CN109492961A - A kind of goods and material handling method, system and computer readable storage medium - Google Patents

A kind of goods and material handling method, system and computer readable storage medium Download PDF

Info

Publication number
CN109492961A
CN109492961A CN201811060932.XA CN201811060932A CN109492961A CN 109492961 A CN109492961 A CN 109492961A CN 201811060932 A CN201811060932 A CN 201811060932A CN 109492961 A CN109492961 A CN 109492961A
Authority
CN
China
Prior art keywords
goods
materials
information
module
storage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811060932.XA
Other languages
Chinese (zh)
Inventor
杨雪霁
吕炎杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Institute of Electronics of CAS
Original Assignee
Institute of Electronics of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Institute of Electronics of CAS filed Critical Institute of Electronics of CAS
Priority to CN201811060932.XA priority Critical patent/CN109492961A/en
Publication of CN109492961A publication Critical patent/CN109492961A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/087Inventory or stock management, e.g. order filling, procurement or balancing against orders
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Human Resources & Organizations (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Development Economics (AREA)
  • Finance (AREA)
  • Accounting & Taxation (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of goods and material handling method, system and computer readable storage mediums, which comprises obtains the selection catalogue of goods and materials;Wherein, the selection catalogue includes: at least one of goods and materials identification information, specification information, company-information, place of production information, packaged information;According to procurement demand, the selection target goods and materials from the selection catalogue;Based on the target goods and materials, output buying report;Storage registration is carried out to the target goods and materials, updates and exports status reporting.

Description

A kind of goods and material handling method, system and computer readable storage medium
Technical field
The present invention relates to computer technology more particularly to a kind of goods and material handling methods, system and computer-readable storage medium Matter.
Background technique
Under the prior art, information management system rises to data base management system by file management system, and based on number According to the material Management System of base management system, only carry out simple material statistics management at present, without qualitative materiel control and Design guidance, major defect and technical deficiency are as follows:
1, the basic data source of goods and materials not enough standardizes, can not the selection to goods and materials effectively controlled, goods and materials system It cannot achieve design to select, only realize simple handling of goods and materials.
2, the plan control of entire handling of goods and materials process is poor, accuracy is poor.Overstocking for stock in storage easy to form, is not easy to drop Low stock cost;
3, the information collection of entire handling of goods and materials process and process are uncontrolled, can not accomplish information traceability, lack real The information inquiry of existing handling of goods and materials process and report generate.
Summary of the invention
It can in order to solve the above technical problems, the embodiment of the invention provides a kind of goods and material handling method, system and computers Read storage medium.
A kind of goods and material handling method provided in an embodiment of the present invention, comprising:
Obtain the selection catalogue of goods and materials;Wherein, the selection catalogue includes: goods and materials identification information, specification information, producer's letter At least one of breath, place of production information, packaged information;
According to procurement demand, the selection target goods and materials from the selection catalogue;
Based on the target goods and materials, output buying report;
Storage registration is carried out to the target goods and materials, updates and exports status reporting.
Wherein, the method also includes:
For the goods and materials in warehouse, setting storage time limit;
It prescribes a time limit when goods and materials storage exceeds the storage period, exports the first warning reports.
Wherein, the method also includes:
Demand is stored according to inventory limitation and goods and materials, the stockpile number early warning upper and lower limit threshold value of the goods and materials is set;
When the physical holding of stock quantity of the goods and materials is beyond the upper limit threshold or is lower than the lower threshold, output second Warning reports.
Wherein, the method also includes:
When the outbound goods and materials quantity of selection is more than stock in storage quantity, outputting alarm information.
Wherein, the method also includes:
Storage registration is carried out to cancelling stocks goods and materials, updates and exports status reporting.
Wherein, the method also includes:
Information is recorded according to the outbound of goods and materials, installation information registration is carried out to the goods and materials.
A kind of material Management System that the embodiment of the present invention also provides, comprising:
Module is obtained, for obtaining the selection catalogue of goods and materials;Wherein, the selection catalogue includes: goods and materials identification information, rule At least one of lattice information, company-information, place of production information, packaged information;
Selecting module is used for according to procurement demand, the selection target goods and materials from the selection catalogue;
Report output module is purchased, for being based on the target goods and materials, output buying report;
Storage Registration Module updates for carrying out storage registration to the target goods and materials and exports status reporting.
Wherein, the system also includes time limit setup module and the first warning module,
The time limit setup module, for for the goods and materials in warehouse, setting storage time limit;
First warning module exports the first precaution alarm for prescribing a time limit when goods and materials storage beyond the storage period Table.
Wherein, the system also includes stockpile number threshold setting module and the second warning module,
The object is arranged for storing demand according to inventory limitation and goods and materials in the stockpile number threshold setting module The stockpile number early warning upper and lower limit threshold value of money;
Second warning module beyond the upper limit threshold or is lower than institute for the physical holding of stock quantity when the goods and materials When stating lower threshold, the second warning reports are exported.
Wherein, the storage Registration Module is also used to carry out storage registration to cancelling stocks goods and materials, updates and exports inventory's report Table.
Wherein, the system also includes installation information Registration Module,
The installation information Registration Module carries out installation letter to the goods and materials for recording information according to the outbound of goods and materials Breath registration.
In the embodiment of the present invention, a kind of computer readable storage medium is provided, is stored thereon with computer program, it is special The step of sign is, which realizes any one of aforementioned goods and material handling method when being executed by processor.
In the technical solution of the embodiment of the present invention, the selection catalogue of goods and materials is obtained;Wherein, the selection catalogue includes: object Provide at least one of identification information, specification information, company-information, place of production information, packaged information;According to procurement demand, from institute It states and selects selection target goods and materials in catalogue;Based on the target goods and materials, output buying report;The target goods and materials are put in storage Registration, updates and exports status reporting.In this way, increasing handling of goods and materials design guidance by the selection catalogue for obtaining goods and materials, change The mode that material on hand management is carried out since purchase of goods and materials link is just is become, qualitative materiel cost and procurement risk will be reduced Link is advanced to the design phase, selects the design of directory content specification to select additionally by defining, to guarantee qualitative materiel;It is logical Crossing export and managing the report of each link realizes acquisition of information during handling of goods and materials, realizes the control to qualitative materiel System.
Detailed description of the invention
Attached drawing generally shows each embodiment discussed herein by way of example and not limitation;
Fig. 1 is a kind of flow diagram of goods and material handling method of the embodiment of the present invention;
Fig. 2 is a kind of framework schematic diagram of material Management System of the embodiment of the present invention;
Fig. 3 is a kind of workflow schematic diagram of stock management of the embodiment of the present invention;
Fig. 4 is the workflow schematic diagram that a kind of outbound of the embodiment of the present invention is received;
Fig. 5 is a kind of structural schematic diagram of material Management System of the embodiment of the present invention;
Fig. 6 is a kind of structural schematic diagram of material Management System of the embodiment of the present invention.
Specific embodiment
The characteristics of in order to more fully hereinafter understand the embodiment of the present invention and technology contents, with reference to the accompanying drawing to this hair The realization of bright embodiment is described in detail, appended attached drawing purposes of discussion only for reference, is not used to limit the embodiment of the present invention.
Fig. 1 is a kind of flow diagram of goods and material handling method of the embodiment of the present invention, as shown in Figure 1, the goods and materials pipe Reason method the following steps are included:
Step 101: obtaining the selection catalogue of goods and materials;Wherein, the selection catalogue includes: goods and materials identification information, specification letter At least one of breath, company-information, place of production information, packaged information.
Here goods and materials identification information includes: the information such as goods and materials title, materiel code;Specification information includes: specifications and models, matter Measure the information such as grade;Company-information includes: the information such as the details of manufacturer;Place of production information include: product affiliated country origin, The information such as the better address of factory;Packaged information includes: the information such as outer dimension, packing forms, selects catalogue particular content not It is limited to content listed above, can also includes such as other material informations of the key technical indexes, detail specification.
Step 102: according to procurement demand, the selection target goods and materials from the selection catalogue.
Specifically realize that process may is that user by corresponding goods and materials title in inquiry selection catalogue or by specific inspection Rope conditional information retrieval meets the goods and materials of procurement criteria.
Step 103: being based on the target goods and materials, output buying report.
Here output buying report is realized with guaranteeing information traceability during handling of goods and materials to buying link quality Control.
Step 104: storage registration being carried out to the target goods and materials, updates and exports status reporting.
It when newly-increased materials warehousing, needs to update original status reporting, and exports characterization material on hand storage shape after storage The status reporting of condition, to realize to the tracking of stock management link information and quality control.Specifically stock management workflow It will be elaborated in embodiment below.
In one embodiment, goods and material handling method further include: for the substance in warehouse, setting storage time limit;Work as institute It states goods and materials storage to prescribe a time limit beyond the storage period, exports the first warning reports.Pass through the validity period cut-off of goods and materials in setting warehouse Time, and form the bill of material report beyond the storage time limit, i.e. the first warning reports, to realize goods and materials early warning of exceeding the time limit;Here, First warning reports content includes but is not limited to the goods and materials that exceed the time limit, and can also include the goods and materials content for closing on the storage time limit.In this way, real Now to the effective monitoring of stock in storage, realize to the tracking of inventory's link information and quality control.
In one embodiment, goods and material handling method further include: demand is stored according to inventory limitation and goods and materials, institute is set State the stockpile number early warning upper and lower limit threshold value of goods and materials;When the physical holding of stock quantity of the goods and materials is beyond the upper limit threshold or low When the lower threshold, the second warning reports are exported.In this way, clear can intuitively show which goods and materials lacks in inventory, Which goods and materials is superfluous, to form effective supervision to material storage quantity.
In one embodiment, goods and material handling method further include: when the outbound goods and materials quantity of selection is more than stock in storage number When amount, outputting alarm information.Specifically, it can be when the outbound quantity of selection, which is greater than inventory, to use goods and materials quantity, prompt is worked as Preceding business can not be handled, outputting alarm information;When inventory can be zero with quantity, when carrying out outbound operation, then this can not be selected Item goods and materials.
In one embodiment, goods and material handling method further include: storage registration is carried out to cancelling stocks goods and materials, updates and exports library Deposit report.Here cancelling stocks goods and materials include being not limited to: causing to carry out because task is cancelled, consumption is remaining or material issuance is undesirable Retract the goods and materials in warehouse.Cancelling stocks can be used as a kind of in-stockroom operation, and workflow is consistent with storage process, and specific cancelling stocks manages work Making process will elaborate in the embodiment below.
In one embodiment, goods and material handling method further include: according to the outbound of goods and materials record information, to the goods and materials into The registration of luggage machine information.Specifically, it can be firstly introduced into outbound list by installation inventory registration of personnel, that is, introduce going out for the goods and materials Library records information, then by the specifications and models of system Auto-writing goods and materials, batch group number, device number etc., then by installation registration of personnel The information such as figure number, position number, installation time, installation people are filled in, installation inventory is completed.It installs in this way, realizing in handling of goods and materials The effective monitoring of link, the rapid feedback for qualitative materiel problem provide support.Fig. 2 is a kind of goods and materials pipe of the embodiment of the present invention The framework schematic diagram of reason system, the realization function of each management module can refer in the operation layer of material Management System shown in Fig. 2 The associated description of aforementioned goods and material handling method and understand, the integral frame of the material Management System will be specifically described below, and Each management module and the function of its Neutron module are specifically described based on aforementioned goods and material handling method:
As shown in Fig. 2, material Management System includes basic environment layer, running environment layer and operation layer.Wherein, basic management Layer provides a reliable physical environment, including operating system and hardware device for system operation;Running environment layer is information The data source of system is made of system function data and two class data of user data, and the relationship of the two is: performance data is The realization of system function provides support, and user data is user's system specified operation object;Operation layer is material Management System 201, the system be one based on material base information management, using comprehensive analysis decision as core, to goods and materials whole flow process The information system that period is managed, material Management System 201 comprise the following modules: select management 202, purchasing management 203, Storehouse management 204, report query management 205, installation inventory management 206, basic data management 207, system maintenance management 208.
Select management 202, the module be used for by establish goods and materials selection catalogue realize to material base data management with And maintenance, concrete function are as follows: goods and materials selection catalogue data is pushed into software platform desktop, is selected with design, and will choosing Purchasing management 203. is directly passed to result
Selecting management 202 includes selecting two catalogue, demand application submodules.Specifically, material Management System 201 needs The selection catalogue of goods and materials is established, selecting catalogue is the core content of this system.Catalogue particular content is selected to be referred to preceding Providing in the step 101 of management method selects directory content to realize.Establish the source for selecting catalogue to guarantee user's goods and materials data Uniquely, user is only capable of selecting progress goods and materials selection in catalogue, selects in this way, reaching goods and materials design, guarantees product quality Purpose.Optionally, user when in use, can be inquired by the information in system, corresponding goods and materials in catalogue be found, by object Money is added in collection and current inventory, and system can give user and prompt accordingly;After opening collection or current inventory, Display goods and materials essential information may include and be not limited to: goods and materials title, model, model specification, vendor name, and can be deleted It removes;It selects 202 achievable users of management to draft requirement report, embodies each attribute of the demand of newly-increased goods and materials, select and mention for design For effectively referring to and controlling, basic input is provided for purchasing management 203.
Purchasing management 203 is the management of goods and materials whole procurement activity process, is related to proposition, the procurement plan of procurement demand Summarize, the formation of buying task, the formulation of procurement contract, guarantee that information with pushing-type mode pushes corresponding link to;Buying pipe Reason 203 includes procurement plan, three buying task, procurement contract submodules, to realize the movable management of purchase of goods and materials.Wherein, Procurement plan is that the demand request slip that user proposes for demand personnel summarizes, examines, and system is supported according to careful after examination & approval It criticizes conclusion and modifies demand request slip, can demand goods and materials be made whether with the operation of Li Ku by the procurement request list of examination & approval;Buying Task forms buying task for sharing out the work according to procurement plan cover sheet to corresponding procurement staff.Procurement contract is used for After user selects operating efficiency in buying task document and distributes supplier, system can generate contract, buying according to supplier Contract information includes but is not limited to: procurement contract number, supplier, project, purchasing department, contract award date, goods and materials title, type Number, specification, credit rating, unit contract price, contract quantity, contract value, the contents such as contractual delivery date.
Storehouse management 204, in time, accurately managing stock in storage information, and by material storage information opening to object Relevant use, staff planners are provided, provides support for the selection of goods and materials, in Cooley use, mating and timely receive;Storage is facilitated to live Dynamic controllability accomplishes the reasonable occupancy for utilizing, saving circulating fund of storage and reduces the investment of human resources.Warehouse pipe Reason 204 includes stock management, outbound management, stock relocation management, four submodules of management of making an inventory.
In storehouse management 204, workflow that stock management submodule includes: administrative staff fill in buying storage bill, library Room is received with after physicals, is taken stock, and the process of storage is registered;Wherein, buying storage bill is generated according to procurement contract, Main table item of information includes but is not limited to: storage bill number, warehouse title, procurement item, contract odd numbers, goods and materials title, model rule Lattice, measurement unit, supplier, credit rating, batch number, validity period, goods yard number, storage quality certification number, unit contract price, contract number Amount should enter quantity, storage unit price, the storage amount of money, the date of expiry, enter the contents such as quantity, goods yard number in fact.Fig. 3 is the present invention The workflow schematic diagram of a kind of stock management of embodiment, as shown in figure 3, in each node of process: drafting storage bill, quality inspection It tests, terminate process (depositary management storage), according to the difference of user's operation permission, fill in relevant information, examination & approval storage;For being unsatisfactory for It is put in storage desired document, directly fills in opinion, and auto-returned gives application storage people.Stock management further includes neck material cancelling stocks pipe Reason, neck material cancelling stocks management are since task is cancelled, consumption is remaining or material issuance is not inconsistent outbound goods and materials caused by due to requirement etc. again Retract the management process in warehouse.Cancelling stocks is considered as a kind of in-stockroom operation, and workflow is consistent with stock management.
In storehouse management 204, the workflow of outbound management submodule receives outbound list as shown in figure 4, receiving people and drafting, Receiving outbound list includes but is not limited to: outbound list number, warehouse title, using department, project name, name of product, component name Title, supplier, batch number, stockpile number, should send out quantity, actual quantity issued, stores list at goods and materials title, specifications and models, credit rating Valence receives the amount of money, date of expiry etc.;After outbound list submits quality audit, after relevant person in charge is examined, until depositary management Stock fills in real hair material information, carries out outbound, system checks and writes off inventory automatically.Wherein, outbound management submodule judges automatically: when When should send out quantity greater than inventory's quantity available, system will be prompted to mistake and can not handle the business;In addition, working as inventory's quantity available When being zero, when system outbound, the goods and materials can not be selected.
In storehouse management 204, stock relocation management submodule includes three kinds of affiliated item advance, goods yard transfer, warehouse transfer industry Business.Wherein, affiliated item advance refer mainly to when the management, i.e. purchase of goods and materials of the transition process between the occupied project of goods and materials which Mesh proposes demand, and when using the project variation.And warehouse title, goods yard do not allow to change when affiliated item advance;Goods Bit transition refers mainly to goods and materials in the transfer process in same store interior difference goods yard.Goods yard can change simultaneously goods and materials when shifting The information such as goods yard, affiliated project, finance classification;Warehouse transfer refers mainly to physical transfer of the goods and materials between warehouse and (is transferred to and turns Operate out) management process, the main variation for realizing goods and materials storage repository.Warehouse shift when, thus it is possible to vary warehouse, goods yard number, The information such as financial classification, affiliated project.After stock relocation examination & approval pass through, system registers the change conditions of stockpile number automatically.
It in storehouse management 204, makes an inventory and manages submodule, be used to propose inventory task according to the actual situation, then root Inventory checking is generated according to task and carries out Physical ount, and finally result input system of actually making an inventory, system calculates profit and loss simultaneously automatically Carry out the processing of inventory profit loss on disposal.Job order of making an inventory includes task odd numbers, time of making an inventory, warehouse of making an inventory, goods and materials title, the specification type made an inventory Number, measurement unit, physical count quantity, inventory's actual quantity, inventory profit quantity, loss on disposal quantity etc..
Inventory management 206 of installing simplifies installation information for the outbound record registration installation information according to goods and materials granting Typing, and installation information is timely feedbacked, support is provided for quality problems fast reaction.The workflow for inventory management 206 of installing Journey: installation registration of personnel is firstly introduced into outbound list, i.e. the outbound record of introducing goods and materials granting, then by system Auto-writing goods and materials Specifications and models, batch group number device number etc., then the letters such as figure number, position number, installation time, installation people are filled in by installation registration of personnel Breath completes installation inventory.
Report query management 205, for inquiring each functional module information in material Management System 201, the inquiry function provided There can be two class query patterns of fuzzy query and accurate inquiry, section selects different inquiry moulds according to the difference of each functional module business Formula, and to have targetedly data result generate and output report, report include status reporting, buying report, financial statement, Warning reports;Wherein, status reporting includes but is not limited to: inventory's batch inquiry table, historical storage inquiry table, storage detail list, The obvious table of outbound;Buying report includes but is not limited to: contract progress report table, contract value statistical form, contract value summary sheet; Financial statement can form inventory's reconciliation statistical form;Warning reports can form safety inventory warning reports: by being arranged to object The setting of safety inventory quantity is provided, which existing material storage lacks in early warning inventory, and realizes goods and materials early warning of exceeding the time limit: setting The early warning rule of substance date of expiry, system form the bill of material that will exceed validity period, and prompting is reviewed immediately; System can also form bill of material of exceeding the time limit, and export the goods and materials report that exceeds the time limit.
Basic data management 207, including two submodules of service basic data and materiel code information.Wherein, business base Plinth data submodule can safeguard goods and materials essential attribute, affiliated project, supplier information, warehouse information etc., be counted According to dictionary, guarantee the consistency of system data;Materiel code message sub-module, mainly for the goods and materials of the super selection catalogue of system Carry out the newly-increased activity for forming coding.It must be it is noted that all selection goods and materials sources of material Management System 201 be all based on choosing With catalogue.The goods and materials selected in catalogue have the experience of abundant design, multiple successful stories, good quality assurance, lower Purchase cost, good supply channel, therefore it is reliable for selecting goods and materials in catalogue, and when the goods and materials that design is selected exceed mesh It records range (belonging to newly-increased goods and materials), then the application for increasing goods and materials proposition materiel code newly must be fulfiled stringent approval process, be recognized Select the standard of catalogue that can just be added into selection catalogue to meet.
System maintenance management 208, including two submodules of organizational structure and rights management.Wherein, organizational structure submodule, For the tissue of maintenance system, personnel, role etc., the functions such as user, setting password are created;Rights management submodule, for pair User in system carries out delineation of power, fine granularity to submodule grade, and three members of setting system, realizes separation of the three powers: Specifically, system manager is responsible for maintenance system normal operation, safe and secret administrator is responsible for user authority management and audit, peace Full audit administrator audits to system manager and safe and secret member.
Material Management System 201 provided in an embodiment of the present invention realizes goods and materials overall process, comprehensive management, from supply The overall processes such as quotient's selection, the demand of goods and materials, plan, buying, inventory, installation, comprehensively consider the various aspects such as plan, quality, progress It is required that improving handling of goods and materials efficiency and integral level;And based on the selection catalogue established in management 202 is selected, reinforce to goods and materials The support of management design link: by selecting catalogue to establish, traditional handling of goods and materials mode is changed, goods and materials guidance is completed and sets The variation of meter, will reduce quality cost and procurement risk is advanced to the design phase, and Specification Design is selected, and ensure that product matter Amount;Report query management 205 realizes safety inventory early warning, goods and materials warning function of exceeding the time limit, and ensure that safety inventory and goods and materials It is qualified effective, production and quality risk are reduced, and automatically generate corresponding report, saves human resources and time.
Fig. 5 is a kind of structural schematic diagram of material Management System of the embodiment of the present invention, as shown in Figure 5, comprising:
Module 501 is obtained, for obtaining the selection catalogue of goods and materials;Wherein, the selection catalogue includes: goods and materials mark letter At least one of breath, specification information, company-information, place of production information, packaged information;
Selecting module 502 is used for according to procurement demand, the selection target goods and materials from the selection catalogue;
Report output module 503 is purchased, for being based on the target goods and materials, output buying report;
Storage Registration Module 504 updates for carrying out storage registration to the target goods and materials and exports status reporting.
In one embodiment, the material Management System further includes time limit setup module 505 and the first warning module 506, wherein time limit setup module 505, for for the goods and materials in warehouse, setting storage time limit;First warning module 506 is used It prescribes a time limit in when goods and materials storage beyond the storage period, exports the first warning reports.
In one embodiment, the material Management System further include: stockpile number threshold setting module 507 and second is in advance Alert module 508, wherein stockpile number threshold setting module 507, for storing demand, setting according to inventory limitation and goods and materials The stockpile number early warning upper and lower limit threshold value of the goods and materials;Second warning module 508, for working as the physical holding of stock number of the goods and materials Amount exports the second warning reports beyond the upper limit threshold or when being lower than the lower threshold.
In one embodiment, the storage Registration Module 504 is also used to carry out storage registration to cancelling stocks goods and materials, updates And export status reporting.
In one embodiment, the material Management System further includes installation information Registration Module 509,
The installation information Registration Module 509 installs to the goods and materials for recording information according to the outbound of goods and materials Information registration.
It will be appreciated by those skilled in the art that the realization function of each module in material Management System shown in fig. 5 can join According to the method for aforementioned handling of goods and materials associated description and understand.The function of each module in material Management System shown in fig. 5 can It is realized, can also be realized by specific logic circuit and running on the program on processor.
Fig. 6 is a kind of structural schematic diagram of material Management System of the embodiment of the present invention, material Management System shown in fig. 6 600 settings are on the terminal, comprising: at least one processor 601, memory 602, user interface 603, at least one network Interface 604.Various components in material Management System 600 are coupled by bus system 605.It is understood that bus system 605 for realizing the connection communication between these components.Bus system 605 further includes that power supply is total in addition to including data/address bus Line, control bus and status signal bus in addition.But for the sake of clear explanation, various buses are all designated as total linear system in Fig. 6 System 605.
Wherein, user interface 603 may include display, keyboard, mouse, trace ball, click wheel, key, button, sense of touch Plate or touch screen etc..
Memory 602 in the embodiment of the present invention is for storing various types of data to support material Management System 600 Operation.The example of these data includes: any computer program for operating in material Management System 600, is such as operated System 6021 and application program 6022;Wherein, operating system 6021 include various system programs, such as ccf layer, core library layer, Layer etc. is driven, for realizing various basic businesses and the hardware based task of processing.Application program 6022 may include various Application program, for realizing various applied business.Realize that the program of present invention method may be embodied in application program In 6022.
The method that the embodiments of the present invention disclose can be applied in processor 601, or be realized by processor 601. Processor 601 may be a kind of IC chip, the processing capacity with signal.During realization, the above method it is each Step can be completed by the integrated logic circuit of the hardware in processor 601 or the instruction of software form.Above-mentioned processing Device 601 can be general processor, digital signal processor or other programmable logic device, discrete gate or transistor Logical device, discrete hardware components etc..Processor 601 may be implemented or execute the disclosed each side in the embodiment of the present invention Method, step and logic diagram.General processor can be microprocessor or any conventional processor etc..In conjunction with of the invention real The step of applying method disclosed in example can be embodied directly in hardware decoding processor and execute completion, or use decoding processor In hardware and software module combination execute completion.Software module can be located in storage medium, which is located at storage The step of device 602, processor 601 reads the information in memory 602, completes preceding method in conjunction with its hardware.
It is appreciated that memory 602 can be volatile memory or nonvolatile memory, may also comprise volatibility and Both nonvolatile memories.Wherein, nonvolatile memory can be read-only memory (ROM, Read Only Memory), Programmable read only memory (PROM, Programmable Read-Only Memory) can comment on display and may be programmed read-only storage Device (EPROM, Erasable Programmable Read-Only Memory), electricity can comment on display programmable read only memory The storage of (EEPROM, Electrically Erasable Programmable Read-Only Memory), magnetic random access Device (FRAM, ferromagnetic random access memory), flash memory (Flash Memory), magnetic surface are deposited Reservoir, CD or CD-ROM (CD-ROM, Compact Disc Read-Only Memory);Magnetic surface storage can be Magnetic disk storage or magnetic tape storage.Volatile memory can be random access memory (RAM, Random Access Memory), it is used as External Cache.By exemplary but be not restricted explanation, the RAM of many forms is available, such as Static random access memory (SRAM, Static Random Access Memory), synchronous static random access memory (SSRAM, Synchronous Static Random Access Memory), dynamic random access memory (DRAM, Dynamic Random Access Memory), Synchronous Dynamic Random Access Memory (SDRAM, Synchronous Dynamic Random Access Memory), double data speed synchronous dynamic RAM (DDRSDRAM, Double Data Rate Synchronous Dynamic Random Access Memory), enhanced synchronous dynamic random Access memory (ESDRAM, Enhanced Synchronous Dynamic Random Access Memory), synchronized links Dynamic random access memory (SLDRAM, SyncLink Dynamic Random Access Memory), direct rambus Random access memory (DRRAM, Direct Rambus Random Access Memory).Description of the embodiment of the present invention is deposited Reservoir 602 is intended to include but is not limited to the memory of these and any other suitable type.
Based on the goods and material handling method that each embodiment of the application provides, the application also provides a kind of computer-readable storage medium Matter, referring to shown in Fig. 6, the computer readable storage medium may include: the memory 602 for storing computer program, Above-mentioned computer program can be executed by the processor 601 of material Management System 600, to complete step described in preceding method.It calculates Machine readable storage medium storing program for executing can be FRAM, ROM, PROM, EPROM, EEPROM, Flash Memory, magnetic surface storage, light The memories such as disk or CD-ROM.
It should be understood that between technical solution documented by the embodiment of the present invention, in the absence of conflict, Ke Yiren Meaning combination.
The above is only a preferred embodiment of the present invention, is not intended to limit the scope of the invention, all to utilize this hair Equivalent structure or equivalent flow shift made by bright specification and accompanying drawing content is applied directly or indirectly in other relevant skills Art field, is included within the scope of the present invention.

Claims (12)

1. a kind of goods and material handling method, which is characterized in that the described method includes:
Obtain the selection catalogue of goods and materials;Wherein, the selection catalogue include: goods and materials identification information, specification information, company-information, At least one of place of production information, packaged information;
According to procurement demand, the selection target goods and materials from the selection catalogue;
Based on the target goods and materials, output buying report;
Storage registration is carried out to the target goods and materials, updates and exports status reporting.
2. goods and material handling method according to claim 1, which is characterized in that the method also includes:
For the goods and materials in warehouse, setting storage time limit;
It prescribes a time limit when goods and materials storage exceeds the storage period, exports the first warning reports.
3. goods and material handling method according to claim 1, which is characterized in that the method also includes:
Demand is stored according to inventory limitation and goods and materials, the stockpile number early warning upper and lower limit threshold value of the goods and materials is set;
When the physical holding of stock quantity of the goods and materials is beyond the upper limit threshold or is lower than the lower threshold, the second early warning is exported Report.
4. goods and material handling method according to claim 1, which is characterized in that the method also includes:
When the outbound goods and materials quantity of selection is more than stock in storage quantity, outputting alarm information.
5. goods and material handling method according to claim 1, which is characterized in that the method also includes:
Storage registration is carried out to cancelling stocks goods and materials, updates and exports status reporting.
6. goods and material handling method according to claim 1, which is characterized in that the method also includes:
Information is recorded according to the outbound of goods and materials, installation information registration is carried out to the goods and materials.
7. a kind of material Management System, which is characterized in that the system comprises:
Module is obtained, for obtaining the selection catalogue of goods and materials;Wherein, the selection catalogue includes: goods and materials identification information, specification letter At least one of breath, company-information, place of production information, packaged information;
Selecting module is used for according to procurement demand, the selection target goods and materials from the selection catalogue;
Report output module is purchased, for being based on the target goods and materials, output buying report;
Storage Registration Module updates for carrying out storage registration to the target goods and materials and exports status reporting.
8. material Management System according to claim 7, which is characterized in that the system also includes time limit setup module and First warning module,
The time limit setup module, for for the goods and materials in warehouse, setting storage time limit;
First warning module exports the first warning reports for prescribing a time limit when goods and materials storage beyond the storage period.
9. material Management System according to claim 7, which is characterized in that the system also includes stockpile number threshold values to set Module and the second warning module are set,
The goods and materials are arranged for storing demand according to inventory limitation and goods and materials in the stockpile number threshold setting module Stockpile number early warning upper and lower limit threshold value;
Second warning module, for the physical holding of stock quantity when the goods and materials beyond the upper limit threshold or lower than under described When limiting threshold value, the second warning reports are exported.
10. material Management System according to claim 7, which is characterized in that the storage Registration Module is also used to moving back Library goods and materials carry out storage registration, update and export status reporting.
11. material Management System according to claim 7, which is characterized in that the system also includes installation information registrations Module,
The installation information Registration Module carries out installation information to the goods and materials and steps on for recording information according to the outbound of goods and materials Note.
12. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that the computer program quilt The step of any one of claim 1 to 6 goods and material handling method is realized when processor executes.
CN201811060932.XA 2018-09-12 2018-09-12 A kind of goods and material handling method, system and computer readable storage medium Pending CN109492961A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811060932.XA CN109492961A (en) 2018-09-12 2018-09-12 A kind of goods and material handling method, system and computer readable storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811060932.XA CN109492961A (en) 2018-09-12 2018-09-12 A kind of goods and material handling method, system and computer readable storage medium

Publications (1)

Publication Number Publication Date
CN109492961A true CN109492961A (en) 2019-03-19

Family

ID=65690434

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811060932.XA Pending CN109492961A (en) 2018-09-12 2018-09-12 A kind of goods and material handling method, system and computer readable storage medium

Country Status (1)

Country Link
CN (1) CN109492961A (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110555657A (en) * 2019-09-09 2019-12-10 云南电网有限责任公司西双版纳供电局 material management system, warehousing method, ex-warehouse method and ex-warehouse method
CN110610340A (en) * 2019-09-19 2019-12-24 深圳前海微众银行股份有限公司 Spare part management method, device, equipment and computer readable storage medium
CN111598288A (en) * 2020-02-29 2020-08-28 贵州电网有限责任公司 Material demand prediction management method based on material overall process data
CN112598358A (en) * 2020-12-30 2021-04-02 杭州拓深科技有限公司 Intelligent aid decision purchasing method
CN112819351A (en) * 2021-02-07 2021-05-18 北京实耐固连接技术有限公司 Accessory information management method, device, computer equipment and medium
CN113032409A (en) * 2019-12-24 2021-06-25 航天信息股份有限公司 Inventory management method, device, equipment and medium for emergency materials
CN113222495A (en) * 2021-04-13 2021-08-06 西安子国微科技有限公司 Warehouse management system and management method thereof
CN113361837A (en) * 2020-03-03 2021-09-07 中国移动通信集团贵州有限公司 Material assembly strategy determining method and device and electronic equipment
CN113688444A (en) * 2021-10-26 2021-11-23 南京国睿信维软件有限公司 Enterprise material model selection method based on knowledge engineering
CN113807779A (en) * 2021-09-02 2021-12-17 上汽通用五菱汽车股份有限公司 Intelligent management method, device and equipment for stamping production and computer storage medium
CN114139975A (en) * 2021-12-03 2022-03-04 广东电网有限责任公司 Life cycle data processing method, device, equipment and medium for metering materials
CN114399245A (en) * 2021-12-11 2022-04-26 首钢京唐钢铁联合有限责任公司 Control method and device of intelligent oil product library
CN114881578A (en) * 2022-07-06 2022-08-09 国网浙江省电力有限公司 Overstocked material automatic inventory method based on multi-element collaborative traceability
CN115063047A (en) * 2022-08-11 2022-09-16 华能能源交通产业控股有限公司 Early warning material allocation method and device, electronic equipment and storage medium
CN115187181A (en) * 2022-09-14 2022-10-14 深圳市星网信通科技有限公司 Material management method, server and storage medium thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102693484A (en) * 2012-05-04 2012-09-26 金涛 Enterprise one-stop procurement service system
CN203930937U (en) * 2014-02-27 2014-11-05 杭州帕萨旺物联网科技有限公司 A kind of intelligent storage management system of applying RFID
CN104504543A (en) * 2014-11-14 2015-04-08 镇江市新创计算机系统集成有限公司 Project investment control and management system and use method thereof
CN104657837A (en) * 2015-02-13 2015-05-27 国家电网公司 Team and group integrated operation management system based on storage ERP (enterprise resource planning)
US20170116572A1 (en) * 2015-10-22 2017-04-27 Wal-Mart Stores, Inc. Systems and methods for delivering goods to consumers
CN106651120A (en) * 2016-11-07 2017-05-10 成都科曦科技有限公司 Smart hotel material supply chain management and control system
CN107437213A (en) * 2017-07-24 2017-12-05 隆藏信息科技(上海)有限公司 Ordering method and procurement practice based on group user procurement platform

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102693484A (en) * 2012-05-04 2012-09-26 金涛 Enterprise one-stop procurement service system
CN203930937U (en) * 2014-02-27 2014-11-05 杭州帕萨旺物联网科技有限公司 A kind of intelligent storage management system of applying RFID
CN104504543A (en) * 2014-11-14 2015-04-08 镇江市新创计算机系统集成有限公司 Project investment control and management system and use method thereof
CN104657837A (en) * 2015-02-13 2015-05-27 国家电网公司 Team and group integrated operation management system based on storage ERP (enterprise resource planning)
US20170116572A1 (en) * 2015-10-22 2017-04-27 Wal-Mart Stores, Inc. Systems and methods for delivering goods to consumers
CN106651120A (en) * 2016-11-07 2017-05-10 成都科曦科技有限公司 Smart hotel material supply chain management and control system
CN107437213A (en) * 2017-07-24 2017-12-05 隆藏信息科技(上海)有限公司 Ordering method and procurement practice based on group user procurement platform

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
朱颂仪 等: "库存物资动态监测管理软件的应用与实现", 《自动化应用》 *

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110555657A (en) * 2019-09-09 2019-12-10 云南电网有限责任公司西双版纳供电局 material management system, warehousing method, ex-warehouse method and ex-warehouse method
CN110610340A (en) * 2019-09-19 2019-12-24 深圳前海微众银行股份有限公司 Spare part management method, device, equipment and computer readable storage medium
CN113032409A (en) * 2019-12-24 2021-06-25 航天信息股份有限公司 Inventory management method, device, equipment and medium for emergency materials
CN111598288A (en) * 2020-02-29 2020-08-28 贵州电网有限责任公司 Material demand prediction management method based on material overall process data
CN113361837A (en) * 2020-03-03 2021-09-07 中国移动通信集团贵州有限公司 Material assembly strategy determining method and device and electronic equipment
CN112598358A (en) * 2020-12-30 2021-04-02 杭州拓深科技有限公司 Intelligent aid decision purchasing method
CN112819351A (en) * 2021-02-07 2021-05-18 北京实耐固连接技术有限公司 Accessory information management method, device, computer equipment and medium
CN113222495A (en) * 2021-04-13 2021-08-06 西安子国微科技有限公司 Warehouse management system and management method thereof
CN113807779A (en) * 2021-09-02 2021-12-17 上汽通用五菱汽车股份有限公司 Intelligent management method, device and equipment for stamping production and computer storage medium
CN113688444A (en) * 2021-10-26 2021-11-23 南京国睿信维软件有限公司 Enterprise material model selection method based on knowledge engineering
CN113688444B (en) * 2021-10-26 2022-06-21 南京国睿信维软件有限公司 Enterprise material model selection method based on knowledge engineering
CN114139975A (en) * 2021-12-03 2022-03-04 广东电网有限责任公司 Life cycle data processing method, device, equipment and medium for metering materials
CN114399245A (en) * 2021-12-11 2022-04-26 首钢京唐钢铁联合有限责任公司 Control method and device of intelligent oil product library
CN114881578A (en) * 2022-07-06 2022-08-09 国网浙江省电力有限公司 Overstocked material automatic inventory method based on multi-element collaborative traceability
CN114881578B (en) * 2022-07-06 2022-09-23 国网浙江省电力有限公司 Overstocked material automatic inventory method based on multi-element collaborative traceability
CN115063047A (en) * 2022-08-11 2022-09-16 华能能源交通产业控股有限公司 Early warning material allocation method and device, electronic equipment and storage medium
CN115187181A (en) * 2022-09-14 2022-10-14 深圳市星网信通科技有限公司 Material management method, server and storage medium thereof
CN115187181B (en) * 2022-09-14 2023-08-08 深圳星网信通科技股份有限公司 Material management method, server and storage medium thereof

Similar Documents

Publication Publication Date Title
CN109492961A (en) A kind of goods and material handling method, system and computer readable storage medium
Perboli et al. Blockchain in logistics and supply chain: A lean approach for designing real-world use cases
CN109858751A (en) Power engineering Evaluating Projects System
Yandri et al. Evaluation model for the implementation of information technology service management using fuzzy ITIL
CN104992308A (en) Enterprise informatization management system
CN104504543A (en) Project investment control and management system and use method thereof
Zhao et al. Research and development of inventory management and human resource management in ERP
WO2011072233A1 (en) Energy facility control system
CN104899143B (en) The software peer review system implementation device of data mining is provided
CN105160467A (en) Engineering change control management system and method therefor
CN105184503A (en) Contract management system and method for executing contract management by utilizing contract management system
CN109840737A (en) A kind of mine materials management system
CN111353787A (en) Equipment comprehensive guarantee system based on cloud platform
CN111275343A (en) Block chain-based purchasing and inventory collaborative management method, equipment and medium
Haratua et al. Web-Based Inventory Application Development for PT. Palugada Indonesia
Wang et al. Application of blockchain technology in value chain of procurement in manufacturing enterprises
Ezema et al. Industrial design and simulation of a JIT material handling system
NOVIKOV et al. Improving the enterprise resource planning system based on digital modules of the industry 4.0 concept
Phan et al. Development a warehouse management information system
Huang et al. Informatization design of raw material purchase and payment for feed processing enterprises under ERP system environment
Rawat Today's inventory management systems: A tool in achieving best practices in indian business
CN113610408A (en) Cost and budget management system based on enterprise cost element quota
CN109087076B (en) Production and manufacturing enterprise warehouse architecture autonomous simulator control method and system
Yang et al. Towards a taxonomy of technical debt for COTS-intensive cyber physical systems
Ding et al. A New Mathematical Model for Economic Ordering with Preventive Maintenance and Reworking in a Supply Chain

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190319