CN115288437A - 一种尿素造粒塔建设用模板安装结构 - Google Patents

一种尿素造粒塔建设用模板安装结构 Download PDF

Info

Publication number
CN115288437A
CN115288437A CN202210904951.6A CN202210904951A CN115288437A CN 115288437 A CN115288437 A CN 115288437A CN 202210904951 A CN202210904951 A CN 202210904951A CN 115288437 A CN115288437 A CN 115288437A
Authority
CN
China
Prior art keywords
fixed
template
bottom template
cross beam
vertical beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202210904951.6A
Other languages
English (en)
Other versions
CN115288437B (zh
Inventor
邵伟
李炳良
孙帅
杨超山
邵传金
徐利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tengzhou Construction Engineering Group Co ltd
Original Assignee
Tengzhou Construction Engineering Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tengzhou Construction Engineering Group Co ltd filed Critical Tengzhou Construction Engineering Group Co ltd
Priority to CN202210904951.6A priority Critical patent/CN115288437B/zh
Publication of CN115288437A publication Critical patent/CN115288437A/zh
Application granted granted Critical
Publication of CN115288437B publication Critical patent/CN115288437B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

本发明公开了一种尿素造粒塔建设用模板安装结构,包括固定横梁、固定竖梁、第一底模板、侧模板、第二底模板、第一固定吊筋、第二固定吊筋、钢管、钢桁架托板,所述固定横梁与固定竖梁连接,固定竖梁利用螺栓固定在地面或支架上,固定横梁的右端设有第一固定吊筋,且第一固定吊筋贯穿固定横梁设置,第一固定吊筋的末端与焊接板连接,焊接板与第二底模板一体成型,第二底模板与侧模板连接,侧模板设有两块,另一块侧模板与固定竖梁连接,所述固定横梁上设有螺栓安装的垫块,垫块靠近固定竖梁设置,垫板上安装有第二固定吊筋。本发明设计合理;第一固定吊筋、第二固定吊筋提高了第二底模板、第一底模板固定的稳定性。

Description

一种尿素造粒塔建设用模板安装结构
技术领域
本发明涉及一种尿素造粒塔建设用模板安装结构。
背景技术
尿素在农业生产中有着重要的作用,尿素能提供作物生长需要的氮元素,尿素生产过程中为了便于运输、保存,需要对尿素进行造粒操作,造粒塔是常用的设备,因造粒塔高度较高在建造时需要用到模板,现有的模板安装结构在使用过程中底模板易发生位移进而影响混凝土的浇筑。
发明内容
本发明的目的在于提供一种尿素造粒塔建设用模板安装结构,以解决上述技术问题。
为实现上述目的本发明采用以下技术方案:
一种尿素造粒塔建设用模板安装结构,包括固定横梁、固定竖梁、第一底模板、侧模板、第二底模板、第一固定吊筋、第二固定吊筋、钢管、钢桁架托板,所述固定横梁与固定竖梁连接,固定竖梁利用螺栓固定在地面或支架上,固定横梁的右端设有第一固定吊筋,且第一固定吊筋贯穿固定横梁设置,第一固定吊筋的末端与焊接板连接,焊接板与第二底模板一体成型,第二底模板与侧模板连接,侧模板设有两块,另一块侧模板与固定竖梁连接,所述固定横梁上设有螺栓安装的垫块,垫块靠近固定竖梁设置,垫板上安装有第二固定吊筋,第二固定吊筋的下部与三角形吊筋连接,三角形吊筋与第一底模板连接,所述第一底模板的下方设有钢管,钢管的下方设有钢桁架托板,钢桁架托板与固定竖梁连接。
优选的,所述二固定吊筋上安装有加固钢筋,加固钢筋将两块侧模板连接。
优选的,所述第二固定吊筋上设有螺纹,套筒与第二固定吊筋螺纹连接,套筒的两侧设有一体成型的小套管,加固钢筋与小套筒螺纹连接。
优选的,所述钢桁架托板呈L型设计,钢桁架托板上开设有多个插槽,插片与插槽连接,钢桁架托板上设有螺纹连接的螺杆,螺杆上设有螺钉安装的弹簧,弹簧与侧模板的外表面接触,侧模板、第一底模板、第二底模板安装完成后在前、后两端安装端模板,顶部安装顶模板然后浇筑混凝土。
与现有技术相比,本发明具有以下优点:本发明设计合理;第一固定吊筋、第二固定吊筋提高了第二底模板、第一底模板的稳定性,第二固定吊筋下方的三角形吊筋增加了稳定性;第一底模板下方的钢管提高了第一底模板的抗压能力,从而避免了建筑混凝土时出现脱落的情况,且钢管具有一定的缓冲能力;钢桁架托板上的插槽、插片能将钢管固定在不同的位置,钢桁架托板上的弹簧、螺杆能增加侧模板的径向力;加固钢筋与小套管连接从而防止侧模板出现跑模的情况,套筒在第二固定吊筋上移动从而改变加固钢筋的位置适应不同的要求。
附图说明
图1为本发明尿素造粒塔建设用模板安装结构示意图。
图2为本发明尿素造粒塔建设用模板安装结构的第二固定吊筋分解示意图。
图3为本发明尿素造粒塔建设用模板安装结构的钢桁架托板示意图。
具体实施方式
下面结合附图和具体实施例对本发明作进一步详细阐述。
如图1-3所示,一种尿素造粒塔建设用模板安装结构,包括固定横梁1、固定竖梁2、第一底模板3、侧模板4、第二底模板5、第一固定吊筋7、第二固定吊筋9、钢管11、钢桁架托板13,所述固定横梁1与固定竖梁2连接,固定竖梁2利用螺栓固定在地面或支架上,固定横梁1的右端设有第一固定吊筋7,且第一固定吊筋7贯穿固定横梁1设置,第一固定吊筋7的末端与焊接板6连接,焊接板6与第二底模板5一体成型,第二底模板5与侧模板4连接,侧模板4设有两块,另一块侧模板4与固定竖梁2连接,所述固定横梁1上设有螺栓安装的垫块8,垫块8靠近固定竖梁2设置,垫板8上安装有第二固定吊筋9,第二固定吊筋9的下部与三角形吊筋10连接,三角形吊筋10与第一底模板3连接,所述第一底模板3的下方设有钢管11,钢管11的下方设有钢桁架托板13,钢桁架托板13与固定竖梁2连接,第二固定吊筋9上安装有加固钢筋12,加固钢筋12将两块侧模板4连接,第二固定吊筋9上设有螺纹,套筒14与第二固定吊筋9螺纹连接,套筒14的两侧设有一体成型的小套管15,加固钢筋12与小套筒15螺纹连接,钢桁架托板13呈L型设计,钢桁架托板13上开设有多个插槽16,插片17与插槽16连接,钢桁架托板13上设有螺纹连接的螺杆18,螺杆18上设有螺钉安装的弹簧19,弹簧19与侧模板4的外表面接触,侧模板4、第一底模板3、第二底模板5安装完成后在前、后两端安装端模板,顶部安装顶模板然后浇筑混凝土。
以上所述为本发明较佳实施例,对于本领域的普通技术人员而言,根据本发明的教导,在不脱离本发明的原理与精神的情况下,对实施方式所进行的改变、修改、替换和变型仍落入本发明的保护范围之内。

Claims (4)

1.一种尿素造粒塔建设用模板安装结构,包括固定横梁(1)、固定竖梁(2)、第一底模板(3)、侧模板(4)、第二底模板(5)、第一固定吊筋(7)、第二固定吊筋(9)、钢管(11)、钢桁架托板(13),其特征在于,所述固定横梁(1)与固定竖梁(2)连接,固定竖梁(2)利用螺栓固定在地面或支架上,固定横梁(1)的右端设有第一固定吊筋(7),且第一固定吊筋(7)贯穿固定横梁(1)设置,第一固定吊筋(7)的末端与焊接板(6)连接,焊接板(6)与第二底模板(5)一体成型,第二底模板(5)与侧模板(4)连接,侧模板(4)设有两块,另一块侧模板(4)与固定竖梁(2)连接,所述固定横梁(1)上设有螺栓安装的垫块(8),垫块(8)靠近固定竖梁(2)设置,垫板(8)上安装有第二固定吊筋(9),第二固定吊筋(9)的下部与三角形吊筋(10)连接,三角形吊筋(10)与第一底模板(3)连接,所述第一底模板(3)的下方设有钢管(11),钢管(11)的下方设有钢桁架托板(13),钢桁架托板(13)与固定竖梁(2)连接。
2.根据权利要求1所述的一种尿素造粒塔建设用模板安装结构,其特征在于,所述第二固定吊筋(9)上安装有加固钢筋(12),加固钢筋(12)将两块侧模板(4)连接。
3.根据权利要求2所述的一种尿素造粒塔建设用模板安装结构,其特征在于,所述第二固定吊筋(9)上设有螺纹,套筒(14)与第二固定吊筋(9)螺纹连接,套筒(14)的两侧设有一体成型的小套管(15),加固钢筋(12)与小套筒(15)螺纹连接。
4.根据权利要求1所述的一种尿素造粒塔建设用模板安装结构,其特征在于,所述钢桁架托板(13)呈L型设计,钢桁架托板(13)上开设有多个插槽(16),插片(17)与插槽(16)连接,钢桁架托板(13)上设有螺纹连接的螺杆(18),螺杆(18)上设有螺钉安装的弹簧(19),弹簧(19)与侧模板(4)的外表面接触,侧模板(4)、第一底模板(3)、第二底模板(5)安装完成后在前、后两端安装端模板,顶部安装顶模板然后浇筑混凝土。
CN202210904951.6A 2022-07-29 2022-07-29 一种尿素造粒塔建设用模板安装结构 Active CN115288437B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210904951.6A CN115288437B (zh) 2022-07-29 2022-07-29 一种尿素造粒塔建设用模板安装结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210904951.6A CN115288437B (zh) 2022-07-29 2022-07-29 一种尿素造粒塔建设用模板安装结构

Publications (2)

Publication Number Publication Date
CN115288437A true CN115288437A (zh) 2022-11-04
CN115288437B CN115288437B (zh) 2024-01-30

Family

ID=83826892

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210904951.6A Active CN115288437B (zh) 2022-07-29 2022-07-29 一种尿素造粒塔建设用模板安装结构

Country Status (1)

Country Link
CN (1) CN115288437B (zh)

Citations (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
PT72321A (fr) * 1980-01-08 1981-03-01 Sousa Manuel Eduardo X Appareil de coupe et accomplissement device with finish by stamping cutting
JP2000291189A (ja) * 1999-02-03 2000-10-17 Shimizu Corp 梁貫通穴の形成方法および梁貫通穴用型枠
CN101319516A (zh) * 2007-06-05 2008-12-10 汪卫东 可拆装式建筑物
JP2009057685A (ja) * 2007-08-29 2009-03-19 Sumitomo Mitsui Construction Co Ltd 移動吊支保工
CN101984202A (zh) * 2010-11-05 2011-03-09 湖南长大建设集团股份有限公司 一种用于现浇结构模板加固的夹具
CN102733608A (zh) * 2012-08-03 2012-10-17 贵州开磷建设有限责任公司 一种造粒塔喷头层施工方法
CN102777044A (zh) * 2012-08-07 2012-11-14 中化二建集团有限公司 尿素造粒塔钢结构喷淋层吊装方法
CN103321404A (zh) * 2013-06-20 2013-09-25 贵州开磷建设有限责任公司 一种造粒塔塔壁混凝土变化段滑模模板调整施工方法
KR101596860B1 (ko) * 2015-05-07 2016-03-07 한국철도기술연구원 곡선부 프리캐스트 벽체 제작을 위한 가변형 형틀장치, 그 형틀장치를 이용한 곡선부 프리캐스트 벽체 제조방법 및 그 제조방법에 의해 제작된 곡선부 프리캐스트 벽체
CN106088582A (zh) * 2016-07-08 2016-11-09 广州市第四建筑工程有限公司 滑模平台及其应用于钢筋混凝土筒体滑模施工方法
RU2671872C1 (ru) * 2017-07-14 2018-11-07 Олег Александрович Вирачев Комплект опалубки и способ его монтажа
CN208858167U (zh) * 2018-09-03 2019-05-14 江苏省建筑工程集团有限公司 钢管桁架梁吊装空中精准就位用限位装置
CN210164237U (zh) * 2018-12-29 2020-03-20 中建四局第六建筑工程有限公司 一种后浇带无顶撑支模加固装置
CN211114814U (zh) * 2019-11-05 2020-07-28 中建二局第三建筑工程有限公司 一种钢筋混凝土梁加固模板
CN111502262A (zh) * 2020-04-15 2020-08-07 广西建工集团第五建筑工程有限责任公司 装配式横梁浇筑模板组件、混凝土结构及其施工方法
CN211691463U (zh) * 2019-09-17 2020-10-16 谢肇荣 建筑用顶托
CN211849246U (zh) * 2019-12-13 2020-11-03 中交四航局第一工程有限公司 一种适用于高桩码头的反吊系统
CN212611991U (zh) * 2020-05-08 2021-02-26 中交第三航务工程勘察设计院有限公司 一种现浇混凝土墩台底模板吊筋结构
CN212743356U (zh) * 2020-05-07 2021-03-19 武汉正远岩土科技有限公司 一种逆作法吊模系统
CN113006465A (zh) * 2021-03-04 2021-06-22 天蓬智慧建造(广东)科技有限公司 一种墙体浇筑模具及方法
CN214834714U (zh) * 2021-01-07 2021-11-23 中建七局第二建筑有限公司 一种伸缩缝位置剪力墙侧模加固装置
CN214883674U (zh) * 2021-05-11 2021-11-26 中建七局安装工程有限公司 一种逆作法井壁浇筑施工用支撑结构
KR102341843B1 (ko) * 2021-01-22 2021-12-22 신희경 무해체 보거푸집
CN215717172U (zh) * 2021-01-13 2022-02-01 中铁七局集团武汉工程有限公司 一种爬模预埋件施工装置

Patent Citations (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
PT72321A (fr) * 1980-01-08 1981-03-01 Sousa Manuel Eduardo X Appareil de coupe et accomplissement device with finish by stamping cutting
JP2000291189A (ja) * 1999-02-03 2000-10-17 Shimizu Corp 梁貫通穴の形成方法および梁貫通穴用型枠
CN101319516A (zh) * 2007-06-05 2008-12-10 汪卫东 可拆装式建筑物
JP2009057685A (ja) * 2007-08-29 2009-03-19 Sumitomo Mitsui Construction Co Ltd 移動吊支保工
CN101984202A (zh) * 2010-11-05 2011-03-09 湖南长大建设集团股份有限公司 一种用于现浇结构模板加固的夹具
CN102733608A (zh) * 2012-08-03 2012-10-17 贵州开磷建设有限责任公司 一种造粒塔喷头层施工方法
CN102777044A (zh) * 2012-08-07 2012-11-14 中化二建集团有限公司 尿素造粒塔钢结构喷淋层吊装方法
CN103321404A (zh) * 2013-06-20 2013-09-25 贵州开磷建设有限责任公司 一种造粒塔塔壁混凝土变化段滑模模板调整施工方法
KR101596860B1 (ko) * 2015-05-07 2016-03-07 한국철도기술연구원 곡선부 프리캐스트 벽체 제작을 위한 가변형 형틀장치, 그 형틀장치를 이용한 곡선부 프리캐스트 벽체 제조방법 및 그 제조방법에 의해 제작된 곡선부 프리캐스트 벽체
CN106088582A (zh) * 2016-07-08 2016-11-09 广州市第四建筑工程有限公司 滑模平台及其应用于钢筋混凝土筒体滑模施工方法
RU2671872C1 (ru) * 2017-07-14 2018-11-07 Олег Александрович Вирачев Комплект опалубки и способ его монтажа
CN208858167U (zh) * 2018-09-03 2019-05-14 江苏省建筑工程集团有限公司 钢管桁架梁吊装空中精准就位用限位装置
CN210164237U (zh) * 2018-12-29 2020-03-20 中建四局第六建筑工程有限公司 一种后浇带无顶撑支模加固装置
CN211691463U (zh) * 2019-09-17 2020-10-16 谢肇荣 建筑用顶托
CN211114814U (zh) * 2019-11-05 2020-07-28 中建二局第三建筑工程有限公司 一种钢筋混凝土梁加固模板
CN211849246U (zh) * 2019-12-13 2020-11-03 中交四航局第一工程有限公司 一种适用于高桩码头的反吊系统
CN111502262A (zh) * 2020-04-15 2020-08-07 广西建工集团第五建筑工程有限责任公司 装配式横梁浇筑模板组件、混凝土结构及其施工方法
CN212743356U (zh) * 2020-05-07 2021-03-19 武汉正远岩土科技有限公司 一种逆作法吊模系统
CN212611991U (zh) * 2020-05-08 2021-02-26 中交第三航务工程勘察设计院有限公司 一种现浇混凝土墩台底模板吊筋结构
CN214834714U (zh) * 2021-01-07 2021-11-23 中建七局第二建筑有限公司 一种伸缩缝位置剪力墙侧模加固装置
CN215717172U (zh) * 2021-01-13 2022-02-01 中铁七局集团武汉工程有限公司 一种爬模预埋件施工装置
KR102341843B1 (ko) * 2021-01-22 2021-12-22 신희경 무해체 보거푸집
CN113006465A (zh) * 2021-03-04 2021-06-22 天蓬智慧建造(广东)科技有限公司 一种墙体浇筑模具及方法
CN214883674U (zh) * 2021-05-11 2021-11-26 中建七局安装工程有限公司 一种逆作法井壁浇筑施工用支撑结构

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘元文;: "造粒塔顶层水平结构悬吊施工技术", 建材世界, no. 04, pages 120 - 122 *
张建华;郭正兴;王永泉;: "106.05m高空悬挑混凝土构件模板支撑施工平台设计与施工", 施工技术, no. 08, pages 318 - 319 *

Also Published As

Publication number Publication date
CN115288437B (zh) 2024-01-30

Similar Documents

Publication Publication Date Title
CN215717143U (zh) 一种可调节尺寸的混凝土浇筑钢模板系统
CN115288437A (zh) 一种尿素造粒塔建设用模板安装结构
CN218509001U (zh) 一种花篮式悬挑工字梁
CN211816942U (zh) 一种建筑钢结构简易安装连接加固结构
CN110670873B (zh) 一种超高大截面混凝土柱钢模板的托撑体系及施工方法
CN201649632U (zh) 可变截面方柱模板调节定位架
CN214363134U (zh) 异型现浇混凝土花槽防撞护栏施工结构
CN210562911U (zh) 一种安全性能高的钢筋桁架楼层板
CN2319486Y (zh) 工具式可调柱箍
CN202148494U (zh) 一种桥梁用模板支架
CN112323835A (zh) 基础筏板马凳筋的施工方法
CN218757045U (zh) 一种适用于多种拱箱尺寸的装配式挂篮
CN220521117U (zh) 一种用于凹面混凝土结构爬模挂座系统
CN219773622U (zh) 一种可调式吊模降板内支撑结构
CN201093122Y (zh) 一种电缆支架
CN201794295U (zh) 小板跨预制梁楼板支模体系
CN215255037U (zh) 一种电子信息工程用通信塔固定座
CN216406171U (zh) 一种型钢混凝土梁模板安装构造
CN212897185U (zh) 建筑施工用加强结构
CN217871840U (zh) 一种建筑模板加固件
CN219826269U (zh) 一种用于新旧结构间的加固装置
CN215671116U (zh) 用于粮仓混凝土天沟支模的支撑结构
CN219862389U (zh) 桥面翼缘板托架及支架系统
CN216515159U (zh) 一种桥梁高塔主筋快速安装吊具
CN219386821U (zh) 一种现浇混凝土空心楼盖加固装置

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant