Prior art keywords
plan
management
tracking
storage
modification
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810363318.4A
Other languages
Chinese (zh)
Inventor
简军
向太芳
周红卫
蒋卫
马兴江
李红利
李�浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Shaogang Engineering Technology Co Ltd
Original Assignee
Guangdong Shaogang Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Shaogang Engineering Technology Co Ltd filed Critical Guangdong Shaogang Engineering Technology Co Ltd
Priority to CN201810363318.4A priority Critical patent/CN108764629A/en
Publication of CN108764629A publication Critical patent/CN108764629A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06316Sequencing of tasks or work
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/087Inventory or stock management, e.g. order filling, procurement or balancing against orders
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Abstract

The present invention relates to a kind of production management systems, include:User management module;Plan module, plan module include that planning management, handling of goods and materials, waste filling management and data import;Plan auditing module, including planned audit, plan tracking and waste filling tracking;Workshop management module includes plan target, waste filling task and stock control function;Sales management module includes plan tracking, stock management, goes out library management and inventory tracking.The management of planning item easy to produce is assigned from plan, planned production execution, project complete that into library, project sale and project stock etc. management comprehensive can be monitored.

Description

A kind of production management system
Technical field
The invention belongs to manage system regions, it is related to a kind of production management system.
Background technology
From factory to workshop it is at different levels function related personnel in production planning management, assigned from service parts planning, go to plan It completes into library, then to be related to being mutually linked for multiple processes or workshop more for sale to spare part project and a spare part project Item management, needs to consume a large amount of administration cost, and assign the economic benefit of speed and benefit concerning production, and existing pipe Reason system has the disadvantages that:
1, a kind of spare part project is all corresponding there are one COM code constant throughout one's life, and the spare part project of same COM code is in system Middle retrieval can only obtain the primary information recorded at first.
2, the spare part project that sale is completed cannot be hidden, and page info is too many.
3, locating function is not comprehensive, and information that cannot be on demand is directly searched.
It 4, cannot auto-sequencing in chronological order, it has not been convenient to monthly project statistics.
5, it is more that machining processes are directed to, process tracking can not be carried out.
6, inquiry spare part project cannot be based on contract numbered, therefore whether the contract is completed also to need manual record.
Invention content
In order to overcome the disadvantages mentioned above of the prior art, the present invention to provide a kind of production management system, disclosure satisfy that from production The project plan is accepted, is organized into down to workshop(It can be changed according to production establishment)Organization of production is carried out, then arrives vehicle Between complete handle into library to division department's marketing balance complete, conduct monitoring at all levels management can be carried out.
The technical solution adopted by the present invention to solve the technical problems is:A kind of production management system includes:
User management module inputs network address in browser address bar, while being installed in internal lan addition real server IP address, you can system is accessed.Administrator can be actually needed according to production management and authorize, and authorize person liable in user With corresponding content is inputted in password field, you can enter opposite management module and operated;
Plan module includes that planning management, handling of goods and materials, waste filling management and data import;Wherein planning management function Have:
1)Plan inquiry:Can inquiry plan assign the time, plan receiving time, goods and materials relevant information, contract number, plan submit feelings Condition audits situation, and complete situation, sales situation, and contract performance participates in workshop;
2)The newly-increased plan of single:It can single input data in dialog box;
3)Modification plan/plan certain plan modification to be new:In modification option, after completing information solicitation, modification is clicked. If it is desired to modification project is generated new plan, then the new plan of generation is clicked;
4)Delete plan:It chooses corresponding plan to click to delete;
5)Submit plan:To making plan, the check box accordingly planned is chosen, then clicks and submits plan;
6)Plan export:Designated position can be downloaded to by clicking the Export Option to the content of needs;
7)Plan audit is completed:A certain plan, workshop warehousing quantity are consistent with planned quantity, you can audit is completed, this operation is aobvious It is shown as " manual examination and verification completion ";
8)Marketing audit is completed:A certain plan outbound number is consistent with planned quantity, you can carries out marketing audit completion, this operation will It is shown as " manual sales, which audit, to complete ";
Handling of goods and materials can carry out newly-increased goods and materials, material information modification, deletion material information and goods and materials into handling of goods and materials interface Inquiry, can persistence material information, as long as log in when input COM code can show all information.
Waste filling management can carry out newly-increased waste filling plan, inquiry waste filling plan and deletion into waste filling planning management interface Waste filling plan;
Data import, and historical data importing and the importing of batch new data can be carried out by importing interface into data, reduce people's list altogether Item input operation, helps to improve data input efficiency, convenient for statistics;
Plan auditing module, including planned audit, plan tracking and waste filling tracking;
Wherein plan audit is that donor produces submission plan selection by reaching responsibility scheduling of production under ability, to there is doubt Selection do not remodified by the way that plan people can be retracted;
Plan tracking includes plan inquiry, export Excel tables, plan audit is completed and function is completed in marketing audit;
Plan tracking module includes planned tracking, waste filling tracking, storage tracking, outbound tracking and inventory tracking function, storage Tracking, outbound tracking and inventory tracking can respectively to product, every outbound sale including every completion storage production The contract of product and every unfinished product of the sale in inventory, quantity, time are retrieved, but cannot change related letter Breath;
Workshop management module includes plan target, waste filling task and stock control function;
Plan target checks the urgency level of plan target:Show the range of the remaining number of days for the plan of being timely completed;
Storage transfers:If a certain plan target has storage, association plan can be checked;Also other vehicles of a certain plan can be checked Between the association situation that participates in;
Stock control can retrieve all completion plans in this workshop not into the storage in library.It can also carry out newly-increased goods and materials storage Management, modification goods and materials stock control and deletion goods and materials stock control;
Sales management module includes plan tracking, stock management, goes out library management and inventory tracking;
Stock management, storage:In-stockroom operation is handled to workshop completion plan, is convenient for follow-up sales;It is put in storage record modification:To storage Record data retrieval and modification;Delete storage record:Such as being put in storage data has doubtful, can storage record be deleted and be logged in again.
Go out library management, the plan to completing sale records, and pays attention to:It has to fill in when outbound operates under normal conditions Contract number, unless the outbound is history stock in storage, modification outbound record:It can carry out outbound record data modification;Delete into Library records:Storage record can be deleted.
The administrator is generally division department manager, can be inquired in the functional mandate of " user management " interface progress, user, The operations such as user's addition, Modify password and deletion user.
The urgency level of the plan target be divided into (- ∞, 10) it is urgent [10,30) it is general [30, ∞) it is wide and, simultaneously Workload and urgency level can be updated.
The positive effect of the present invention is:The management of planning item easy to produce, assigned from plan, planned production execution, item Mesh completes that into library, project sale and project stock etc. management comprehensive can be monitored, and is that planning item is not omitted;To emphasis Project can supervise tracking and coordination in time, it is ensured that punctual delivery;Duplicated project can be recorded according to system and reduced again The time of login, effectively improve working efficiency;There is detailed data analysis for annual monthly summary, is given birth to convenient for preferably guidance Industry is sought.
Specific implementation mode
With reference to embodiment, the present invention is further described.
A kind of production management system, structure are as follows:
User management module
Functions of modules Corresponding role Function declaration
The 1 new user of addition System manager User name, password and corresponding permission.
2 modification users System manager Attribute of a certain user in addition to user name can be changed.
3 delete user System manager Delete the corresponding user of a certain user name.
4 administrator's passwords are reseted System manager Change the login password of administrator.
5 inquiry user lists System manager Inquire user name, password and the authority information of all users
6 export user lists System manager Export Excel tables.
Plan management, audit management and tracing management module
Functions of modules Corresponding role Function declaration
1 imports plan with Excel Plan Contract number is that must fill out with materiel code.
2 carry out data with Excel Migration Plan Data preparation at certain format, imported with Excel.
The 3 webpage modes of filling in a form add Add plan Plan Fill substance is needed when addition such as【1】Middle function declaration.
4 modification plans Plan The all properties of arbitrary plan can be changed.
5 delete plan Plan Based on contract number the plan of deletion can confirm with materiel code.
6 submit plan Plan Plan after submission, the plan audit talent can audit.
7 people are that audit has been planned At Plan It is only effective to having audited the plan passed through.
8 inquiry plans Plan, audit and with Track, Sales Administrator The planned details of institute in inquiry system.
9 export plans Plan Export Excel tables
10 audit plans Plan audit The plan having been filed on is audited, by or do not pass through.
11 people are audit plan pin It sells off into Plan It is sale completion to change a certain its sale completion situation of planning.
12, which inquire certain workshop, participates in Plan Workshop and outer committee administrator Inquire the plan of workshop participation.
13 fill in the current of plan Complete quantity Workshop and outer committee administrator The current completion quantity of a certain plan is recorded
14【Additionally】Plan is urgent Degree develops the color Workshop and outer committee administrator 【Function 12】When operation, develop the color to the emergency procedure of plan.Develop the color basis:It is shown in red when planning system of distance current time 5 days, when plan is apart from present system time (5- 10] when day, it is shown as yellow, remaining is shown in green.(It is shown in green when planning plan completion)
The 15 new goods and materials of addition   Add new materiel code, title, figure number, material, substance, unit.
16 modification goods and materials   Attribute of a certain goods and materials in addition to materiel code can be changed.
17 delete goods and materials   Delete the corresponding goods and materials of a certain materiel code.
18 inquiry goods and materials lists Plan tracking The details of goods and materials in inquiry system, can be with additional queries condition.
19 addition waste filling plans Plan Add a new waste filling plan.Once addition is completed, audit is needed not move through, each workshop is visible to the waste filling plan.
20 modification waste filling plans Plan Change the content of a certain waste filling plan.
21 delete waste filling plan Plan Delete a certain waste filling plan.
22 inquiry waste filling plans Plan is tracked with plan The details of all waste filling plans in inquiry system.It can be with additional queries condition when inquiry.To a certain waste filling plan, its original plan information can be shown.
23, which inquire certain workshop, participates in Waste filling plan Workshop and outer committee administrator The plan that workshop participates in is specified in inquiry.
24 determine that waste filling plan is complete Work Workshop and outer committee administrator The completion situation for changing a certain waste filling plan is to have completed.The operation is irreversible.
Workshop stock control module
Functions of modules Corresponding role Function declaration
1 addition workshop storage Workshop and outer committee administrator Workshop storage is added, the storage quantity of certain goods and materials of workshop is specified.
2 modification workshop storages Workshop and outer committee administrator Change the storage quantity of certain goods and materials of workshop.
3 delete workshop storage Workshop and outer committee administrator Delete the inventory information of certain goods and materials of workshop.
4 workshop storages prompt work( Energy Workshop and outer committee administrator Work as execution【Workshop module -3】Operation when, system provides the storage quantity prompt facility of the goods and materials and draws the function of taking the goods and materials of specified quantity as current completion number of tasks from storage.
Sales management module
Module work( Energy Corresponding role Function declaration
1 is added into Library records Sales Administrator Registration storage record.After adding successfully, system will uniquely confirm a certain plan according to materiel code and contract number, and by the cumulative completion quantity as the plan of warehousing quantity, when the scheduled completion quantity reaches plan When assigning quantity, the scheduled completion.
2 change into Library records Sales Administrator The information of a certain storage record is changed, system will be compared according to modified warehousing quantity with the warehousing quantity before modification, and the completion quantity that corresponding plan is recorded to the storage is updated into Mobile state.
3 delete into Library records Sales Administrator The information of a certain storage record is deleted, system will deduct warehousing quantity in the completion quantity for recording corresponding plan from the storage.
4 inquire into Library records Sales management Member, plan with Track people All storages in inquiry system record information.It can be with given query condition when inquiry.
5 add out Library records Sales Administrator Register outbound record.Contract number allows for sky, and in business processing, when being sold to third-party, contract number must be empty for, and should add corresponding remark information.After adding successfully, system will be according to materiel code Uniquely confirm a certain plan with contract number, and by the cumulative sales volume as the plan of warehousing quantity, when the planned selling quantity, which reaches plan, assigns quantity, which completes.
6 modifications Outbound is remembered Record Sales Administrator The information of a certain outbound record is changed, system will be compared according to modified outbound quantity with the outbound quantity before modification, and the sales volume that corresponding plan is recorded to the outbound is updated into Mobile state.
7 delete out Library records Sales Administrator The information of a certain outbound record is deleted, system will deduct outbound quantity from the sales volume that the outbound records corresponding plan.
8 inquire Library records Sales management Member, plan with Track people All outbounds in inquiry system record information.It can be with given query condition when inquiry.
9 inquiry libraries It deposits Sales management Member, plan with Track people Inventory is that the stockpile number of a certain goods and materials is described.Inventory is updated by storage and outbound operation dynamic.
Segregation of duties:Administrator, plan, plan audit, shop organizer, outer committee administrator, Sales Administrator, plan with Track etc..

Claims (3)

1. a kind of production management system, it is characterised in that include:
User management module inputs network address in browser address bar, while being installed in internal lan addition real server IP address, you can system is accessed;Administrator can be actually needed according to production management and authorize, and authorize person liable in user With corresponding content is inputted in password field, you can enter opposite management module and operated;
Plan module includes that planning management, handling of goods and materials, waste filling management and data import;Wherein planning management function Have:
1)Plan inquiry:Can inquiry plan assign the time, plan receiving time, goods and materials relevant information, contract number, plan submit feelings Condition audits situation, and complete situation, sales situation, and contract performance participates in workshop;
2)The newly-increased plan of single:It can single input data in dialog box;
3)Modification plan/plan certain plan modification to be new:In modification option, after completing information solicitation, modification is clicked, If it is desired to modification project is generated new plan, then the new plan of generation is clicked;
4)Delete plan:It chooses corresponding plan to click to delete;
5)Submit plan:To making plan, the check box accordingly planned is chosen, then clicks and submits plan;
6)Plan export:Designated position can be downloaded to by clicking the Export Option to the content of needs;
7)Plan audit is completed:A certain plan, workshop warehousing quantity are consistent with planned quantity, you can audit is completed, this operation is aobvious It is shown as " manual examination and verification completion ";
8)Marketing audit is completed:A certain plan outbound number is consistent with planned quantity, you can carries out marketing audit completion, this operation will It is shown as " manual sales, which audit, to complete ";
Handling of goods and materials can carry out newly-increased goods and materials, material information modification, deletion material information and goods and materials into handling of goods and materials interface Inquiry, can persistence material information, as long as log in when input COM code can show all information;
Waste filling management can carry out newly-increased waste filling plan, inquiry waste filling plan into waste filling planning management interface and delete waste filling Plan;
Data import, and historical data importing and the importing of batch new data can be carried out by importing interface into data, reduce people's list altogether Item input operation, helps to improve data input efficiency, convenient for statistics;
Plan auditing module, including planned audit, plan tracking and waste filling tracking;
Wherein plan audit is that donor produces submission plan selection by reaching responsibility scheduling of production under ability, to there is doubt Selection do not remodified by the way that plan people can be retracted;
Plan tracking includes plan inquiry, export Excel tables, plan audit is completed and function is completed in marketing audit;
Plan tracking module includes planned tracking, waste filling tracking, storage tracking, outbound tracking and inventory tracking function, storage Tracking, outbound tracking and inventory tracking can respectively to product, every outbound sale including every completion storage production The contract of product and every unfinished product of the sale in inventory, quantity, time are retrieved, but cannot change related letter Breath;
Workshop management module includes plan target, waste filling task and stock control function;
Plan target checks the urgency level of plan target:Show the range of the remaining number of days for the plan of being timely completed;
Storage transfers:If a certain plan target has storage, association plan can be checked;Also other vehicles of a certain plan can be checked Between the association situation that participates in;
Stock control can retrieve all completion plans in this workshop not into the storage in library, can also carry out newly-increased goods and materials storage Management, modification goods and materials stock control and deletion goods and materials stock control;
Sales management module includes plan tracking, stock management, goes out library management and inventory tracking;
Stock management, storage:In-stockroom operation is handled to workshop completion plan, is convenient for follow-up sales;It is put in storage record modification:To storage Record data retrieval and modification;Delete storage record:Such as being put in storage data has doubtful, can storage record be deleted and be logged in again;
Go out library management, the plan to completing sale records, and pays attention to:It has to fill in contract when outbound operates under normal conditions Number, unless the outbound is history stock in storage, modification outbound record:It can carry out outbound record data modification;Delete storage note Record:Storage record can be deleted.
2. production management system as described in claim 1, it is characterised in that:The administrator is generally division department manager, can be with Functional mandate, user's inquiry, user's addition, Modify password are carried out at " user management " interface and delete the operations such as user.
3. production management system as described in claim 1, it is characterised in that:The urgency level of the plan target be divided into (- ∞, 10) urgent [10,30) it is general [30, ∞) it is wide and, while workload and urgency level can be updated.
CN201810363318.4A 2018-04-21 2018-04-21 A kind of production management system Pending CN108764629A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810363318.4A CN108764629A (en) 2018-04-21 2018-04-21 A kind of production management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810363318.4A CN108764629A (en) 2018-04-21 2018-04-21 A kind of production management system

Publications (1)

Publication Number Publication Date
CN108764629A true CN108764629A (en) 2018-11-06

Family

ID=64011041

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810363318.4A Pending CN108764629A (en) 2018-04-21 2018-04-21 A kind of production management system

Country Status (1)

Country Link
CN (1) CN108764629A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111461575A (en) * 2020-04-27 2020-07-28 广东电网有限责任公司东莞供电局 Visual task management and control system and method
CN111768078A (en) * 2020-05-28 2020-10-13 青岛奥利普自动化控制系统有限公司 Beer industry manufacturing execution system
CN112348311A (en) * 2020-09-26 2021-02-09 广东韶钢工程技术有限公司 Production management method and production management system
CN112348477A (en) * 2020-11-13 2021-02-09 山东新华健康产业有限公司 Production management system for medical instrument factory and use method thereof
CN112581086A (en) * 2020-12-16 2021-03-30 上海英应机器人科技有限公司 System for real-time production data acquisition and production resource tracking management of site

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102419830A (en) * 2010-09-27 2012-04-18 周小丹 Workshop resource planning system
CN104504543A (en) * 2014-11-14 2015-04-08 镇江市新创计算机系统集成有限公司 Project investment control and management system and use method thereof
CN106296087A (en) * 2016-08-04 2017-01-04 中冶赛迪电气技术有限公司 A kind of Spare Parts Inventory Management System of Facing to Manufacturing industry
CN107480901A (en) * 2017-08-22 2017-12-15 杰克缝纫机股份有限公司 Garment production management method and system
CN107506860A (en) * 2017-08-25 2017-12-22 宁波灵云科技信息服务有限公司 System and implementation method are realized in lean production plan
CN107704989A (en) * 2017-08-25 2018-02-16 宁波纷享软件科技有限公司 Use Lean Manufacturing management system and method
CN107748962A (en) * 2017-11-01 2018-03-02 杭州立越网络科技有限公司 A kind of drink enterprise integration of production and marketing operations management system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102419830A (en) * 2010-09-27 2012-04-18 周小丹 Workshop resource planning system
CN104504543A (en) * 2014-11-14 2015-04-08 镇江市新创计算机系统集成有限公司 Project investment control and management system and use method thereof
CN106296087A (en) * 2016-08-04 2017-01-04 中冶赛迪电气技术有限公司 A kind of Spare Parts Inventory Management System of Facing to Manufacturing industry
CN107480901A (en) * 2017-08-22 2017-12-15 杰克缝纫机股份有限公司 Garment production management method and system
CN107506860A (en) * 2017-08-25 2017-12-22 宁波灵云科技信息服务有限公司 System and implementation method are realized in lean production plan
CN107704989A (en) * 2017-08-25 2018-02-16 宁波纷享软件科技有限公司 Use Lean Manufacturing management system and method
CN107748962A (en) * 2017-11-01 2018-03-02 杭州立越网络科技有限公司 A kind of drink enterprise integration of production and marketing operations management system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111461575A (en) * 2020-04-27 2020-07-28 广东电网有限责任公司东莞供电局 Visual task management and control system and method
CN111768078A (en) * 2020-05-28 2020-10-13 青岛奥利普自动化控制系统有限公司 Beer industry manufacturing execution system
CN112348311A (en) * 2020-09-26 2021-02-09 广东韶钢工程技术有限公司 Production management method and production management system
CN112348477A (en) * 2020-11-13 2021-02-09 山东新华健康产业有限公司 Production management system for medical instrument factory and use method thereof
CN112581086A (en) * 2020-12-16 2021-03-30 上海英应机器人科技有限公司 System for real-time production data acquisition and production resource tracking management of site

Similar Documents

Publication Publication Date Title
CN108764629A (en) A kind of production management system
CN107831750B (en) IMES intelligent manufacturing execution system
US7340410B1 (en) Sales force automation
Gordon et al. Information systems
Boucher et al. Design of industrial information systems
CN110334950B (en) Iron tower intelligent production and group management and control system
CN107563627A (en) Workshop MES management methods and system based on bar codes technique
US20040024784A1 (en) Information system for manipulating data related to the ordering and performance of services and communication of results
CN109978497A (en) A kind of business administration office platform system based on cloud ERP management
CN112990886B (en) Aviation industry data management display system based on mobile phone terminal
US20040139035A1 (en) System and method for integration of value-added product costs
CN111080262A (en) Intelligent logistics platform management method
US20040143488A1 (en) System and method for integration of actual product costs
CN114298550A (en) Method for treating cement production operation data
CN110032154A (en) A kind of production control method and system of be pilot
CN101059852A (en) System and method for managing enterprise environmental impacts
US7461019B2 (en) System and method for integration of material costs of a product
CN116862409A (en) Asset management method based on system
CN107506860A (en) System and implementation method are realized in lean production plan
CN107704989A (en) Use Lean Manufacturing management system and method
KR20090022146A (en) Railroad construction business management system
Hrybkov et al. Modeling of the decision support system structure in the planning and controlling of contracts implementation
Lopes Application of a multiple indirect cost pool system to a real case
Redlein et al. IT Support
Vakoniemi Improvement of production processes by measuring

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181106