CN109858751A - Power engineering Evaluating Projects System - Google Patents

Power engineering Evaluating Projects System Download PDF

Info

Publication number
CN109858751A
CN109858751A CN201811608255.0A CN201811608255A CN109858751A CN 109858751 A CN109858751 A CN 109858751A CN 201811608255 A CN201811608255 A CN 201811608255A CN 109858751 A CN109858751 A CN 109858751A
Authority
CN
China
Prior art keywords
project
evaluation
management
file
engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811608255.0A
Other languages
Chinese (zh)
Inventor
王洪玲
吴凤洁
陈正浩
孟金林
姜东红
聂永
武玉
刘端媚
喻涛
靳华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Datang Corp Science and Technology Research Institute Co Ltd
Original Assignee
China Datang Corp Science and Technology Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Datang Corp Science and Technology Research Institute Co Ltd filed Critical China Datang Corp Science and Technology Research Institute Co Ltd
Priority to CN201811608255.0A priority Critical patent/CN109858751A/en
Publication of CN109858751A publication Critical patent/CN109858751A/en
Pending legal-status Critical Current

Links

Abstract

The present invention relates to a kind of engineering project review systems, belong to power engineering construction project overall process technical economic evaluation management study field, it is made of client layer, application layer, podium level and data Layer, including task module, project appraisal module, system management module.Wherein in task module main presentation system project evaluation state automatic push prompting message;Project appraisal module realizes each stage science decision of power engineering project construction, control of investment, the online evaluation of bidding assessment evaluation;System management module effect designs for system flow, monitors and historical data management etc..The problems such as that system solves the problem power engineering project construction process evaluation processes is unclear, responsibility is unknown, data missing, content are imperfect, management is to mark data deficiencies, realize standardization, standardization and the information system management of project appraisal work, work quality and efficiency are improved, the promotion of Engineering Project Construction fine-grained management level is promoted.

Description

Power engineering Evaluating Projects System
Technical field
The invention belongs to journey project appraisal field more particularly to a kind of power engineering Evaluating Projects Systems.
Background technique
The economic internal review of electric power project engineering is the important content of enterprise construction projects Cost Management, traditional skill The economic enterprise's inner examination of art since participant is numerous, the level of IT application is low, lacks operative constraint mechanism, do not advise by operation flow Model, often exist responsibility is unknown, data is not complete, content is imperfect, to mark data deficiencies the problems such as, link up at high cost, examine work Make low efficiency, examination progress control difficulty is big, is unfavorable for safeguarding the seriousness and preciseness of censorship, has biggish conjunction rule Accusing of the risk inside especially faces a considerable number of economic censorship demand of power engineering construction Project Technical.
Summary of the invention
In order to solve the above technical problems, the object of the present invention is to provide a kind of effectively control examine process, greatly improve it is careful Look into the power engineering Evaluating Projects System of efficiency.
In order to achieve the above object, the technical scheme adopted by the invention is that:
Power engineering Evaluating Projects System of the present invention supports oracle database, direct by browser using B/S framework The functional module provided using system, including task module, engineering project evaluate module, system management module;With C# and Js is main development language, is run based on Microsoft.NET Framework4.0, is strengthened by workflow engine and examines work Journey Row control;Using WebService technology and XML format, realization cross platform system integrates and data interaction;By client layer, Application layer, podium level and data Layer composition, the upper transmitting file of user are cached into temporary storage first, after receiving submission instruction Into pending project database, storing the associated documents into pending project database cannot modify, delete for output Operation guarantees the trackability of evaluation process;
The task module, system carry out authentication type management mode, require according to reengineering and standardized administration, According to workflow and examine that content is public to relevant departments, group, evaluation unit, branch and subsidiaries, project by system manager's account It takes charge of and opens an account and be arranged obligational authority;Realize that work is pending, the information reminding having done, submitted, having completed, in display systems process Project name, sponsor unit and the people of all evaluations and the information such as time, evaluation unit and people and time, and pass through newly-built, brush Newly, opening, processing record, send, retract and close down, and realize completion each task needed for evaluation.
The project appraisal module, system are set according to the system architectures such as project construction program, industry standard, key control point Meter, by evaluation relevant unit's obligational authority setting, finished item information management, feasibility study, Preliminary design, optimization are set Meter, calling for tenders of project, engineering construction, change management, contract management, final acceptance of construction, technology innovation project, technical economic evaluation count, are more Project investment realizes the data information transfers such as construction project conceptual design, control of investment, bidding assessment more to the evaluation content such as mark Efficiently, more transparent, review result has more specific directive function, accomplishes risk Prior Control.
The system management module, system are designed by flow definition, progress flow monitoring and historical data management, and one It is confirmation system Project evaluation title, business module ownership, the scope of application, start-stop time, creation and modification people and time, process Coding etc.;Second is that carry out project appraisal initiation, handle, supervise and manage, paying close attention to, time-out, terminate, stop etc. flow monitorings design;Third is that To the creation of each link responsible person concerned task of system flow, processing, the historical datas such as reads and supervised and manage and be managed.
Further, engineering project evaluates module, including process control as follows:
System manager requires default professional management to examine account, professional responsible person's audit account according to examination service management Family, business responsible person examine account, check account, report account to a higher authorities for approval for applying for that the project entity of evaluation business opens up for the first time, if Set obligational authority;
It is first in system management module finished item basic business with account is reported to a higher authorities for approval if project entity applies for project appraisal for the first time Configuration, then construction project information is made a report on by newly-built operation online in engineering project evaluation module, evaluation is applied in selection Business unit;If having deposited inspection item, the business unit to be applied for evaluation is directly selected;Then selected business sheet is made a report on online Member evaluation content uploads evaluation file by associated documents directoryof, submits evaluation application;
Professional responsible person receives evaluation application, specifies and sends circulation to professional management, distributes evaluation task;
Professional management carries out data preliminary hearing, examines the accuracy, normalization, integrality for making a report on content and uplink data, if It is unqualified, opinion to be improved is filled in, any link is retracted in selection, and process is rejected;If qualified, Review Conference is arranged, uploads meeting Guide specifies and sends circulation to next link professional management, expert under line is organized to make a joint checkup;
Professional management uploads expert and makes a joint checkup the meeting summary file to be formed, and feeds back review comment to project entity;
The corresponding opinion of the meeting summary file, and the evaluation text that modification and perfection is reported to a higher authorities for approval are replied in project entity's online editing Part is uploaded the supportive file of correlation of supplement by associated documents directoryof, is specified and is sent circulation to professional management, replys evaluation Examination reports;
Whether the modified evaluation file of professional management review, which presses examination reports, is implemented one by one, modifies, if unqualified, is filled in It is rejected after opinion to be improved;If qualified, work out and submit technical economic evaluation project by monofile, transmission is specified to circulate to special Industry responsible person, reports review comment step by step;
Professional responsible person audits review comment and rejects previous link after filling in opinion to be improved if unqualified;If qualified, It is directly based upon the technical economic evaluation project and examination reports is filled in by monofile, transmission is specified to circulate to business responsible person, Review comment is reported step by step;
Business responsible person examines review comment, if unqualified, fill in opinion to be improved and rejects previous link;If qualified, directly It connects and examination reports is filled in by monofile based on the technical economic evaluation project, specify and send circulation to professional responsible person, criticize Standard provides evaluation examination reports;
What professional responsible person's upload was provided passes notice monofile.
Further, " opening " function key of task module is to open the quick side of unitem evaluation business information Formula.
Further, the project appraisal business information of project appraisal module includes the essential information of Project evaluation, related text Part and work disposal record.
The essential information, system are solidified, executed and made a report on project by system template, process and Permission Design and examined The state of criticizing, evaluation number are reported file name, file type, project code, project name, designing unit, the budgetary estimate amount of money to a higher authorities for approval and are examined Surely valence, applicant, examiner and date, suggestions made after examination etc. are controlled, reflects the main profile information of engineering project, is mentioned for evaluation For convenient, fast and accurate accurate Technical Reference, the evaluation time can be substantially saved.
The associated documents, system is by creating, deletion, downloading, online editing, importing attachment, check the function such as history Can, realize that reporting the quick of file, meeting guide, examination reports, modification file and data etc. to a higher authorities for approval including Project evaluation transmits, in time It feeds back, standardize modification, complete to submit, realization all process data information persistences of evaluation, required foundation file system, Comprehensively, full and accurate, improve evaluation efficiency and quality.
The processing record, system are designed and are applied by system flow, and reflection participates in Project evaluation relevant people comprehensively Member, division of duty, processing time and result and handling suggestion, evaluation track can relate.
Further, project information management in project appraisal module is arranged by system administration level and obligational authority, real Existing group company's accountability unit's registers solidifications at different levels, Project evaluation coding, title, approval code, engineering classification, building site and The reflection of the relevant informations such as scale, construction unit, designing unit, plan time, shows project management main body and content, engineering comprehensively It is horizontal to promote project construction management for project overview, main unit of taking part in building.
Further, the associated documents pass through system introducing, acquisition, each class formation of output or unstructured information number According to reporting evaluation consulting contract that file covered to a higher authorities for approval, examine notification sheet, application for developing, design report, bidding sector division, quasi- evaluation The project appraisals necessary conditions such as file, branch and subsidiaries' opinion;Examination reports include evaluation unit opinion, expert opinion, examine and lead to Cross the files such as notification sheet, the reflection evaluation course professional work content and result of system;Modification file has been modified by review comment It is kind, Outcome Document is ultimately formed, realizes the closed loop management of project appraisal work.
Feasibility study evaluates business unit associated documents inventory and includes evaluation consulting contract, examines that notification sheet, project are vertical Item reply file, design scheme, feasibility study report, special report, the supportive lists of documents of economic evaluation, branch and subsidiaries' meaning See, other associated documents;As the key link for the project construction decision for directly affecting 80% or more investment, pass through import system Semi-structured and unstructured (WORD table, drawing, picture, PDF) file, comprehensive demonstration, system evaluation design scheme, can The report of row Journal of Sex Research, special report, economic benefit full spectrum information data, for project science decision provide system, comprehensively, rule The technical support of model.
Preliminary design review business unit associated documents inventory include evaluation consulting contract, examine notification sheet, approved document, Feasibility study report, Preliminary design drawing, Preliminary design report, the report of specialty work Preliminary design, Preliminary design technology are examined Look into formal budgetary estimate, the geological mapping report, contract account, capital equipment (material, construction) contract of position paper, outer committee's design object The expense that file, the requisition of construction place and cleaning take provides and according to file or agreement, the general expenses branch of work in preliminary project stage Hold the supportive lists of documents of file, economic evaluation, branch company's examination reports, other associated documents;
Optimization design evaluate business unit associated documents inventory include evaluation consulting contract, examine notification sheet, approved document, Budget estimate of preliminary design report, adjustment of budgetary estimation report, investment mutation analysis report-hydroelectric project, design alteration summary report-water power Engineering, major design change report-hydroelectric project, major design change reply, specialty work adjustment report and examination reports, conjunction Same account, capital equipment (material, construction) contract documents, construction drawing, branch company's examination reports, other associated documents;
Calling for tenders of project evaluates business unit associated documents inventory and includes evaluation consulting contract, examines notification sheet, Preliminary design Report, closing in budgetary estimate group reply-thermoelectricity, adjustment of budgetary estimation report-water power, group reply bidding sector division file, quasi- examine Bidding document and bill of quantities, branch company's examination reports, other associated documents;Calling for tenders of project file is Engineering Project Implementation mistake The work programmatic document such as equipment materials supply, engineering construction, management and cost consultation, unit regulation, passes through introgressive line in journey The associated documents such as bidding document, bill of quantities, technical specification, engineering drawing of uniting examine and the determination of bid contrul valence, realize Bidding management Whole Process Control, to guarantee that the completion of project progress, quality and investment set objective provides safeguard.
Engineering construction evaluate business unit associated documents inventory include evaluation consulting contract, examine notification sheet, approved document, Group company go into operation reply, budget estimate of preliminary design and explanation, execute budgetary estimate and explanation of compilation, contract account, capital equipment (material Material, construction) contract documents, branch company's examination reports, other associated documents;
Change management evaluate business unit associated documents inventory include evaluation consulting contract, examine notification sheet, approved document, Preliminary design report, change in the work special report, construction drawing, Notification of Changes list, confirmation of quantity of works, acceptance of concealed work money Material, branch company's examination reports, other associated documents;
Contract management evaluation business unit associated documents inventory include evaluate consulting contract, examine notification sheet, approval it is general Calculate class file, bidding document-electronic edition, containing supplement variation on contract construction contract-cardboard and electronic edition, drawing-cardboard and Electronic edition, visa list (order ticket, connection list, Request for Change)-cardboard and electronic edition, approved auditing for construction completion account management implementation Method or settlement principle, unit in charge of construction, the signed and stamped clearing book-cardboard of supervisor, clearing book-electronic edition, branch company examine Look into opinion, other relevant documents (data, voucher etc.);
Final acceptance of construction evaluation business unit associated documents inventory includes evaluating consulting contract, the budgetary estimate class file of approval, conjunction With account, all devices (material, construction) contract documents, bidding document-electronic edition, visa list, (order ticket contacts single, change It is more single)-cardboard and electronic edition, project final acceptance of construction report, the Engineering Settlement book handled, the report of engineering lump sum and engineering it is total Report is settled accounts, the engineering lump sum principle of approval, branch company's examination reports, other relevant documents (data, voucher etc.), examines and leads to Know.
Further, the technical economic evaluation statistic unit, system are automatically generated and are reflected in and be by acquiring in real time System task interface, counts Project evaluation organization, engineering classification, project type, project region, project status, authorization Date, project code, feasibility study, Preliminary design, calling for tenders of project, change in the work, Office Of Contract Settlements etc. evaluate business information, branch The export of excel file and application are held, provides support for group company's project construction situation analysis and summary.
Further, the entry invests bidding assessment unit, and system is by stencil design to Project evaluation according to list Position title, engineering classification, file type, authorization date, file status, reference number of a document, file name, project code progress are multinomial Mesh investment to mark analyze, analysis result include report to a higher authorities for approval the amount of money, authorization the amount of money, examine increase (subtracting) volume, examine increase (subtracting) rate, check and approve the amount of money, The careful closing in dynamic amount of money, the interior careful closing in dynamic amount of money, the budgetary estimate amount of money, middle marked price etc. outside realize entry scheme and investment to mark It manages, supports the export of excel file and application, provided for project construction and the market development of operational period, raising core competitiveness Data information reference.
According to the above aspect of the present invention, power engineering Evaluating Projects System of the present invention has at least the following advantages:
1. realizing the economic enterprise's inner examination procedure control of power engineering construction Project Technical, reduces and close rule internal control wind Danger.
The system administrative account of different rights, duty fulfillment to people are set according to participant's Functional division;From evaluation business Application, file are made a report on and provide examination reports, approval process automation, and suggestions made after examination and modification file automatic safety shelves, realization can Retrospect, business participants at different levels can check Project evaluation Technological Economy relevant information and work progress at any time, solve traditional electricity Power engineering construction project technical economic evaluation work there are processes it is unclear, responsibility is unknown the problems such as, realize evaluation business norms And information system management, project construction fine-grained management level and scale effect are promoted, work quality and efficiency are improved.
2. specification power engineering construction projects technical economic evaluation archive files management accumulates data resource.
According to the estimation of the feasibility study of the projects such as thermoelectricity, water power, wind-powered electricity generation, estimation per design, adjustment of budgetary estimation, bidding document, (construction is consulted Ask, debugging, management), execute the types of business of the technical economic evaluations such as budgetary estimate, design alteration, Office Of Contract Settlements and engineering lump sum, Be to report file, meeting guide, examination reports, modification file and four major class of data to a higher authorities for approval by related data specification, according to target, Inventory is studied in the settings such as construction period, many types in detail;It can just receive to examine application when reporting file qualification to a higher authorities for approval, solve biography Unite the economic evaluation of power engineering construction Project Technical there are data incomplete, content is imperfect, to mark data deficiencies the problems such as, Realize evaluation traffic criteria management.
3. realizing projects technical economic evaluation situation automatic statistical analysis and bidding assessment
According to the management needs of responsible partys at different levels, corresponding Project evaluation characteristic attribute information is set, is applied by evaluation People makes a report in business application, inquires by characteristic attribute value, and the automatic statistical analysis and project that system realizes evaluation situation are to mark.
The above description is only an overview of the technical scheme of the present invention, in order to better understand the technical means of the present invention, And can be implemented in accordance with the contents of the specification, the following is a detailed description of the preferred embodiments of the present invention and the accompanying drawings.
Detailed description of the invention
Fig. 1 power engineering Evaluating Projects System framework schematic diagram of the present invention;
Fig. 2 power engineering Evaluating Projects System bidding document Review Workflow of the present invention;
Fig. 3 power engineering Evaluating Projects System interface schematic diagram of the present invention.
Specific embodiment
With reference to the accompanying drawings and examples, specific embodiments of the present invention will be described in further detail.Implement below Example is not intended to limit the scope of the invention for illustrating the present invention.
Embodiment 1
The present embodiment power engineering Evaluating Projects System-is by taking bidding document management of appraising as an example
The selection permission of the corresponding Project evaluation of the login account of pre-set user and the evaluation permission for treating Project evaluation;
The login account and password of user are verified, user is by selection to Project evaluation, and typing is with described wait evaluate The relevant project operation information of project, evaluation file issue an evaluation request;
Whether the judgement project operation information meets content standard, and judges the file format of the evaluation file And whether file content meets scheduled file format;If meeting, allow the project operation information and evaluation File is saved to wait evaluate in database;If not meeting, feed back it is described evaluation file file format or file content whether Meet scheduled file format;
Project evaluation, which has user's output of evaluation qualification should be to the corresponding review result of Project evaluation, if evaluation, to be waited for this As a result to pass through, then the review result, project operation information and evaluation file are saved to evaluation and is completed in database It saves;If review result is not pass through, exports evaluation and user is not initiated by result to evaluation request;
The business information includes: engineering essential information, project profile, unit of taking part in building, associated documents, wherein engineering base This information includes at least: engineering classification, construction unit, the project name of engineering, project type, project region, is set building site Count unit, project status, check and approve code etc.;
The Project evaluation includes: that project information management, feasibility study evaluation, preliminary design review, optimization design are commented It examines, calling for tenders of project evaluation, engineering construction evaluation, change management evaluation, contract management evaluation, final acceptance of construction evaluation, technology innovation project Evaluation.
It is illustrated by taking bidding document management of appraising as an example: registration bidding document essential information, according to bidding document file Classified catalogue selects template file establishment associated documents or locally uploads other associated documents, submits examination & approval realization business evaluation Process automation circulation, examination & approval pass through rear relevant documentation automatic archiving.
Newly-built bidding document: essential information is evaluated in essential information bookmark maintenance bidding document, is saved.
Report examination data: including 3 kinds of newly-built modes:
It creates: is clicked from local new buttons from local, system pops up local file selection interface, according to file storage Local path, which finds and clicks after filesselected, opens button or double left button mouse click, and file is uploaded in system.
It is newly-built from template: to click from template new buttons, system pop-up selection document template interface, automatic display ought be above The corresponding template file of shelves classification, clicks confirming button after choosing template file, template file is extracted current bidding document In.Solidification template is distinguished from template new files to create and the newly-built two ways of uncured template.
Mode 1 solidifies template online editing: choosing solidification template file, clicks tool bar online editing button, system is logical It crosses webpage and opens template file, carry out solidification template middle finger and determine content online editing and preservation.
The uncured template of mode 2 replaces attachment: choosing uncured template file, clicks tool bar download button, specifies mould Then plate file download carries out the editor of template file outside system, returns system after the completion of editor and replace to local path Original template file is changed, click tools item imports accessory button, and whether system prompt " replaces attachment ", and it clicks "Yes" and is replaced successfully, Click "No" abort operation.
It selects: clicking from project attachment select button, system pops up current project associated documents and selects boundary from project attachment Face selection can refer to current bidding document from construction project " associated documents ", choose the file line leftmost side, click selection Button, then confirming button is clicked, construction project associated documents are introduced into current bidding document.
Modify examination data: if you need to modify after file uploading system, openable this document is modified and is saved;It can also be into The replacement of row file attachment.
Delete examination data: if you need to delete after file uploading system, select file clicks delete button, and system prompt " is Record is currently chosen in no deletion ", it clicks "Yes" confirmation and deletes, click "No" and unerase.
Check examination data: if you need to check after file uploading system, click file name or select file click check by Button, system are called the desktop software of the machine respective file format to open this document automatically and are checked.
Submit examination data: after file uploads, click tools submitting button, system pops up flow startup window, Show bidding document Review Workflow predetermined, such as following figure:
Next button in upper figure is clicked, system pops up following figure task and sends window, next link approver is shown automatically, It clicks confirming button process to issue, automatic push to approver.
Modify bidding document
Modification bidding document: bidding document, then click tools Edit button are not submitted from bidding document list selection, is beaten Editing interface is begun the compilation of, safeguard bidding document essential information and reports data to a higher authorities for approval, modification is finished and saved.Bidding document has been filed on, then should Bidding document does not allow to edit.
Delete bidding document
Deletion project: bidding document, then click tools delete button, system is not submitted to mention from bidding document list selection Show that confirmation is deleted, clicks "Yes" and delete successfully, click "No" abort operation.Bidding document has been filed on, then the bidding document is not permitted Perhaps it deletes.
Professional responsible person arranges examination task
Into homepage Pending tasks: professional responsible person's login system clicks the bid that need to be evaluated from homepage Pending tasks File name, into evaluation interface.
Specified professional management: clicking and send, and system pops up task and sends interface, and specified evaluation profession is managed, then clicked Confirming button, process automatic flow to latter link processing people.
Professional management data preliminary hearing
Into homepage Pending tasks: professional management login system clicks the bid text that need to be evaluated from homepage Pending tasks Part title, into evaluation interface.
Data is reported in examination to a higher authorities for approval, unqualified rejection: being evaluated interface in bidding document, is switched to associated documents bookmark, audit report The data of examining, such as unqualified to fill in suggestions made after examination, button is retracted in click, and task window is retracted in system pop-up, may be selected to retract any Link is clicked and is determined, process is rejected.
Data is reported in examination to a higher authorities for approval, and qualification submits " technical economic evaluation project examination list ", meeting guide: data is reported in audit to a higher authorities for approval, If qualification quotes template establishment or local upload " technical economic evaluation project examination list ", meeting guide, operation is same " to report bid File " relevant operation.Send button is clicked after the completion of submitting, system pops up task and sends window, clicks and determines, process flows automatically Go to latter link processing people.
Professional management feeds back organization of examination and comment opinion
Into homepage Pending tasks: professional management clicks the bidding document title that need to be evaluated from homepage Pending tasks, into Enter to evaluate interface.
Submitting " specialist examination opinionaire ", " XXXX project XXXX bid section construction bid inspection of documents opinion ", " meeting is recorded Want ": under examination reports relevant classification node, the establishment of reference template or locally upload " technical economic evaluation project examination list ", Meeting guide is operated with " reporting bidding document " relevant operation.
Midway decryption bidding document: downloading bidding document is decrypted and is saved outside system, then clicks and import attachment Button, the bidding document after selection decryption replace former bidding document.
Submit: click send button, system pop up task and send window after the completion of the above operation, click and determine, process is certainly Latter link processing people is arrived in dynamic circulation.
Examine that application user modifies bidding document
Into homepage Pending tasks: examine that application user clicks the bidding document title of rejection from homepage Pending tasks, Into evaluation interface.
Modify bidding document: selection bidding document clicks online Edit button, modifies bidding document and saves;Or selection It is edited outside system after bidding document downloading, is clicked after modification and import attachment, replaced with modified bidding document Former bidding document.
Reply evaluation " meeting summary " opinion: online Edit button is clicked in selection evaluation " meeting summary ", and modification meeting is recorded It wants and saves;Or edited outside system after selection meeting summary downloading, it is clicked after modification and imports attachment, with modification Meeting summary afterwards replaces former meeting summary.
It submits: clicking send button after the completion of modification, system pops up task and sends window, clicks and determines, process flows automatically Go to latter link processing people.
Professional management checks bidding document
Into homepage Pending tasks: professional management clicks the bidding document title for needing review from homepage Pending tasks, into Enter to evaluate interface.
Review bidding document: operation is the same, unqualified rejection, and qualification is under examination reports relevant classification node, and establishment is simultaneously It submits " technical economic evaluation project passes through list "
It submits: clicking send button after the completion of review, system pops up task and sends window, clicks and determines, process flows automatically Go to latter link processing people.
Professional responsible person audits bidding document
Into homepage Pending tasks: professional responsible person clicks the bidding document title that need to be examined from homepage Pending tasks, Into evaluation interface.
Audit bidding document: operation is the same, unqualified to reject previous link, and qualification is directly based upon " technical economic evaluation item Mesh passes through list " fill in audit opinion
It submits: clicking send button after the completion of examining, system pops up task and sends window, clicks and determines, process flows automatically Go to latter link processing people.
Business responsible person examines bidding document
Into homepage Pending tasks: opinion approver clicks the bidding document title that need to be examined from homepage Pending tasks, Into evaluation interface.
Examine bidding document: operation is the same, unqualified to reject previous link, and qualification is directly based upon " technical economic evaluation item Mesh passes through list " fill in suggestions made after examination
It submits: clicking send button after the completion of examination & approval, system pops up task and sends window, clicks and determines, process flows automatically Go to latter link processing people.
Professional responsible person provides examination & approval by connection list and reports
Into homepage Pending tasks: professional responsible person clicks from homepage Pending tasks need to provide examination & approval by contacting list Bidding document title, into evaluation interface.
It is single by connection to provide examination & approval: under examination reports relevant classification node, the establishment of reference template or local upload " are examined Look into and pass through notification sheet "-external, it operates with " reporting bidding document " relevant operation.
Decryption bidding document, which uploads, passes bidding document: the bidding document under downloading " reporting file to a higher authorities for approval " classification is being System is outer to be decrypted, and is then uploaded under " examination reports _ pass bidding document (outside) " classification.
It submits: clicking send button after the completion of the above operation, system pops up task and sends window, and it clicks and determines, process knot Beam.
Bid information in registration
Bid information in registration: the bidding document that selection examination & approval pass through clicks " checking ", opens editing interface, is believing substantially It marks the price in breath bookmark typing, clicks to save and close editing interface.
Inquire bidding document
Bidding document is inquired according to organization: being directed to multi-layer institutional framework user, and left mouse button clicks organization Any hierarchy node in tree, system automatic fitration correspond to bidding document in the scope of organization.
According to keyword query bidding document: typing title, applicant, date of application, item in query scheme input frame Mesh coding, project name etc. are used as querying condition, and system automatic fitration goes out qualified bidding document.
Embodiment 2
The present embodiment power engineering Evaluating Projects System further includes evaluation statistical function, is on the basis of embodiment 1 System just sets budgetary estimate, adjustment of budgetary estimation, bidding document, executes budgetary estimate, design by querying condition, the estimation of statistics construction project feasibility study Change, Office Of Contract Settlements, engineering lump sum, the evaluation quantity of customized evaluation and displaying evaluation progress;Wherein, querying condition packet Include project entity, project type, project region, project status, authorization date, engineering classification, construction project.
It further include entry investment bidding assessment function, system is examined by querying condition, the statistics evaluation file application amount of money Deposit volume calculates and examines increase and decrease volume and careful gradient, analyzes result and is exported and applied with excel file;Wherein, querying condition includes Project entity, file type, the authorization date, file status, reference number of a document/title, engineering classification, one of construction project or Several combinations.
The above is only a preferred embodiment of the present invention, it is not intended to restrict the invention, it is noted that for this skill For the those of ordinary skill in art field, without departing from the technical principles of the invention, can also make it is several improvement and Modification, these improvements and modifications also should be regarded as protection scope of the present invention.

Claims (8)

1. a kind of power engineering Evaluating Projects System, including task module, project appraisal module, system management module, It is characterized in that:
Task module carries out authentication type management mode, according to reengineering and standardized administration requirement, by system manager's account Family is according to workflow and examines that content is opened an account and set to relevant departments, group, evaluation unit, branch and subsidiaries, project entity Set obligational authority;Realize that work is pending, the information reminding having done, submitted, having completed, the project of all evaluations in display systems process Title, sponsor unit and people and the information such as time, evaluation unit and people and time, and pass through newly-built, refreshing, opening, processing note It records, send, retract and closes down and complete each task needed for realization evaluation;
Project appraisal module is designed according to the system architectures such as project construction program, industry standard, key control point, by evaluating phase Close the setting of unit obligational authority, finished item information management, feasibility study, Preliminary design, optimization design, calling for tenders of project, work Journey implementation, change management, contract management, final acceptance of construction, technology innovation project, evaluation statistics, entry investment evaluate content to mark etc., Realize that the data information transfers such as construction project conceptual design, control of investment, bidding assessment are more efficient, more transparent, review result is more With specific directive function, accomplish risk Prior Control;
System management module is designed by flow definition, carries out flow monitoring and historical data management, first is that confirmation system evaluation Project name, business module ownership, the scope of application, start-stop time, creation and modification people and time, process encoding etc.;Second is that into Row project appraisal initiates, handles, supervising and manage, paying close attention to, time-out, the flow monitorings design such as terminates, stops;Third is that each ring of system flow The historical datas such as the creation of responsible person concerned's task, processing is saved, has read and supervised and manage to be managed.
2. power engineering Evaluating Projects System according to claim 1, which is characterized in that " opening " of task module Function key is essential information, associated documents and the processing record of unitem.
One essential information solidifies, executes and makes a report on project examination state, evaluation by system template, process and Permission Design It numbers, report file name, file type, project code, project name, designing unit, the budgetary estimate amount of money and authorization control valence, Shen to a higher authorities for approval It asks someone, examiner and date, suggestions made after examination etc., reflects the main profile information of engineering project, provided conveniently, fastly for evaluation Prompt, accurate Technical Reference can substantially save the evaluation time;
Secondly associated documents, by it is newly-built, deletion, downloading, online editing, import attachment, check the functions such as history, realization includes Project evaluation reports quickly transmitting, timely feedback, standardizing and repair for file, meeting guide, examination reports, modification file and data etc. to a higher authorities for approval Change, complete to submit, realizes all process data information persistences of evaluation, it is required according to file system, comprehensive, full and accurate, Improve evaluation efficiency and quality;
Thirdly processing record, is designed and applied by system flow, reflection participates in Project evaluation related personnel, responsibility point comprehensively Work, processing time and result and handling suggestion etc., evaluation track can relate.
3. the associated documents of task module according to claim 2 pass through system introducing, acquisition, each class formation of output Or unstructured information data, report to a higher authorities for approval evaluation consulting contract that file covered, examine notification sheet, application for developing, design report, The project appraisals necessary conditions such as bidding sector division, quasi- evaluation file, branch and subsidiaries' opinion;Examination reports include evaluation unit opinion, Expert opinion passes the files such as notification sheet, the reflection evaluation course professional work content and result of system;Modification file is pressed Review comment modification and perfection ultimately forms Outcome Document, realizes the closed loop management of project appraisal work.
4. power engineering Evaluating Projects System according to claim 1, which is characterized in that project is believed in project appraisal module Breath management, is arranged by system administration level and obligational authority, realizes that group company evaluates accountability unit's register solidifications at different levels, comments It examines project code, title, check and approve code, engineering classification, building site and scale, construction unit, designing unit, plan time etc. Relevant information reflection shows that project management main body and content, engineering project overview, main unit of taking part in building, promotion project are built comprehensively If management level.
5. power engineering Evaluating Projects System according to claim 1, which is characterized in that feasibility in project appraisal module Research passes through the semi-structured of import system as the key link for the project construction decision for directly affecting 80% or more investment And unstructured document, comprehensive demonstration, system evaluation design scheme, feasibility study report, special report, economic benefit it is complete Azimuth information data provide system, comprehensive, specification technical support for project science decision.
6. power engineering Evaluating Projects System according to claim 1, which is characterized in that engineering is recruited in project appraisal module File is marked, is the works such as equipment materials supply, engineering construction, management and cost consultation, unit regulation during Engineering Project Implementation Make programmatic document, examined by associated documents such as import system bidding document, bill of quantities, technical specification, engineering drawings, And the determination of bid contrul valence, bidding management Whole Process Control is realized, to guarantee project progress, quality and investment set objective Completion provide safeguard.
7. power engineering Evaluating Projects System according to claim 1, which is characterized in that technology passes through in project appraisal module Ji evaluation statistics, system automatically generate and are reflected in system task module by acquiring in real time, count Project evaluation unit Title, project type, project region, project status, the authorization date, project code, feasibility study, is tentatively set engineering classification Meter, calling for tenders of project, change in the work, Office Of Contract Settlements examine content information, be group company's project construction situation analysis and summarize It provides and supports.
8. power engineering Evaluating Projects System according to claim 1, which is characterized in that entry in project appraisal module Bidding assessment is invested, system counts Project evaluation keynote message by stencil design, including organization, engineering point Class, file type, authorization date, file status, reference number of a document, file name, project code carry out entry investment to mark point Analysis, analysis result include reporting the amount of money, the authorization amount of money to a higher authorities for approval, examining add drop volume, examine add drop rate, check and approve the amount of money, outer careful closing in dynamic gold Volume, the interior careful closing in dynamic amount of money, the budgetary estimate amount of money, middle marked price etc. realize entry scheme and investment bidding assessment, are project construction And the market development of operational period, raising core competitiveness provide data information reference.
CN201811608255.0A 2018-12-26 2018-12-26 Power engineering Evaluating Projects System Pending CN109858751A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811608255.0A CN109858751A (en) 2018-12-26 2018-12-26 Power engineering Evaluating Projects System

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811608255.0A CN109858751A (en) 2018-12-26 2018-12-26 Power engineering Evaluating Projects System

Publications (1)

Publication Number Publication Date
CN109858751A true CN109858751A (en) 2019-06-07

Family

ID=66892542

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811608255.0A Pending CN109858751A (en) 2018-12-26 2018-12-26 Power engineering Evaluating Projects System

Country Status (1)

Country Link
CN (1) CN109858751A (en)

Cited By (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110569557A (en) * 2019-08-15 2019-12-13 北京京研电力工程设计有限公司 Intelligent autonomous design platform for power transmission and transformation project and working method thereof
CN111144848A (en) * 2019-12-27 2020-05-12 昆明海巍科技有限公司 Highway engineering quantity standard list management system and method and computer
CN111178680A (en) * 2019-12-09 2020-05-19 河北建投新能源有限公司 Wind power plant engineering quality overall process management system, method and equipment
CN111339079A (en) * 2019-12-24 2020-06-26 中国航空工业集团公司西安飞机设计研究所 Airworthiness certification process and data management method and architecture for complex electronic hardware
CN111429007A (en) * 2020-03-25 2020-07-17 陕西合友网络科技有限公司 Building project supervision system and supervision method
CN111815302A (en) * 2020-09-08 2020-10-23 江苏神彩科技股份有限公司 On-line evaluation system for polluted plots
CN111861366A (en) * 2020-06-08 2020-10-30 远光软件股份有限公司 Project-ground intelligent auditing system and computer
CN111950976A (en) * 2020-07-23 2020-11-17 深圳供电局有限公司 Engineering project review system and method
CN112232760A (en) * 2020-09-27 2021-01-15 广西绿能电力勘察设计有限公司 Infrastructure management system and method
CN112232761A (en) * 2020-09-27 2021-01-15 广西绿能电力勘察设计有限公司 Infrastructure application system and method
CN112348488A (en) * 2020-12-03 2021-02-09 深圳供电局有限公司 Auxiliary examination method for transformer power-transformation grindable automatic rules based on building information
CN112434364A (en) * 2020-11-26 2021-03-02 上海市城市建设设计研究总院(集团)有限公司 IFC-based construction project early-stage digital delivery and review system and method
CN112598397A (en) * 2020-12-30 2021-04-02 北京迪浩永辉技术有限公司 Circuit design online evaluation method, system, medium, equipment, terminal and application
CN112862434A (en) * 2021-01-29 2021-05-28 北京城建勘测设计研究院有限责任公司 Auditing system based on multi-dimensional complex service
CN113077143A (en) * 2021-03-31 2021-07-06 国网浙江省电力有限公司物资分公司 Comprehensive plan management and control system based on remote examination
CN113177865A (en) * 2021-01-26 2021-07-27 张作中 Intellectual property project application process monitoring method and system
CN113256264A (en) * 2021-06-07 2021-08-13 国网安徽省电力有限公司 Management system, method and device for architecture full-flow management and control and readable storage medium
CN113379377A (en) * 2021-06-02 2021-09-10 南方电网能源发展研究院有限责任公司 Power grid engineering construction approval processing method and device
CN113435743A (en) * 2021-06-25 2021-09-24 北方实验室(沈阳)股份有限公司 Information-based engineering overall process data resource sharing system
CN113516446A (en) * 2021-04-25 2021-10-19 李小龙 Combined office platform on construction line
CN113657871A (en) * 2021-08-31 2021-11-16 广东电网有限责任公司东莞供电局 Scientific and technological innovation project management system and method
CN114493499A (en) * 2021-12-30 2022-05-13 南京维拓科技股份有限公司 Method for evaluating digital model product
CN114519571A (en) * 2022-04-20 2022-05-20 四川省大数据中心 Engineering construction project approval system
CN114782056A (en) * 2022-03-18 2022-07-22 合肥信息工程监理咨询有限公司 Online review and acceptance reporting intelligent linkage engine system
CN116468294A (en) * 2023-04-18 2023-07-21 湖北安源安全环保科技有限公司 Emergency evaluation method, system, terminal and terminal quick positioning method for power enterprises
CN116894646A (en) * 2023-07-28 2023-10-17 湖南巨为科技有限公司 Fine management system for technological project declaration flow
CN117035431A (en) * 2023-09-22 2023-11-10 三峡高科信息技术有限责任公司 Airport engineering project construction risk assessment method based on artificial intelligence
CN116468294B (en) * 2023-04-18 2024-05-14 湖北安源安全环保科技有限公司 Emergency evaluation method, system, terminal and terminal quick positioning method for power enterprises

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104050275A (en) * 2014-06-25 2014-09-17 国家电网公司 Method and system for reviewing project
CN104182851A (en) * 2014-09-11 2014-12-03 广西桂能软件有限公司 Engineering project production management system
CN107292473A (en) * 2016-04-10 2017-10-24 国网山东省电力公司经济技术研究院 The online estimating and examining system of planning feasibility study business and method based on process optimization
CN109784681A (en) * 2018-12-26 2019-05-21 中国大唐集团科学技术研究院有限公司 Power engineering project investment management system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104050275A (en) * 2014-06-25 2014-09-17 国家电网公司 Method and system for reviewing project
CN104182851A (en) * 2014-09-11 2014-12-03 广西桂能软件有限公司 Engineering project production management system
CN107292473A (en) * 2016-04-10 2017-10-24 国网山东省电力公司经济技术研究院 The online estimating and examining system of planning feasibility study business and method based on process optimization
CN109784681A (en) * 2018-12-26 2019-05-21 中国大唐集团科学技术研究院有限公司 Power engineering project investment management system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
洪莺俤: "福建输变工程设计评审系统的设计与实现", 《中国优秀硕士学位论文全文数据库·信息科技辑》 *

Cited By (37)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110569557A (en) * 2019-08-15 2019-12-13 北京京研电力工程设计有限公司 Intelligent autonomous design platform for power transmission and transformation project and working method thereof
CN111178680A (en) * 2019-12-09 2020-05-19 河北建投新能源有限公司 Wind power plant engineering quality overall process management system, method and equipment
CN111178680B (en) * 2019-12-09 2024-02-27 河北建投新能源有限公司 Wind power plant engineering quality overall process management system, method and equipment
CN111339079A (en) * 2019-12-24 2020-06-26 中国航空工业集团公司西安飞机设计研究所 Airworthiness certification process and data management method and architecture for complex electronic hardware
CN111144848A (en) * 2019-12-27 2020-05-12 昆明海巍科技有限公司 Highway engineering quantity standard list management system and method and computer
CN111429007A (en) * 2020-03-25 2020-07-17 陕西合友网络科技有限公司 Building project supervision system and supervision method
CN111861366A (en) * 2020-06-08 2020-10-30 远光软件股份有限公司 Project-ground intelligent auditing system and computer
CN111950976B (en) * 2020-07-23 2024-01-05 深圳供电局有限公司 Project review system and method
CN111950976A (en) * 2020-07-23 2020-11-17 深圳供电局有限公司 Engineering project review system and method
CN111815302A (en) * 2020-09-08 2020-10-23 江苏神彩科技股份有限公司 On-line evaluation system for polluted plots
CN112232761B (en) * 2020-09-27 2023-11-14 广西绿能电力勘察设计有限公司 Infrastructure application system and method
CN112232760A (en) * 2020-09-27 2021-01-15 广西绿能电力勘察设计有限公司 Infrastructure management system and method
CN112232761A (en) * 2020-09-27 2021-01-15 广西绿能电力勘察设计有限公司 Infrastructure application system and method
CN112434364A (en) * 2020-11-26 2021-03-02 上海市城市建设设计研究总院(集团)有限公司 IFC-based construction project early-stage digital delivery and review system and method
CN112348488A (en) * 2020-12-03 2021-02-09 深圳供电局有限公司 Auxiliary examination method for transformer power-transformation grindable automatic rules based on building information
CN112598397A (en) * 2020-12-30 2021-04-02 北京迪浩永辉技术有限公司 Circuit design online evaluation method, system, medium, equipment, terminal and application
CN112598397B (en) * 2020-12-30 2024-01-05 北京迪浩永辉技术有限公司 Circuit design on-line review method, system, medium, equipment, terminal and application
CN113177865A (en) * 2021-01-26 2021-07-27 张作中 Intellectual property project application process monitoring method and system
CN112862434B (en) * 2021-01-29 2024-03-01 北京城建勘测设计研究院有限责任公司 Auditing system based on multi-dimensional complex business
CN112862434A (en) * 2021-01-29 2021-05-28 北京城建勘测设计研究院有限责任公司 Auditing system based on multi-dimensional complex service
CN113077143A (en) * 2021-03-31 2021-07-06 国网浙江省电力有限公司物资分公司 Comprehensive plan management and control system based on remote examination
CN113077143B (en) * 2021-03-31 2022-06-07 国网浙江省电力有限公司物资分公司 Comprehensive plan management and control system based on remote examination
CN113516446A (en) * 2021-04-25 2021-10-19 李小龙 Combined office platform on construction line
CN113379377A (en) * 2021-06-02 2021-09-10 南方电网能源发展研究院有限责任公司 Power grid engineering construction approval processing method and device
CN113256264A (en) * 2021-06-07 2021-08-13 国网安徽省电力有限公司 Management system, method and device for architecture full-flow management and control and readable storage medium
CN113435743A (en) * 2021-06-25 2021-09-24 北方实验室(沈阳)股份有限公司 Information-based engineering overall process data resource sharing system
CN113435743B (en) * 2021-06-25 2023-09-01 北方实验室(沈阳)股份有限公司 Informationized engineering whole-process data resource sharing system
CN113657871A (en) * 2021-08-31 2021-11-16 广东电网有限责任公司东莞供电局 Scientific and technological innovation project management system and method
CN114493499A (en) * 2021-12-30 2022-05-13 南京维拓科技股份有限公司 Method for evaluating digital model product
CN114782056A (en) * 2022-03-18 2022-07-22 合肥信息工程监理咨询有限公司 Online review and acceptance reporting intelligent linkage engine system
CN114519571B (en) * 2022-04-20 2022-07-08 四川省大数据中心 Engineering construction project approval system
CN114519571A (en) * 2022-04-20 2022-05-20 四川省大数据中心 Engineering construction project approval system
CN116468294A (en) * 2023-04-18 2023-07-21 湖北安源安全环保科技有限公司 Emergency evaluation method, system, terminal and terminal quick positioning method for power enterprises
CN116468294B (en) * 2023-04-18 2024-05-14 湖北安源安全环保科技有限公司 Emergency evaluation method, system, terminal and terminal quick positioning method for power enterprises
CN116894646A (en) * 2023-07-28 2023-10-17 湖南巨为科技有限公司 Fine management system for technological project declaration flow
CN117035431A (en) * 2023-09-22 2023-11-10 三峡高科信息技术有限责任公司 Airport engineering project construction risk assessment method based on artificial intelligence
CN117035431B (en) * 2023-09-22 2024-04-16 三峡高科信息技术有限责任公司 Airport engineering project construction risk assessment method based on artificial intelligence

Similar Documents

Publication Publication Date Title
CN109858751A (en) Power engineering Evaluating Projects System
CN112950164B (en) Information system engineering supervision working hour recording information system based on standardized rules
CN106548322B (en) Project examination system
CN103136626B (en) The online management method of engineering project
US8880436B2 (en) Automation system and method for a web-based implementation portal
CN108960627A (en) A kind of full Schedule monitoring management system and method based on scientific research project
KR20110139706A (en) Method and system for workflow integration
CN103985034A (en) Construction payment management system and method with document tracking features
CN109492961A (en) A kind of goods and material handling method, system and computer readable storage medium
CN113487279A (en) Financial centralized management system for financial fusion
CN109816328A (en) Power engineering Project Technical economic information system
JP2018530092A (en) Intellectual property portfolio management system
CN109961264A (en) A kind of enterprise information management system and management method
CN109189844A (en) A kind of inspection examining report business management system
US8560358B2 (en) Collaborative environment to assess, design, and implement product changes
US20220245589A1 (en) Contract management system
CN116542790A (en) Mobile intelligent general account reporting system, control method, equipment and terminal
CN113191517A (en) Integrated management system
CN114936847A (en) Procurement plan management system
CN103426052B (en) Information management system and approaches to IM
CN107220817A (en) One kind research and development data flow management system for tracking
CN113642997A (en) Management system and method for electronic government affairs
US20130211989A1 (en) Legal cost management system
Sürücü et al. Establishing key performance indicators for measuring software-development processes at a large organization
CN106991562A (en) A kind of cost progress becomes more meticulous system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190607

RJ01 Rejection of invention patent application after publication