CN111733834B - Composite type greening device for repairing and greening damaged mountain - Google Patents

Composite type greening device for repairing and greening damaged mountain Download PDF

Info

Publication number
CN111733834B
CN111733834B CN202010566085.5A CN202010566085A CN111733834B CN 111733834 B CN111733834 B CN 111733834B CN 202010566085 A CN202010566085 A CN 202010566085A CN 111733834 B CN111733834 B CN 111733834B
Authority
CN
China
Prior art keywords
mountain
greening
layer
anchor rod
damaged
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010566085.5A
Other languages
Chinese (zh)
Other versions
CN111733834A (en
Inventor
熊显震
谢小松
刘桑妮
李刚
李芬
欧阳春霞
陈玉双
周文君
沈海明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guilin Shishan Greening Experimental Station
Original Assignee
Guilin Shishan Greening Experimental Station
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guilin Shishan Greening Experimental Station filed Critical Guilin Shishan Greening Experimental Station
Priority to CN202010566085.5A priority Critical patent/CN111733834B/en
Publication of CN111733834A publication Critical patent/CN111733834A/en
Application granted granted Critical
Publication of CN111733834B publication Critical patent/CN111733834B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G17/00Cultivation of hops, vines, fruit trees, or like trees
    • A01G17/005Cultivation methods
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G24/00Growth substrates; Culture media; Apparatus or methods therefor
    • A01G24/50Growth substrates; Culture media; Apparatus or methods therefor contained within a flexible envelope
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental Sciences (AREA)
  • Botany (AREA)
  • Cultivation Of Plants (AREA)

Abstract

The invention relates to the technical field of damaged mountain restoration greening engineering, in particular to a composite type greening device for damaged mountain restoration greening, which comprises a damaged mountain body, wherein the damaged mountain body is divided into four parts of a mountain foot platform, a mountain waist elevation, a mountain top elevation I and a mountain top elevation II, a first vegetation layer is planted at the mountain foot platform, a net hanging and spray seeding greening structure is arranged at the mountain waist elevation, a stacked plant bag structure is arranged at the mountain top elevation I, and a tire hanging soil fixing slope protection structure is arranged at the mountain top elevation II. According to the invention, by combining the actual situation of the damaged mountain surface and adopting a plurality of methods for combining the re-greening structures according to the topography of the damaged mountain and the change of the slope of the mountain in the Guibei area, the original baldness is enabled to wear a green new dress on the broken wall of the chlamydia, and the unbalanced ecological system is restored.

Description

Composite type greening device for repairing and greening damaged mountain
Technical Field
The invention relates to the technical field of damaged mountain restoration greening engineering, in particular to a composite type greening device for damaged mountain restoration greening.
Background
The damaged mountain is often called as 'optical head mountain' and is a special water and soil loss form taking the exposed side slope as a main body caused by activities such as mining and quarrying around the city.
The mountain ecological re-greening technology in the prior art has the problems that the re-greening technology is single and relatively independent, the technology integration is lacked, the re-greening purpose is difficult to achieve by a single greening means, and the re-greening research specially aiming at the Guibei karst mountain is not carried out.
Therefore, we propose a composite type greening device for repairing and greening damaged mountain bodies.
Disclosure of Invention
The invention aims to provide a composite type greening device for repairing and greening damaged mountain bodies, which aims to solve the problems in the prior art.
In order to achieve the above purpose, the present invention provides the following technical solutions: a composite type greening device for repairing and greening damaged mountain bodies comprises damaged mountain bodies, wherein the damaged mountain bodies are divided into four parts, namely a mountain foot platform, a mountain waist elevation, a mountain top elevation I and a mountain top elevation II;
a first vegetation layer is planted at the mountain foot platform;
the device comprises a mountain side elevation, a first anchor rod hole is drilled at the mountain side elevation, a first anchor rod is inserted into the first anchor rod hole, a plastic-covered iron net is hung on the first anchor rod, bamboo strips are arranged between the plastic-covered iron net and the mountain side elevation, a high-polymer aggregate substrate layer is sprayed on the plastic-covered iron net, and a second vegetation layer is sprayed on the high-polymer aggregate substrate layer;
the planting bag structure comprises a second anchor rod, a color steel tile layer, a planting bag and a first shrub layer, wherein a second anchor rod hole is drilled in the position of the mountain top elevation I, the second anchor rod is inserted in the second anchor rod hole, the color steel tile layer is paved on the second anchor rod, the planting bag is stacked at the upper end of the color steel tile layer, a first planting soil layer is filled in the planting bag, and the first shrub layer is planted on the first planting soil layer;
the tire hanging soil fixing slope protection structure is arranged at the position of the mountain top elevation II and comprises a third anchor rod, tires and a second bush layer, the tires are stacked at the position of the mountain top elevation II, third anchor rod holes are formed in the position of the mountain top elevation II and located on the left side and the right side of the lower end of the tires and the middle of the upper end of the inner ring of the tires in a drilling mode, the third anchor rod is inserted into the third anchor rod holes in an inserting mode, the third anchor rod is bent upwards and arranged and fixed on the outer side of the tires, a second planting soil layer is backfilled in the inner ring of the tires, and the second bush layer is planted on the second planting soil layer.
As a further optimization of the technical scheme, the first anchor rod, the second anchor rod and the third anchor rod are respectively fixed in the first anchor rod hole, the second anchor rod hole and the third anchor rod hole by pouring pure cement paste.
As a further optimization of the technical scheme, the length of the bamboo strips is 0.5-2m.
As a further optimization of the technical scheme, a gravel layer is arranged between the plant-growing bag and the color steel tile layer.
As a further optimization of the technical scheme, the distance between the second anchor rods is smaller than the length of the Yu Zhi raw bag.
As a further optimization of the present technical solution, the diameter of the tire is 60cm.
Compared with the prior art, the invention has the beneficial effects that: according to the invention, by combining the actual situation of the damaged mountain surface and adopting a plurality of methods for combining the re-greening structures according to the landform of the damaged mountain and the change of the slope of the mountain in the northern area of the osmanthus, the original baldness is worn with a green new dress on the broken wall of the chlamydia, an unbalanced ecological system is repaired, and a traditional garden landscaping method is adopted for places where the mountain legs and the like can form an operation platform; for damaged mountain bodies with relatively gentle slopes, a net hanging spray-seeding structure is adopted; for a rock slope surface with steep gradient or extremely thin soil layer, a stacked plant-growing bag structure is adopted; the side slope is extremely steep to form a broken surface which is reversely broken, and a tire hanging soil fixing slope protection structure is adopted.
Drawings
FIG. 1 is a schematic diagram of the structure of the present invention;
fig. 2 is a schematic structural diagram of the net hanging spray-seeding re-greening structure of the invention;
FIG. 3 is a schematic view of a stacked plant-growing bag structure according to the present invention;
fig. 4 is a schematic structural view of the tire-hanging soil-fixing slope protection structure of the present invention.
In the figure: 1. damaged mountain body; 2. a first vegetation layer; 3. hanging a net, spraying and seeding a re-greening structure; 301. a first anchor rod; 302. a plastic-coated iron net; 303. bamboo strips; 304. a high-polymer aggregate substrate layer; 305. a second vegetation layer; 4. stacking the plant-growing bag structure; 401. a second anchor rod; 402. color steel tile layer; 403. a plant growing bag; 404. a first layer of shrubs; 5. hanging a tire to fix soil and protect slope; 501. a third anchor rod; 502. a tire; 503. a second layer of shrubs.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
Referring to fig. 1-4, the present invention provides a technical solution: the utility model provides a damaged mountain body is restoreed green with compound type and is put, includes damaged mountain body 1, and damaged mountain body 1 is divided into four parts of mountain foot platform, mountain waist facade, mountain top facade I and mountain top facade II, and the mountain foot platform is the slope little, and the topography is comparatively open flat part, and the mountain waist facade is the part of slope below 60 degrees, and mountain top facade I is the part of slope between 60-90 degrees, and mountain top facade II is the part of slope more than 90 degrees.
The mountain foot platform is planted with the first vegetation layer 2, the first vegetation layer 2 can be planted in a greening manner by adopting a traditional garden landscaping method, climbing plants are planted on the inner side of the mountain foot in a arbor-grass-vine combined manner, such as climbing tiger and Chinese starjasmine vine, tree such as oleander, ficus microcarpa and osmanthus fragrans are naturally planted on the outer side of the mountain foot to the top of the slope in groups, shrubs such as bougainvillea, locust tree and silver tree, and ground covers such as ryegrass and bermudagrass, and a more stable ecological community is constructed by the arbor-grass-vine combined planting manner.
The mountain side elevation department is provided with the net of hanging and spouts and broadcast the structure of being covered with green again 3, the net of hanging and spouts and broadcast the structure of being covered with green again 3 and includes first stock 301, plastic-covered iron net 302, bamboo strip 303, high aggregate substrate layer 304 and second vegetation layer 305, the department of mountain side elevation bores and is equipped with first stock hole, the downthehole joint of first stock 301 of first stock to pour into pure cement paste in first stock hole, thereby fix first stock 301, hang the bamboo strip that is equipped with plastic-covered iron net 302 on the first stock 301, plastic-covered iron net 302 and mountain side elevation clearance are equipped with bamboo strip 303, specifically, the optional length is 0.5-2 m's bamboo strip. The plastic-coated iron net 302 is sprayed with a high-polymer aggregate substrate layer 304, the high-polymer aggregate substrate layer 304 is prepared by mixing clay rich in organic matters, loam and other foreign soil materials with an aggregate agent at the moment of spraying and under the action of air, and inducing aggregate reaction to form an artificial greening matrix with the same high-order aggregate structure as natural surface soil.
The mountain top elevation I department is provided with piles up plant-growing bag structure 4, pile up plant-growing bag structure 4 and include second stock 401, various steel tile layer 402, plant-growing bag 403 and first bush layer 404, the I department of mountain top elevation bores and is equipped with the second stock hole, peg graft in the second stock hole has second stock 401, and pour pure cement paste in the second stock hole, thereby fix second stock 401, lay various steel tile layer 402 on the second stock 401, the upper end of various steel tile layer 402 piles up and has plant-growing bag 403, specifically, the interval of second stock 401 is little Yu Zhisheng length of bag 403, make plant-growing bag 403 pile up more firmly, it is equipped with the rubble layer to fill between plant-growing bag 403 and the various steel tile layer 402, be convenient for domatic ponding is discharged, plant-growing bag 403 intussuseption is filled with first planting soil layer, it has first bush layer 404 to plant on the first planting soil layer.
The tire hanging soil-fixing slope protection structure 5 is arranged at the mountain top elevation II, the tire hanging soil-fixing slope protection structure 5 comprises a third anchor rod 501, a tire 502 and a second shrub layer 503, the tire 502 is stacked at the mountain top elevation II, and specifically, the tire with the diameter of 60cm can be adopted. The mountain top facade II department and be located tire 502 lower extreme left and right sides and tire 502 inner race upper end middle part and all bore and be equipped with the third stock hole, the downthehole joint of third stock 501 to pour pure cement paste in the third stock hole, thereby fix third stock 501, third stock 501 upwards buckle and set up and fix in the tire 502 outside, thereby spacing fixed with tire 502, third stock 501 adopts the screw steel that the diameter is 12mm, tire 502 inner circle backfills the second planting soil layer, has planted second bush layer 503 on the second planting soil layer.
Specifically, the first anchor 301, the second anchor 401, and the third anchor 501 are fixed in the first anchor hole, the second anchor hole, and the third anchor hole, respectively, by injecting a pure cement paste.
Specifically, when in use, arbor, shrub, ground cover and climbing plant are planted at a mountain foot platform with small gradient and relatively wide and flat topography in a mode of combining arbor, shrub and vine to construct a more stable ecological community; the net hanging spray seeding re-greening structure 3 is arranged at the mountain waist elevation with the gradient of less than 60 degrees, the high-polymer aggregate substrate layer 304 is adopted as a planting substrate, so that the water retention, fertilizer retention, water permeability and air permeability are good, the erosion of wind and rain can be resisted, in addition, the coiling force of plant root systems and a plant community ecological system which is gradually formed can help plants to survive in severe natural environments such as slope lands, barren lands, drought zones, rocks, hard soil, sandy soil and the like, the vegetation can be restored quickly, the ecological is improved, the mountain bodies are stabilized for a long time, the water and soil loss is prevented, and the purposes of greening and beautifying the environment are achieved; arranging a stacked plant-growing bag structure 4 at a mountain top elevation I with a gradient of 60-90 degrees, and planting a shrub layer in the plant-growing bag 403; the tire hanging soil fixing slope protection structure 5 is arranged at the mountain top elevation II with the gradient of more than 90 degrees, the tire 502 is fixed through the third anchor rod 501, and the shrubs are planted in the tire 502.
Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a damaged mountain body is restoreed afforestation and is used compound type device that turns green, includes damaged mountain body (1), its characterized in that: the damaged mountain body (1) is divided into four parts, namely a mountain foot platform, a mountain waist elevation, a mountain top elevation I and a mountain top elevation II;
a first vegetation layer (2) is planted at the mountain foot platform;
the mountain side elevation department is provided with a net-hanging spray-seeding re-greening structure (3), the net-hanging spray-seeding re-greening structure (3) comprises a first anchor rod (301), a plastic-covered iron net (302), bamboo strips (303), a high-polymer aggregate substrate layer (304) and a second vegetation layer (305), a first anchor rod hole is drilled in the mountain side elevation department, the first anchor rod (301) is inserted into the first anchor rod hole, the plastic-covered iron net (302) is hung on the first anchor rod (301), the bamboo strips (303) are arranged between the plastic-covered iron net (302) and the mountain side elevation, the high-polymer aggregate substrate layer (304) is sprayed on the plastic-covered iron net (302), and the second vegetation layer (305) is sprayed on the high-polymer aggregate substrate layer (304);
the planting bag structure (4) is arranged at the mountain top elevation I, the planting bag structure (4) comprises a second anchor rod (401), a color steel tile layer (402), a planting bag (403) and a first shrub layer (404), a second anchor rod hole is drilled in the mountain top elevation I, the second anchor rod (401) is inserted in the second anchor rod hole, the color steel tile layer (402) is paved on the second anchor rod (401), the planting bag (403) is stacked at the upper end of the color steel tile layer (402), a first planting soil layer is filled in the planting bag (403), and the first shrub layer (404) is planted on the first planting soil layer;
the mountain top facade II departments are equipped with the solid native slope protection structure of hanging tire (5), hang the solid native slope protection structure of tire (5) and include third stock (501), tire (502) and second bush layer (503), mountain top facade II departments sign indicating number has put tire (502), mountain top facade II departments just are located tire (502) lower extreme left and right sides and tire (502) inner race upper end middle part all bore and are equipped with the third stock hole, the downthehole joint of third stock has third stock (501), third stock (501) upwards buckle and set up and fix in the tire (502) outside, tire (502) inner circle backfill has the second planting soil layer, it has second bush layer (503) to plant on the second planting soil layer.
2. The composite greening device for repairing and greening damaged mountain according to claim 1, wherein: the first anchor rod (301), the second anchor rod (401) and the third anchor rod (501) are respectively fixed in the first anchor rod hole, the second anchor rod hole and the third anchor rod hole by pouring pure cement paste.
3. The composite greening device for repairing and greening damaged mountain according to claim 1, wherein: the length of the bamboo strips (303) is 0.5-2m.
4. The composite greening device for repairing and greening damaged mountain according to claim 1, wherein: a broken stone layer is arranged between the plant growth bag (403) and the color steel tile layer (402).
5. The composite greening device for repairing and greening damaged mountain according to claim 1, wherein: the distance between the second anchor rods (401) is smaller than the length of the Yu Zhisheng bags (403).
6. The composite greening device for repairing and greening damaged mountain according to claim 1, wherein: the tire (502) has a diameter of 60cm.
CN202010566085.5A 2020-06-19 2020-06-19 Composite type greening device for repairing and greening damaged mountain Active CN111733834B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010566085.5A CN111733834B (en) 2020-06-19 2020-06-19 Composite type greening device for repairing and greening damaged mountain

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010566085.5A CN111733834B (en) 2020-06-19 2020-06-19 Composite type greening device for repairing and greening damaged mountain

Publications (2)

Publication Number Publication Date
CN111733834A CN111733834A (en) 2020-10-02
CN111733834B true CN111733834B (en) 2024-04-12

Family

ID=72651811

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010566085.5A Active CN111733834B (en) 2020-06-19 2020-06-19 Composite type greening device for repairing and greening damaged mountain

Country Status (1)

Country Link
CN (1) CN111733834B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114467403B (en) * 2021-12-29 2023-05-05 中节能大地环境修复有限公司 Method for restoring mountain green in quarry
CN114467609A (en) * 2022-02-14 2022-05-13 中国水电顾问集团桂阳新能源有限公司 Ecological restoration structure system and restoration method for high and steep rubble soil slope

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101004424B1 (en) * 2010-03-04 2010-12-28 김규흠 Structure for afforestation of a slope using vegetation nets and greening soil mixtures
CN103828633A (en) * 2013-12-05 2014-06-04 大连环复生态技术有限公司 Vegetation bag slope protection vegetation restoration method and structure
CN104196038A (en) * 2014-08-15 2014-12-10 申新山 High and steep rock side slope active protection method and facility
CN107439320A (en) * 2017-09-11 2017-12-08 山东省地质环境监测总站 A kind of greening method of concordant limestone breakage mountain body
CN108374423A (en) * 2016-11-09 2018-08-07 中国瑞林工程技术有限公司 Slope ecological recovery system and its implementation
CN109440788A (en) * 2018-11-16 2019-03-08 安徽国祯环境修复股份有限公司 A kind of surface mine rock side slope stereo ecological restorative procedure

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN212427140U (en) * 2020-06-19 2021-01-29 桂林市石山绿化试验站 Compound type greening device for repairing and greening damaged mountain

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101004424B1 (en) * 2010-03-04 2010-12-28 김규흠 Structure for afforestation of a slope using vegetation nets and greening soil mixtures
CN103828633A (en) * 2013-12-05 2014-06-04 大连环复生态技术有限公司 Vegetation bag slope protection vegetation restoration method and structure
CN104196038A (en) * 2014-08-15 2014-12-10 申新山 High and steep rock side slope active protection method and facility
CN108374423A (en) * 2016-11-09 2018-08-07 中国瑞林工程技术有限公司 Slope ecological recovery system and its implementation
CN107439320A (en) * 2017-09-11 2017-12-08 山东省地质环境监测总站 A kind of greening method of concordant limestone breakage mountain body
CN109440788A (en) * 2018-11-16 2019-03-08 安徽国祯环境修复股份有限公司 A kind of surface mine rock side slope stereo ecological restorative procedure

Also Published As

Publication number Publication date
CN111733834A (en) 2020-10-02

Similar Documents

Publication Publication Date Title
CN106900342B (en) Integrated semi-lithologic high slope vegetation reconstruction protection method
CN101258814B (en) Planting hole and method for using planting hole to green rock slope and breakage mountain body
CN103931371B (en) A kind of biological control method of rock side-slope
CN108589743B (en) Ecological geogrid for slope protection
CN103416278B (en) Method for culturing vegetation in Karst landform region
CN101748719A (en) Method of vegetation restoration and reconstruction of bare rock slope in East China
CN107100176B (en) A kind of expressway slope greening system
CN111733834B (en) Composite type greening device for repairing and greening damaged mountain
CN109287359A (en) A kind of high steep breakage of massif is looked unfamiliar the method that state is quickly repaired
CN112211203A (en) High-strength structure organic fiber composite repair method for high and steep slope
CN111316853A (en) Stone mountain damaged surface vegetation and planting method thereof
CN212427140U (en) Compound type greening device for repairing and greening damaged mountain
CN112144552A (en) Damaged mountain ecological vegetation restoration structure, implementation method and application thereof
CN112219589A (en) Method for recovering vegetation on high and steep fissure development slope in northwest arid region
CN106954404B (en) Local isolating device in saline soil area
CN113455300A (en) Side slope greening method based on microbial synergistic effect
CN210580198U (en) Sloping field water collection and soil conservation structure
CN104612102B (en) A kind of river channel ecology filtration system and construction method thereof
CN112012229A (en) Ecological restoration system for high steep slope rock slope of limestone mine stope
CN108575649A (en) A method of planting heartsease on slope of rock mass
CN211713983U (en) Ecological slope protection for water and soil conservation
CN107419735A (en) A kind of method that slope retaining protection and greening are carried out using external support tube
CN113767806A (en) Karst region stony desertification land comprehensive treatment method
Zhang et al. Study on the application of vegetation protection and ecological restoration technology in stone slope
CN207998857U (en) A kind of ecoscape barricade

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant