CN109886628A - Handling of goods and materials platform and method - Google Patents

Handling of goods and materials platform and method Download PDF

Info

Publication number
CN109886628A
CN109886628A CN201910122579.1A CN201910122579A CN109886628A CN 109886628 A CN109886628 A CN 109886628A CN 201910122579 A CN201910122579 A CN 201910122579A CN 109886628 A CN109886628 A CN 109886628A
Authority
CN
China
Prior art keywords
goods
materials
information
maintenance
handling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910122579.1A
Other languages
Chinese (zh)
Inventor
吴晓冬
冲莉
徐政立
张郁
朱莉
张志倜
吴敏
陈剑杰
施亮
张辰翀
杨洁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI RAIL TRANSIT MAINTENANCE SUPPORT Co Ltd
Original Assignee
SHANGHAI RAIL TRANSIT MAINTENANCE SUPPORT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI RAIL TRANSIT MAINTENANCE SUPPORT Co Ltd filed Critical SHANGHAI RAIL TRANSIT MAINTENANCE SUPPORT Co Ltd
Priority to CN201910122579.1A priority Critical patent/CN109886628A/en
Publication of CN109886628A publication Critical patent/CN109886628A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a kind of handling of goods and materials platform and method, it is equipped with into library module, library module, planning department issue module, repair and scrap module, maintenance of information module, print module out;The user of relevant departments logs in platform by client device, executes and its operation that respectively permission matches;The database interaction data of each module of platform and user and handling of goods and materials, realizes materials warehousing, goods and materials outbound, and production plan portion goods and materials issue, maintenance of supplies and scrap, maintenance of information, the execution of the processes such as material information printing.The present invention uses electronic approval mode, facilitates circulation, uses manpower and material resources sparingly.Goods and materials carry out identity using C code, convenient for tracking;Goods and materials outbound warehousing information updates in time, facilitates access;Scrap repair message circulation in time, it is more convenient to operate.

Description

Handling of goods and materials platform and method
Technical field
The present invention relates to a kind of handling of goods and materials platform and methods.
Background technique
To the improved efficiency of enterprise, the promotion in terms of production management is usually only focused on, however the handling of goods and materials of enterprise It is that enterprise's whole efficiency promotes the extremely important ring of aspect.Integrally there is problems, such as object at present in handling of goods and materials field Money management each department's information is mutually indepedent, and goods and materials approval distributing process is very long, and material information is not prompt enough etc., such as in goods and materials Storage, outbound management aspects, the long-term existence each department such as issue maintenance, scrap and independently keep accounts, and material information does not circulate, examination & approval Period is longer, the flow of material time too long the problems such as, cause handling of goods and materials chaotic, cause production efficiency low, waste a large amount of people Power material resources cost, these all restrict the orderly progress of business event.
Summary of the invention
The object of the present invention is to provide a kind of handling of goods and materials platform and method, the efficiency of Lai Tigao handling of goods and materials saves object Power human cost.
A technical solution of the invention is to provide a kind of goods and material handling method realized based on handling of goods and materials platform, packet Contain:
Materials warehousing process: before materials warehousing, judge whether goods and materials have the C code as unique identity;If the object The lane database provided in handling of goods and materials platform has corresponding C code and device model information, then is directly put in storage;If the C of the goods and materials Code and device model loss of learning, then carry out the pre-registration of material information, is fed back and is examined according to equipment management department and production plan portion The information passed through is criticized, judges that the C code of the goods and materials and device model information are correct, then pre-registration audit is completed, by production plan Portion generates C code, which permits storage;
Goods and materials outbound process: proposing demand application by sector of demand, anti-via production plan portion and equipment management department difference After the information that feedback examination & approval pass through, goods and materials are locked, and when goods and materials are got by the sector of demand, based on the feelings for recalling goods and materials The information of inventory in condition more new database completes goods and materials outbound.
Optionally, allow any one to possess the account of goods and materials in-stockroom operation permission and carry out pre-registration, it is below to provide Goods and materials pre-registration: goods and materials title, model, affiliated profession, said system, brand, goods and materials unit, goods and materials unit price, goods and materials institute Belong to route, remarks and goods and materials picture.
Optionally, the goods and material handling method realized based on handling of goods and materials platform, is also included on handling of goods and materials platform, The process that goods and materials issue is carried out by production plan portion:
It first passes through to draw up that the goods and materials that will be issued are chosen and generated and issues bill of material;Then it generates and issues goods and materials letter Breath, include: goods and materials title, model, affiliated profession, said system, brand, goods and materials unit, goods and materials unit price, the affiliated route of goods and materials, Remarks and goods and materials picture;
Production plan portion, goods and materials receiving department, maintenance department, handling of goods and materials person respectively have and inquire information of drawing up Permission;
The permission for the material information that there is inquiry to have issued, get, be put in storage in production plan portion;
Goods and materials receiving department, maintenance department, handling of goods and materials person have the object in the state that issued for inquiring its department Standing breath, and carry out the permission that goods and materials get operation, issue single printing.
Optionally, the goods and material handling method realized based on handling of goods and materials platform, also comprising passing through handling of goods and materials platform The maintenance process and scrapping process of execution:
Maintenance request slip is proposed by the department for having object that need to repair, is examined respectively at circulation to expert engineer, line manager Core, after the information that expert engineer, line manager feed back that audit passes through respectively, maintenance request slip is sent to professional teams and groups, right Object carries out professional teams and groups and reviews one's lessons by oneself;
After the professional teams and groups of progress review one's lessons by oneself, when professional teams and groups provide object repaired feedback information, professional teams and groups are carried out Test directly exempts to survey storage;Professional teams and groups provide the feedback information that object can not be repaired after reviewing one's lessons by oneself when, article information list stream It goes to equipment management department and carries out equipment management department distribution;
After carrying out professional teams and groups' test, according to the feedback information that object is tested not over professional teams and groups, by article information Single circulation carries out equipment management department distribution to equipment management department;Showed according to object by the feedback information of professional teams and groups' test Field receives;
When carry out scene receives, scene being first provided and receives information, carries out on-the-spot test later, on-the-spot test is unacceptable, Article information list is flowed directly to the professional professional teams and groups of teams and groups' progress to review one's lessons by oneself;What on-the-spot test passed through, then it is fetched by maintenance department Object carries out by being put in storage or by online the object.
Optionally, when the circulation of article information list carries out equipment management department distribution to equipment management department, include:
It is article information list to circulate to electronic maintenance group from the process majored in;It is provided to object in electronic maintenance group When repaired feedback information, article information list flows directly to professional teams and groups and carries out professional teams and groups' test;In electronic maintenance group When providing the feedback information that can not be repaired to object, article information list returning equipment management department re-starts equipment management part Match;
Entrust the process dispatched workers to do on-site repairs, be that article information list circulates to Wei Wai company, object is fetched by producer repaired after, object The circulation of part information list carries out professional teams and groups' test to professional teams and groups;
The process scrapped is will to scrap material information to circulate to property management group, property management group provide confirmation object scrap it is anti- After feedforward information, object is carried out to scrap storage.
Optionally, when scrapping storage, checked by property management group and scrap material information, and after filling in and scrapping information table, confirm into Library completes to scrap storage;
Described to scrap material information, include: the record of flow of material and the goods and materials are about fault message and detection parameters The status information of information;
Described fill in scraps information table, includes: goods and materials attribute scraps warehouse selection, warehouse address choice, goods yard selection.
Optionally, the permission in production plan portion includes: materials warehousing, issues goods and materials, maintenance of information, goods and materials at goods and materials outbound Information printing;
The permission of equipment management department includes: application, maintenance of information, goods and materials letter are scrapped in materials warehousing, goods and materials outbound, maintenance Breath printing;
The permission for the maintenance of information for allowing the equipment management department individually operated includes: specialized information maintenance, system information Maintenance, facility information maintenance, material information modification;
The permission for the maintenance of information for allowing the production plan portion individually operated includes: specialized information maintenance, system information Maintenance, facility information maintenance exempt to survey storage, the maintenance of depositary management personal information;
The permission for the maintenance of information for needing the equipment management department and production plan portion to co-operate includes: maintaining unit Information modification, contract information maintenance, the maintenance of contract detail;
Wherein, the specialized information is safeguarded, includes: the modification of professional name, professional classification, state;
The system information is safeguarded, includes: the modification of system name, system professional classification, state;
The facility information is safeguarded, includes: the modification of implementor name, professional name, system name, state.
Optionally, the permission of handling of goods and materials person includes: the goods and materials respectively administered to multiple warehouses of department, carries out The registration of storage and outbound, examination, verification, information addition, storehouse assignment operation, the storage for issuing goods and materials to production plan portion are grasped Make, maintenance of supplies scraps application, the printing of administered material information;
The permission of warehouse keeper includes: to the goods and materials of place storehouse management, carry out the registration of storage and outbound, examination, Verification, information addition, storehouse assignment operation, maintenance of supplies scrap application, the printing of administered material information;
The permission of property management group includes: for the independent warehouse of the management group, carrying out the object bought to production plan portion The registration of money storage and outbound, examination, verification, information addition, storehouse assignment operation, maintenance of supplies scrap application, administered object The printing of standing breath;
The permission of professional teams and groups carries out the storage of goods and materials and stepping on for outbound comprising being directed to the independent warehouse of profession teams and groups Note is checked and accepted, verification, information addition, storehouse assignment operation, is accepted and is conserved task by the maintenance of supplies that production plan portion issues, into The maintenance of row material information, maintenance of supplies scrap application, the printing of administered material information;
The permission of line manager is that maintenance of supplies scraps the processing of the maintenance of supplies opinion of link, includes following operation: Check maintenance material information, maintenance of supplies audit passes through, and maintenance of supplies audit is not by retracting;
The permission of expert engineer is that maintenance of supplies scraps the processing of the maintenance of supplies opinion of link, includes following behaviour Make: checking maintenance material information, maintenance of supplies audit passes through, and maintenance of supplies audit is not by retracting;
The permission of Wei Wai company is that maintenance of supplies scraps the following operation of link: what undertaking was distributed by equipment management department Maintenance of supplies task is retracted to the maintenance of supplies that can be repaired, or to the goods and materials that there is no problem, or is done to the goods and materials that can not be repaired Scrap the application of processing.
Another technical solution of the invention is to provide a kind of handling of goods and materials platform, is suitable for any one of the above and is based on object The goods and material handling method that money management platform is realized;The handling of goods and materials platform includes:
That supports the execution of materials warehousing process enters library module, whether has the corresponding C code of goods and materials and equipment to lane database Type information is judged that the information of receiving device management department and production plan portion feedback in pre-registration audit, and production are counted The C code that the portion of drawing generates directly is put in storage according to goods and materials or is updated the case where storage after pre-registration examination & approval to inventory information;
It supports the library module out that goods and materials outbound process executes, receives the demand application of goods and materials outbound, be forwarded to production meter It draws portion and equipment management department and receives the information of feedback, and carried out based on information is deposited to data library of libraries the case where recalling goods and materials It updates;
The planning department for supporting production plan portion execution goods and materials to issue process issues module, receives production plan portion by intending What system generated issues bill of material, issues material information to be formed;And receive production plan portion, goods and materials receiving department, maintenance Portion, handling of goods and materials person are based on the information inquiring request in respective extent of competence, to provide the letter of drawing up to match with inquiry request The material information for ceasing, having issued, got, being put in storage;
It supports the maintenance for executing maintenance process and scrapping process to scrap module, receives the maintenance application that any department proposes It is single, it is forwarded to expert engineer, at line manager and receives the information of feedback;Maintenance request slip is sent to professional teams and groups and is connect Receive the information fed back after professional teams and groups review one's lessons by oneself;It gives article information single-shot to professional teams and groups and receives professional teams and groups and receive profession The information fed back after teams and groups' test;By article information single-shot be sent to equipment management department carry out equipment management department distribution, and according to Article information list is circulated to electronic maintenance Zu Huoweiwai company and receives the information of feedback by distribution, or according to distribution by scrappage Information flow is provided to property management group and receives the information of feedback.
Optionally, the handling of goods and materials platform, further includes:
Maintenance of information module, in the goods and material handling method realized based on handling of goods and materials platform described in the claim 6, branch Hold production plan portion, equipment management department is performed based on its permission that respectively individually operated permission or two departments co-operate Maintenance of information operation;
Print module provides printing interface, enables to have department's printing of print right and its respective permission phase The information matched.
In conclusion handling of goods and materials platform of the invention and method facilitate circulation using electronic approval mode, people is saved Power material resources.Goods and materials carry out identity using C code, convenient for tracking, facilitate circulation.Goods and materials outbound warehousing information updates convenient in time It consults.It scraps repair message and operates in time more convenient, be conducive to goods and materials and scrap maintenance.
Detailed description of the invention
Fig. 1 handling of goods and materials platform structure figure;
Fig. 2 materials warehousing flow chart;
Fig. 3 goods and materials outbound flow chart;
Fig. 4 production plan portion issues process;
Process is scrapped in Fig. 5 maintenance;
Fig. 6 equipment management department operating right;
Fig. 7 production plan portion operating right;
Fig. 8 equipment management department and the common permission in production plan portion;
Fig. 9 printing function process;
Figure 10 handling of goods and materials person's permission;
Figure 11 warehouse keeper's permission;
Figure 12 property management group permission;
Figure 13 production plan portion permission;
Figure 14 equipment management department permission;
Figure 15 line manager's permission;
Figure 16 expert engineer's permission;
Figure 17 profession teams and groups permission;
Figure 18 Wei Wai company permission.
Specific embodiment
As shown in Figure 1, a kind of handling of goods and materials platform of the invention, includes: entering library module 1, out library module 2, under planning department Module 3 is sent out, module 4, maintenance of information module 5, print module 6 are scrapped in maintenance.The user of relevant departments can be set by client Standby (such as PC, but not limited to this) platform is logged in, it executes and its operation that respectively permission matches.To support respective streams Each module of the execution of journey, platform can have judging unit, execute arbitration functions involved in respective process;Can have with The database of handling of goods and materials carries out the interface of data interaction, to inquire or be obtained needed for handling of goods and materials in corresponding process Data, and the data etc. being in progress about goods and materials and/or process are written or updated to database;It can have and relevant departments Login user carry out data interaction interface, in corresponding process obtain need each department provide data, Xiang Gebu The user of door, which forwards data, provides process is in progress relevant notification information, etc..
For entering library module, C code is the key that materials warehousing, and C code is that applying and purchasing the experiment materials platform generates in purchase of goods and materials The C code of MSCP code, unique identity of this yard as goods and materials, such as VGA signal coder is C0103998.Fig. 2 is shown The process of materials warehousing, first determines whether the goods and materials have C code before storage, if the goods and materials are in the number of handling of goods and materials platform There are corresponding information, i.e. C code and device model information according to library the inside, so that it may directly be put in storage;If goods and materials C code and set Standby type information lacks, and Yao Jinhang material information pre-registration (such as jumps the corresponding interface of pre-registration, receives user and carry out pre-registration Provided information);All accounts for possessing storage permission operation can carry out pre-registration, and pre-registration is to fill out the information of goods and materials It writes and is shaped to a goods and materials pre-registration, goods and materials pre-registration includes: goods and materials title, model, affiliated profession, affiliated system System, brand, goods and materials unit (such as: a, case etc.), goods and materials are monovalent, the affiliated route of goods and materials, remarks and goods and materials picture.It is put in storage mould Block is transmitted to corresponding department to relevant information and receives the approval information of its each self feed back, by production plan portion and sets Standby management department examines, and confirms that goods and materials C code and device model information are errorless, then audit pre-registration in production plan portion is completed to generate C code, then the goods and materials permit storage.To relevant information (such as C of goods and materials being put in storage after direct storage or pre-registration in database Code, device model information, inventory, but not limited to this) it is updated.
Goods and materials outbound is divided into Three models: the first goods and materials is received, and second of delivery of goods and materials or shifting library, the third is trans-departmental It allots.Fig. 3 show the process of goods and materials outbound, proposes demand application by sector of demand first, and library module is by related application out Information is transmitted to corresponding department and receives the approval information of its feedback, passes through via production plan portion and equipment management department examination & approval Afterwards, goods and materials are locked, is then got by requiring department, the database of handling of goods and materials platform is changed during getting, is based on The case where recalling goods and materials updates the information of inventory.Goods and materials outbound is completed.
Fig. 4 show the process that planning department issues goods and materials.On handling of goods and materials platform, goods and materials are carried out down by production plan portion Hair carries out issuing first goods and materials and draws up that (draw up is that production plan portion has been directed to the goods and materials that will be issued during issuing goods and materials It is chosen and what is generated issues bill of material, which does not pass through production plan portion by issuing).Then it generates and issues goods and materials Information, material information can be identical as pre-registration material information, comprising: goods and materials title, model, affiliated profession, said system, product Board, and goods and materials unit (such as: a, case etc.), goods and materials are monovalent, the affiliated route of goods and materials, remarks and goods and materials picture;Planning department issues mould Material information is drawn up and is issued in block acquisition, is updated to the content that database is related to.Each difference department issues different Information carries out inquiry operation: the production plan portion, department that issues of supervisor's goods and materials and maintenance department, receiving department handling of goods and materials person can be with To drawing up, information is inquired;Production plan portion permission, which can check, have been issued, has got, being put in storage material information;Receiving unit Door maintenance department handling of goods and materials person's permission can check that this department has issued the material information under state, can be got, be printed The operation such as lower bill.
The interface that module is scrapped in maintenance corresponds to each department.Maintenance flow is being scrapped before process.As shown in figure 5, first Maintenance application is first proposed by department, expert engineer is given to respectively and audits, line manager audits, according to feedback information After the approval, whether professional teams and groups are connected to maintenance request slip and provide and determine to connect the information repaired for judgement;Decision is connect and is repaired, specially Industry teams and groups are reviewed one's lessons by oneself, and professional teams and groups provide the judgement information whether repaired as the case may be can if repaired Storage is surveyed to carry out teams and groups' test or directly exempt from.Exempt from the survey storage i.e. goods and materials after testing without failure, is directly put in storage, exempts to survey Storage is as the mode of materials warehousing.
Professional teams and groups' test is carried out, then professional teams and groups provide the object whether by the judgement information of the test, such as Fruit does not pass through the relevant information for testing then object to be repaired, flows directly to equipment management department and carries out equipment management department distribution;Such as Fruit then carries out live receiving by test: the scene of filling in receives information, carries out on-the-spot test later, and on-the-spot test is unacceptable, The professional professional teams and groups of teams and groups' progress are then flowed directly to review one's lessons by oneself.If on-the-spot test passes through, fetched by maintenance department, maintenance department takes The object can be by being put in storage or by online after returning: passing through maintenance department's on-the-spot test by being put in storage, and confirms it Afterwards, materials warehousing process is carried out;Pass through maintenance department's on-the-spot test by online, and is used on the line after confirming, it should The information state mark of goods and materials becomes online.
It is aforementioned in the case where judging that professional teams and groups test unacceptable situation, by article information list circulation to equipment management department into The distribution of row equipment management department.It is can choose in equipment management department distribution from majoring in, committee dispatches workers to do on-site repairs and scraps.In majoring in certainly, The article information list circulates to electronic maintenance group, and electronic maintenance group repairs object, if electronic maintenance group repairs object Multiple then flow directly to professional teams and groups and carry out professional teams and groups' test, returning equipment management department carries out equipment pipe if it can not repair Match reason part.In committee dispatches workers to do on-site repairs, which is fetched by producer, carries out producer's reparation, professional teams and groups are arrived in circulation after producer repairs Test.In scrapping, which will pass through property management group acknowledge, then carry out scrapping storage.
The process for scrapping storage is different from materials warehousing, checks scrappage standing by property management group first when scrapping storage Breath, scrap material information include the record of the flow of material and the status information of the goods and materials include fault message and other inspection Parameter information is surveyed, fills in that scrap information table include: goods and materials attribute, scraps warehouse selection, warehouse address choice, goods yard selection.It fills out Write it is complete, confirmation storage, that is, complete scrap storage.
Maintenance of information is the management service operation based on entire platform, and permission is only limitted to administrative department, equipment management department with Production plan portion.As shown in fig. 6, maintenance of information permission individually operated in the permission of equipment management department has: specialized information dimension Shield, system information maintenance, facility information maintenance, material information modification.As shown in fig. 7, the maintenance of information permission in production plan portion It include: specialized information maintenance, system information maintenance, facility information is safeguarded, exempts to survey storage, the maintenance of depositary management personal information.Such as Fig. 8 institute Show have in the maintenance of information permission that equipment management department is co-operated with production plan portion: the modification of maintaining unit information, contract information Maintenance, the maintenance of contract detail.Wherein, the specialized information maintenance of goods and materials includes: professional name, professional classification, the modification of state;System Maintenance of information includes: system name, system professional classification, the modification of state;Facility information maintenance includes: implementor name, and professional name is System name, the modification of state.
Platform of the invention is provided with printing interface by print module.It can be to choosing at each interface for having printing function In option generate list then printed, as shown in Figure 9.
In the handling of goods and materials platform, according to the difference of the job category of different departments, for different departments and same The different levels of department are provided with different permissions.There is the power of following management position and department in the handling of goods and materials platform Limit: handling of goods and materials person's permission, warehouse keeper's permission, handling of goods and materials group permission, production plan portion permission, equipment management department power Limit, line manager's permission, expert engineer's permission, professional teams and groups' permission and committee's other unit's permission.The circulation of goods and materials is different There is different processing modes in department, and handling of goods and materials platform is now illustrated from permission angle.
Handling of goods and materials person's permission: having a handling of goods and materials person in each department, manages multiple material depots, and be equipped with more A warehouse keeper, each warehouse keeper manage a warehouse.The permission of handling of goods and materials person has five major class: materials warehousing, Goods and materials outbound, planning department issue goods and materials, maintenance is scrapped, printed.Its permission is as shown in Figure 10.It is carried out for materials warehousing, outbound Registration is checked and accepted, verification, information addition, the operation such as storehouse assignment;Goods and materials are issued for production plan portion, higher level department to be put in storage Operation;The function that maintenance of supplies is scrapped scraps module and its process referring to aforementioned maintenance of supplies;Material information printing, is that will select In material information print.
Warehouse keeper's permission: there are one or more warehouse in the teams and groups below each department and department, often A warehouse keeper will be arranged in a warehouse, scrap for materials warehousing, outbound and maintenance of supplies, print material information It is operated.Warehouse keeper's permission is as shown in figure 11.
Property management group permission: property management group belongs to an independent teams and groups, is under the jurisdiction of department, has been mainly responsible for production plan portion Purchase materials warehousing, outbound and the maintenance of old goods and materials are scrapped, and have the printing of material information under its command.Property management group permission is as schemed Shown in 12.
Production plan portion permission issues goods and materials, maintenance of information, printing comprising materials warehousing, goods and materials outbound, planning department, such as schemes Shown in 13.Equipment management department permission include materials warehousing, goods and materials outbound, maintenance scrap, maintenance of information, printing, as shown in figure 14.
Line manager's permission: in the platform, the permission of line manager is that maintenance of supplies scraps the maintenance of supplies meaning of link The processing seen has following operation: checking maintenance material information, maintenance of supplies audit passes through, and maintenance of supplies audit is not by retracting. Line manager's permission is as shown in figure 15.
Expert engineer's permission: in the platform, the permission of expert engineer is that maintenance of supplies scraps the goods and materials dimension of link The processing for repairing opinion has following operation: checking maintenance material information, maintenance of supplies audit passes through, and maintenance of supplies audit does not pass through It retracts.Expert engineer's permission is as shown in figure 16.
Professional teams and groups' permission: it is special that professional teams and groups refer to that the senior engineer for having professional speciality for certain means of production in Category I is constituted Industry maintenance teams and groups carry out special maintenance maintenance for the goods and materials of line production, and professional teams and groups exist as independent teams and groups, There is the warehouse of oneself, can be carried out outbound, the storage of goods and materials, accept and task is conserved by the maintenance of supplies that production plan portion issues, it is right The information of one line goods and materials carries out maintenance of information, such as goods and materials status information, contract information etc., and can repair to problem goods and materials It scraps, material information printing is carried out to the information for having goods and materials under its command.Professional teams and groups' permission is illustrated in fig. 17 shown below.
Wei Wai company permission: the maintenance of supplies task distributed by equipment management department is accepted by Wei Wai company, to what can be repaired Processing is retracted or scrapped to the maintenance of supplies goods and materials that perhaps there is no problem.Wei Wai company permission is as shown in figure 18.
In one specific embodiment, the handling of goods and materials platform is applicable in Windows operating system, and the platform is for a The hardware configuration requirement of people's computer are as follows: memory is not less than 512M, and processor is general mainstream processor, such as AMD, Intel.It should Platform is that browser logs in platform, and platform and data are stored on the server, the server are as follows: Windows server 2008R2Standard, processor-server are Intel (R) Xeon (R), frequency 2.4GHz, 64 bit manipulation systems.
Be to rely on software design in conclusion handling of goods and materials platform of the invention, be put in storage in goods and materials, outbound, under Hair such as repair, scraps at the management aspects shared data information, so that goods and materials tracking approval distributing automates, goods and materials data are in real time more Newly, a large amount of manpower and material resources are saved for handling of goods and materials, ensures that production orderly carries out.
It is discussed in detail although the contents of the present invention have passed through above preferred embodiment, but it should be appreciated that above-mentioned Description is not considered as limitation of the present invention.After those skilled in the art have read above content, for of the invention A variety of modifications and substitutions all will be apparent.Therefore, protection scope of the present invention should be limited to the appended claims.

Claims (10)

1. it is a kind of based on handling of goods and materials platform realize goods and material handling method, characterized by comprising:
Materials warehousing process: before materials warehousing, judge whether goods and materials have the C code as unique identity;If the goods and materials exist The lane database of handling of goods and materials platform has corresponding C code and device model information, then is directly put in storage;If the C code of the goods and materials and Device model loss of learning then carries out the pre-registration of material information, logical according to equipment management department and the feedback examination & approval of production plan portion The information crossed judges that the C code of the goods and materials and device model information are correct, then pre-registration audit is completed, and is given birth to by production plan portion At C code, which permits storage;
Goods and materials outbound process: proposing demand application by sector of demand, feeds back and examines respectively via production plan portion and equipment management department After the information batch passed through, goods and materials are locked, and when goods and materials are got by the sector of demand, based on the case where recalling goods and materials more The information of inventory in new database completes goods and materials outbound.
2. the goods and material handling method realized as described in claim 1 based on handling of goods and materials platform, which is characterized in that be also included in object On money management platform, the process that goods and materials issue is carried out by production plan portion:
It first passes through to draw up that the goods and materials that will be issued are chosen and generated and issues bill of material;Then it generates and issues material information, wrap Contain: goods and materials title, model, affiliated profession, said system, brand, goods and materials unit, goods and materials unit price, the affiliated route of goods and materials, remarks with And goods and materials picture;
Production plan portion, goods and materials receiving department, maintenance department, handling of goods and materials person respectively have the power inquired information of drawing up Limit;
The permission for the material information that there is inquiry to have issued, get, be put in storage in production plan portion;
Goods and materials receiving department, maintenance department, handling of goods and materials person have the goods and materials letter in the state that issued for inquiring its department Breath, and carry out the permission that goods and materials get operation, issue single printing.
3. the goods and material handling method realized as claimed in claim 2 based on handling of goods and materials platform, which is characterized in that also comprising passing through The maintenance process and scrapping process that handling of goods and materials platform executes:
Maintenance request slip is proposed by the department for having object that need to repair, is audited respectively at circulation to expert engineer, line manager, After expert engineer, line manager feed back the information that passes through of audit respectively, maintenance request slip is sent to professional teams and groups, to object into Row profession teams and groups review one's lessons by oneself;
After the professional teams and groups of progress review one's lessons by oneself, when professional teams and groups provide object repaired feedback information, professional teams and groups' test is carried out Or directly exempt to survey storage;Professional teams and groups provide the feedback information that object can not be repaired after reviewing one's lessons by oneself when, the circulation of article information list is arrived Equipment management department carries out equipment management department distribution;
After carrying out professional teams and groups' test, according to the feedback information that object is tested not over professional teams and groups, by article information list stream It goes to equipment management department and carries out equipment management department distribution;Scene is carried out by the feedback information of professional teams and groups' test according to object to connect By;
When carry out scene receives, scene is first provided and receives information, carries out on-the-spot test later, on-the-spot test is unacceptable, by object Part information list flows directly to the professional professional teams and groups of teams and groups' progress and reviews one's lessons by oneself;What on-the-spot test passed through, then object is fetched by maintenance department, The object is carried out by being put in storage or by online.
4. the goods and material handling method realized as claimed in claim 3 based on handling of goods and materials platform, which is characterized in that article information list It circulates to when equipment management department progress equipment management department distribution, includes:
It is article information list to circulate to electronic maintenance group from the process majored in;It is provided in electronic maintenance group and object has been repaired When multiple feedback information, article information list flows directly to professional teams and groups and carries out professional teams and groups' test;It is provided in electronic maintenance group When the feedback information that can not be repaired to object, article information list returning equipment management department re-starts equipment management department distribution;
Entrust the process dispatched workers to do on-site repairs, be that article information list circulates to Wei Wai company, object is fetched by producer repaired after, object letter Interest statement circulation carries out professional teams and groups' test to professional teams and groups;
The process scrapped is will to scrap material information to circulate to property management group, provides the feedback letter that confirmation object is scrapped in property management group After breath, object is carried out to scrap storage.
5. the goods and material handling method realized as claimed in claim 4 based on handling of goods and materials platform, which is characterized in that scrap storage When, it is checked by property management group and scraps material information, and after filling in and scrapping information table, confirmation storage is completed to scrap storage;
Described to scrap material information, include: the record of flow of material and the goods and materials are about fault message and detection parameters information Status information;
Described fill in scraps information table, includes: goods and materials attribute scraps warehouse selection, warehouse address choice, goods yard selection.
6. the goods and material handling method realized as claimed in claim 5 based on handling of goods and materials platform, which is characterized in that production plan portion Permission, include: materials warehousing, goods and materials outbound, issue goods and materials, maintenance of information, material information printing;
The permission of equipment management department includes: materials warehousing, goods and materials outbound, application is scrapped in maintenance, maintenance of information, material information are beaten Print;
The permission for the maintenance of information for allowing the equipment management department individually operated includes: specialized information maintenance, system information dimension Shield, facility information maintenance, material information modification;
The permission for the maintenance of information for allowing the production plan portion individually operated includes: specialized information maintenance, system information dimension Shield, facility information maintenance exempt to survey storage, the maintenance of depositary management personal information;
The permission for the maintenance of information for needing the equipment management department and production plan portion to co-operate includes: maintaining unit information Modification, contract information maintenance, the maintenance of contract detail;
Wherein, the specialized information is safeguarded, includes: the modification of professional name, professional classification, state;
The system information is safeguarded, includes: the modification of system name, system professional classification, state;
The facility information is safeguarded, includes: the modification of implementor name, professional name, system name, state.
7. the goods and material handling method realized as claimed in claim 6 based on handling of goods and materials platform, which is characterized in that handling of goods and materials person Permission, include: the goods and materials that multiple warehouses of department are respectively administered, carry out storage and the registration of outbound, examination, core To the addition of, information, storehouse assignment operation, the in-stockroom operation of goods and materials is issued to production plan portion, maintenance of supplies is scrapped application, managed Have jurisdiction over the printing of material information;
The permission of warehouse keeper includes: to the goods and materials of place storehouse management, carrying out storage and the registration of outbound, examination, core To the addition of, information, storehouse assignment operation, maintenance of supplies scraps application, the printing of administered material information;
The permission of property management group includes: for the independent warehouse of the management group, enter the goods and materials that production plan portion has been bought The registration of library and outbound, examination, verification, information addition, storehouse assignment operation, maintenance of supplies scrap application, administered goods and materials letter The printing of breath;
The permission of professional teams and groups carries out the storage of goods and materials and the registration of outbound, tests comprising being directed to the independent warehouse of profession teams and groups It receives, verification, information addition, storehouse assignment operation, accepts and task is conserved by the maintenance of supplies that production plan portion issues, carry out goods and materials Maintenance of information, maintenance of supplies scrap application, the printing of administered material information;
The permission of line manager is that maintenance of supplies scraps the processing of the maintenance of supplies opinion of link, includes following operation: checking Material information is repaired, maintenance of supplies audit passes through, and maintenance of supplies audit is not by retracting;
The permission of expert engineer is that maintenance of supplies scraps the processing of the maintenance of supplies opinion of link, includes following operation: looking into See maintenance material information, maintenance of supplies audit passes through, and maintenance of supplies audit is not by retracting;
The permission of Wei Wai company is that maintenance of supplies scraps the following operation of link: accepting the goods and materials distributed by equipment management department Maintenance task is retracted to the maintenance of supplies that can be repaired, or to the goods and materials that there is no problem, or does and scrap to the goods and materials that can not be repaired The application of processing.
8. the goods and material handling method realized as described in claim 1 or 7 based on handling of goods and materials platform, which is characterized in that allow to appoint The account that meaning one possesses goods and materials in-stockroom operation permission carries out pre-registration, to provide goods and materials pre-registration below: goods and materials name Title, model, affiliated profession, said system, brand, goods and materials unit, goods and materials unit price, the affiliated route of goods and materials, remarks and goods and materials figure Piece.
9. a kind of handling of goods and materials platform, suitable for what is realized described in any one of claim 3-8 based on handling of goods and materials platform Goods and material handling method, which is characterized in that the handling of goods and materials platform includes:
That supports the execution of materials warehousing process enters library module, whether has the corresponding C code of goods and materials and device model to lane database Information judged, the information and production plan portion of receiving device management department and production plan portion feedback in pre-registration audit The C code of generation is directly put in storage according to goods and materials or is updated the case where storage after pre-registration examination & approval to inventory information;
It supports the library module out that goods and materials outbound process executes, receives the demand application of goods and materials outbound, be forwarded to production plan portion And equipment management department and the information for receiving feedback, and carried out more based on information is deposited to data library of libraries the case where recalling goods and materials Newly;
The planning department for supporting production plan portion execution goods and materials to issue process issues module, receives production plan portion and passes through life of drawing up At issue bill of material, issue material information to be formed;And receive production plan portion, goods and materials receiving department, maintenance department, object Administrator is expected based on the information inquiring request in respective extent of competence, to provide the information of drawing up to match with inquiry request, The material information issue, got, being put in storage;
It supports the maintenance for executing maintenance process and scrapping process to scrap module, receives the maintenance request slip that any department proposes, It is forwarded to expert engineer, at line manager and receives the information of feedback;Maintenance request slip is sent to professional teams and groups and is received The information that professional teams and groups feed back after reviewing one's lessons by oneself;It gives article information single-shot to professional teams and groups and receives professional teams and groups and receive special course The information fed back after group test;By article information single-shot be sent to equipment management department carry out equipment management department distribution, and according to point Goods and materials will be scrapped with article information list circulates to electronic maintenance Zu Huoweiwai company and receives the information of feedback, or according to distribution Information flow is to property management group and receives the information of feedback.
10. handling of goods and materials platform as claimed in claim 9, which is characterized in that
The handling of goods and materials platform, further includes:
Maintenance of information module in the goods and material handling method realized described in the claim 6 based on handling of goods and materials platform, supports life Producing planning department, equipment management department, respectively the permission of individually operated permission or two departments co-operation is performed information based on it Attended operation;
Print module provides printing interface, and enabling the printing of the department with print right with its, respectively permission matches Information.
CN201910122579.1A 2019-02-18 2019-02-18 Handling of goods and materials platform and method Pending CN109886628A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910122579.1A CN109886628A (en) 2019-02-18 2019-02-18 Handling of goods and materials platform and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910122579.1A CN109886628A (en) 2019-02-18 2019-02-18 Handling of goods and materials platform and method

Publications (1)

Publication Number Publication Date
CN109886628A true CN109886628A (en) 2019-06-14

Family

ID=66928515

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910122579.1A Pending CN109886628A (en) 2019-02-18 2019-02-18 Handling of goods and materials platform and method

Country Status (1)

Country Link
CN (1) CN109886628A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110866060A (en) * 2019-11-19 2020-03-06 国网青海省电力公司检修公司 Team management software based on SQL-Server database
CN111680899A (en) * 2020-05-29 2020-09-18 新奥(中国)燃气投资有限公司 Asset management method and device
CN112215542A (en) * 2020-09-24 2021-01-12 珠海华伟电气科技股份有限公司 Intelligent storehouse management system
CN112561096A (en) * 2020-12-23 2021-03-26 上海地铁维护保障有限公司 Full-life maintenance method for subway vehicle equipment
CN115018410A (en) * 2022-05-23 2022-09-06 李晶 National multi-system mutual-recognition management coding system for multi-class emergency equipment materials

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103279856A (en) * 2013-06-09 2013-09-04 青岛农业大学 High-precision measuring industry inventory management system
CN103413211A (en) * 2013-08-22 2013-11-27 国家电网公司 Material management method and device
CN103426054A (en) * 2013-06-28 2013-12-04 赛龙通信技术(深圳)有限公司 Production jig management system and control method
CN104504543A (en) * 2014-11-14 2015-04-08 镇江市新创计算机系统集成有限公司 Project investment control and management system and use method thereof
CN104915818A (en) * 2015-05-31 2015-09-16 镇江东软信息技术有限公司 Warehouse cargo management system
CN105160515A (en) * 2015-09-23 2015-12-16 胡卫建 Earthquake rescue equipment material storage information system and material storage and distribution control method
CN105225040A (en) * 2015-09-25 2016-01-06 中铁建电气化局集团南方工程有限公司 Based on the preparation of construction material overall process method for tracing of Internet of Things
CN106067107A (en) * 2016-07-26 2016-11-02 上海普攀计算机信息科技有限公司 A kind of storehouse management application system based on the Internet
CN109118087A (en) * 2018-08-15 2019-01-01 国网吉林省电力有限公司长春市双阳区供电公司 Power Material based on electronic order mode is prefabricated and allocator

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103279856A (en) * 2013-06-09 2013-09-04 青岛农业大学 High-precision measuring industry inventory management system
CN103426054A (en) * 2013-06-28 2013-12-04 赛龙通信技术(深圳)有限公司 Production jig management system and control method
CN103413211A (en) * 2013-08-22 2013-11-27 国家电网公司 Material management method and device
CN104504543A (en) * 2014-11-14 2015-04-08 镇江市新创计算机系统集成有限公司 Project investment control and management system and use method thereof
CN104915818A (en) * 2015-05-31 2015-09-16 镇江东软信息技术有限公司 Warehouse cargo management system
CN105160515A (en) * 2015-09-23 2015-12-16 胡卫建 Earthquake rescue equipment material storage information system and material storage and distribution control method
CN105225040A (en) * 2015-09-25 2016-01-06 中铁建电气化局集团南方工程有限公司 Based on the preparation of construction material overall process method for tracing of Internet of Things
CN106067107A (en) * 2016-07-26 2016-11-02 上海普攀计算机信息科技有限公司 A kind of storehouse management application system based on the Internet
CN109118087A (en) * 2018-08-15 2019-01-01 国网吉林省电力有限公司长春市双阳区供电公司 Power Material based on electronic order mode is prefabricated and allocator

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110866060A (en) * 2019-11-19 2020-03-06 国网青海省电力公司检修公司 Team management software based on SQL-Server database
CN111680899A (en) * 2020-05-29 2020-09-18 新奥(中国)燃气投资有限公司 Asset management method and device
CN112215542A (en) * 2020-09-24 2021-01-12 珠海华伟电气科技股份有限公司 Intelligent storehouse management system
CN112215542B (en) * 2020-09-24 2023-01-31 珠海华伟电气科技股份有限公司 Intelligent storehouse management system
CN112561096A (en) * 2020-12-23 2021-03-26 上海地铁维护保障有限公司 Full-life maintenance method for subway vehicle equipment
CN115018410A (en) * 2022-05-23 2022-09-06 李晶 National multi-system mutual-recognition management coding system for multi-class emergency equipment materials

Similar Documents

Publication Publication Date Title
CN109886628A (en) Handling of goods and materials platform and method
CN104808639B (en) Pharmaceutical product manufacturing execution system and method
CN106251082A (en) System for managing stock service of business
US7127409B2 (en) Methods and systems for aviation nonconformance component management
US20060287954A1 (en) Method and system for tracking and verifying repair estimates, invoices, and billing exceptions
CN106650971A (en) LIMS-based laboratory management system
CN110009172A (en) Asset life cycle Data Modeling Method based on SG-CIM model
CN111815281A (en) Information system project supervision project bid management system
CN1963850A (en) System for managing stock service of business
CN108694513A (en) A kind of assay calibration laboratory certificate management system and method
CN109949910A (en) Medical Devices Life cycle Network Management System
CN110751303A (en) Intelligent device full life cycle monitoring and inquiring system based on cloud computing
CN108665125A (en) The method and system of harmful influence supervision are realized based on flow dynamic configuration
Wickboldt et al. Blockchain for workshop event certificates–a proof of concept in the aviation industry
US20020138166A1 (en) Data processing system for implementing an exchange
CN114781795A (en) Enterprise Resource Planning (ERP) -based comprehensive purchasing management system and management method
US20050222882A1 (en) Quality problem treatment supporting system
CN112862341A (en) Project cost management system
Huang et al. Informatization design of raw material purchase and payment for feed processing enterprises under ERP system environment
JP3909613B2 (en) Computer-readable recording medium recording design review processing system and design review processing program
Tseng et al. Accountability centered approach to business process reengineering
CN111899133A (en) Informatization platform construction method and application based on civil inspection service
US7664665B2 (en) System and method for distribution management
CN110619399A (en) Management platform and management method of intelligent equipment
Putra et al. Project Monitoring System for Material Circulation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190614