotation, at curing pool, carry out steam curing, the demoulding is also taken out the concrete-pile of moulding; It is characterized in that: described precast concrete pile die is 20 meters of above long moulds, a mould can be produced branched precast concrete pile simultaneously, on mould, female die transportation is in process of production with perpendicular to the horizontal parallel of factory building crane beam axis direction, described centrifugation apparatus, curing pool are laterally arranged in parallel perpendicular to factory building crane beam axis direction, go out a track and are positioned at Chai Zhuan district.
2. the production method of a kind of precast concrete pile according to claim 1, the internal diameter that it is characterized in that described prefabricated concrete pipe pile mould is 300 millimeters~600 millimeters.
3. the production method of a kind of precast concrete pile according to claim 1, is characterized in that production stage specifically comprises:
A, making precast concrete pile cages;
B, ready two or more steel reinforcement cages are loaded onto after end plate, by intermediate joint device, joined end to end and connect, be yi word pattern;
C, precast concrete pile die is taken apart as upper and lower half module with wind big gun; Upper mold section is winched on the clean-up frame in patrix clearing zone with crane, the two or more steel reinforcement cages that simultaneously step b connected winch in female die, then at the two ends of mould, load onto precast concrete pile end plate, anchor plate, stretch board, stretching support board;
D, the female die that installs steel reinforcement cage is winched on flat car by crane;
E, the concrete preparing is injected to the female die that installs steel reinforcement cage by feeding hopper;
F, upper mold section and female die are closed up, die bolt is screwed and put in place with wind big gun;
G, by the steel reinforcement cage after jack pair matched moulds, carry out prestressing force stretching, be stretched to the numerical value that meets national standard;
H, mould good prestressed stretch-draw is winched to High Rotation Speed on centrifugation apparatus with crane;
I, the pulp-water in mould is toppled over out;
J, mould is winched in curing pool together with concrete-pile, carry out steam curing;
K, mould is taken apart with wind big gun, two in same mould or branched precast concrete pile are carried out to stripping operation, remove intermediate joint device, by the dolly in Chu Zhuan district, be transported to a stockyard, then carry out next step circulation and produce.
4. the production method of a kind of precast concrete pile according to claim 3, is characterized in that described crane is when handling mould and steel reinforcement cage, adopts the mode of multiple spot lifting, to coordinate the long mould of precast concrete pile.
5. according to the production method of a kind of precast concrete pile described in claim 1 or 3, it is characterized in that, the two ends of described centrifugation apparatus respectively arrange a motor.
6. according to the production method of a kind of precast concrete pile described in claim 1 or 3, it is characterized in that production technology in described factory building arrange comprise steel reinforcement cage processing district 1 and successively adjacent steel reinforcement cage stockyard 2, go out a track 3, Chai Zhuan district 4, curing pool 5, patrix clearing zone 6, centrifugation apparatus 7, feeding zone 8, remaining slurry retracting device 13, hauling operation crane 14 and crane beam 15 between stretched zone 9, mixing plant 10, concrete ferry-boat transportation system 11, the dull and stereotyped track 12 of feeding, patrix district and centrifugal district, with main building connect across precast concrete pile stockyard 16.
CN201010604071.4A 2010-12-24 2010-12-24 Method for producing precast concrete piles Expired - Fee Related CN102398305B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010604071.4A CN102398305B (en) 2010-12-24 2010-12-24 Method for producing precast concrete piles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010604071.4A CN102398305B (en) 2010-12-24 2010-12-24 Method for producing precast concrete piles

Publications (2)

Publication Number Publication Date
CN102398305A CN102398305A (en) 2012-04-04
CN102398305B true CN102398305B (en) 2014-04-16

Family

ID=45881154

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010604071.4A Expired - Fee Related CN102398305B (en) 2010-12-24 2010-12-24 Method for producing precast concrete piles

Country Status (1)

Country Link
CN (1) CN102398305B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103358398A (en) * 2012-09-26 2013-10-23 苏州混凝土水泥制品研究院有限公司 Method for producing high-strength pipe pile
CN103586970B (en) * 2013-10-02 2015-11-18 嘉兴欣创混凝土制品有限公司 Concrete pile body flow line production system
CN103624872B (en) * 2013-11-27 2016-04-13 江苏东浦管桩有限公司 Prestressed concrete anticorrosion pile tube automatic assembly line operating platform
CN109227920B (en) * 2018-07-10 2024-10-11 俞向阳 Centrifugal concrete pile production line
CN110116263B (en) * 2019-05-07 2021-04-09 东莞市建安管桩有限公司 Automatic change steel reinforcement cage production line
CN115214015A (en) * 2022-09-01 2022-10-21 宁波一中管桩有限公司 Preparation method of H-shaped concrete pile

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1597286A (en) * 2004-09-16 2005-03-23 颜小荣 Method of manufacturing prestressed high strength concrete hollow square pile centrifugal, steam, maintenance method
CN101885208A (en) * 2009-09-21 2010-11-17 宁波一中管桩有限公司 Method for manufacturing novel high-efficiency, energy-saving and environmentally-friendly centrifugal concrete pile
CN101890756A (en) * 2009-11-19 2010-11-24 宁波一中管桩有限公司 Novel highly-efficiency, energy-saving and environmentally-friendly method and system for manufacturing centrifugal concrete pile

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR0130721B1 (en) * 1995-01-12 1998-04-08 육기동 Improved process supplemented with internal vibration for preparing high strength concrete pipes
JPH1110615A (en) * 1997-06-19 1999-01-19 Kaseihin Shoji Kk Method and apparatus for manufacturing centrifugal force concrete molding

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1597286A (en) * 2004-09-16 2005-03-23 颜小荣 Method of manufacturing prestressed high strength concrete hollow square pile centrifugal, steam, maintenance method
CN101885208A (en) * 2009-09-21 2010-11-17 宁波一中管桩有限公司 Method for manufacturing novel high-efficiency, energy-saving and environmentally-friendly centrifugal concrete pile
CN101890756A (en) * 2009-11-19 2010-11-24 宁波一中管桩有限公司 Novel highly-efficiency, energy-saving and environmentally-friendly method and system for manufacturing centrifugal concrete pile

Also Published As

Publication number Publication date
CN102398305A (en) 2012-04-04

Similar Documents

Publication Publication Date Title
CN102398305B (en) Method for producing precast concrete piles
CN108580758B (en) Double-deck reinforcing bar net piece processingequipment
CN107650258A (en) A kind of bidirectional circulating structure prefabricated components production line and control method
CN102744779B (en) PHC (prestressed concrete pipe pile) pile streamline conveying production line
CN101890756A (en) Novel highly-efficiency, energy-saving and environmentally-friendly method and system for manufacturing centrifugal concrete pile
CN103452350B (en) Assembling electronic workshop and construction method thereof
CN104153587B (en) A kind of built with ribbed bricks body of wall assembly construction method
CN113752379B (en) Concrete T beam prefabrication construction method adopting secondary tensioning process and movable pedestal
CN105773833B (en) A kind of production method of T-shaped sheet pile mould and T-shaped sheet pile
CN104710155A (en) Production technology of precast reinforced concrete piles
CN101337399A (en) Whole-course full-automatic quick production line of wall board
CN202062499U (en) Twin-span rotary-type concrete tubular pile manufacturing device
CN104047422A (en) Cylinder die manufacturing and mounting method
CN101885208B (en) System for manufacturing novel high-efficiency, energy-saving and environmentally-friendly centrifugal concrete pile
CN201626039U (en) Novel high-effective, energy-saving and environmental centrifugal concrete pile making manufacturing system
CN103993739A (en) Method for constructing stiff beam of spraying layer of prilling tower
CN108978699B (en) Land integral prefabricated bearing platform and production and installation method thereof
CN203487674U (en) Precast lattice girder
CN102248601A (en) Method for producing precast concrete piles by transverse running water
CN110616706A (en) Construction method for layering binding in large-diameter pile foundation reinforcing steel bar hole
CN101956372A (en) Quick construction method for No. 0 section of prestressed concrete beam type bridge
CN107338768B (en) Factory type large aqueduct construction system and method
CN107042575A (en) A kind of umbrella skeleton support assembled core and prefabricated component manufacture method
CN213034912U (en) Concrete pile production system
CN201778323U (en) Building foundation pit prestress cuboid soldier pile and forming mold thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140416

Termination date: 20211224

CF01 Termination of patent right due to non-payment of annual fee