CN104504543A - Project investment control and management system and use method thereof - Google Patents

Project investment control and management system and use method thereof Download PDF

Info

Publication number
CN104504543A
CN104504543A CN201410650124.4A CN201410650124A CN104504543A CN 104504543 A CN104504543 A CN 104504543A CN 201410650124 A CN201410650124 A CN 201410650124A CN 104504543 A CN104504543 A CN 104504543A
Authority
CN
China
Prior art keywords
article
inventory
module
information
category
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410650124.4A
Other languages
Chinese (zh)
Inventor
仲金梅
朱楠地
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHENJIANG XINCHUANG COMPUTER SYSTEM INTEGRATION CO Ltd
Original Assignee
ZHENJIANG XINCHUANG COMPUTER SYSTEM INTEGRATION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENJIANG XINCHUANG COMPUTER SYSTEM INTEGRATION CO Ltd filed Critical ZHENJIANG XINCHUANG COMPUTER SYSTEM INTEGRATION CO Ltd
Priority to CN201410650124.4A priority Critical patent/CN104504543A/en
Publication of CN104504543A publication Critical patent/CN104504543A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/087Inventory or stock management, e.g. order filling, procurement or balancing against orders

Landscapes

  • Business, Economics & Management (AREA)
  • Economics (AREA)
  • Engineering & Computer Science (AREA)
  • Marketing (AREA)
  • Quality & Reliability (AREA)
  • Finance (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Human Resources & Organizations (AREA)
  • Accounting & Taxation (AREA)
  • Operations Research (AREA)
  • Development Economics (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a project investment control and management system and a use method thereof. The system comprises a system setting module, a warehousing module, a warehouse-out module, a warehouse returning module, a requirement module, an electronic tag module and an inventory alarming module. The system has the advantages that smooth material flow in a management process is guaranteed through the management and the control of all warehousing and warehouse-out activities of an investment and construction item and the effective statistics and analysis of inventory data, so that a decision maker can find problems early and adopt a corresponding measure to regulate investment and inventory structures, so that a reservation period is shortened, capital turnover is quickened, and inventory occupation is lowered to a maximum extent; the warehousing and warehouse-out situations of important materials can be monitored at any time, hidden dangers can be found in advance, emergencies can be dealt with in time, system operation complexity is reduced by the intelligent design of the system, and the system has the advantages of being stable and reliable in working and simple in maintenance.

Description

A kind of project investment control management system and using method thereof
Technical field
The present invention relates to engineering comprehensive management domain, in particular to a kind of project investment control management system and using method thereof.
Background technology
The core of modern project control of investment management is architectural Material management, and specifically refer to the buying of goods and materials and the control of stock, architectural Material nature of management is the management of stock in fact.The construction activities of construction work includes each stage such as buying, installation, debugging, trial run, final acceptance of construction of goods and materials, and the management of construction investment is through whole engineering process, and stock control is wherein one of most important content in whole building construction process.
Most of stock control theory is thought, stock is the summation that all tangible and invisible material of physically and in logic storehouse warehouse compartment is extremely worth, specifically comprise finished product, starting material, goods, product in transit, produce before material, standby redundancy etc.Although it is necessary for holding some stocks, not only excessive stock is useless and occupy fund.The fund taken is all in demand for development of company, new product development etc.; Reduce the occupation of capital and can also greatly reduce interest from bank loan and risk.The stock material large especially to those amount of purchases, the Purchased Item market price has fluctuation, strengthens stock control effect more obvious.Therefore, balance company's inventory investment and other credit requirement most important.
By searching document and data, the stock control of many building enterprises still based on labor management, directly results in storage and inventory cost high.But from the trend of Construction Enterprise Information since the sixties in 20th century, the stock control of building enterprise also needs to trend towards informationization, networking and Highgrade integration.The stock in storage management of building enterprise is very complicated, very loaded down with trivial details often.Due to grasped goods and materials huge number, the channel order goods, manage, provided is each variant, management system between each enterprise is not quite similar, all kinds of statistical report form is various, therefore stock control must work out a set of information system of inventory control, realize computerize operation, and corresponding scheme must be formulated according to the concrete condition of enterprise.According to current business administration system, general inventory management system, always according to grasped material category, is correspondingly divided into several section office to carry out the plan of goods and materials, orders goods, checks and writes off collection, check and accepting storing.Complete building enterprise's procurement management system should comprise Bian and purchase planning management, and contract is admitted a child into a nursery school the modules such as management, stock control, quota management, statistical management, financial management.Wherein stock control is the core of whole materials storage management system.Therefore be necessary that a set of independently inventory management system of exploitation is to improve enterprise work efficiency, and this cover inventory management system used is the core in enterprise production and operation management activity, this system must can be used for controlling the stockpile number of rational inventory cost, timely and appropriate discovery, makes enterprise's activity in production maximizing efficiency.
Along with the development of computer network, the interchange of information embodies efficient, accurately, and the phenomenon such as quick.Inventory management system belongs to typical information management system (MIS), it can cast aside loaded down with trivial details Data Enter work, avoid the mistake because fatigue produces, and the management work such as the preservation of the information of giving bring great convenience, and also improve its security.The operator of building enterprise stock alleviates the complexity of day-to-day operations, loaded down with trivial details degree in the urgent need to the system of a Semi-intelligent Modular in daily business process for this reason, increases the accuracy rate of services client, and then increases the competitive power in industry, promotes the level of profitability.As a part for computer utility, use computing machine to manage inventory information, there is the advantage that manual management is incomparable.Such as: quick-searching, easy-to-look-up, reliability is high, good confidentiality, cost are low.These advantages greatly can improve the efficiency of stock control, and therefore, developing a set of like this engineering inventory management system becomes necessary thing.
For this reason, inventor is in conjunction with oneself knowledge accumulation for many years and practical experience, on the basis of fully investigation and practice, Access database and VB is utilized to design an inventory management system, user utilizes this engineering inventory management system, the staff in building site can be made to obtain relevant information better faster, such as: registration, inquiry goods yard inquiry goods amount, outbound and warehouse-in etc. of building materials, can shorten in buying goods and materials and the time of extracting goods and materials and extraction goods and materials, buyer can also utilize this system, get a good buy by shopping around, cost-saving and buy qualified building materials, so, engineering inventory management system is significant to user.
Summary of the invention
For the defect that prior art exists, the present invention proposes a kind of project investment control management system and using method thereof, by to capital fund all enter the management of outbound activity and control and to the effective statistics and analysis of inventory data, to ensure logistics unimpeded in management process, decision-maker is pinpointed the problems early, Bian gets corresponding measure, adjustment fund and inventory structures, shorten reservation period, accelerate turnover of funds, reduce stock to greatest extent to take, simultaneously, by periodic warehouse stock counting, leak in timely remedial management, inventory management system is made to reflect the current situation in each warehouse in enterprise in real time, for all kinds of managerial personnel never ipsilateral information needed is provided, to coordinate enterprise operation receiving larger benefit.
For achieving the above object, a kind of project investment control management system technical scheme of the present invention, a kind of project investment control management system comprises application server, database server, electronic tag and client, and described application server is connected with database server and client respectively; Application server is wirelessly connected with electronic tag; Electronic tag is wherein used for electronic tag and putaway stock to bind, and obtains the information in the geographic position of putaway stock; Application server wherein comprises with lower module:
System setup module; For completing the printing of form and setting, management to Operation Log; Realize keeper added by administration interface or delete user, add new management person or delete original keeper, the legitimacy of authentication of users, stop disabled user to log in; To modify the operation of password;
Enter library module; For realizing warehouse-in Sorting Materials numbering; To the filling in of storage bill, upgrade, delete warehouse-in record, check on-hand inventory information, the inquiry of warehouse-in record and printing;
Go out library module; For realizing the filling in of outbound list, upgrading, delete outbound record, check on-hand inventory information, the inquiry of outbound record and printing;
Also library module; For realizing the filling in of also storehouse list, upgrading, delete also storehouse record, also the inquiry of storehouse record and printing;
Demand module; For completing the filling in of plan of needs table, upgrading, establishment, delete procurement plan information, check existing procurement information, the inquiry of procurement information and printing, and prediction plan of needs in a short time;
Stock's alarm module; For when certain class material actual inventory is lower than set safety stock, then carry out alarm by warning device;
Further preferably, the system setup module of described application server comprises setting of printing part, user management part and log management part;
Further preferably, the library module that enters of described application server comprises sorting code number part, and the Information Monitoring of storage bill comprises title material, material number, supplier information, procurement price and quantity, purchasing agent;
Further preferably, the Information Monitoring going out outbound list in library module of described application server comprises title material, material number, use department, outbound time and quantity, handler;
Further preferably, the demand module of described application server comprises plan of needs matrix section and procurement plan matrix section; Wherein, the Information Monitoring of plan of needs table institute comprises title material, material number, sector of demand, quantity required, required time; The information that procurement plan matrix section gathers comprises title material, material number, stockpile number, purchase quantity, buying hour;
Further preferably, stock's alarm module of described application server comprises tank farm stock monitoring section and warning device, carries out alarm for the actual inventory when certain material lower than during safety stock;
Further preferably, described electronic tag comprises its geographic position is carried out to the locating device of track and localization, wirelessly transmitted the wireless signal transceiver of its geographical location information; For by electronic tag with enter library material and bind, obtain the information that it enters the geographic position of library material, and enter other relevant informations combination of library material therewith.
The using method of project investment control management system of the present invention comprises the following steps:
1. will enter library material to carry out classifying and numbering, and enter library material and be divided into following a few class: category-A article: high level will be worth the relative minority article accounting for inventory master value 70-80%, be generally the 15-20% of article; Category-B article: intermediate value total value accounts for the 15-20% of inventory master value.Article number is placed in the middle, usually accounts for the 30-40% of article; C class article: low value inventory master value is almost negligible, only accounts for 5-10%.Be the great majority of article, usually account for 60-70%; By native system, category-A, category-B, C class numbering are carried out to material, enter for different classifications the management and control that library material carries out different stage.
2. put material management and control in storage: strictly control category-A article, comprise and do complete, record accurately, high-rise supervision and often evaluation, frequently deliver goods from supplier by large change release, the time in advance of to workshop tight tracking to compress; Normal control is done to category-B article, comprises good record and conventional concern; The control easy to use as far as possible to C class article, such as regularly in kind, the summary record of visual examination stock or with easy notation show replenishment of inventory oneself through ordering goods, adopt large tank farm stock and size of order to avoid short supply, arrange to give low priority during the calendar plan of workshop.Give in activities category-A article with high priority to compress it time in advance and stock.Normal process is given to category-B article, only gives high priority when key.Give C class article with lowest priority.
3. put material in situ supervision in storage: adopt electronic tag to carry out instant tracing management to category-A article, make supvr understand warehouse-in, the outbound situation of category-A article at any time, carry out interim Plan rescheduling.
4. order or purchase management: category-A article to be provided in time, procurement information and status poll accurately, computer data needs manually to be checked, and carries out stage and makes an inventory, and evaluate frequently to reduce stocks; To category-B article, by some cycles maybe evaluation inventory data and ordering place when there is great change, operation is by routine business process; Can make an inventory to C class article and process or ordering place calculating, order goods and do not make a plan, controlled with the experience of business personnel.
The present invention mainly carries out designed system for the present situation being current stock control; Warehouse-in goods and materials various equipment, starting material and parts that mainly enterprise is required in producing; After when stocking up, effective collection confirmed as by contract on inspection, carry out an acceptance inspection warehouse-in, fills in storage bill, carries out warehouse-in registration.Each department of enterprise needs to propose material requirements application according to required material equipment total value and department's activity in production.Planner outputs material equipment outbound list according to the demand of whole enterprise, storekeeper according to outbound monokaryon to delivery apparatus, starting material and parts.The complete needs of some equipment use return in time warehouse-in, fill in also storehouse list.Carry out statistical study according to the moon, season, construction speed etc. as required, produce corresponding report; The feature of warehouse inventory management is that information processing capacity is larger, the material equipment managed, starting material and parts are of a great variety, and due to the document generating capacities such as storage bill, outbound list, requirement report large especially, related information is many, the mode of inquiry and statistics is different, therefore in management, implements certain difficulty.What in the process of management, often there will be information repeats transmission; Document, form are of a great variety, and each department's specification such as not to be united at the problem.In the design process of native system, in order to overcome these difficulties, meet the needs of computer management, some principles below Bian has got: the first, the form of unified various original document, unified accounts and report tableau format; The second, delete unnecessary managing redundant, realize management standardization, scientific; 3rd, program code standardization, software unitizes, and guarantees maintainability and the practicality of software; 4th, interface is simplified as far as possible, accomplishes practicality, convenience, meets the needs of different levels employee in enterprise as far as possible; 5th, set up Operation Log, system records carried out various operations automatically.
The function that native system completes mainly contains following: the input of the various information of (1) stock control, comprises the input etc. of warehouse-in, outbound, also storehouse, demand information; (2) inquiry of the various information of stock control, amendment and maintenance; (3) generation of material and instrument buying form; (4) in material stock, add allowed maximum stock and close minimum inventories field, monitoring is realized to all stock in storages and reports to the police; (5) the material requirements management of each department of building site; (6) management of Operation Log.
From the above technical solution of the present invention shows that, beneficial effect of the present invention is:
1. by warehouse all enter the management of outbound activity and control and to the effective statistics and analysis of inventory data, to ensure logistics unimpeded in enterprise's production, decision-maker is pinpointed the problems early, Bian gets corresponding measure, adjustment inventory structures, shorten reservation period, accelerate turnover of funds, reduce stock to greatest extent and take;
2. by periodic warehouse stock counting, leak in timely remedial management, make inventory management system reflect the current situation in each warehouse in enterprise in real time, for all kinds of managerial personnel never ipsilateral provide information needed, to coordinate enterprise operation receiving larger benefit;
3. system grasps warehouse-in, the outbound situation of monitoring emphasis material at any time, scents a hidden danger in advance, processes accident in time.To the intelligentized design of system, decrease the complicacy of Dynamic System, system works is reliable and stable, safeguards simple.
Accompanying drawing explanation
Fig. 1 is the structural representation of the project investment control management system of the embodiment of the present invention, wherein:
1-database server, 2-application server, 3-electronic tag, 4-client;
Fig. 2 is inventory system data flowchart in embodiments of the invention;
Fig. 3 is that the stock's entity E-R in embodiments of the invention in database design schemes;
Fig. 4 is that the warehouse-in entity E-R in embodiments of the invention in database design schemes;
Fig. 5 is that the outbound entity E-R in embodiments of the invention in database design schemes;
Fig. 6 is that the demand entity E-R in embodiments of the invention in database design schemes;
Fig. 7 is that the also storehouse entity E-R in embodiments of the invention in database design schemes;
Fig. 8 is that the procuring entity E-R in embodiments of the invention in database design schemes;
Fig. 9 is the E-R figure of relation between the entity in embodiments of the invention in database design;
Figure 10 is the code Design schematic diagram entering library material in embodiments of the invention.
Embodiment
In order to more understand technology contents of the present invention, institute's accompanying drawings is coordinated to be described as follows especially exemplified by specific embodiment.
With reference to figure 1, a kind of project investment control management system, comprises application server 2, database server 1, electronic tag 3 and client 4, and described application server 2 is connected with database server 1 and client 4 respectively; Application server 2 is wirelessly connected with electronic tag 3, and wherein electronic tag 3 is for binding electronic label device and putaway stock, obtains the information in the geographic position of putaway stock; Application server 2 wherein comprises with lower module:
System setup module; For completing the printing of form and setting, management to Operation Log; Realize keeper added by administration interface or delete user, add new management person or delete original keeper, the legitimacy of authentication of users, stop disabled user to log in; To modify the operation of password;
Enter library module; To warehouse-in Sorting Materials numbering for realizing, complete the filling in of storage bill, upgrade, delete warehouse-in record, check on-hand inventory information, the inquiry of warehouse-in record and printing;
Go out library module; For realizing the filling in of outbound list, upgrading, delete outbound record, check on-hand inventory information, the inquiry of outbound record and printing;
Also library module; For realizing the filling in of also storehouse list, upgrading, delete also storehouse record, also the inquiry of storehouse record and printing;
Demand module; For completing the filling in of plan of needs table, upgrading, establishment, delete procurement plan information, check existing procurement information, the inquiry of procurement information and printing, and prediction plan of needs in a short time;
Stock's alarm module; For when certain class material actual inventory is lower than set safety stock, then carry out alarm by warning device;
Further preferably, the system setup module of described application server comprises setting of printing part, user management part and log management part;
Further preferably, the library module that enters of described application server comprises sorting code number part, and the Information Monitoring of storage bill comprises title material, material number, supplier information, procurement price and quantity, purchasing agent;
Further preferably, the Information Monitoring going out outbound list in library module of described application server comprises title material, material number, use department, outbound time and quantity, handler;
Further preferably, the demand module of described application server comprises plan of needs matrix section and procurement plan matrix section; Wherein, the Information Monitoring of plan of needs table institute comprises title material, material number, sector of demand, quantity required, required time; The information that procurement plan matrix section gathers comprises title material, material number, stockpile number, purchase quantity, buying hour;
Further preferably, stock's alarm module of described application server comprises tank farm stock monitoring section and warning device, carries out alarm for the actual inventory when certain material lower than during safety stock.
Further preferably, described electronic tag comprises its geographic position is carried out to the locating device of track and localization, wirelessly transmitted the wireless signal transceiver of its geographical location information; For by electronic tag with enter library material and bind, obtain the information that it enters the geographic position of library material, and enter other relevant informations combination of library material therewith;
The using method of project investment control management system of the present invention comprises the following steps:
1. will enter library material to carry out classifying and numbering, and enter library material and be divided into following a few class: category-A article: high level will be worth the relative minority article accounting for inventory master value 70-80%, be generally the 15-20% of article; Category-B article: intermediate value total value accounts for the 15-20% of inventory master value.Article number is placed in the middle, usually accounts for the 30-40% of article; C class article: low value inventory master value is almost negligible, only accounts for 5-10%.Be the great majority of article, usually account for 60-70%; By native system, category-A, category-B, C class numbering are carried out to material, enter for different classifications the management and control that library material carries out different stage.
2. put material management and control in storage: strictly control category-A article, comprise and do complete, record accurately, high-rise supervision and often evaluation, frequently deliver goods from supplier by large change release, the time in advance of to workshop tight tracking to compress; Normal control is done to category-B article, comprises good record and conventional concern; The control easy to use as far as possible to C class article, such as regularly in kind, the summary record of visual examination stock or with easy notation show replenishment of inventory oneself through ordering goods, adopt large tank farm stock and size of order to avoid short supply, arrange to give low priority during the calendar plan of workshop.Give in activities category-A article with high priority to compress it time in advance and stock.Normal process is given to category-B article, only gives high priority when key.Give C class article with lowest priority.
3. put material in situ supervision in storage: adopt electronic tag to carry out instant tracing management to category-A article, make supvr understand warehouse-in, the outbound situation of category-A article at any time, carry out interim Plan rescheduling.
4. order or purchase management: category-A article to be provided in time, procurement information and status poll accurately, computer data needs manually to be checked, and carries out stage and makes an inventory, and evaluate frequently to reduce stocks; To category-B article, by some cycles maybe evaluation inventory data and ordering place when there is great change, operation is by routine business process; Can make an inventory to C class article and process or ordering place calculating, order goods and do not make a plan, controlled with the experience of business personnel.
Below describe the developing principle of system of the present invention in detail:
The development environment of native system: the computer platform used due to most of intra-company is all based on Windows environment, in order to reduce system cost, farthest should utilize existing resource, compatible existing environment, use development environment below: network operating system: Window7; Database server: MicrosoftAccessr2003; Front-end Developing Tool: visualBasic6.0; DAO: native system uses ADO control, to simplify programming.
The database server design concept of native system: inventory system data flowchart as shown in Figure 2, by to enterprise's storehouse management content and data flow analysis, the data item conjunction data structure of design is as follows: 1) material code information, the data item comprised has material number, title material.2) on-hand inventory information, the data item comprised has current material, existing number, maximum stock, minimum inventories etc.3) materials'use information, state the etc. when data item comprised has the material of use, use department, number, service time, an outbound.4) material purchases information, the material that the data item comprised has Bian to purchase, purchasing agent, supplier, purchase amounts, buying hour etc.5) information given back by material, and the data item comprised is given back material, gives back department, gives back number, given back time, handler etc.6) materials demand information, the data item comprised has the department of demand, demand material, demand number, required time.According to entity, outbound entity, warehouse-in entity, the procuring entity, also storehouse entity, demand entity in stock of the entity cooked up above.The E-R figure of database entities as shown in Fig. 3, Fig. 4, Fig. 5, Fig. 6, Fig. 7, Fig. 8 and Fig. 9, between superincumbent entity and entity relation basis on, form the relation between each form, complete database logic structure design.
Enter the code Design of library material: any stock all can be divided into following three classes: category-A article, high level is worth the relative minority article accounting for inventory master value 70-80%, is generally the 15-20% of article; Category-B article: intermediate value total value accounts for the 15-20% of inventory master value, article number is placed in the middle, usually accounts for the 30-40% of article; C class article: low value inventory master value is almost negligible, only accounts for 5-10%, are the great majority of article, usually account for 60-70%; Therefore, to entering the code Design of library material as shown in Figure 10, for entering the code Design schematic diagram of library material in the present embodiment.
The input and output design of the client of native system: native system Interface Standard Windows form, input through keyboard, man-machine interaction, easily uses.The design of input and output is considered both artistic and practical and easy-to-understand, and both pictures and texts are excellent, and user can see corresponding content intuitively.User, by VB designed system interface input data, forms exchanges data, storage with database, forms the functions such as form.
The safety Design of native system: comprise multiple bivariate table in system database, so in the connection of system and database, not the connection of database and system is not write direct code, but by carrying out Operation system setting to server end, make database name and path invisible, and arranged by the database security of Access, ensure that the security of database.System gives different rights according to user identity difference, and user's code entry, also ensure that the security of system data equally.
In sum, native system has done certain research & design to the inventory management system in project investment control management system, and user can utilize this system to carry out logging in, manages, inquires about, input data, generating report forms etc.This system can help building enterprise to save a large amount of buying hours, improves the quality of material purchases, time saving and energy saving, also can help the rational dispensing materials in building ground, not waste building materials, forms benign cycle.In addition, native system can also be provided with a function be connected with network, is beneficial to more new database like this, can avoid the outmoded of database data own, can better contact with supplier.
Above instructions word and accompanying drawing are only explanation of the invention and explanation, in any form the present invention be not construed as limiting and limit, scope of the present invention is as the criterion with claims, and all do not exceed the apparent amendment of present inventive concept, conversion and replacement scheme all within the scope of the present invention.

Claims (8)

1. a project investment control management system, it is characterized in that comprising: application server, database server, electronic tag and client, described application server is connected with database server and client respectively, and application server is wirelessly connected with electronic tag; Described application server 2 comprises with lower module:
System setup module; For completing the printing of form and setting, management to Operation Log, adding or deleting user, add new management person or delete original keeper, the legitimacy of authentication of users, stoping disabled user to log in, the operation of password of modifying;
Enter library module; To warehouse-in Sorting Materials numbering for realizing, complete the filling in of storage bill, upgrade, delete warehouse-in record, check on-hand inventory information, the inquiry of warehouse-in record and printing;
Go out library module; For realizing the filling in of outbound list, upgrading, delete outbound record, check on-hand inventory information, the inquiry of outbound record and printing;
Also library module; For realizing the filling in of also storehouse list, upgrading, delete also storehouse record, also the inquiry of storehouse record and printing;
Demand module; For completing the filling in of plan of needs table, upgrading, establishment, delete procurement plan information, check existing procurement information, the inquiry of procurement information and printing;
Stock's alarm module; For when certain material actual inventory is lower than set safety stock, carry out alarm.
2. project investment control management system according to claim 1, is characterized in that, the system setup module of described application server comprises setting of printing part, user management part and log management part.
3. project investment control management system according to claim 1, it is characterized in that, the library module that enters of described application server comprises sorting code number part, and the Information Monitoring of storage bill comprises title material, material number, supplier information, procurement price and quantity, purchasing agent's information.
4. project investment control management system according to claim 1, is characterized in that, the Information Monitoring going out outbound list in library module of described application server comprises title material, material number, use department, outbound time and quantity, handler's information.
5. project investment control management system according to claim 1, it is characterized in that, the demand module of described application server comprises plan of needs matrix section and procurement plan matrix section, wherein, the Information Monitoring of plan of needs table institute comprises title material, material number, sector of demand, quantity required, required time; The information gathered at procurement plan matrix section comprises title material, material number, stockpile number, purchase quantity, buying hour.
6. project investment control management system according to claim 1, is characterized in that, stock's alarm module of described application server comprises tank farm stock monitoring section and warning device.
7. project investment control management system according to claim 1, is characterized in that, described electronic tag comprises its geographic position is carried out to the locating device of track and localization, wirelessly transmitted the wireless signal transceiver of its geographical location information.
8. a using method for project investment control management system according to claim 1, is characterized in that the method comprises the following steps:
1) library material will be entered carry out classifying and numbering, and enter library material and be divided into following a few class: category-A article: high level will be worth the relative minority article accounting for inventory master value 70-80%; Category-B article: intermediate value total value accounts for the 15-20% of inventory master value; C class article: low value inventory master value accounts for 5-10%, and by native system, category-A, category-B, C class numbering are carried out to material, the management and control of different stage is carried out for different classification materials.
2) put material management and control in storage, strictly control category-A article, do complete, record accurately, high-rise supervision and often evaluation, frequently deliver goods from supplier by large change release, the time in advance of to workshop tight tracking to compress; Normal control is done to category-B article, does good record and conventional concern; The control easy to use to C class article, regular visual examination stock is in kind, summary record; To category-A article with high priority to compress it time in advance and stock, normal process is given to category-B article, only gives high priority when key, give C class article with lowest priority.
3) put material in situ supervision in storage, electronic tag binding is adopted to category-A article, carries out instant tracing management, make supvr understand warehouse-in, the outbound situation of category-A article at any time, carry out interim Plan rescheduling.
4) order or purchase management, to provide in time category-A article, procurement information and status poll accurately, is manually checked, carry out stage and make an inventory and evaluate to reduce stocks its computer data; To category-B article, by some cycles maybe evaluation inventory data and ordering place when there is great change, by routine business operational processes; Can make an inventory to C class article and process or ordering place calculating, order goods and do not make a plan in advance.
CN201410650124.4A 2014-11-14 2014-11-14 Project investment control and management system and use method thereof Pending CN104504543A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410650124.4A CN104504543A (en) 2014-11-14 2014-11-14 Project investment control and management system and use method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410650124.4A CN104504543A (en) 2014-11-14 2014-11-14 Project investment control and management system and use method thereof

Publications (1)

Publication Number Publication Date
CN104504543A true CN104504543A (en) 2015-04-08

Family

ID=52945937

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410650124.4A Pending CN104504543A (en) 2014-11-14 2014-11-14 Project investment control and management system and use method thereof

Country Status (1)

Country Link
CN (1) CN104504543A (en)

Cited By (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105373874A (en) * 2015-06-06 2016-03-02 洛阳名力科技开发有限公司 ERP decision support system
CN105930448A (en) * 2016-04-20 2016-09-07 高德(无锡)电子有限公司 Design method using database management material and production film
CN106169107A (en) * 2016-07-12 2016-11-30 华腾实业(深圳)股份有限公司 Enterprise production management method
CN106570670A (en) * 2016-11-03 2017-04-19 北京挖玖电子商务有限公司 Intelligent supply chain system
CN106845905A (en) * 2017-01-25 2017-06-13 九三粮油工业集团有限公司 Goods and material handling method
CN107292743A (en) * 2017-06-07 2017-10-24 前海梧桐(深圳)数据有限公司 The intelligent decision making method and its system invested and financed for enterprise
CN107292548A (en) * 2016-03-31 2017-10-24 富泰华工业(深圳)有限公司 Warehouse material management system and method
CN107451730A (en) * 2017-07-27 2017-12-08 榆林市动物疫病预防控制中心 Animal epidemic prevention and control center vaccine network management platform
CN108197857A (en) * 2017-12-26 2018-06-22 国网河北省电力有限公司衡水市冀州区供电分公司 Handling of goods and materials server and method
CN108629429A (en) * 2018-05-03 2018-10-09 四川长虹电器股份有限公司 A kind of company's article management system
CN108665205A (en) * 2018-01-05 2018-10-16 浙江华安安全设备有限公司 A kind of police equipment management system
CN108734382A (en) * 2018-01-05 2018-11-02 浙江华安安全设备有限公司 A kind of police materias manager information system of public security bureau
CN108764629A (en) * 2018-04-21 2018-11-06 广东韶钢工程技术有限公司 A kind of production management system
CN108960741A (en) * 2018-07-26 2018-12-07 中广核核电运营有限公司 A kind of nuclear power station group factory Spare Parts Inventory Management System
CN109034979A (en) * 2018-08-21 2018-12-18 上海互海信息科技有限公司 A kind of quotation system and price quoting method
CN109492961A (en) * 2018-09-12 2019-03-19 中国科学院电子学研究所 A kind of goods and material handling method, system and computer readable storage medium
CN109492968A (en) * 2018-10-29 2019-03-19 西北工业大学 Cutter treasury management system based on database technology
CN109784852A (en) * 2019-01-12 2019-05-21 重庆洪峰工业设备安装有限公司 A kind of electronic system and working method of Engineering Oriented debit
CN109872110A (en) * 2019-03-05 2019-06-11 深圳市国晨工程造价咨询有限公司 A kind of project materials purchasing management system
CN109886628A (en) * 2019-02-18 2019-06-14 上海地铁维护保障有限公司 Handling of goods and materials platform and method
CN110033220A (en) * 2019-04-13 2019-07-19 江苏润桐数据服务有限公司 A kind of material stock management method and device
CN110110824A (en) * 2019-04-28 2019-08-09 苏州市医用仪器厂 Biological products constant temperature oscillation storage box with stock control function
CN110516973A (en) * 2019-08-30 2019-11-29 中国建筑第五工程局有限公司 Architectural engineering material Management System and management method
CN110910063A (en) * 2019-11-18 2020-03-24 何小钟 Method for collecting material information in road construction process
CN111626676A (en) * 2020-05-27 2020-09-04 山东理工职业学院 Logistics management system based on computer
CN111861299A (en) * 2019-04-30 2020-10-30 上海梅山钢铁股份有限公司 Iron and steel enterprise full-process inventory level early warning and control method
CN113159655A (en) * 2021-05-26 2021-07-23 长沙迈迪克智能科技有限公司 Disease control material management method, system and storage medium
CN116342076A (en) * 2023-05-30 2023-06-27 山东建筑大学设计集团有限公司 Engineering information management system and management method
CN116611708A (en) * 2023-06-02 2023-08-18 深圳市虎匠科技投资发展有限公司 Method and system for intelligent construction digital management
CN116805233A (en) * 2023-08-25 2023-09-26 建信金融科技有限责任公司 Asset inventory control method, device, equipment and storage medium

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101894314A (en) * 2010-04-23 2010-11-24 南京邮电大学 Method for applying warehouse based on internet of things
CN102163306A (en) * 2011-03-24 2011-08-24 武汉理工大学 Discrete manufacturing process product quality information management system based on RFID (radio frequency identification)

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101894314A (en) * 2010-04-23 2010-11-24 南京邮电大学 Method for applying warehouse based on internet of things
CN102163306A (en) * 2011-03-24 2011-08-24 武汉理工大学 Discrete manufacturing process product quality information management system based on RFID (radio frequency identification)

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘莹莹: "HD机械制造公司存货管理研究", 《中国优秀硕士学位论文全文数据库(经济与管理科学辑)》 *
胡素爱: "基于Delphi的仓库管理系统设计与实现", 《中国优秀硕士学位论文全文数据库(信息科技辑)》 *

Cited By (34)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105373874A (en) * 2015-06-06 2016-03-02 洛阳名力科技开发有限公司 ERP decision support system
CN107292548A (en) * 2016-03-31 2017-10-24 富泰华工业(深圳)有限公司 Warehouse material management system and method
CN105930448A (en) * 2016-04-20 2016-09-07 高德(无锡)电子有限公司 Design method using database management material and production film
CN106169107A (en) * 2016-07-12 2016-11-30 华腾实业(深圳)股份有限公司 Enterprise production management method
CN106570670A (en) * 2016-11-03 2017-04-19 北京挖玖电子商务有限公司 Intelligent supply chain system
CN106845905A (en) * 2017-01-25 2017-06-13 九三粮油工业集团有限公司 Goods and material handling method
CN107292743A (en) * 2017-06-07 2017-10-24 前海梧桐(深圳)数据有限公司 The intelligent decision making method and its system invested and financed for enterprise
CN107451730A (en) * 2017-07-27 2017-12-08 榆林市动物疫病预防控制中心 Animal epidemic prevention and control center vaccine network management platform
CN108197857A (en) * 2017-12-26 2018-06-22 国网河北省电力有限公司衡水市冀州区供电分公司 Handling of goods and materials server and method
CN108665205A (en) * 2018-01-05 2018-10-16 浙江华安安全设备有限公司 A kind of police equipment management system
CN108734382A (en) * 2018-01-05 2018-11-02 浙江华安安全设备有限公司 A kind of police materias manager information system of public security bureau
CN108764629A (en) * 2018-04-21 2018-11-06 广东韶钢工程技术有限公司 A kind of production management system
CN108629429A (en) * 2018-05-03 2018-10-09 四川长虹电器股份有限公司 A kind of company's article management system
CN108960741A (en) * 2018-07-26 2018-12-07 中广核核电运营有限公司 A kind of nuclear power station group factory Spare Parts Inventory Management System
CN108960741B (en) * 2018-07-26 2021-08-31 中广核核电运营有限公司 Stock management system for spare parts of nuclear power station group plant
CN109034979A (en) * 2018-08-21 2018-12-18 上海互海信息科技有限公司 A kind of quotation system and price quoting method
CN109492961A (en) * 2018-09-12 2019-03-19 中国科学院电子学研究所 A kind of goods and material handling method, system and computer readable storage medium
CN109492968A (en) * 2018-10-29 2019-03-19 西北工业大学 Cutter treasury management system based on database technology
CN109784852A (en) * 2019-01-12 2019-05-21 重庆洪峰工业设备安装有限公司 A kind of electronic system and working method of Engineering Oriented debit
CN109886628A (en) * 2019-02-18 2019-06-14 上海地铁维护保障有限公司 Handling of goods and materials platform and method
CN109872110A (en) * 2019-03-05 2019-06-11 深圳市国晨工程造价咨询有限公司 A kind of project materials purchasing management system
CN110033220A (en) * 2019-04-13 2019-07-19 江苏润桐数据服务有限公司 A kind of material stock management method and device
CN110110824A (en) * 2019-04-28 2019-08-09 苏州市医用仪器厂 Biological products constant temperature oscillation storage box with stock control function
CN111861299B (en) * 2019-04-30 2023-10-17 上海梅山钢铁股份有限公司 Whole-process inventory level early warning and control method for iron and steel enterprises
CN111861299A (en) * 2019-04-30 2020-10-30 上海梅山钢铁股份有限公司 Iron and steel enterprise full-process inventory level early warning and control method
CN110516973A (en) * 2019-08-30 2019-11-29 中国建筑第五工程局有限公司 Architectural engineering material Management System and management method
CN110910063A (en) * 2019-11-18 2020-03-24 何小钟 Method for collecting material information in road construction process
CN111626676A (en) * 2020-05-27 2020-09-04 山东理工职业学院 Logistics management system based on computer
CN113159655A (en) * 2021-05-26 2021-07-23 长沙迈迪克智能科技有限公司 Disease control material management method, system and storage medium
CN116342076A (en) * 2023-05-30 2023-06-27 山东建筑大学设计集团有限公司 Engineering information management system and management method
CN116611708A (en) * 2023-06-02 2023-08-18 深圳市虎匠科技投资发展有限公司 Method and system for intelligent construction digital management
CN116611708B (en) * 2023-06-02 2024-03-19 深圳市虎匠科技投资发展有限公司 Method and system for intelligent construction digital management
CN116805233A (en) * 2023-08-25 2023-09-26 建信金融科技有限责任公司 Asset inventory control method, device, equipment and storage medium
CN116805233B (en) * 2023-08-25 2023-12-15 建信金融科技有限责任公司 Asset inventory control method, device, equipment and storage medium

Similar Documents

Publication Publication Date Title
CN104504543A (en) Project investment control and management system and use method thereof
CN107831750B (en) IMES intelligent manufacturing execution system
Ge et al. Research on the maturity of big data management capability of intelligent manufacturing enterprise
CN203165006U (en) Engineering project management system
CN105913211A (en) Material managing and controlling system and method
CN101256647A (en) Item management system being suitable for garden engineering
CN103268531A (en) Secondary energy management platform for energy center
CN101582135A (en) Logistic management system with data mining method
Krmac Intelligent value chain networks: business intelligence and other ICT tools and technologies in supply/demand chains
CN111353787A (en) Equipment comprehensive guarantee system based on cloud platform
Lu et al. A application of cloud computing and IOT in logistics
CN115170090A (en) Project management method and device, electronic equipment and readable storage medium
Zhu Optimization and Simulation for E‐Commerce Supply Chain in the Internet of Things Environment
Oner et al. RFID-based warehouse management system in wool yarn industry
US20240037483A1 (en) System and Method of Providing a Supply Chain Digital Hub
US20130166338A1 (en) Enhanced business planning and operations management system
CN102663539A (en) Operation cost management system based on platform of internet of things
Polivka et al. Selection of the ERP System with Regard to the Global 4th Industrial Revolution
KR100584903B1 (en) System for real time controlling driving data of power plant
Ethirajan et al. Connecting engineering technology with enterprise systems for sustainable supply chain management
Ivanov et al. Processes, systems, and models
CN111445117A (en) Fixed asset dynamic management system based on tracing technology
Soliman Does the Cloud System Drive Supply Chain Sustainability?
Wang et al. Web-based, multi-platform, centralized, offline-compatible supply chain management system for emergency responses
Kurbonovich Analysis of application of information systems at industrial enterprises

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150408

RJ01 Rejection of invention patent application after publication