CN111429007A - Building project supervision system and supervision method - Google Patents
Building project supervision system and supervision method Download PDFInfo
- Publication number
- CN111429007A CN111429007A CN202010219244.4A CN202010219244A CN111429007A CN 111429007 A CN111429007 A CN 111429007A CN 202010219244 A CN202010219244 A CN 202010219244A CN 111429007 A CN111429007 A CN 111429007A
- Authority
- CN
- China
- Prior art keywords
- information
- supervision
- module
- proctoring
- audit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 33
- 238000012550 audit Methods 0.000 claims abstract description 48
- 238000010276 construction Methods 0.000 claims abstract description 30
- 230000001960 triggered effect Effects 0.000 claims abstract description 12
- 238000012937 correction Methods 0.000 claims description 8
- 238000012795 verification Methods 0.000 claims description 8
- 238000012986 modification Methods 0.000 claims description 7
- 230000004048 modification Effects 0.000 claims description 7
- 239000000126 substance Substances 0.000 claims description 3
- 238000007726 management method Methods 0.000 abstract description 12
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000001105 regulatory effect Effects 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000001934 delay Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000012797 qualification Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06395—Quality analysis or management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Data Mining & Analysis (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a building project supervision system and a supervision method, wherein the supervision system comprises: the information receiving module is used for receiving supervision information in the construction process of the building project; the form auditing module is used for comparing the supervision information received by the information receiving module with a preset form standard, if the supervision information is consistent with the preset form standard, the auditing is passed, and the substantial auditing module is triggered, otherwise, the form correcting module is triggered; and the essence auditing module is used for comparing the supervision information audited by the form auditing module with a preset technical specification, if the supervision information is consistent with the preset technical specification, the audit is passed, and otherwise, the essence correcting module is triggered. The invention also discloses a corresponding supervision method. The building project supervision system provided by the invention is provided with the form auditing module and the essence auditing module, so that the correctness of supervision information can be ensured, and the normal management is further ensured.
Description
Technical Field
The application relates to a building project supervision system and a supervision method, and belongs to the technical field of building management.
Background
The construction project supervision refers to a professional management service activity that a project supervision enterprise (supervision company) with corresponding qualification receives the entrustment of a construction unit, namely a project legal person, undertakes part of project management work of the construction unit, and controls the construction behavior of the construction unit on behalf of the construction unit.
In the construction project supervision process, the supervision engineer needs to write a supervision log. The supervision log is the original record of supervision activities performed by supervision engineers, is an important data for executing supervision entrustment contracts, compiling supervision completion files, processing claims, delays and changes, is an important, most original and reliable material for analyzing engineering quality problems, and is also the most basic component of the supervision files.
In the prior art, the supervision logs written by each supervision engineer have no fixed template, so that the possibility of missing items exists, meanwhile, the supervision engineers of one project are more, the time consumption is long when the data managers integrate the daily supervision logs, and the correct filling of the supervision logs is difficult to ensure only depending on the audit of the data managers due to professional content.
Disclosure of Invention
The application aims to provide a building project supervision system and a supervision method, so as to solve the problem that management is wrong due to incorrect supervision log filling in the building project supervision process in the prior art.
The building project supervision system of the invention comprises:
the information receiving module is used for receiving supervision information in the construction process of the building project;
the form auditing module is used for comparing the supervision information received by the information receiving module with a preset form standard, if the supervision information is consistent with the preset form standard, the auditing is passed, and the substantial auditing module is triggered, otherwise, the form correcting module is triggered;
and the essence auditing module is used for comparing the supervision information audited by the form auditing module with a preset technical specification, if the supervision information is consistent with the preset technical specification, the audit is passed, and otherwise, the essence correcting module is triggered.
Preferably, the information receiving module comprises one or more information receiving units;
the information receiving unit is used for acquiring the corresponding proctoring information according to one or more categories in a preset file template.
Preferably, the form modification module feeds back the proctoring information inconsistent with the preset form specification to the information receiving module, and the information receiving module modifies the fed-back proctoring information.
Preferably, the substantive modification module feeds back the proctoring information inconsistent with the preset technical specification to the information receiving module, and the information receiving module modifies the fed-back proctoring information.
Preferably, the method further comprises the following steps:
and the electronic signature module is used for signing the proctorial information which passes the verification of the essence verification module and needs to be signed.
Preferably, the method further comprises the following steps:
and the encryption module is used for encrypting the proctoring information audited by the substantial audit module.
Preferably, the method further comprises the following steps:
and the storage module is used for storing the proctoring information which is signed by the electronic signature module and encrypted by the encryption module.
The invention also discloses a building project supervision method using the supervision system, which comprises the following steps:
acquiring supervision information in the construction process of a building project;
and performing formal audit and substantive audit on the proctoring information.
Preferably, the form audit and the essence audit are performed on the proctoring information, specifically:
comparing the proctoring information with a preset form standard, if the proctoring information is consistent with the preset form standard, passing the audit, entering the substantial audit, and otherwise, correcting the proctoring information in a form level;
and comparing the proctoring information which passes the form verification with a preset technical specification, if the proctoring information is consistent with the preset technical specification, the verification is passed, otherwise, the proctoring information is corrected in a substantial content level.
Preferably, after performing formal audit and substantial audit on the proctoring information, the method further includes:
encrypting the proctoring information which passes the substantive audit;
performing electronic signature on the proctoring information which passes the substantial audit and needs to be signed;
and storing the proctoring information which is electronically signed and encrypted.
Compared with the prior art, the building project supervision system and the supervision method have the following beneficial effects:
the building project supervision system provided by the invention is provided with the form auditing module and the essence auditing module, so that the correctness of supervision information can be ensured, and the normal management is further ensured.
The invention realizes that the corresponding proctoring information is obtained according to the type in the preset file template through a plurality of information receiving units. The supervision personnel only need to fill in the supervision information of the day according to the types set in the template, and missing items can not occur. A building project has a plurality of supervisors, and each supervisor can realize that the supervision information is transmitted to the form audit module through the respective information receiving unit for form audit.
The invention is provided with the form correction module and the essence correction module to respectively correct the proctoring information which does not conform to the form specification and the technical specification, thereby ensuring the correctness of the finally obtained proctoring information.
The invention is provided with the electronic signature module, can sign the information needing to be signed in the proctoring information audited by the essence auditing module, and is simple and fast.
The invention is provided with an encryption module which encrypts the proctoring information audited by the essence auditing module, preferably watermark encryption.
The invention is provided with the storage module, can record and store the whole process of receiving and auditing the proctoring information, and is convenient for subsequent searching and use.
The invention also discloses a building project supervision method, which can realize systematization of supervision information and ensure the completeness and accuracy of the supervision information.
Drawings
FIG. 1 is a schematic structural diagram of a construction project supervision system according to the present invention;
FIG. 2 is a flow chart of a construction project supervision method according to the present invention.
List of parts and reference numerals:
1. an information receiving module; 2. a form audit module; 3. a substance audit module; 4. a form correction module; 5. a substantial correction module; 6. an electronic signature module; 7. an encryption module; 8. and a storage module.
Detailed Description
The present invention will be described in detail with reference to examples, but the present invention is not limited to these examples.
FIG. 1 is a schematic structural diagram of a project supervision system according to the present invention.
The project supervision system of the invention comprises: the information receiving module 1 is used for receiving supervision information in the construction process of a building project; wherein, proctoring information includes: the project management system comprises project quality supervision information, project cost supervision information, project progress supervision information, contract supervision information and information management supervision information, supervision information for coordinating the relation of related parties of the project construction and the like.
The form auditing module 2 compares the supervision information received by the information receiving module 1 with a preset form standard, if the supervision information is consistent with the preset form standard, the auditing is passed, and the substantial auditing module is triggered, otherwise, the form correcting module is triggered; the preset form specifications in the application comprise a standard supervision category template, a standard supervision file template, a standard supervision flow template and the like. The form auditing module 2 respectively compares the file quantity and the file name of the supervision information received by the information receiving module 1 with a standard supervision file template in the form specification, compares the supervision type of the supervision information received by the information receiving module 1 with a standard supervision type template in the form specification, compares the flow sequence in the supervision information received by the information receiving module 1 with the flow sequence in the standard supervision flow template, and passes the form auditing only when the supervision information received by the information receiving module 1 is compared with each template in the form specification to be consistent.
And the essence auditing module 3 compares the supervision information audited by the form auditing module 2 with a preset technical specification, if the supervision information is consistent with the preset technical specification, the audit is passed, and otherwise, the essence correcting module is triggered. The essence auditing module 3 is mainly used for auditing whether the supervision information is correct or not from the technical level. The technical specification involved in the substantive auditing module 3 is a construction project supervision specification. The construction project supervision standard is a regulation published by the Chinese construction industry publisher in 2013, is compiled by the Ministry of housing of the people's republic of China and the Ministry of urban and rural construction, and relates to the construction project supervision standard (GB/T50319-2013).
The form auditing module and the essence auditing module are set, so that the correctness of the supervision information can be ensured, and the normal management is ensured.
The information receiving module 1 in the invention comprises one or more information receiving units; and the information receiving unit is used for acquiring corresponding proctoring information according to one or more categories in a preset file template.
In a building project, there are general supervision engineers, supervision engineers corresponding to each specialty and supervisors, and in order to realize that each supervisor can report the corresponding supervision information, the invention sets up a plurality of information receiving units, and each supervisor uses one information receiving unit. A file template is preset in each information receiving unit, and one or more supervision categories, such as a progress category, a quality category, a cost category and the like, are related in the template. The proctoring personnel only need to input the proctoring content of each day into the corresponding proctoring category. Therefore, information omission can be effectively avoided, and the complexity of recording is reduced.
The form correction module 4 is arranged in the invention and used for feeding back the proctoring information inconsistent with the preset form standard to the information receiving module 1, and the proctoring personnel corresponding to the information receiving module 1 modify the fed-back proctoring information. The modification content is modification on the form of the supervision information, and comprises the type related to the supervision information, the number and the name of files of the supervision information, the receiving and auditing process of the supervision information and the like. And after the modification is finished, submitting the modified.
The essence correction module 5 provided in the invention is used for feeding back the proctoring information inconsistent with the preset technical specification to the information receiving module 1, and the proctoring personnel corresponding to the information receiving module 1 modifies the fed-back proctoring information. The modified content is the substance content of the proctoring information. After the modification is completed, the modified data are submitted to the substantive auditing module 3 for auditing again.
Furthermore, the electronic signature module 6 is further arranged and used for signing the proctorial information which is audited through the essence auditing module 3 and needs to be signed, and the method is simple and fast.
Further, the application is also provided with an encryption module 7, which is used for encrypting the proctoring information which is audited by the essence auditing module 3. Preferably watermark encryption.
In order to facilitate subsequent searching and use, the electronic signature management system is further provided with a storage module 8 for storing the proctoring information which is signed by the electronic signature module and encrypted by the encryption module.
FIG. 2 is a flow chart of a construction project supervision method according to the present invention.
The building project supervision method comprises the following steps:
And 2, performing form audit and essence audit on the supervision information. Formal auditing is to audit the regulatory information from the formal level, and substantive auditing is to audit the regulatory information from the technical level.
Wherein the step 2 specifically comprises the following steps:
step 2.1, comparing the supervision information with a preset form standard, if the supervision information is consistent with the preset form standard, passing the audit, entering the actual audit, and otherwise, performing formal correction on the supervision information; the form specification in the application comprises a standard supervision category, a standard supervision file, a standard supervision flow and the like. The form audit respectively compares the file quantity and the file name of the credit supervision information with a standard supervision file in a form specification, compares the supervision type of the supervision information with the standard supervision type in the form specification, compares the flow sequence in the supervision information with the flow sequence in the standard supervision flow, and passes the form audit only when the supervision information is compared with all the contents in the form specification in a consistent manner.
And 2.2, comparing the audit information which passes the form audit with a preset technical specification, if the audit information is consistent with the preset technical specification, the audit is passed, otherwise, the audit information is corrected in substantial content. The substantive audit mainly examines whether the proctoring information is correct or not from the technical level. The technical specification involved in the substantive audit is a construction project supervision specification. The construction project supervision standard is a regulation published by the Chinese construction industry publisher in 2013, is compiled by the Ministry of housing of the people's republic of China and the Ministry of urban and rural construction, and relates to the construction project supervision standard (GB/T50319-2013).
The present application further comprises, after step 2:
And 5, storing the proctoring information subjected to electronic signature and encryption for facilitating subsequent searching.
The supervision method can realize systematization of supervision information and simultaneously ensure the completeness and accuracy of the supervision information.
Although the present application has been described with reference to a few embodiments, it should be understood that various changes, substitutions and alterations can be made herein without departing from the spirit and scope of the application as defined by the appended claims.
Claims (10)
1. A building project supervision system, comprising:
the information receiving module is used for receiving supervision information in the construction process of the building project;
the form auditing module is used for comparing the supervision information received by the information receiving module with a preset form standard, if the supervision information is consistent with the preset form standard, the auditing is passed, and the substantial auditing module is triggered, otherwise, the form correcting module is triggered;
and the essence auditing module is used for comparing the supervision information audited by the form auditing module with a preset technical specification, if the supervision information is consistent with the preset technical specification, the audit is passed, and otherwise, the essence correcting module is triggered.
2. The building project supervision system according to claim 1, wherein the information receiving module comprises one or more information receiving units;
the information receiving unit is used for acquiring the corresponding proctoring information according to one or more categories in a preset file template.
3. The building project supervision system according to claim 1, wherein the form modification module feeds back the supervision information that is inconsistent with the preset form specification to the information reception module, and the information reception module modifies the fed-back supervision information.
4. The building project supervision system according to claim 1, wherein the substantive correction module feeds back the supervision information inconsistent with the preset technical specification to the information receiving module, and the information receiving module modifies the fed-back supervision information.
5. The building project supervision system according to claim 1, further comprising:
and the electronic signature module is used for signing the proctorial information which passes the verification of the essence verification module and needs to be signed.
6. The building project supervision system according to claim 5, further comprising:
and the encryption module is used for encrypting the proctoring information audited by the substantial audit module.
7. The building project supervision system according to claim 6, further comprising:
and the storage module is used for storing the proctoring information which is signed by the electronic signature module and encrypted by the encryption module.
8. A method for supervising a construction project, comprising:
acquiring supervision information in the construction process of a building project;
and performing formal audit and substantive audit on the proctoring information.
9. The building project supervision method according to claim 8, characterized in that the supervision information is subjected to form audit and substance audit, specifically:
comparing the proctoring information with a preset form standard, if the proctoring information is consistent with the preset form standard, passing the audit, entering the substantial audit, and otherwise, correcting the proctoring information in a form level;
and comparing the proctoring information which passes the form verification with a preset technical specification, if the proctoring information is consistent with the preset technical specification, the verification is passed, otherwise, the proctoring information is corrected in a substantial content level.
10. The building project overseeing method as recited in claim 8, further comprising, after performing the formal audit and the substantive audit on the overseeing information:
encrypting the proctoring information which passes the substantive audit;
performing electronic signature on the proctoring information which passes the substantial audit and needs to be signed;
and storing the proctoring information which is electronically signed and encrypted.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010219244.4A CN111429007A (en) | 2020-03-25 | 2020-03-25 | Building project supervision system and supervision method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010219244.4A CN111429007A (en) | 2020-03-25 | 2020-03-25 | Building project supervision system and supervision method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111429007A true CN111429007A (en) | 2020-07-17 |
Family
ID=71548626
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010219244.4A Pending CN111429007A (en) | 2020-03-25 | 2020-03-25 | Building project supervision system and supervision method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111429007A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2018156180A (en) * | 2017-03-15 | 2018-10-04 | Phcホールディングス株式会社 | Prescription audit information display device, prescription audit information display method, and prescription audit information display program |
CN109146724A (en) * | 2018-08-31 | 2019-01-04 | 万翼科技有限公司 | Output value accounting method, device and computer readable storage medium |
CN109492203A (en) * | 2018-11-21 | 2019-03-19 | 深圳中广核工程设计有限公司 | A kind of nuclear power large-scale synthesis reporting format method of calibration and system |
CN109710903A (en) * | 2018-08-20 | 2019-05-03 | 平安普惠企业管理有限公司 | Management method, device, equipment and the storage medium of document |
CN109784681A (en) * | 2018-12-26 | 2019-05-21 | 中国大唐集团科学技术研究院有限公司 | Power engineering project investment management system |
CN109858751A (en) * | 2018-12-26 | 2019-06-07 | 中国大唐集团科学技术研究院有限公司 | Power engineering Evaluating Projects System |
CN110910092A (en) * | 2019-11-21 | 2020-03-24 | 四川高路交通信息工程有限公司 | Highway construction information management platform |
-
2020
- 2020-03-25 CN CN202010219244.4A patent/CN111429007A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2018156180A (en) * | 2017-03-15 | 2018-10-04 | Phcホールディングス株式会社 | Prescription audit information display device, prescription audit information display method, and prescription audit information display program |
CN109710903A (en) * | 2018-08-20 | 2019-05-03 | 平安普惠企业管理有限公司 | Management method, device, equipment and the storage medium of document |
CN109146724A (en) * | 2018-08-31 | 2019-01-04 | 万翼科技有限公司 | Output value accounting method, device and computer readable storage medium |
CN109492203A (en) * | 2018-11-21 | 2019-03-19 | 深圳中广核工程设计有限公司 | A kind of nuclear power large-scale synthesis reporting format method of calibration and system |
CN109784681A (en) * | 2018-12-26 | 2019-05-21 | 中国大唐集团科学技术研究院有限公司 | Power engineering project investment management system |
CN109858751A (en) * | 2018-12-26 | 2019-06-07 | 中国大唐集团科学技术研究院有限公司 | Power engineering Evaluating Projects System |
CN110910092A (en) * | 2019-11-21 | 2020-03-24 | 四川高路交通信息工程有限公司 | Highway construction information management platform |
Non-Patent Citations (1)
Title |
---|
李怀前等: "《防洪工程建设管理手册》", 30 April 2016, 郑州:黄河水利出版社 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11494402B1 (en) | Apparatus and methods for producing data structures having internal self-references suitable for immutably representing and verifying data | |
US9223819B2 (en) | Linking of parent-child data records in a legacy software modernization system | |
US20120089562A1 (en) | Methods and Apparatus for Integrated Management of Structured Data From Various Sources and Having Various Formats | |
CN103473342A (en) | Report data generating method and system | |
CN111031036A (en) | Block chain-based vaccine information monitoring method and device and computer equipment | |
CN110932859B (en) | User information processing method, device and equipment and readable storage medium | |
US11347719B2 (en) | Multi-table data validation tool | |
CN111666464A (en) | Project document cooperation management system and method based on cloud service | |
CN106059762A (en) | Data security processing method and apparatus | |
CN106383812A (en) | New contract policy test method and apparatus | |
CN113158233A (en) | Data preprocessing method and device and computer storage medium | |
CN115221380A (en) | Method, system and platform for managing urban construction files in batches | |
Rong et al. | DevDocOps: Enabling continuous documentation in alignment with DevOps | |
CN111429007A (en) | Building project supervision system and supervision method | |
CN117036062A (en) | Accounting resource calculation method and device | |
CN104216986A (en) | Device and method for improving data query efficiency through pre-operation according to data update period | |
CN110457308A (en) | A kind of accounting data processing analysis method and system | |
Gatling et al. | Enterprise information management with SAP | |
CN110163732A (en) | A kind of processing method and processing system of accounting statement | |
Saiedian et al. | A streamlined, cost-effective database approach to manage requirements traceability | |
CN111639478B (en) | Automatic data auditing method and system based on EXCEL document | |
CN115936593A (en) | Enterprise business annual audit data processing method combined with RPA (resilient packet Access) automated robot | |
Larsen et al. | Recent industrial applications of VDM in Japan | |
CN112596806A (en) | Data lake data loading script generation method and system | |
Lemaire-Harvey et al. | RPA internal controls support audit readiness |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20200717 |