CN109930455A - 一种市政道路路缘石安装结构及施工装置以及施工方法 - Google Patents
一种市政道路路缘石安装结构及施工装置以及施工方法 Download PDFInfo
- Publication number
- CN109930455A CN109930455A CN201910362536.0A CN201910362536A CN109930455A CN 109930455 A CN109930455 A CN 109930455A CN 201910362536 A CN201910362536 A CN 201910362536A CN 109930455 A CN109930455 A CN 109930455A
- Authority
- CN
- China
- Prior art keywords
- water
- kerbstone
- preformed groove
- steady layer
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/60—Planning or developing urban green infrastructure
Landscapes
- Road Paving Structures (AREA)
Abstract
本发明涉及一种市政道路路缘石安装结构及施工装置以及施工方法,属于道路施工技术领域,包括设置在路基上的水稳层,位于顶层的所述水稳层的两侧设置有预留槽,所述预留槽为倒梯形槽,且预留槽内铺设有路缘石,所述路缘石底部通过水泥砂浆层固定在预留槽内,所述路缘石的背部设置有砼靠背,所述砼靠背采用一体浇筑成型,且砼靠背的底部设置有与倒梯形槽斜边配合卡槽,本发明施工简单,施工速度快,省时省力,有效缩短施工周期。
Description
技术领域
本发明涉及一种市政道路路缘石安装结构及施工装置以及施工方法,属于道路施工技术领域。
背景技术
在市政、公路工程中,路缘石安装的传统方法为,在路基或水稳上放出路缘石位置线,在该处支设路缘石混凝土垫层模板,然后浇筑路缘石混凝土垫层,待垫层混凝土强度达到75%以上时开始砌筑路缘石,砌筑完成后,做砼靠背。在实际施工中存在以下问题:1、路缘石砌筑前必须先施工混凝土垫层,支设垫层模板、浇筑混凝土,工序较多,且必须留出混凝土养护时间;2、一般路面工程工期较紧,路缘石安装工程量大,工序多,如不投入大量人工,很难确保工期;3、路缘石混凝土垫层施工投入大量人工、材料,加大工程成本;4路缘石安装工程未完成,直接影响下道工序(路面工程)施工。
同时,在路基水稳层铺设时,为了加快施工进度一般支设钢模板,用D=12-16的钢筋钉入地面,直接卡在钢模板背面这种方法固定模板,这种方案虽然简单易操作,但是稳固效果很差,水稳碾压时容易将模板位移,从而导致跑模,失去安装模板的意义。
发明内容
为解决现有技术存在的技术问题,本发明提供了一种施工简单,施工速度快,省时省力的市政道路路缘石安装结构及施工装置以及施工方法。
为实现上述目的,本发明所采用的技术方案为一种市政道路路缘石安装结构,包括设置在路基上的水稳层,位于顶层的所述水稳层的两侧设置有预留槽,所述预留槽为倒梯形槽,且预留槽内铺设有路缘石,所述路缘石底部通过水泥砂浆层固定在预留槽内,所述路缘石的背部设置有砼靠背,所述砼靠背采用一体浇筑成型,且砼靠背的底部设置有与倒梯形槽斜边配合卡槽。
一种市政道路路缘石安装结构的施工装置,包括水稳层成型装置和砼靠背成型装置,所述水稳层成型装置主要由固定在水稳层两侧的三角支架及模具固定架构成,所述三角支架沿水稳层长度方向布置,且三角支架斜边的两端分别竖直设置有多个固定钢管,所述固定钢管与三角支架固定连接,所述固定钢管内设置有用于插装在路基内的定位筋,所述三角支架的内侧安装有模具固定架,所述模具固定架相互插接连接,所述模具固定架上吊挂有预留槽成型模具,所述预留槽成型模具为梯形结构;
所述砼靠背成型装置主要由固定卡具、侧模板和垫块构成,所述侧模板固定在水稳层的一侧,所述侧模板和路缘石之间设置有垫块,所述侧模板和路缘石通过固定卡具进行固定。
优选的,所述预留槽成型模具为方木制成的梯形结构,且该梯形结构的底角为45°,所述预留槽成型模具的外部还包裹有钢衬。
优选的,所述固定卡具包括U型卡及固定在U型卡上的顶紧螺杆。
优选的,所述预留槽成型模具的一侧设置有用于挂在模具固定架上的挂钩,所述预留槽成型模具的顶部设置有凹槽,所述凹槽内安装有吊钩,所述吊钩与预留槽成型模具的顶面齐平。
一种市政道路路缘石安装结构的施工方法,按照以下步骤进行操作,
a、水稳层铺设
1)现场测量放线确定铺设水稳层边线;
2)在水稳层的边线支设三角支架及模具固定架,三角支架及模具固定架验收完成后,开始铺设水稳层;
3)待水稳层铺设完成后,将预留槽成型模具挂在模具固定架上,并确保模具位置无误,然后开始碾压水稳层,使预留槽成型模具嵌入水稳层内,并提高路缘石台背处水稳层的密实性;
4)待水稳层初凝后,拆除三角支架、模具固定架及预留槽成型模具;
b、安装路缘石
将水稳层的预留槽内铺设路缘石,将路缘石通过水泥砂浆进行固定;
c、砼靠背制作
1)待路缘石的水泥砂浆凝固后,将侧模板通过固定卡具固定在路缘石上;
2)在侧模板和路缘石之间浇筑水泥砂浆;
3)待水泥砂浆凝固后,砼靠背制作完成。
与现有技术相比,本发明具有以下技术效果:本发明施工简单,安装方便,采用直接在水稳上铺设,不用做路缘石混凝土垫层,在铺设水稳时预留路缘石砌筑槽,然后直接砌筑路缘石,这样有效降低了材料的成本;同时在施工方时,不用支设混凝土模板、不用浇筑混凝土、不用留出混凝土养护时间,省时省工。
此外,通过自制模具进行水稳层的铺设、预留槽和路沿石靠背的制作,操作简单、安装方便,也便于拆卸,能够大大提高施工效率。
附图说明
图1为本发明的结构示意图。
图2为本发明中水稳层成型装置的结构示意图。
图3为本发明中砼靠背成型装置的结构示意图。
图4为本发明中预留槽成型模具的结构示意图。
图5为本发明中预留槽成型模具的的侧面结构示意图。
具体实施方式
为了使本发明所要解决的技术问题、技术方案及有益效果更加清楚明白,以下结合附图及实施例,对本发明进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于限定本发明。
如图1所示,一种市政道路路缘石安装结构,包括设置在路基上的水稳层1,位于顶层的水稳层的两侧设置有预留槽2,预留槽2为倒梯形槽,且预留槽2内铺设有路缘石3,采用倒梯形结构设计,方便拆除模具时保护水稳层不被破坏,路缘石3底部通过水泥砂浆层4固定在预留槽2内,路缘石3的背部设置有砼靠背,砼靠背5采用一体浇筑成型,且砼靠背5的底部设置有与倒梯形槽斜边配合卡槽6。
本发明采用直接在水稳上铺设,不用做路缘石混凝土垫层,在铺设水稳时预留路缘石砌筑槽,然后直接砌筑路缘石,这样有效降低了材料的成本;同时在施工方时,不用支设混凝土模板、不用浇筑混凝土、不用留出混凝土养护时间,省时省工,并且安装方便,施工小效率高。
如图2至图5所示,一种市政道路路缘石安装结构的施工装置,包括水稳层成型装置7和砼靠背成型装置8,水稳层成型装置7主要由固定在水稳层两侧的三角支架9及模具固定架10构成,三角支架9沿水稳层长度方向布置,且三角支架9斜边的两端分别竖直设置有多个固定钢管11,固定钢管11与三角支架9固定连接,固定钢管11内设置有用于插装在路基内的定位筋12,三角支架9的内侧安装有模具固定架10,模具固定架10采用插接结构进行拼合,使模具固定架10能够拼合成一个整体,便于水稳层的施工。模具固定架10上吊挂有预留槽成型模具13,预留槽成型模具13为梯形结构;砼靠背成型装置9主要由固定卡具14、侧模板15和垫块16构成,侧模板15固定在水稳层1的一侧,侧模板15和路缘石3之间设置有垫块16,侧模板15和路缘石3通过固定卡具14进行固定。
本发明采用自制的水稳层成型装置7和砼靠背成型装置8进行水稳层的铺设和路沿石靠背的制作。整个模具结构简单,安装、拆卸方便,能够快速进行预留槽的成型和水稳层的铺设,能够有效缩短施工周期。
其中预留槽成型模具13为方木制成的梯形结构,且该梯形结构的底角为45°,预留槽成型模具的外部还包裹有钢衬18。预留槽成型模具13采用钢衬包裹能够延长模具的使用寿命,便于重复使用。底角采用45°设置,能够使预留槽的结构更加合理,便于路沿石靠背的固定与成型。固定卡具14包括U型卡19及固定在U型卡上的顶紧螺杆20。利用顶紧螺杆20对侧模板和路沿石进行夹紧固定,固定方便、可靠。
此外,预留槽成型模具13的一侧设置有用于挂在模具固定架上的挂钩21,预留槽成型模具13的顶部设置有凹槽22,凹槽22内安装有吊钩23,吊钩23与预留槽成型模具13的顶面齐平。由于预留槽成型模具13在水稳层初凝之后需要取出,并且还要不影响对水稳层的滚压。吊钩23采用隐藏式设计,顶部不突出预留槽成型模具13表面,进而不影响滚压;挂钩21采用在侧边安装,直接挂在模具固定架10上,安装方便,同时也不影响对水稳层的滚压。
在具体施工时,按照以下步骤进行操作,
a、水稳层铺设
1)现场测量放线确定铺设水稳层边线;
2)在水稳层的边线支设三角支架及模具固定架,三角支架及模具固定架验收完成后,开始铺设水稳层;
3)待水稳层铺设完成后,将预留槽成型模具挂在模具固定架上,并确保模具位置无误,然后开始碾压水稳层,使预留槽成型模具嵌入水稳层内,并提高水稳层的密实性;
4)待水稳层凝固后,拆除三角支架、模具固定架及预留槽成型模具;
b、安装路缘石
将水稳层的预留槽内铺设路缘石,将路缘石通过水泥砂浆进行固定;
c、砼靠背制作
1)待路缘石的水泥砂浆凝固后,将侧模板通过固定卡具固定在路缘石上;
2)在侧模板和路缘石之间浇筑水泥砂浆;
3)待水泥砂浆凝固后,砼靠背制作完成。
以上仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包在本发明范围内。
Claims (6)
1.一种市政道路路缘石安装结构,其特征在于:包括设置在路基上的水稳层,位于顶层的所述水稳层的两侧设置有预留槽,所述预留槽为倒梯形槽,且预留槽内铺设有路缘石,所述路缘石底部通过水泥砂浆层固定在预留槽内,所述路缘石的背部设置有砼靠背,所述砼靠背采用一体浇筑成型,且砼靠背的底部设置有与倒梯形槽斜边配合卡槽。
2.一种市政道路路缘石安装结构的施工装置,其特征在于:包括水稳层成型装置和砼靠背成型装置,所述水稳层成型装置主要由固定在水稳层两侧的三角支架及模具固定架构成,所述三角支架沿水稳层长度方向布置,且三角支架斜边的两端分别竖直设置有多个固定钢管,所述固定钢管与三角支架固定连接,所述固定钢管内设置有用于插装在路基内的定位筋,所述三角支架的内侧安装有模具固定架,所述模具固定架相互插接连接,所述模具固定架上吊挂有预留槽成型模具,所述预留槽成型模具为梯形结构;
所述砼靠背成型装置主要由固定卡具、侧模板和垫块构成,所述侧模板固定在水稳层的一侧,所述侧模板和路缘石之间设置有垫块,所述侧模板和路缘石通过固定卡具进行固定。
3.根据权利要求2所述的一种市政道路路缘石安装结构的施工装置,其特征在于:所述预留槽成型模具为方木制成的梯形结构,且该梯形结构的底角为45°,所述预留槽成型模具的外部还包裹有钢衬。
4.根据权利要求2所述的一种市政道路路缘石安装结构的施工装置,其特征在于:所述固定卡具包括U型卡及固定在U型卡上的顶紧螺杆。
5.根据权利要求2或3所述的一种市政道路路缘石安装结构的施工装置,其特征在于:所述预留槽成型模具的一侧设置有用于挂在模具固定架上的挂钩,所述预留槽成型模具的顶部设置有凹槽,所述凹槽内安装有吊钩,所述吊钩与预留槽成型模具的顶面齐平。
6.一种市政道路路缘石安装结构的施工方法,其特征在于:按照以下步骤进行操作,
a、水稳层铺设
1)现场测量放线确定铺设水稳层边线;
2)在水稳层的边线支设三角支架及模具固定架,三角支架及模具固定架验收完成后,开始铺设水稳层;
3)待水稳层铺设完成后,将预留槽成型模具挂在模具固定架上,并确保模具位置无误,然后开始碾压水稳层,使预留槽成型模具嵌入水稳层内,并提高路缘石台背处水稳层的密实性;
4)待水稳层初凝后,拆除三角支架、模具固定架及预留槽成型模具;
b、安装路缘石
将水稳层的预留槽内铺设路缘石,将路缘石通过水泥砂浆进行固定;
c、砼靠背制作
1)待路缘石的水泥砂浆凝固后,将侧模板通过固定卡具固定在路缘石上;
2)在侧模板和路缘石之间浇筑水泥砂浆;
3)待水泥砂浆凝固后,砼靠背制作完成。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910362536.0A CN109930455B (zh) | 2019-04-30 | 2019-04-30 | 一种市政道路路缘石安装结构及施工装置以及施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910362536.0A CN109930455B (zh) | 2019-04-30 | 2019-04-30 | 一种市政道路路缘石安装结构及施工装置以及施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109930455A true CN109930455A (zh) | 2019-06-25 |
CN109930455B CN109930455B (zh) | 2023-05-09 |
Family
ID=66991269
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910362536.0A Active CN109930455B (zh) | 2019-04-30 | 2019-04-30 | 一种市政道路路缘石安装结构及施工装置以及施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109930455B (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110424224A (zh) * | 2019-07-19 | 2019-11-08 | 杭州江润科技有限公司 | 路缘石的施工方法 |
CN112626983A (zh) * | 2020-12-17 | 2021-04-09 | 中建八局第二建设有限公司 | 一种道路路缘石快速施工工具及其施工方法 |
CN113737613A (zh) * | 2021-09-22 | 2021-12-03 | 江苏城东建设工程有限公司 | 一种路牙石后背素砼高效施工方法 |
CN113981763A (zh) * | 2021-11-12 | 2022-01-28 | 中铁七局集团郑州工程有限公司 | 适于湿陷性黄土地区海绵城市的人行道施工方法 |
CN114960345A (zh) * | 2022-06-14 | 2022-08-30 | 中国一冶集团有限公司 | 一种侧石靠背混凝土浇注装置 |
Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AT6281U1 (de) * | 2002-07-23 | 2003-07-25 | Werner Weissenboeck Ges M B H | Verlegehilfe für steine |
KR100654170B1 (ko) * | 2006-06-08 | 2006-12-06 | 이종열 | 도로경계석 시공장치 |
CN101748896A (zh) * | 2008-12-13 | 2010-06-23 | 广西建工集团第五建筑工程有限责任公司 | 现浇混凝土地面平整度和标高控制装置及用于施工的方法 |
CN102071614A (zh) * | 2009-11-24 | 2011-05-25 | 上海通用汽车有限公司 | 石块路的施工方法及用于该方法的靠尺 |
CN102776826A (zh) * | 2012-08-15 | 2012-11-14 | 中国水利水电第十四工程局有限公司 | 一种路面混凝土槽钢定型模板 |
CN104313985A (zh) * | 2014-10-24 | 2015-01-28 | 中建海峡建设发展有限公司 | 路缘石简易安装机 |
CN104452554A (zh) * | 2014-12-11 | 2015-03-25 | 济南黄河路桥工程公司 | 一种道路立沿石施工方法及立沿石后背砼钢模 |
CN104563498A (zh) * | 2013-12-17 | 2015-04-29 | 中太建设集团股份有限公司 | 一种用于楼板预留洞施工的ppr组合模具 |
CN104911981A (zh) * | 2015-05-28 | 2015-09-16 | 秦皇岛市卢龙华通工程机械厂 | 一种新型路缘石滑模机 |
CN105274930A (zh) * | 2015-10-27 | 2016-01-27 | 北方民族大学 | 湿陷性黄土道路防水层铺设装置 |
CN106087670A (zh) * | 2016-07-28 | 2016-11-09 | 云南省公路科学技术研究院 | 线形可变混凝土模板 |
CN208309347U (zh) * | 2018-06-07 | 2019-01-01 | 张保元 | 一种新型的道路路缘石后背混凝土支架 |
CN109594450A (zh) * | 2018-11-29 | 2019-04-09 | 安阳市兴盛市政工程检测有限公司 | 一种卡槽式水泥混凝土路沿石垫块结构及其施工方法 |
CN209854513U (zh) * | 2019-04-30 | 2019-12-27 | 山西建设投资集团有限公司 | 一种市政道路路缘石安装结构及施工装置 |
CN210086000U (zh) * | 2019-04-30 | 2020-02-18 | 山西建设投资集团有限公司 | 一种市政道路路缘石施工装置 |
-
2019
- 2019-04-30 CN CN201910362536.0A patent/CN109930455B/zh active Active
Patent Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AT6281U1 (de) * | 2002-07-23 | 2003-07-25 | Werner Weissenboeck Ges M B H | Verlegehilfe für steine |
KR100654170B1 (ko) * | 2006-06-08 | 2006-12-06 | 이종열 | 도로경계석 시공장치 |
CN101748896A (zh) * | 2008-12-13 | 2010-06-23 | 广西建工集团第五建筑工程有限责任公司 | 现浇混凝土地面平整度和标高控制装置及用于施工的方法 |
CN102071614A (zh) * | 2009-11-24 | 2011-05-25 | 上海通用汽车有限公司 | 石块路的施工方法及用于该方法的靠尺 |
CN102776826A (zh) * | 2012-08-15 | 2012-11-14 | 中国水利水电第十四工程局有限公司 | 一种路面混凝土槽钢定型模板 |
CN104563498A (zh) * | 2013-12-17 | 2015-04-29 | 中太建设集团股份有限公司 | 一种用于楼板预留洞施工的ppr组合模具 |
CN104313985A (zh) * | 2014-10-24 | 2015-01-28 | 中建海峡建设发展有限公司 | 路缘石简易安装机 |
CN104452554A (zh) * | 2014-12-11 | 2015-03-25 | 济南黄河路桥工程公司 | 一种道路立沿石施工方法及立沿石后背砼钢模 |
CN104911981A (zh) * | 2015-05-28 | 2015-09-16 | 秦皇岛市卢龙华通工程机械厂 | 一种新型路缘石滑模机 |
CN105274930A (zh) * | 2015-10-27 | 2016-01-27 | 北方民族大学 | 湿陷性黄土道路防水层铺设装置 |
CN106087670A (zh) * | 2016-07-28 | 2016-11-09 | 云南省公路科学技术研究院 | 线形可变混凝土模板 |
CN208309347U (zh) * | 2018-06-07 | 2019-01-01 | 张保元 | 一种新型的道路路缘石后背混凝土支架 |
CN109594450A (zh) * | 2018-11-29 | 2019-04-09 | 安阳市兴盛市政工程检测有限公司 | 一种卡槽式水泥混凝土路沿石垫块结构及其施工方法 |
CN209854513U (zh) * | 2019-04-30 | 2019-12-27 | 山西建设投资集团有限公司 | 一种市政道路路缘石安装结构及施工装置 |
CN210086000U (zh) * | 2019-04-30 | 2020-02-18 | 山西建设投资集团有限公司 | 一种市政道路路缘石施工装置 |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110424224A (zh) * | 2019-07-19 | 2019-11-08 | 杭州江润科技有限公司 | 路缘石的施工方法 |
CN110424224B (zh) * | 2019-07-19 | 2021-01-15 | 杭州江润科技有限公司 | 路缘石的施工方法 |
CN112626983A (zh) * | 2020-12-17 | 2021-04-09 | 中建八局第二建设有限公司 | 一种道路路缘石快速施工工具及其施工方法 |
CN112626983B (zh) * | 2020-12-17 | 2022-08-30 | 中建八局第二建设有限公司 | 一种道路路缘石快速施工工具及其施工方法 |
CN113737613A (zh) * | 2021-09-22 | 2021-12-03 | 江苏城东建设工程有限公司 | 一种路牙石后背素砼高效施工方法 |
CN113737613B (zh) * | 2021-09-22 | 2023-02-28 | 江苏城东建设工程有限公司 | 一种路牙石后背素砼高效施工方法 |
CN113981763A (zh) * | 2021-11-12 | 2022-01-28 | 中铁七局集团郑州工程有限公司 | 适于湿陷性黄土地区海绵城市的人行道施工方法 |
CN113981763B (zh) * | 2021-11-12 | 2022-11-18 | 中铁七局集团郑州工程有限公司 | 适于湿陷性黄土地区海绵城市的人行道施工方法 |
CN114960345A (zh) * | 2022-06-14 | 2022-08-30 | 中国一冶集团有限公司 | 一种侧石靠背混凝土浇注装置 |
CN114960345B (zh) * | 2022-06-14 | 2024-05-17 | 中国一冶集团有限公司 | 一种侧石靠背混凝土浇注装置 |
Also Published As
Publication number | Publication date |
---|---|
CN109930455B (zh) | 2023-05-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109930455A (zh) | 一种市政道路路缘石安装结构及施工装置以及施工方法 | |
CN104631512B (zh) | 吊模法后浇带梁板施工方法 | |
CN106437142A (zh) | 一种现浇坡屋面双层模板结构及坡屋面施工方法 | |
CN101289866A (zh) | 软土地基下基坑工程中局部深坑预制混凝土胎模施工方法 | |
CN110552370A (zh) | 基于逆作法的环形内衬墙整体单边支模施工方法 | |
CN104831932A (zh) | 一种高标号混凝土柱脚的施工工艺 | |
CN110306644A (zh) | 市政雨污分流管道的施工方法 | |
CN104154756B (zh) | 加热炉炉墙整体浇注施工方法 | |
CN204212023U (zh) | 一种拼接式钢筋混凝土临时路面 | |
CN109797969B (zh) | 后浇带工具式超前吊模系统的施工方法 | |
CN210086000U (zh) | 一种市政道路路缘石施工装置 | |
CN106284789B (zh) | 用于控制现浇楼板成型质量的施工工艺 | |
CN102425110A (zh) | 市政立交箱梁全断面现浇砼施工方法 | |
CN110409600A (zh) | 单元组合式污水池结构施工方法 | |
CN108625531A (zh) | 一种浇筑构造柱混凝土免拆模板的施工方法 | |
CN112814116B (zh) | 一种现浇排水沟的施工方法 | |
CN106337530B (zh) | 一种框架梁施工缝封堵的施工方法 | |
CN203096762U (zh) | 一种防冻胀地梁 | |
CN204418691U (zh) | 一种用于现浇竖向构件与水平构件连接处混凝土拦截装置 | |
CN107354826A (zh) | 隧道内嵌入式轨道系统的快速施工方法 | |
CN101929245A (zh) | 薄腹梁立式施工方法 | |
CN209854513U (zh) | 一种市政道路路缘石安装结构及施工装置 | |
CN207672389U (zh) | 路基混凝土路肩现浇模具 | |
CN103171052B (zh) | 双柱消浪体一次性预制施工工法 | |
CN206448272U (zh) | 路基边坡拱形骨架一次成型模具 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |