CN2418156Y - Double guiding-beam bridge-laying machine - Google Patents

Double guiding-beam bridge-laying machine Download PDF

Info

Publication number
CN2418156Y
CN2418156Y CN 00208647 CN00208647U CN2418156Y CN 2418156 Y CN2418156 Y CN 2418156Y CN 00208647 CN00208647 CN 00208647 CN 00208647 U CN00208647 U CN 00208647U CN 2418156 Y CN2418156 Y CN 2418156Y
Authority
CN
China
Prior art keywords
guiding
bridge
chassis
backward
leading
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 00208647
Other languages
Chinese (zh)
Inventor
齐瑞明
朱新生
胡志军
贾学敏
刘会平
王满
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIDAIHE MACHINERY FACTORY QINHUANGDAO CITY
Original Assignee
BEIDAIHE MACHINERY FACTORY QINHUANGDAO CITY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIDAIHE MACHINERY FACTORY QINHUANGDAO CITY filed Critical BEIDAIHE MACHINERY FACTORY QINHUANGDAO CITY
Priority to CN 00208647 priority Critical patent/CN2418156Y/en
Application granted granted Critical
Publication of CN2418156Y publication Critical patent/CN2418156Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a double guiding-beams bridge-laying machine for highways and railways, comprising a main guiding-beam and an auxiliary guiding-beam butt-jointed at the front end, and the front part of the auxiliary guiding-beam is provided with a supporting leg. A front and a rear cranes are arranged on the main guiding-beam; the underside of the main guiding-beam is provided with a front and a rear supporting legs, an edge beam oil cylinder and a front and a rear trolleys connected with the main guiding-beam through a hanging wheel and a supporting roller; the trolley body of the front trolley is provided with an upper and a lower joists connected by a central shaft and are provided with rolling bodies. Compared with the existing double guiding-beam bridge-laying machines, the utility model has the advantages of light weight and short machine body, a vertically moving rail does not need to be laid, and the utility model is suitable for the construction of a bridge with a small curvature radius.

Description

Double guide beam bridge erecting machine
The utility model relates to the bridge erection machinery of highway and railway, specifically a kind of double guide beam bridge erecting machine.
At present, the double guide beam bridge erecting machine that in highway and railway bridge erecting operation, uses, mainly by the leading beam of trussed construction and configuration in the above can be longitudinal and transverse mobile play crane and be fixed on below the leading beam vertically move chassis and before, during and after supporting leg forms,, assembly unit speed simple in structure with it is widely used soon.But, its advancing in operation process moves ahead because of relying on vertical shift chassis integral body, need on the good precast bridge of frame, lay long rails, and the length of nose girder can not be less than 2.5 times of pier distance, operational difficulty when setting up curved bridge in addition, the curved bridge construction of inapplicable small curvature radius.
The purpose of this utility model is the problems referred to above at existing double guide beam bridge erecting machine existence, and provides a kind of length that does not need to lay advance track, nose girder at bridge floor can foreshorten to 1.75 times of pier distance and be suitable for setting up the novel double guide beam bridge erecting machine that small curvature radius is bent bridge.
The technical scheme that realizes above-mentioned purpose is: a kind of double guide beam bridge erecting machine, have leading beam and butt up against front end and the guidance beam of telescopic legs forwardly is set, on leading beam, dispose forward and backward crane, below leading beam, be provided with forward and backward telescopic legs and reach the forward and backward chassis that is connected with leading beam by change gear and carrying roller with the side bar oil cylinder.
The technical scheme that realizes above-mentioned purpose also comprises: the upper and lower joist that the car body of preceding chassis is provided with relative configuration and is connected by central axis, its fitting face of the both sides of upper and lower joist is provided with corresponding deep-slotted chip breaker, is equipped with rolling element in its deep-slotted chip breaker.
The utility model is compared with existing double guide beam bridge erecting machine, has following advantage:
1, do not need on the good precast bridge of frame, to lay long rails;
2, exchange length foreshortens to 1.75 times of pier distances by 2.5 times of original piers distances;
3, can realize the complete machine gyration, be suitable for setting up of curved bridge;
4, complete machine is in light weight.
Accompanying drawing 1 is this double guide beam bridge erecting machine overall structure schematic diagram;
Accompanying drawing 2 is that back chassis and leading beam have reached crane configuration structure schematic diagram;
Accompanying drawing 3 is that preceding chassis and leading beam have reached crane configuration structure schematic diagram.
The utility model is described in further detail below in conjunction with drawings and Examples:
Provide as accompanying drawing 1, this double guide beam bridge erecting machine has the leading beam 1 of trussed construction and is docked at the guidance beam 2 of its front end, and its leading beam is the load spandrel girder, and teaching beam is simple and easy lightweight structures.Be respectively arranged with telescopic legs 5,6,7 at the two ends of leading beam and the front portion of guidance beam.On leading beam 1, dispose forward and backward crane 3,4, be respectively arranged with side bar oil cylinder 8 and forward and backward chassis 9,10 in the bottom of leading beam 1.
Provide as accompanying drawing 2, accompanying drawing 3, the top and bottom of the leading beam 1 of this double guide beam bridge erecting machine are respectively arranged with track.Planer-type plays the road wheel of crane 3,4 by the bottom and cooperates with the track of its upper end and has realized vertically moving of crane, is provided with the horizontal travelling car that disposes on cross track and this track by self crossbeam and finishes horizontal mobile to hanging precast beam and play crane.Two forward and backward chassis 9 and 10 are assemblied on the track of leading beam lower end by two groups of change gears 11 and the carrying roller 12 that disposes motor separately respectively, are used to realize that leading beam vertically moves or make two chassis to vertically move with guidance Liang Shangzuo at leading beam on two chassis.Dispose the lateral rows travelling wheel in the lower end of each chassis, its be laid on the cross track of construction on the beam and cooperate and can realize that complete machine is laterally mobile.
Provide as accompanying drawing 3, the car body of the preceding chassis 9 of this bridge formation machine is provided with relative configuration and by the upper and lower joist 14 and 15 that central axis 13 is connected, is used for realizing leading beam corner at erection process.The arc groove of edge rolling element 16 on its fitting face of the both sides of upper and lower joist, offering, the friction when being used to reduce upper and lower joist and reversing relatively.
This double guide beam bridge erecting machine is when building bridge construction, stretch out rear support leg make the back chassis unsettled after, start back chassis change gear motor and the back chassis can be moved forward to the appropriate location on leading beam, fix the back chassis and reclaim rear support leg, before can starting, the carrying roller motor of back chassis and the leading relative chassis of beam is moved forward, and pier was finished the supporting of nose girder and fixing before the supporting leg of teaching the beam front end was arrived, pier and fall rear support leg and make back chassis reach in place before chassis makes it to move to before then starting respectively, promptly by step type move finish bridge formation machine complete machine stride the pier displacement.In the curved bridge erection process, when after after chassis moves forward to the appropriate location, can start the traversing motor of back chassis, make complete machine rotate respective angles around the upper and lower joist central axis of preceding chassis, can realize turning to of the machine of building bridge, finish setting up of curved bridge.The supporting leg of its leading beam front portion can be used for the bridge formation machine turn to finish after, the supporting when the upper and lower joist of preceding chassis resets.

Claims (2)

1, a kind of double guide beam bridge erecting machine, include leading beam (1), on leading beam, dispose forward and backward crane (3), (4), below leading beam, be provided with forward and backward telescopic legs (5), (6) and side bar oil cylinder (8) and forward and backward chassis (9), (10), it is characterized in that: to being connected to the front portion guidance beam (2) of telescopic legs (7) is set at the front end of leading beam (1), described forward and backward chassis (9), (10) are connected with leading beam (1) with carrying roller (12) by the change gear (11) that assembles thereon.
2, require described double guide beam bridge erecting machine according to right 1, it is characterized in that: the car body of chassis (9) is provided with relative configuration and is connected by central axis (13) before described upper and lower joist (14), (15), its fitting face of both sides of upper and lower joist (14), (15) is provided with corresponding deep-slotted chip breaker, is equipped with rolling element (16) in its deep-slotted chip breaker.
CN 00208647 2000-04-28 2000-04-28 Double guiding-beam bridge-laying machine Expired - Fee Related CN2418156Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 00208647 CN2418156Y (en) 2000-04-28 2000-04-28 Double guiding-beam bridge-laying machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 00208647 CN2418156Y (en) 2000-04-28 2000-04-28 Double guiding-beam bridge-laying machine

Publications (1)

Publication Number Publication Date
CN2418156Y true CN2418156Y (en) 2001-02-07

Family

ID=33575964

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 00208647 Expired - Fee Related CN2418156Y (en) 2000-04-28 2000-04-28 Double guiding-beam bridge-laying machine

Country Status (1)

Country Link
CN (1) CN2418156Y (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100415995C (en) * 2005-07-21 2008-09-03 郑州市华中建筑机械有限公司 Half span type down guide frame bridging machine and its beam building method
CN101824803A (en) * 2010-04-29 2010-09-08 郑州市华中建机有限公司 Bridge erecting machine for bridge erection
CN1880581B (en) * 2006-01-18 2010-10-13 秦皇岛天业通联重工股份有限公司 Method for erecting a last arch bridge in front of tunnel and accessing tunnel by railway bridge girder erection machine
CN101967798A (en) * 2010-10-08 2011-02-09 中铁一局集团有限公司 Highway double-guide-beam bridge erecting machine and turning method
CN1816665B (en) * 2003-06-06 2014-12-03 佩德罗·阿尔瓦雷斯·里贝罗·多·卡尔罗·帕谢科 Gantry with auto-adjusting prestessing
CN108611983A (en) * 2018-06-19 2018-10-02 沙焕焕 A kind of Bridge Erector of bridging method and band special piling machine
CN109944163A (en) * 2019-03-13 2019-06-28 郑州新大方重工科技有限公司 A kind of double nose-girder type integration of transporting and building Bridge Erectors

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1816665B (en) * 2003-06-06 2014-12-03 佩德罗·阿尔瓦雷斯·里贝罗·多·卡尔罗·帕谢科 Gantry with auto-adjusting prestessing
CN100415995C (en) * 2005-07-21 2008-09-03 郑州市华中建筑机械有限公司 Half span type down guide frame bridging machine and its beam building method
CN1880581B (en) * 2006-01-18 2010-10-13 秦皇岛天业通联重工股份有限公司 Method for erecting a last arch bridge in front of tunnel and accessing tunnel by railway bridge girder erection machine
CN101824803A (en) * 2010-04-29 2010-09-08 郑州市华中建机有限公司 Bridge erecting machine for bridge erection
CN101967798A (en) * 2010-10-08 2011-02-09 中铁一局集团有限公司 Highway double-guide-beam bridge erecting machine and turning method
CN108611983A (en) * 2018-06-19 2018-10-02 沙焕焕 A kind of Bridge Erector of bridging method and band special piling machine
CN109944163A (en) * 2019-03-13 2019-06-28 郑州新大方重工科技有限公司 A kind of double nose-girder type integration of transporting and building Bridge Erectors

Similar Documents

Publication Publication Date Title
CN201801818U (en) Bridge erecting machine capable of erecting double-track twin beams at tunnel entrance by zero distance
CN203530847U (en) Bridge erecting machine capable of erecting narrow small-curvature-radius highway ramp bridges
CN110541347A (en) large-span full-hydraulic tire walking type tunnel inverted arch trestle and construction method
CN107558378A (en) A kind of Bridge Erector and its bridging method for being used to set up full precast beam
CN201058969Y (en) Novel bridging machine
CN2418156Y (en) Double guiding-beam bridge-laying machine
CN110158486B (en) Bridge girder erection machine for erecting spliced wide beams and construction method
CN108130862B (en) Tunnel passing beam vehicle
CN107311047A (en) The steel box-girder lift structure and method for improving of large span bondbeam
CN107604828A (en) The Bridge Erector of double-T shaped beam bridge
CN201695345U (en) Striding pierced type bridge erector
CN207919265U (en) Suitable for covering rail plate-type ballastless track plate paver on steel truss girder bridge
CN207078928U (en) A kind of steel box-girder lift structure of large span bondbeam
CN202482773U (en) Split mounting type girder carrier
CN2712991Y (en) Multi-span movable form-frame bridge fabrication machine
CN104929056B (en) The hydraulic drive of a kind of sphere track and control Bridge Erector, bridge formation system and bridging method
CN107401124A (en) The Bridge Erector of T-shaped beam bridge
CN208502797U (en) It is a kind of for Subway Tunnel can automatically walk trolley
CN202023156U (en) Symmetric segment elevating bridge erecting machine
CN109944163A (en) A kind of double nose-girder type integration of transporting and building Bridge Erectors
CN217678651U (en) Combined transverse-moving type abdominal mould longitudinal-moving device for support cast-in-place method
CN110259228A (en) It is a kind of sky iron intelligent vehicle section solid storing system and storage dispatching method
CN218263976U (en) Pipe gallery trolley for building engineering
CN216947915U (en) Bridge girder erection machine for erecting medium-low speed magnetic suspension track beam
CN216864834U (en) Device is erected to zero road bed first-span T beam in two-way four lane highway bridge connection tunnels in mountain area

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee