CN101984202A - 一种用于现浇结构模板加固的夹具 - Google Patents

一种用于现浇结构模板加固的夹具 Download PDF

Info

Publication number
CN101984202A
CN101984202A CN2010105331515A CN201010533151A CN101984202A CN 101984202 A CN101984202 A CN 101984202A CN 2010105331515 A CN2010105331515 A CN 2010105331515A CN 201010533151 A CN201010533151 A CN 201010533151A CN 101984202 A CN101984202 A CN 101984202A
Authority
CN
China
Prior art keywords
adjusting device
jig arm
root
anchor clamps
cross beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010105331515A
Other languages
English (en)
Inventor
李和平
李天成
李盛
吴伟宏
周妙玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUNAN CHANGDA CONSTRUCTION GROUP CO Ltd
Original Assignee
HUNAN CHANGDA CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUNAN CHANGDA CONSTRUCTION GROUP CO Ltd filed Critical HUNAN CHANGDA CONSTRUCTION GROUP CO Ltd
Priority to CN2010105331515A priority Critical patent/CN101984202A/zh
Publication of CN101984202A publication Critical patent/CN101984202A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

一种用于现浇结构模板加固的夹具,所述夹具包括固定夹臂(1)、横梁、调整装置基座(4)、调整装置(5)、活动夹臂(6);固定夹臂(1)的根部顺序刚性连接横梁、调整装置基座(4)和调整装置(5),其总体形成U型结构;活动夹臂(6)的根部套装在调整装置(5)上;固定夹臂(1)和活动夹臂(6)的悬臂末端,面对面设置夹臂齿口。横梁包括平行布置的抗拉的小横梁(2)和抗压的大横梁(3);小横梁(2)和大横梁(3)的一端都与固定夹臂(1)的根部刚性连接,另外一端都与调整装置基座(4)刚性连接。调整装置(5)为双螺杆结构或者螺杆加导杆结构。本发明结构简单合理,能够确保钢筋混凝土现浇质量,减少返工,节约工程成本。

Description

一种用于现浇结构模板加固的夹具
技术领域
本发明涉及一种用于现浇结构模板加固的夹具。
背景技术
在建筑混凝土结构施工过程中,梁、柱、墙的结构模板在支设后常常需要进一步加固,目前,常用的方法是罗杆丝杠法,即简单地通过按原支设方法用架管和对拉螺杆进行加密。这种方法的缺点在于由于架管和对拉螺杆的所占空间较大,支模完成后加密操作非常不方便;而且,采用这种方法加固需要两人以上进行协作,费时费力。
发明内容
本发明的目的在于克服现有技术中的不足,提供一种用于现浇结构模板加固的夹具。
本发明的目的通过下述技术方案予以实现:所述夹具包括固定夹臂、横梁、调整装置基座、调整装置、活动夹臂;所述固定夹臂的根部顺序刚性连接横梁、调整装置基座和调整装置,其总体形成U型结构;所述活动夹臂的根部套装在调整装置上;所述固定夹臂和活动夹臂的悬臂末端,面对面设置夹臂齿口。
所述横梁包括平行布置的抗拉的小横梁和抗压的大横梁;所述小横梁和大横梁的一端都与固定夹臂的根部刚性连接,另外一端都与调整装置基座刚性连接。
所述调整装置包括两根螺杆、垫圈和螺母,两根螺杆平行布置,它们的根部刚性安装在调整装置基座上;所述活动夹臂的根部套装在两根螺杆上;在夹具工作时,调节螺母,调整并锁紧固定夹臂和活动夹臂的相对距离和压力。
所述调整装置包括一根螺杆及其垫圈、螺母,和一根导杆,螺杆和导杆平行布置,它们的根部刚性安装在调整装置基座上;所述活动夹臂的根部套装在螺杆和导杆上;在夹具工作时,调节螺母,调整并锁紧固定夹臂和活动夹臂的相对距离和压力。
与现有技术相比,本发明具有结构简单合理,使用方便,能够确保钢筋混凝土现浇质量,减少返工,节约工程成本等优点。 
附图说明
图1为本发明第一实施例构造示意图;
图2为本发明第二实施例构造示意图;
图3为图1实施例一的夹具实际应用于现浇梁的加固放大示意图;
图4为图1实施例一的夹具实际应用于现浇墙或柱的加固放大示意图;
图中:1-固定夹臂,2-小横梁,3-大横梁,4-调整装置基座,5-调整装置,6-活动夹臂,7-螺杆,8-垫圈,9-螺母,10-导杆,11-结构模板骨架,12-钢筋混凝土梁,13-钢筋混凝土墙或柱。
具体实施方式
下面结合附图和实施例对本发明作进一步说明:
参照附图1-2,本发明所述夹具包括固定夹臂1、横梁、调整装置基座4、调整装置5、活动夹臂6;所述固定夹臂1的根部顺序刚性连接横梁、调整装置基座4和调整装置5,其总体形成U型结构;所述活动夹臂6的根部套装在调整装置5上;所述固定夹臂1和活动夹臂6的悬臂末端,面对面设置夹臂齿口。
所述横梁包括平行布置的抗拉的小横梁2和抗压的大横梁3;所述小横梁2和大横梁3的一端都与固定夹臂1的根部刚性连接,另外一端都与调整装置基座4刚性连接。
参照附图1,所述调整装置5包括两根螺杆7、垫圈8和螺母9,两根螺杆7平行布置,它们的根部刚性安装在调整装置基座4上;所述活动夹臂6的根部套装在两根螺杆7上;在夹具工作时,调节螺母9,调整并锁紧固定夹臂1和活动夹臂6的相对距离和压力。在本实施例中,最接近活动夹臂6根部的螺杆7上设置两套垫圈螺母,在给活动夹臂6根部定位的同时,将其根部夹持住,另外一根螺杆7上设置一套垫圈螺母,起定位和锁紧作用。
参照附图2,所述调整装置5包括一根螺杆7及其垫圈8、螺母9,和一根导杆10,螺杆7和导杆10平行布置,它们的根部刚性安装在调整装置基座4上;所述活动夹臂6的根部套装在螺杆7和导杆10上;在夹具工作时,调节螺母9,调整并锁紧固定夹臂1和活动夹臂6的相对距离和压力。在本实施例中,螺杆7上设置一套垫圈螺母,给活动夹臂6根部起定位和锁紧作用,导杆10为活动夹臂6的移动提供定位和支撑作用。
参照附图3,为图1实施例一的夹具实际应用于现浇梁的加固放大示意图。在本实际应用中,现浇的钢筋混凝土梁12的结构模板骨架11有三方落入本夹具的U型结构中,调节螺母9,调整并锁紧固定夹臂1和活动夹臂6的相对距离和预定的压力。
参照附图4,为图1实施例一的夹具实际应用于现浇墙或柱的加固放大示意图。在本实际应用中,现浇的钢筋混凝土墙或柱13的结构模板骨架11有三方落入本夹具的U型结构中,调节螺母9,调整并锁紧固定夹臂1和活动夹臂6的相对距离和预定的压力。
实施例二的实际应用与实施例一的实际应用完全一样,这里不再赘述。本发明的夹具可有效地加固结构模板,从而保证混凝土的浇筑不会发生跑模,有效地避免了反攻,大大地提高了混凝土的浇注质量。

Claims (4)

1.一种用于现浇结构模板加固的夹具,其特征在于:所述夹具包括固定夹臂(1)、横梁、调整装置基座(4)、调整装置(5)、活动夹臂(6);所述固定夹臂(1)的根部顺序刚性连接横梁、调整装置基座(4)和调整装置(5),其总体形成U型结构;所述活动夹臂(6)的根部套装在调整装置(5)上;所述固定夹臂(1)和活动夹臂(6)的悬臂末端,面对面设置夹臂齿口。
2.根据权利要求1所述的用于现浇结构模板加固的夹具,其特征在于:所述横梁包括平行布置的抗拉的小横梁(2)和抗压的大横梁(3);所述小横梁(2)和大横梁(3)的一端都与固定夹臂(1)的根部刚性连接,另外一端都与调整装置基座(4)刚性连接。
3.根据权利要求1或2所述的用于现浇结构模板加固的夹具,其特征在于:所述调整装置(5)包括两根螺杆(7)、垫圈(8)和螺母(9),两根螺杆(7)平行布置,它们的根部刚性安装在调整装置基座(4)上;所述活动夹臂(6)的根部套装在两根螺杆(7)上;在夹具工作时,调节螺母(9),调整并锁紧固定夹臂(1)和活动夹臂(6)的相对距离和压力。
4.根据权利要求1或2所述的用于现浇结构模板加固的夹具,其特征在于:所述调整装置(5)包括一根螺杆(7)及其垫圈(8)、螺母(9),和一根导杆(10),螺杆(7)和导杆(10)平行布置,它们的根部刚性安装在调整装置基座(4)上;所述活动夹臂(6)的根部套装在螺杆(7)和导杆(10)上;在夹具工作时,调节螺母(9),调整并锁紧固定夹臂(1)和活动夹臂(6)的相对距离和压力。
CN2010105331515A 2010-11-05 2010-11-05 一种用于现浇结构模板加固的夹具 Pending CN101984202A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105331515A CN101984202A (zh) 2010-11-05 2010-11-05 一种用于现浇结构模板加固的夹具

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105331515A CN101984202A (zh) 2010-11-05 2010-11-05 一种用于现浇结构模板加固的夹具

Publications (1)

Publication Number Publication Date
CN101984202A true CN101984202A (zh) 2011-03-09

Family

ID=43641372

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105331515A Pending CN101984202A (zh) 2010-11-05 2010-11-05 一种用于现浇结构模板加固的夹具

Country Status (1)

Country Link
CN (1) CN101984202A (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102182305A (zh) * 2011-04-11 2011-09-14 阮中亮 建筑浇筑模板拼合连接的夹紧装置
CN104120878A (zh) * 2013-04-25 2014-10-29 郭光德 H扣件
CN104389436A (zh) * 2014-12-02 2015-03-04 国家电网公司 安全防护保险卡装置
CN105625717A (zh) * 2016-03-23 2016-06-01 上海宝冶集团有限公司 一种剪力墙腰梁砼浇筑模板堵头工具及其封堵方法
CN106049861A (zh) * 2016-07-26 2016-10-26 中国建筑第八工程局有限公司 钢框模板防位移装置
CN109403628A (zh) * 2018-12-20 2019-03-01 昌宜(天津)模板租赁有限公司 一种铝模板节点加固装置
CN110158955A (zh) * 2019-06-11 2019-08-23 张晓和 一种建筑模板的固定机构
CN112982987A (zh) * 2021-02-01 2021-06-18 湖南嘉晟住建科技有限公司 一种新型不等翼缘钢混组合波纹腹板h型梁的施工方法
CN115288437A (zh) * 2022-07-29 2022-11-04 滕州建工建设集团有限公司 一种尿素造粒塔建设用模板安装结构

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5064163A (en) * 1987-07-28 1991-11-12 Josef Maier Connecting device for shuttering panels
CN1804338A (zh) * 2006-01-25 2006-07-19 王志燕 建筑模板锁定连接夹具
CN201152023Y (zh) * 2007-12-18 2008-11-19 南通华荣建设集团有限公司 活动式建筑模板卡夹具
CN201236484Y (zh) * 2008-08-04 2009-05-13 陈涛 一种快速模板夹具
CN201261944Y (zh) * 2008-09-19 2009-06-24 常州第一建筑工程有限公司 一种模板夹具
CN201512947U (zh) * 2009-09-25 2010-06-23 中国建筑第七工程局有限公司 建筑用模板卡具
CN201835528U (zh) * 2010-11-05 2011-05-18 湖南长大建设集团股份有限公司 一种用于现浇结构模板加固的夹具

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5064163A (en) * 1987-07-28 1991-11-12 Josef Maier Connecting device for shuttering panels
CN1804338A (zh) * 2006-01-25 2006-07-19 王志燕 建筑模板锁定连接夹具
CN201152023Y (zh) * 2007-12-18 2008-11-19 南通华荣建设集团有限公司 活动式建筑模板卡夹具
CN201236484Y (zh) * 2008-08-04 2009-05-13 陈涛 一种快速模板夹具
CN201261944Y (zh) * 2008-09-19 2009-06-24 常州第一建筑工程有限公司 一种模板夹具
CN201512947U (zh) * 2009-09-25 2010-06-23 中国建筑第七工程局有限公司 建筑用模板卡具
CN201835528U (zh) * 2010-11-05 2011-05-18 湖南长大建设集团股份有限公司 一种用于现浇结构模板加固的夹具

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102182305A (zh) * 2011-04-11 2011-09-14 阮中亮 建筑浇筑模板拼合连接的夹紧装置
CN102182305B (zh) * 2011-04-11 2012-10-03 阮中亮 建筑浇筑模板拼合连接的夹紧装置
CN104120878A (zh) * 2013-04-25 2014-10-29 郭光德 H扣件
CN104389436A (zh) * 2014-12-02 2015-03-04 国家电网公司 安全防护保险卡装置
CN105625717B (zh) * 2016-03-23 2017-08-04 上海宝冶集团有限公司 一种剪力墙腰梁砼浇筑模板堵头工具及其封堵方法
CN105625717A (zh) * 2016-03-23 2016-06-01 上海宝冶集团有限公司 一种剪力墙腰梁砼浇筑模板堵头工具及其封堵方法
CN106049861A (zh) * 2016-07-26 2016-10-26 中国建筑第八工程局有限公司 钢框模板防位移装置
CN106049861B (zh) * 2016-07-26 2018-07-31 中国建筑第八工程局有限公司 钢框模板防位移装置
CN109403628A (zh) * 2018-12-20 2019-03-01 昌宜(天津)模板租赁有限公司 一种铝模板节点加固装置
CN109403628B (zh) * 2018-12-20 2024-05-03 昌宜(天津)模板租赁有限公司 一种铝模板节点加固装置
CN110158955A (zh) * 2019-06-11 2019-08-23 张晓和 一种建筑模板的固定机构
CN112982987A (zh) * 2021-02-01 2021-06-18 湖南嘉晟住建科技有限公司 一种新型不等翼缘钢混组合波纹腹板h型梁的施工方法
CN115288437A (zh) * 2022-07-29 2022-11-04 滕州建工建设集团有限公司 一种尿素造粒塔建设用模板安装结构
CN115288437B (zh) * 2022-07-29 2024-01-30 滕州建工建设集团有限公司 一种尿素造粒塔建设用模板安装结构

Similar Documents

Publication Publication Date Title
CN101984202A (zh) 一种用于现浇结构模板加固的夹具
CN201835528U (zh) 一种用于现浇结构模板加固的夹具
CN202509763U (zh) 一种承插型盘扣式与扣件式钢管组合模板支架装置
CN207920087U (zh) 一种剪力墙转角模板加固装置
CN207260599U (zh) 一种可调节式框架柱钢筋定位卡
CN204715739U (zh) 一种剪力墙模板加固结构
CN102003067B (zh) 饰面清水混凝土结构梁、柱接头模板加固体系
CN203374000U (zh) 一种焊接式张拉装置
CN203755466U (zh) 锈蚀钢筋混凝土框架平面节点加固装置
CN216949103U (zh) 一种混凝土施工用的钢筋锚固装置
CN213268604U (zh) 一种可伸缩可拆卸的钢筋笼支撑装置
CN217175829U (zh) 一种预制构件安装的调节装置
CN202706554U (zh) 一种单侧模板可调节螺栓加固件
CN201931229U (zh) 建筑钢筋窄间隙焊接固定支架
CN211006352U (zh) 一种墩柱模板加固结构
CN204728317U (zh) 一种灌注桩万能支撑杆件
CN203603459U (zh) 爬模体系用稳固装置
CN202910233U (zh) 一种制作环形钢筋箍的装置
CN220522001U (zh) 狭窄沟槽内拆模工具
CN201152023Y (zh) 活动式建筑模板卡夹具
CN202416861U (zh) 建筑施工模板支撑器
CN216665056U (zh) 一种新型房屋建筑用钢筋加固连接结构
CN109629717A (zh) 模壳免翻施工工艺
CN208586897U (zh) 一种组合楼板施工悬挑部模板支撑工具
CN212351919U (zh) 一种建筑钢筋连接支撑机构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20110309