AT9393U1 - TRAIN CONSTRUCTION FOR THE MAINTENANCE OF A TRAIL - Google Patents
TRAIN CONSTRUCTION FOR THE MAINTENANCE OF A TRAIL Download PDFInfo
- Publication number
- AT9393U1 AT9393U1 AT0050006U AT5002006U AT9393U1 AT 9393 U1 AT9393 U1 AT 9393U1 AT 0050006 U AT0050006 U AT 0050006U AT 5002006 U AT5002006 U AT 5002006U AT 9393 U1 AT9393 U1 AT 9393U1
- Authority
- AT
- Austria
- Prior art keywords
- vehicle
- track
- working
- coupling
- longitudinal direction
- Prior art date
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61D—BODY DETAILS OR KINDS OF RAILWAY VEHICLES
- B61D15/00—Other railway vehicles, e.g. scaffold cars; Adaptations of vehicles for use on railways
Landscapes
- Engineering & Computer Science (AREA)
- Transportation (AREA)
- Mechanical Engineering (AREA)
- Train Traffic Observation, Control, And Security (AREA)
- Machines For Laying And Maintaining Railways (AREA)
- Body Structure For Vehicles (AREA)
- Platform Screen Doors And Railroad Systems (AREA)
Abstract
Ein Gleisbauzug (1) für die Instandhaltung eines Gleises besteht aus einem Arbeits- und einem Zugfahrzeug (2, 4). Das Zugfahrzeug (4) weist einen Laderaum (8) mit einer in Fahrzeuglängsrichtung verschiebbaren Abdeckung (9) auf und ist mit einer frontseitigen Einstiegstüre (11) und einem an diese anschließenden Durchgang (12) ausgestattet. Das Arbeitsfahrzeug (2) weist einen durch zwei parallel zueinander und in Fahrzeuglängsrichtung verlaufende Seitenwände (15) begrenzten, von der Einstiegstüre (11) aus begehbaren Arbeitsraum (17) auf. Damit kann die Sicherheit für im Arbeitsfahrzeug (2) arbeitende Personen optimiert werden.A track construction train (1) for the maintenance of a track consists of a work vehicle and a towing vehicle (2, 4). The towing vehicle (4) has a loading space (8) with a cover (9) which can be displaced in the vehicle longitudinal direction and is equipped with a front access door (11) and a passage (12) adjoining it. The work vehicle (2) has a work space (17) bounded by two side walls (15) running parallel to one another and extending in the vehicle longitudinal direction and accessible from the access door (11). This can be used to optimize the safety of persons working in the work vehicle (2).
Description
2 AT 009 393 U12 AT 009 393 U1
Die Erfindung betrifft einen Gleisbauzug für die Instandhaltung eines Gleises, bestehend aus einem Arbeitsfahrzeug und einem durch eine Kupplung mit diesem verbundenen Zugfahrzeug.The invention relates to a track construction train for the maintenance of a track, consisting of a working vehicle and a tractor connected by a coupling with this.
Durch DE 20208835 U ist ein Arbeits- bzw. Instandhaltungsfahrzeug bekannt, das zwei parallel zueinander verlaufende, endseitig jeweils auf Schienenfahrwerken abgestützte Fachwerkträger aufweist. Diese sind zur Bildung eines bodenlosen Wagenkastens jeweils mit einer Vielzahl von Dachträgern zur Abstützung einer Plane und Bildung eines in einer Achslängsrichtung durch die beiden Fachwerkträger begrenzten Arbeitsraumes verbunden. Das Instandhaltungsfahrzeug wird von einer Lokomotive bewegt.DE 20208835 U a work or maintenance vehicle is known, which has two mutually parallel, supported at each end on rail trolleys trusses. These are connected to form a bottomless car body in each case with a plurality of roof carriers for supporting a tarpaulin and forming a bounded in an axial longitudinal direction by the two truss workspace. The maintenance vehicle is moved by a locomotive.
Die Aufgabe der vorliegenden Erfindung liegt nun in der Schaffung eines Gleisbauzuges der eingangs genannten Art, mit dem Arbeits- und Zugfahrzeug eine zur weiteren Verbesserung der Sicherheit für die Arbeitskräfte dienende Einheit bilden.The object of the present invention is now to provide a track construction train of the type mentioned, with the work and towing vehicle to serve a further improvement of the safety of the workers unit.
Diese Aufgabe wird erfindungsgemäß mit einem Gleisbauzug der gattungsgemäßen Art durch die im Kennzeichen von Anspruch 1 angeführten Merkmale erreicht.This object is achieved according to the invention with a track construction train of the generic type by the features cited in the characterizing part of claim 1.
Ein derartig ausgebildeter Gleisbauzug ergibt eine bezüglich der Sicherheit für die Arbeitskräfte bestens optimierte konstruktive Gesamteinheit. Es ist nunmehr für die Arbeitskräfte möglich, zwischen zwei je an einem Zugsende angekuppelten Gleisbearbeitungsmaschinen zu pendeln, ohne dafür den Gleisbauzug seitlich in Richtung zum Nachbargleis verlassen zu müssen. In diesem Zusammenhang ist auch der Laderaum optimal in den Arbeitsraum integriert.Such a trained track construction results in respect of the safety of workers optimally optimized overall structural unit. It is now possible for the workers to commute between two each attached to a train end track processing machines, without having to leave the track construction laterally towards the neighboring track. In this context, the cargo space is optimally integrated into the workspace.
Weitere Vorteile der Erfindung ergeben sich aus den Unteransprüchen und der Zeichnungsbeschreibung.Further advantages of the invention will become apparent from the dependent claims and the drawing description.
Im folgenden wird die Erfindung anhand eines in der Zeichnung dargestellten Ausführungsbeispieles näher beschrieben. Es zeigen:In the following the invention will be described with reference to an embodiment shown in the drawing. Show it:
Fig. 1 und 2 eine Seitenansicht eines Gleisbauzuges bzw. eine Draufsicht auf diesen.1 and 2 is a side view of a track construction train or a plan view of this.
Ein in Fig. 1 und 2 dargestellter Gleisbauzug 1 setzt sich aus einem Arbeitsfahrzeug 2 und einem mit diesen durch eine Kupplung 3 verbundenen Zugfahrzeug 4 zusammen.A track construction train 1 shown in FIGS. 1 and 2 is composed of a work vehicle 2 and a towing vehicle 4 connected thereto by a coupling 3.
Das Zugfahrzeug 4 ist mit einer Energieeinheit 5 ausgestattet, die zur Versorgung eines Fahrantriebes 6 und sämtlicher weiterer auf dem Gleisbauzug 1 befindlichen Antriebe dient. Auf einem an die Kupplung 3 angrenzenden Fahrzeugende 7 ist ein Laderaum 8 mit einer in Fahrzeuglängsrichtung verschiebbaren Abdeckung 9 vorgesehen.The towing vehicle 4 is equipped with an energy unit 5, which serves to supply a travel drive 6 and all other located on the track construction train 1 drives. On a vehicle end 7 adjacent to the coupling 3, a loading space 8 with a cover 9 which can be displaced in the vehicle longitudinal direction is provided.
An einem von der Kupplung 3 distanzierten Fahrzeugende 10 ist das Zugfahrzeug 4 mit einer frontseitigen Einstiegstüre 11 sowie mit einem an diese anschließenden, zur Kupplung 3 führenden Durchgang 12 ausgestattet. Durch die mittig zwischen zwei Seitenwänden 25 positionierte Einstiegstüre 11 ist ein Zugang zu einer Fahrkabine 13 möglich.At a distance from the clutch 3 vehicle end 10, the towing vehicle 4 is equipped with a front entrance door 11 and a subsequent to this, leading to the clutch 3 passage 12. By centrally positioned between two side walls 25 access door 11 access to a cab 13 is possible.
Das endseitig auf Schienenfahrwerken 14 abgestützte Arbeitsfahrzeug 2 weist zwei parallel zueinander und in Fahrzeuglängsrichtung verlaufende Seitenwände 15 auf. Diese begrenzen gemeinsam mit einer beide Seitenwände 15 miteinander verbindenden Dachebene 16 einen Arbeitsraum 17. Damit sind auf einem darunter befindlichen Gleis 18 stehende Arbeitskräfte gehindert, den Arbeitsraum 17 in Richtung zu einem Nebengleis zu verlassen und damit optimal geschützt.The end supported on rail chassis 14 working vehicle 2 has two parallel to each other and extending in the vehicle longitudinal direction side walls 15. These limit together with a both side walls 15 interconnecting roof level 16 a working space 17. Thus standing on a track 18 below standing workers prevented to leave the working space 17 in the direction of a siding and thus optimally protected.
Im Arbeitsraum 17 befindet sich eine Vielzahl von Versorgungsleitungen 19 für elektrische, pneumatische und hydraulische Antriebe. Sämtliche Versorgungsleitungen 19 werden von der Energieeinheit 5 gespeist. Das Arbeitsfahrzeug 2 ist mit in Fahrzeuglängsrichtung verschiebbaren Hebevorrichtungen 20 zum Transport von Ladegut 21 zwischen dem Laderaum 8 und demIn the working space 17 is a plurality of supply lines 19 for electric, pneumatic and hydraulic drives. All supply lines 19 are fed by the power unit 5. The working vehicle 2 is provided with lifting devices 20 displaceable in the vehicle longitudinal direction for transporting load 21 between the loading space 8 and the vehicle
Claims (4)
Priority Applications (12)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AT0050006U AT9393U1 (en) | 2006-06-28 | 2006-06-28 | TRAIN CONSTRUCTION FOR THE MAINTENANCE OF A TRAIL |
PL07764853T PL2038481T3 (en) | 2006-06-28 | 2007-06-26 | Track renewal train for maintaining a track |
EP07764853A EP2038481B1 (en) | 2006-06-28 | 2007-06-26 | Track renewal train for maintaining a track |
PCT/EP2007/005627 WO2008000432A1 (en) | 2006-06-28 | 2007-06-26 | Track renewal train for maintaining a track |
AU2007264044A AU2007264044B2 (en) | 2006-06-28 | 2007-06-26 | Track renewal train for maintaining a track |
DK07764853.3T DK2038481T3 (en) | 2006-06-28 | 2007-06-26 | Track maintenance train to maintain a track |
JP2009516972A JP5300720B2 (en) | 2006-06-28 | 2007-06-26 | Track building train to repair track |
CN2007800242672A CN101479429B (en) | 2006-06-28 | 2007-06-26 | Track renewal train for maintaining a track |
RU2008147825/11A RU2423572C2 (en) | 2006-06-28 | 2007-06-26 | Track-laying train for railway servicing |
AT07764853T ATE519893T1 (en) | 2006-06-28 | 2007-06-26 | TRACK TRAIN FOR TRACK MAINTENANCE |
ES07764853T ES2370272T3 (en) | 2006-06-28 | 2007-06-26 | TRAIN OF CONSTRUCTION OF ROADS FOR THE MAINTENANCE OF A RAILWAY. |
HK09107627.7A HK1127793A1 (en) | 2006-06-28 | 2009-08-19 | Track renewal train for maintaining a track |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AT0050006U AT9393U1 (en) | 2006-06-28 | 2006-06-28 | TRAIN CONSTRUCTION FOR THE MAINTENANCE OF A TRAIL |
Publications (1)
Publication Number | Publication Date |
---|---|
AT9393U1 true AT9393U1 (en) | 2007-09-15 |
Family
ID=38198989
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
AT0050006U AT9393U1 (en) | 2006-06-28 | 2006-06-28 | TRAIN CONSTRUCTION FOR THE MAINTENANCE OF A TRAIL |
AT07764853T ATE519893T1 (en) | 2006-06-28 | 2007-06-26 | TRACK TRAIN FOR TRACK MAINTENANCE |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
AT07764853T ATE519893T1 (en) | 2006-06-28 | 2007-06-26 | TRACK TRAIN FOR TRACK MAINTENANCE |
Country Status (11)
Country | Link |
---|---|
EP (1) | EP2038481B1 (en) |
JP (1) | JP5300720B2 (en) |
CN (1) | CN101479429B (en) |
AT (2) | AT9393U1 (en) |
AU (1) | AU2007264044B2 (en) |
DK (1) | DK2038481T3 (en) |
ES (1) | ES2370272T3 (en) |
HK (1) | HK1127793A1 (en) |
PL (1) | PL2038481T3 (en) |
RU (1) | RU2423572C2 (en) |
WO (1) | WO2008000432A1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2011038793A1 (en) * | 2009-09-30 | 2011-04-07 | Robel Bahnbaumaschinen Gmbh | Vehicle that can be driven on a track |
DE102009033516A1 (en) * | 2009-07-15 | 2011-04-14 | Db Gleisbau Gmbh | Vehicle for executing building measures in track area of rail traffic, has hollow-box shaped, rigid frame and two working platforms which are overlaid on two track undercarriages |
DE102010022679A1 (en) | 2010-06-04 | 2011-12-08 | Robel Bahnbaumaschinen Gmbh | Vehicle combination for transporting rails |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107244327A (en) * | 2017-07-19 | 2017-10-13 | 宝鸡中车时代工程机械有限公司 | Construction of railways stores van |
CN109080650A (en) * | 2018-08-21 | 2018-12-25 | 中车南京浦镇车辆有限公司 | Railroad car bodywork shield |
DE102022106069A1 (en) | 2022-03-16 | 2023-09-21 | Windhoff Bahn- Und Anlagentechnik Gmbh | Methods for vegetation management, as well as rail vehicles and trains for this purpose |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2172563B (en) * | 1985-03-23 | 1989-06-28 | Permanent Way Equip | Rail vehicle |
JPH0349093Y2 (en) * | 1987-08-07 | 1991-10-21 | ||
JP3214595B2 (en) * | 1994-10-13 | 2001-10-02 | 株式会社フジクラ | Automatic trough lid laying apparatus and trough lid laying method |
ATA47295A (en) * | 1995-03-16 | 1996-07-15 | Plasser Bahnbaumasch Franz | RAILWAY VEHICLE |
JP2753214B2 (en) * | 1996-04-02 | 1998-05-18 | 日本輸送機株式会社 | Work truck for track inspection of monorail |
EP0801022A3 (en) * | 1996-04-09 | 1999-02-10 | Franz Plasser Bahnbaumaschinen-Industriegesellschaft m.b.H. | Railway-working machine with a slewing crane |
DE20208835U1 (en) * | 2002-06-07 | 2002-10-10 | ROBEL Bahnbaumaschinen GmbH, 83395 Freilassing | maintenance vehicle |
AT6158U3 (en) * | 2003-01-29 | 2004-03-25 | Plasser Bahnbaumasch Franz | MACHINE FOR TREATING A TRACK |
AT7266U3 (en) * | 2004-08-19 | 2005-12-15 | Plasser Bahnbaumasch Franz | TRACK CONSTRUCTION MACHINE |
DE202004013732U1 (en) * | 2004-09-03 | 2004-12-16 | Robel Bahnbaumaschinen Gmbh | maintenance vehicle |
-
2006
- 2006-06-28 AT AT0050006U patent/AT9393U1/en not_active IP Right Cessation
-
2007
- 2007-06-26 RU RU2008147825/11A patent/RU2423572C2/en active
- 2007-06-26 AT AT07764853T patent/ATE519893T1/en active
- 2007-06-26 EP EP07764853A patent/EP2038481B1/en not_active Not-in-force
- 2007-06-26 WO PCT/EP2007/005627 patent/WO2008000432A1/en active Application Filing
- 2007-06-26 JP JP2009516972A patent/JP5300720B2/en not_active Expired - Fee Related
- 2007-06-26 DK DK07764853.3T patent/DK2038481T3/en active
- 2007-06-26 PL PL07764853T patent/PL2038481T3/en unknown
- 2007-06-26 ES ES07764853T patent/ES2370272T3/en active Active
- 2007-06-26 AU AU2007264044A patent/AU2007264044B2/en not_active Ceased
- 2007-06-26 CN CN2007800242672A patent/CN101479429B/en not_active Expired - Fee Related
-
2009
- 2009-08-19 HK HK09107627.7A patent/HK1127793A1/en not_active IP Right Cessation
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102009033516A1 (en) * | 2009-07-15 | 2011-04-14 | Db Gleisbau Gmbh | Vehicle for executing building measures in track area of rail traffic, has hollow-box shaped, rigid frame and two working platforms which are overlaid on two track undercarriages |
WO2011038793A1 (en) * | 2009-09-30 | 2011-04-07 | Robel Bahnbaumaschinen Gmbh | Vehicle that can be driven on a track |
DE102010022679A1 (en) | 2010-06-04 | 2011-12-08 | Robel Bahnbaumaschinen Gmbh | Vehicle combination for transporting rails |
WO2011151015A1 (en) | 2010-06-04 | 2011-12-08 | Robel Bahnbaumaschinen Gmbh | Vehicle train for transporting rails |
Also Published As
Publication number | Publication date |
---|---|
ATE519893T1 (en) | 2011-08-15 |
JP5300720B2 (en) | 2013-09-25 |
EP2038481B1 (en) | 2011-08-10 |
CN101479429B (en) | 2011-10-12 |
WO2008000432A1 (en) | 2008-01-03 |
EP2038481A1 (en) | 2009-03-25 |
JP2009541123A (en) | 2009-11-26 |
DK2038481T3 (en) | 2011-11-14 |
AU2007264044B2 (en) | 2012-08-23 |
HK1127793A1 (en) | 2009-10-09 |
RU2423572C2 (en) | 2011-07-10 |
AU2007264044A1 (en) | 2008-01-03 |
PL2038481T3 (en) | 2012-04-30 |
RU2008147825A (en) | 2010-08-10 |
ES2370272T3 (en) | 2011-12-14 |
CN101479429A (en) | 2009-07-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1789299B1 (en) | Maintenance vehicle | |
EP2576908B1 (en) | Vehicle train for transporting rails | |
DE102005034582B4 (en) | Conveyor system and method for the simultaneous transport of workpieces and fitters in a production line | |
DE2550391C2 (en) | Method for removing bedding material from ballast bedding | |
EP2179092B1 (en) | Machine for the pick-up and storage of track fastenings of a track and method thereof | |
DE102011012024B3 (en) | Transport device i.e. mono-rail system, for use in underground mining applications, has transport train whose drive unit comprises gear wheel, and is supported with carrier rollers on inner sides of lower flange | |
EP2038481B1 (en) | Track renewal train for maintaining a track | |
WO2017129214A1 (en) | Maintenance vehicle | |
EP0721026A1 (en) | Machine and installation for performing operations on a railway track | |
EP1369330B2 (en) | Maintenance vehicle | |
EP2601350B1 (en) | System for cleaning a ballast bed | |
DE102010014596B4 (en) | Vehicle for carrying out construction work in the railway track area | |
CH624443A5 (en) | ||
EP1391364B1 (en) | Dismountable railway vehicle, comprising a lifting platform | |
DE202006013482U1 (en) | Track construction vehicle e.g. for track repair, has work vehicle which is connected to towing vehicle by coupler and vehicle has loading space with cover which is adjustable in vehicle longitudinal direction | |
AT502438B1 (en) | PROCESS AND VEHICLE COMBINATION FOR WORKING IRONS | |
AT4620U2 (en) | TRACK CONSTRUCTION MACHINE TO RECEIVE BED MATERIAL | |
DE1226389B (en) | Device for supplying electrical energy with the aid of cables intended for conveyor devices that move on rails | |
EP3145784A1 (en) | Bulk material loading wagon | |
DE1455054C3 (en) | ||
DE202010004856U1 (en) | Vehicle for carrying out construction work in the rail track area | |
AT511192B1 (en) | MACHINE FOR RENEWING A TRAIL | |
DE2920790A1 (en) | Rail truck shunting trolley - has lengthwise truck wheel guides sloping downwards from centre to ends | |
DE1756183A1 (en) | Conveyor device | |
DE4240397A1 (en) | Loader for pallets onto vehicles - has transporter trucks with hoist cooperating with pallets and joined by couplings |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MM01 | Lapse because of not paying annual fees |
Effective date: 20120630 |