CN1270027C CNB2004100029720A CN200410002972A CN1270027C CN 1270027 C CN1270027 C CN 1270027C CN B2004100029720 A CNB2004100029720 A CN B2004100029720A CN 200410002972 A CN200410002972 A CN 200410002972A CN 1270027 C CN1270027 C CN 1270027C
Authority
CN
China
Prior art keywords
frame
bridge shape
machinery
shape longeron
machinery according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2004100029720A
Other languages
Chinese (zh)
Other versions
CN1519429A (en
Inventor
伯纳德·赫弗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Franz Plasser Bahnbaumaschinen Industrie GmbH
Original Assignee
Franz Plasser Bahnbaumaschinen Industrie GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Franz Plasser Bahnbaumaschinen Industrie GmbH filed Critical Franz Plasser Bahnbaumaschinen Industrie GmbH
Publication of CN1519429A publication Critical patent/CN1519429A/en
Application granted granted Critical
Publication of CN1270027C publication Critical patent/CN1270027C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/16Transporting, laying, removing, or replacing rails; Moving rails placed on sleepers in the track

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)
  • Cage And Drive Apparatuses For Elevators (AREA)
  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The frames (2,4) detachably connected by a coupling (3) are moved on a track (8) using under carriages (5). One end of a bridge girder (14) is connected to the frame (2) and the other end (17) is supported on the frame (4). A guiding unit (18) is provided to move the end (17) of the bridge girder on the frame (4) along longitudinal direction.

Description

The machinery that repair rail is used
Technical field
The present invention relates to the machinery that a kind of repair rail is used.
Background technology
One of No. 4979247 patent introductions of the US machinery used of new-track more, known.There is a bridge shape longeron that is equipped with the operation unit at the rear portion of this machinery, when shifting the building site traveling, bridge shape longeron can be moved on to the transfer site location by job position, and there is auxiliary running mechanism at its two ends for this reason.Yet adopt this class machinery regulation one short track section cost to be very high and to be unfavorable for reducing expenses.
Summary of the invention
The technical problem to be solved in the present invention will be created a kind of machinery exactly, requires this machinery in the short track section process of regulation, also can change rail in case of necessity.
The machinery that above-mentioned technical problem is used by a kind of repair rail solves, it has first frame of utilizing the rail travelling mechanism traveling, horizontal drive device and operation unit are housed away above, first frame releasably links to each other with second frame of utilizing the rail travelling mechanism traveling by a hookup, described machinery also has a mechanical longitudinal extension in edge, the bridge shape longeron of boom hoisting is housed, first termination of this bridge shape longeron links to each other with first frame, and can rotate around a vertical axis, second termination of beam shape longeron then is bearing on second frame, and can utilize a guiding device vertically moving with respect to second frame along machinery.
Bridge shape longeron can move on second frame and just might utilize second frame to transport rail on the one hand, can utilize bridge shape longeron in the clear rail to be sent to track on the other hand again or transports rail from track.Successfully change after the rail, also can utilize the operation unit that is contained on first frame to proofread and correct the orbital position of the track section that passes through regulation and finish track regulation overall process.
Described guiding device be two along mechanical cross roller with rim separated by a distance, these two roller with rim can roll at the guide rail that is fixed on second frame.Described bridge shape longeron links to each other with an auxiliary running mechanism near the scope of second termination.Utilize a drive unit can make described auxiliary running mechanism around one perpendicular to bridge shape longeron rotational longitudinally.Described auxiliary running mechanism can be regulated with respect to the height of axis.Described bridge shape longeron is equipped with an operating room.Described operating room is positioned at second termination, and utilizes a drive unit can regulate the height of this operating room with respect to bridge shape longeron.Described bridge shape longeron can longitudinally stretch.
Description of drawings
Further illustrate the present invention by the accompanying drawing illustrated embodiment below, in the accompanying drawing:
Fig. 1 to 4 is according to the lateral view of machinery of the present invention when the different work position;
Fig. 5 is the diagrammatic sketch of a telescopic bridge shape longeron.
The specific embodiment
Machinery 1 shown in Fig. 1 to 4 by first frame 2 with utilize hookup 3 therewith second frame 4 that links to each other of frame form.Two frames 2,4 utilize the rail travelling mechanism 5 can traveling on the track 8 with rail 6 and sleeper 7.First frame 2 is equipped with one to walk 9, one driver's cabins 10 of horizontal drive device and operation unit 11.
Have loading surface 12 on second frame 4, have two above along mechanical cross guide rail 13 separated by a distance.First termination 15 along the bridge shape longeron 14 of mechanical longitudinal extension links to each other with first frame 2, and can rotate around vertical axis 16.Second termination 17 of bridge shape longeron 14 links to each other with guiding device 18.Guiding device is separated by a distance along mechanical cross, can be along the roller with rim 19 of guide rail 13 rollings.
Bridge shape longeron 14 is being near linking to each other with auxiliary running mechanism 20 (Fig. 3) in the scope of second termination 17, utilize drive unit 21 can make auxiliary running mechanism around one perpendicular to bridge shape longeron 14 longitudinally axis 22 rotate and adjusting to the height of this axis.In also being equipped with, second termination 17 of bridge shape longeron 14 establish the operating room 23 of control device 24.Utilize drive unit 25 can regulate the height of 23 pairs of bridge shapes of operating room longeron 14.Bridge shape longeron also is equipped with the boom hoisting 26 of many monkey forms, is used for gripping and lifts one section rail 27.
Hereinafter will further introduce the operating principle of machinery 1.Machinery 1 arrives after the track section of preparing regulation, slings from loading surface 12 with one section rail 27 of boom hoisting 26 grippings, throws off hookup 3 then, and horizontal drive device 9 is walked in starting, makes first frame leave certain distance.Guiding device 18 is rolled, up to hookup 3 (see figure 2)s that arrive at second frame 4 on guide rail 13.So just vacate a construction neutral gear 28 for changing one section rail 27.
As shown in Figure 3, can be with auxiliary running mechanism 20 in second termination 17 of track 8 upper support beam shape longerons 14.Like this, second frame 4 just can be left construction neutral gear 28, so as to see off one section old or fetch one section new rail 27.
As soon as second frame 4 arrives at construction neutral gear 28 again and guiding device 18 is contacted with guide rail 13, so that again two frames, 2,4 usefulness hookups 3 are linked together (see figure 4).After this one section relayable rail 27 changing can be put on the loading surface 12.
The final step of regulation operation is to utilize the operation unit 11 of making unit and track lifting unit form firm by ramming that is contained on first frame 2 to make the orbital position of the track section of one section new rail 27 of lay reach optimum degree.When shifting the building site traveling, operating room 23 is fallen.
As shown in Figure 5, bridge shape longeron 14 vertically can be made telescopic type along machinery, with lengthening construction neutral gear.

Claims (8)

1. the machinery (1) of a repair rail (8) usefulness, it has first frame (2) of utilizing rail travelling mechanism (5) traveling, horizontal drive device (9) and operation unit (11) are housed away above, first frame releasably links to each other with second frame (4) of utilizing rail travelling mechanism (5) traveling by a hookup (3), described machinery also has a mechanical longitudinal extension in edge, the bridge shape longeron (14) of boom hoisting (26) is housed, first termination (15) of this bridge shape longeron links to each other with first frame (2), and can rotate around a vertical axis (16), second termination (17) of bridge shape longeron (14) then is bearing on second frame (4), and can utilize a guiding device (18) vertically moving with respect to second frame along machinery.
2. machinery according to claim 1 is characterized in that, described guiding device (18) be two along mechanical cross roller with rim separated by a distance (19), these two roller with rim can roll at the guide rail (13) that is fixed on second frame (4).
3. machinery according to claim 1 and 2 is characterized in that, described bridge shape longeron (14) links to each other with an auxiliary running mechanism (20) near the scope of second termination (17).
4. machinery according to claim 3 is characterized in that, utilizes a drive unit (21) can make described auxiliary running mechanism (20) center on one perpendicular to bridge shape longeron (14) axis of pitch (22) rotation longitudinally.
5. machinery according to claim 4 is characterized in that, described auxiliary running mechanism (20) can be regulated with respect to the height of described axis of pitch (22).
6. machinery according to claim 1 is characterized in that, described bridge shape longeron (14) is equipped with an operating room (23).
7. machinery according to claim 6 is characterized in that, described operating room (23) is positioned at second termination (17), and utilizes a drive unit (25) can regulate the height of this operating room with respect to bridge shape longeron (14).
8. machinery according to claim 1 is characterized in that, described bridge shape longeron (14) can longitudinally stretch.
CNB2004100029720A 2003-01-29 2004-01-21 Machinery for repairing rail Expired - Fee Related CN1270027C (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
ATGM38/2003 2003-01-29
AT0003803U AT6158U3 (en) 2003-01-29 2003-01-29 MACHINE FOR TREATING A TRACK

Publications (2)

Publication Number Publication Date
CN1519429A CN1519429A (en) 2004-08-11
CN1270027C true CN1270027C (en) 2006-08-16

Family

ID=3479871

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2004100029720A Expired - Fee Related CN1270027C (en) 2003-01-29 2004-01-21 Machinery for repairing rail

Country Status (11)

Country Link
US (1) US20040144282A1 (en)
EP (1) EP1443149B1 (en)
JP (1) JP4113133B2 (en)
CN (1) CN1270027C (en)
AT (2) AT6158U3 (en)
AU (1) AU2004200309B2 (en)
DE (1) DE502004004324D1 (en)
DK (1) DK1443149T3 (en)
ES (1) ES2288673T3 (en)
PL (1) PL200349B1 (en)
RU (1) RU2257439C1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110578275A (en) * 2016-01-14 2019-12-17 罗贝尔铁路建筑机械有限责任公司 Maintenance vehicle and method

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT9393U1 (en) * 2006-06-28 2007-09-15 Robel Bahnbaumaschinen Gmbh TRAIN CONSTRUCTION FOR THE MAINTENANCE OF A TRAIL
US8025013B2 (en) * 2007-11-01 2011-09-27 Harsco Technologies Corporation Moving platform on rail vehicle
DE102010022679A1 (en) * 2010-06-04 2011-12-08 Robel Bahnbaumaschinen Gmbh Vehicle combination for transporting rails
RU2495976C2 (en) * 2011-10-28 2013-10-20 Открытое акционерное общество Научно-внедренческий центр "Путевые машины" Unit to separate liners of link-assembling line
WO2016149469A1 (en) * 2015-03-17 2016-09-22 Harsco Technologies LLC Workhead assembly
CN104746396B (en) * 2015-03-30 2016-08-24 株洲时代电子技术有限公司 Track quick track switching operating Operation Van rail guide housing device and operational method thereof
CN105002793B (en) * 2015-07-31 2017-03-08 金鹰重型工程机械有限公司 A kind of vehicle-mounted track exchanging device
AT518062B1 (en) * 2016-02-15 2017-07-15 Plasser & Theurer Export Von Bahnbaumaschinen Gmbh Track construction vehicle for carrying out track construction work
CN110924244B (en) * 2019-12-27 2021-10-26 嘉兴德基机械设计有限公司 Multifunctional railway tamping car
DE102021202939A1 (en) 2021-03-25 2022-09-29 Robel Bahnbaumaschinen Gmbh Method and device for carrying out track work

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3426379A (en) * 1966-09-06 1969-02-11 Kershaw Mfg Co Inc Railroad track cleaning apparatus
CH569839A5 (en) * 1973-10-09 1975-11-28 Matisa Materiel Ind Sa Railway tracklaying machine - truss slides off wagon to span from wagon to tractor and handle track
ATE83814T1 (en) * 1988-08-18 1993-01-15 Scheuchzer Sa TRAIN TO RENEW A RAILWAY TRACK.
EP0768426A1 (en) * 1995-07-31 1997-04-16 Gobarail (Pty) Limited Railway truck assembly
ATA96796A (en) * 1996-06-04 1997-09-15 Plasser Bahnbaumasch Franz MACHINE FOR LAYING A TRACK
DE59711617D1 (en) * 1997-01-10 2004-06-17 Plasser Bahnbaumasch Franz Trolley for pulling long rails stored on transport trolleys
AT3918U3 (en) * 2000-07-13 2001-08-27 Plasser Bahnbaumasch Franz MACHINE FOR RENEWING A TRACK

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110578275A (en) * 2016-01-14 2019-12-17 罗贝尔铁路建筑机械有限责任公司 Maintenance vehicle and method
US10940874B2 (en) 2016-01-14 2021-03-09 Robel Bahnbaumaschinen Gmbh Maintenance vehicle and method
CN110578275B (en) * 2016-01-14 2022-05-13 罗贝尔铁路建筑机械有限责任公司 Maintenance vehicle and method

Also Published As

Publication number Publication date
ATE367481T1 (en) 2007-08-15
AU2004200309B2 (en) 2008-05-22
ES2288673T3 (en) 2008-01-16
EP1443149A2 (en) 2004-08-04
EP1443149A3 (en) 2005-07-20
PL200349B1 (en) 2008-12-31
US20040144282A1 (en) 2004-07-29
PL364544A1 (en) 2004-08-09
JP2004232455A (en) 2004-08-19
CN1519429A (en) 2004-08-11
DE502004004324D1 (en) 2007-08-30
AT6158U3 (en) 2004-03-25
AU2004200309A1 (en) 2004-08-19
JP4113133B2 (en) 2008-07-09
RU2257439C1 (en) 2005-07-27
EP1443149B1 (en) 2007-07-18
DK1443149T3 (en) 2007-10-01
AT6158U2 (en) 2003-05-26

Similar Documents

Publication Publication Date Title
CN1270027C (en) Machinery for repairing rail
CN101061276A (en) Rantry-crane used for transferring rail line
WO2022037327A1 (en) Method for erecting large-radian curved steel box girder bridge deck
CN1904315A (en) Tunnel overhead arch mould plate trolley possessing floating type traffic under carriage
CN107974950A (en) The bridge 3D printing device and construction method of template work compound
CN113309001B (en) Bridge girder erection machine for erecting small-radius bridge
CN104110002B (en) A kind of method for changing steel truss girder bridge floorings
CN110205948A (en) A kind of expanded letter Bridge Erector and its erection method
CN1102978C (en) Machine for laying railway track
JP4962252B2 (en) Bridge erection method and erection device
CN208219416U (en) Height-adjustable beam delivering machine
CN101052767B (en) Mechanism for updating rail
CN108103952A (en) Science of bridge building 3D printing device and construction method
CN2418156Y (en) Double guiding-beam bridge-laying machine
CN215804587U (en) Tunnel lining equipment
CN212202075U (en) Trackless self-propelled tunnel secondary lining trolley
CN103590547A (en) Roof composite board roof conveying system and construction method
CN211420893U (en) Rapid via hole bridge erecting machine
CN207987764U (en) It can carry out the guide girder machine of high and low Switch of working position
CN212561104U (en) Telescopic nose girder mechanism of adjustable angle
CN207987765U (en) Guide girder machine with liftable multi-functional trolley
CN207987778U (en) Guide girder machine with rotatable middle nose girder supporting leg
CN208632926U (en) Roadway paving apparatus vehicle
CN2507903Y (en) Front and back self-telescopic guide beam bridge girder erection machine
CN220099679U (en) Automatic trolley for road bridge deck system construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20060816

Termination date: 20200121