CN110009172A - Asset life cycle Data Modeling Method based on SG-CIM model - Google Patents
Asset life cycle Data Modeling Method based on SG-CIM model Download PDFInfo
- Publication number
- CN110009172A CN110009172A CN201811503389.6A CN201811503389A CN110009172A CN 110009172 A CN110009172 A CN 110009172A CN 201811503389 A CN201811503389 A CN 201811503389A CN 110009172 A CN110009172 A CN 110009172A
- Authority
- CN
- China
- Prior art keywords
- goods
- materials
- life cycle
- information
- wbs
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 25
- 239000000463 material Substances 0.000 claims abstract description 159
- 239000002699 waste material Substances 0.000 claims abstract description 24
- 238000010276 construction Methods 0.000 claims description 29
- 238000003860 storage Methods 0.000 claims description 19
- 238000012384 transportation and delivery Methods 0.000 claims description 14
- 238000012423 maintenance Methods 0.000 claims description 12
- 238000013439 planning Methods 0.000 claims description 9
- 238000012545 processing Methods 0.000 claims description 4
- 238000012546 transfer Methods 0.000 claims description 4
- GOLXNESZZPUPJE-UHFFFAOYSA-N spiromesifen Chemical compound CC1=CC(C)=CC(C)=C1C(C(O1)=O)=C(OC(=O)CC(C)(C)C)C11CCCC1 GOLXNESZZPUPJE-UHFFFAOYSA-N 0.000 claims description 3
- 238000007726 management method Methods 0.000 abstract description 23
- 238000013499 data model Methods 0.000 abstract description 4
- 230000008569 process Effects 0.000 description 7
- 230000006870 function Effects 0.000 description 6
- 238000013461 design Methods 0.000 description 5
- 238000010586 diagram Methods 0.000 description 5
- 238000004519 manufacturing process Methods 0.000 description 5
- 239000006185 dispersion Substances 0.000 description 3
- 238000007689 inspection Methods 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 230000001360 synchronised effect Effects 0.000 description 3
- 238000012360 testing method Methods 0.000 description 3
- 230000015556 catabolic process Effects 0.000 description 2
- 230000004888 barrier function Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 244000309464 bull Species 0.000 description 1
- 238000009430 construction management Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000009472 formulation Methods 0.000 description 1
- 230000008676 import Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 239000000178 monomer Substances 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 230000032258 transport Effects 0.000 description 1
- 238000010200 validation analysis Methods 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
- G06Q10/087—Inventory or stock management, e.g. order filling, procurement or balancing against orders
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/18—Legal services
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Tourism & Hospitality (AREA)
- Entrepreneurship & Innovation (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Game Theory and Decision Science (AREA)
- Accounting & Taxation (AREA)
- Finance (AREA)
- Data Mining & Analysis (AREA)
- Technology Law (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of asset life cycle Data Modeling Methods based on SG-CIM model, introduce material object ID, using ID in kind as core, the COM code that assets are generated in lifecycle management, project code, WBS, assets card number, device coding, resource code, waste and old material coding is associated, establish physical assets Life cycle data model, the information of each key link of asset management is subjected to connection, to complete life cycle management tracking in kind, integrate assets material flow, information flow, monetary value flow, effectively support physical assets whole-life cycle fee.
Description
Technical field
The present invention relates to technical field of power systems, more specifically, it is complete to be related to a kind of assets based on SG-CIM model
Life cycle data modeling method.
Background technique
The relational language being related in the present invention is explained:
SG-CIM: enterprise, State Grid Corporation of China uniform information model (SG-CIM) uses the modeling technique definition of object-oriented, system
One modeling language is expressed, and target is to carry out being abstracted to information model to the business object within the scope of company's full-service
Form is described, and 3.0 be its version number.
ID in kind: being unique lifelong identity coding in kind, by 3 serial numbers+1 of identification code+18 of company code+2
Bit check code forms 24 decimal system equipment material object identification codes.
Project code: the unique encodings of project, for identifying project.
WBS coding: work breakdown structure (WBS) (Work Breakdown Structure, abbreviation WBS) is with hierarchical structure
Form by a project be subdivided into layer by layer it is more tiny, be easier to fulfill one's duties and more manageable unit uses.
COM code: the unique encodings of material, using 9 codes, i.e.+8 serial codes of fixed code " 5 ".
Waste and old material coding: the unique encodings of waste and old material, coded format are " F "+Classification of materials+serial code, wherein object
Material 7 (major class 2, middle 2 class of class, group 3) of classification, serial code 2, totally 10.
Device coding: the unique encodings of Unit account of plant net unified formulation coding rule by state.Using 17 codes, 2 provinces
The random code of letter+14 of company code+1.
Assets coding: the unique encodings of assets, using 12 codes, i.e. 2 assets classes encode+4 assets groups+6
Position serial number.
Guo Wangge business department establishes system according to respective demand according to job responsibility and the scope of business at present, but across portion
Door business cooperation and when data sharing needs to carry out a large amount of man power and materials and links up and the system reform, to realize industry
Business perforation.
But due to the assets sectional management mode formed for a long time, lack unified identity, it is difficult to realize assets information
Shared, there are data barriers, constrain the further in-depth of asset life cycle management.
The program plan information dispersion of assets is in program plan system and PMS2.0 system, equipment purchasing information dispersion at present
In ECP and ERP system, project construction information dispersion is in capital construction management system and ERP system, operation and maintenance and the information point such as retired
Be dispersed in ERP and PMS2.0 system, assets life cycle management at this item have can not accurately obtain (such as other fees, failure at
This), what is had can not correspond to monomer assets (such as operating cost), cannot effectively support the accounting of assets overall life cycle cost.
Asset life-cycle data are dispersed in each service link and multiple information systems, and Business Data Standard and business
Management requires disunity, and assets information is integrated, collected, analyzing difficulty, and use of information level is lower.Especially data cannot be sufficiently total to
Enjoying leads to data bull typing, repeated acquisition, and manually enters data accounting height, and data accuracy, real-time are insufficient, to assets
The underbraced of life cycle management " three stream unifications ", Life cycle cost accounting is extensive, and lean management can not land.In addition
The operation operation of large quantities of grassroot projects, equipment update fastly, more to information data in the asset life-cycle of company in recent years
Overall process tracking causes puzzlement.
Therefore, it is necessary to using identity coding in kind as core, by relevant item number in kind, No. WBS, material number, device number,
Asset number, scheduling number, waste and old material coding are associated, and the information requirements that clearly each node needs to carry, by asset management
The information of each key link carries out connection, establishes physical assets Life cycle data model, realizes to assets life cycle management
Effective support of management.
Summary of the invention
It is an object of the invention to overcome the deficiencies of the prior art and provide a kind of assets based on SG-CIM model to give birth to entirely
Cycle data modeling method is ordered, ID in kind is tie, perforation power grid asset planning and designing, purchase of goods and materials, engineering construction, operation dimension
Shield, retired each stage business of disposition asset life cycle.
In order to solve the above technical problems, the present invention provides a kind of asset life cycle data based on SG-CIM model
Modeling method, characterized in that the following steps are included:
S1, in the power grid asset planning and designing stage:
According to the project plan, project WBS entity is constructed;
According to project equipment detailed list of materials, material essential information entity is generated;
The corresponding relationship of combing project WBS entity and material essential information entity between the two generates goods and materials procurement request,
S2, the purchase of goods and materials stage:
According to purchase of goods and materials application, bidding document is generated;
After calling for bid successfully, according to the goods and materials contract of signing, material object ID is generated,
After goods and materials are manufactured, equipment technical parameters are associated with ID in kind;
It is put in storage after cargo check, joins information association material object ID for checking and accepting;
S3, Construction Phase:
When goods and materials outbound delivery, neck material information is verified according to ID in kind, completes goods and materials delivery outbound business;
When engineering construction, material object ID recording device information is scanned;
When final acceptance of construction, field device material object ID is scanned, checks acceptance of work scene inventory checking;
S4, the operation and maintenance stage:
When putting equipment in service, scanning material object ID obtains facility information, generating device account;
When O&M overhauls, material object ID is generated to storage equipment;
S5, the retired disposition stage:
When equipment is retired, the id information accuracy in kind of checking apparatus handles waste and old material and transfers and be put in storage,
When scrapping processing, corresponding waste and old material information is obtained according to ID in kind, completes waste and old material outbound.
It further, include WBS encoded attributes in WBS entity.
Further, material essential information includes COM code.
Further, the corresponding relationship of combing project WBS entity and material essential information entity between the two includes perfect
WBS coding, materiel code incidence relation.
Further, include WBS coding in ID in kind, COM code, device numbering, power system resource number, fix
Assets coding, waste and old material coding and ID number in kind.
Further, acceptance and delivery list of goods number, contract number and COM code attribute are included in acceptance and delivery list of goods.
Compared with prior art, the beneficial effects obtained by the present invention are as follows being: the present invention exists assets using ID in kind as core
The COM code that is generated in lifecycle management, project code, WBS, etc. be associated, establish physical assets Life cycle
The information of each key link of asset management is carried out connection by data model, to complete life cycle management tracking in kind, integration money
Material flow, information flow, monetary value flow are produced, physical assets whole-life cycle fee is effectively supported.
Detailed description of the invention
Fig. 1 is each inventory association schematic diagram of assets planning stage in the present invention;
Fig. 2 is each inventory association schematic diagram in purchase of goods and materials stage in the present invention;
Fig. 3 is each inventory association schematic diagram of Construction Phase in the present invention;
Fig. 4 is each inventory association schematic diagram in operation and maintenance stage in the present invention;
Fig. 5 is each inventory association schematic diagram in retired disposition stage in the present invention.
Specific embodiment
The invention will be further described below in conjunction with the accompanying drawings.Following embodiment is only used for clearly illustrating the present invention
Technical solution, and not intended to limit the protection scope of the present invention.
A kind of asset life cycle Data Modeling Method based on SG-CIM model of the invention, shown in Figure 1, packet
Include following procedure:
S1, in the power grid asset planning and designing stage:
According to the project plan, project WBS entity is constructed;
According to project equipment detailed list of materials, material essential information entity is generated;
The corresponding relationship of combing project WBS entity and material essential information entity between the two generates goods and materials procurement request,
S2, the purchase of goods and materials stage:
According to purchase of goods and materials application, bidding document is generated;
After calling for bid successfully, according to the goods and materials contract of signing, material object ID is generated,
After goods and materials are manufactured, equipment technical parameters are associated with ID in kind;
It is put in storage after cargo check, joins information association material object ID for checking and accepting;
S3, Construction Phase:
When goods and materials outbound delivery, neck material information is verified according to ID in kind, completes goods and materials delivery outbound business;
When engineering construction, material object ID recording device information is scanned;
When final acceptance of construction, field device material object ID is scanned, checks acceptance of work scene inventory checking;
S4, the operation and maintenance stage:
When putting equipment in service, scanning material object ID obtains facility information, generating device account;
When O&M overhauls, material object ID is generated to storage equipment;
S5, the retired disposition stage:
When equipment is retired, the id information accuracy in kind of checking apparatus handles waste and old material and transfers and be put in storage,
When scrapping processing, corresponding waste and old material information is obtained according to ID in kind, completes waste and old material outbound.
The present invention using ID in kind as core, COM code that assets are generated in lifecycle management, project code,
WBS, etc. be associated, establish physical assets Life cycle data model, the information of each key link of asset management carried out
Connection integrates assets material flow, information flow, monetary value flow to complete life cycle management tracking in kind, effectively support physical assets
Whole-life cycle fee.
Embodiment
A kind of asset life cycle Data Modeling Method based on SG-CIM model of the embodiment of the present invention, including it is following
Process:
1) planning and designing data modeling
Planning and designing mainly include that program plan, engineering design, material requirements such as declare at the service links.
1. program plan link, after aggregate plan is assigned, finished item WBS Structure Creating generates project WBS entity;
Such as a project definition in an annual overall plan, shown in Figure 1, project definition includes project code, project
The attributes such as name entry property, the contents of a project construct project WBS structure according to this purpose attribute, include WBS in WBS entity
The attributes such as coding, expense coding.
2. engineering design link works out project equipment detailed list of materials, material essential information entity is generated;
The attributes such as material group, COM code, material description, material type, product group are generally included in material essential information.
3. material requirements declare link, combing project standard WBS and material group corresponding relationship, material group and device type
Corresponding relationship, according to COM code in the equipment and materials inventory calibration equipment detailed list of materials worked out and WBS, material and equipment
The correctness of type matching relationship creates purchase of goods and materials application after verifying successfully.
It include that procurement request number, COM code, applies for quantity, estimates the amount of money, WBS project number in procurement request
The attributes such as coding.
It in the planning and designing stage, optimizes and revises material requirements and declares equal core business process, improve project code, WBS is compiled
Code, COM code incidence relation generate for material object ID and penetrate through each operation code and get through the first link, be asset life cycle
The basis of model.It is matched by standard WBS with material group corresponding relationship, material group matches with device type corresponding relationship, mentions report
The 3 modular design function point construction of equipment and materials inventory, realize that equipment and materials inventory material is precisely mounted with project WBS, it is ensured that
Material requirements propose report quality, effectively start project purchase of goods and materials stage work.
2) purchase of goods and materials data modeling
The purchase of goods and materials stage mainly includes the business such as bid and purchase, goods and materials contract signing, the goods and materials manufacturing, goods and materials storage dispensing
Link, it is shown in Figure 2.
1. link of bidding and purchasing generates bidding document;
2. goods and materials contract signing link generates material object ID, and is associated with materiel code;
It include that contract number, seller information, buyer data, contract type, contract value, COM code etc. belong in procurement contract
Property.
It is numbered in ID in kind including project definition number, WBS coding, COM code, device numbering, power system resource, is solid
Determine assets coding, waste and old material coding, ID number in kind.
3. goods and materials manufacture link, as required, generating device technical parameter is simultaneously associated with ID in kind for supplier;
4. goods and materials storage dispensing link, according to acceptance and delivery list of goods, scene check checks cargo money, using goods receipt number and
ID in kind, correlating validation material requirements information complete handover storage.
Include the attributes such as acceptance and delivery list of goods number, contract number, COM code, measurement unit in acceptance and delivery list of goods.
Arrival receipt, including inspection of incoming merchandise list number, vendor number, COM code, examination are generated after the inspection of incoming merchandise
The attributes such as quantity.
In the purchase of goods and materials stage, optimize and revise that bid and purchase, goods and materials contract signing, goods and materials are manufactured, goods and materials storage is matched
Send equal core business link.It is associated with by ID in kind with project code, project WBS coding, materiel code, perforation planning and goods and materials
Specialized information realizes that material object ID enables allocation list, the ID in kind of material equipment one-one relationship is generated, the one-to-many pass of material equipment
6 typical cases such as the ID in kind of system is generated, supplier obtains material object ID coding and forming label specification, goods and materials technical parameter are safeguarded set
Function point construction is counted, endowed increment equipment source and technical parameter maintenance and the mobile operation of materials warehousing is realized, establishes goods and materials
With project supply relationship, accurate propping works construction period goods and materials neck material outbound.
3) engineering construction data modeling
Engineering construction mainly includes the service links such as goods and materials outbound, engineering construction, final acceptance of construction, shown in Figure 3.
1. goods and materials outbound link creates goods and materials material requistion.When project goods and materials are delivered, using material requistion odd numbers and material object ID,
Material information is led in verification, is handled neck material and is transferred items, and stock in storage delivery outbound business is completed;
2. engineering construction link, project scene uses scanning material object ID, recording device installation and debugging, commissioning test structuring letter
Breath transports inspection unit for equipment and provides rigging up and debugging and commissioning test information;
3. final acceptance of construction link generates acceptance of work scene inventory checking, and the result that will make an inventory imports ERP system, generating device
Turn money inventory, and be synchronized to PMS system, physical asset management department receives " equipment turns money inventory " in PMS system.Turn money according to equipment
Inventory carries out scene prospecting in kind, scans field device material object ID, checks inventory information, check result is synchronized to PMS system,
Foundation is created as equipment account.
In Construction Phase, optimize the core business process such as engineering construction, final acceptance of construction, object is penetrated through by ID in kind
Money, construction etc. business information, complete goods and materials outbound management, engineering construction data inputting, generate acceptance of work scene inventory checking,
Generating device, which turns money inventory, PMS receiving device turns money inventory, turns money inventory according to equipment carries out 6 allusion quotations such as scene prospecting in kind
The mobile operation of goods and materials neck material outbound, the typing of rigging up and debugging message structure and project are realized in the construction of type design function point
Equipment turns money inventory and automatically generates, and effective propping works precisely turn money and the creation of O&M stage account.
4) operation and maintenance data modeling
Operation and maintenance mainly include the service links such as putting equipment in service, O&M maintenance, shown in Figure 4.
1. putting equipment in service link, when equipment account increases newly, generating device modification application list and equipment nameplate, scanning material object
ID, obtains the information such as equipment physical parameter, test report, associate device nameplate, and ancillary equipment operation information saves generating device
Account is simultaneously synchronized to ERP system, and linkage generates assets and encodes and be associated with ID in kind, and assets coding is back to PMS after creating successfully
System;
2. O&M overhauls link, to the storage equipment for needing to generate material object ID, is encoded and generated using the ID in kind of PMS equipment,
PMS system Mass production material object ID.
In the operation and maintenance stage, the core business process such as putting equipment in service, O&M maintenance are optimized and revised, are managed by ID in kind
Device coding and assets coding, penetrate through power grid asset full production cycle each service link comprehensively, complete ERP equipment, assets information
Attribute field expands, the PMS account maintenance based on ID in kind, the equipment based on ID in kind is made an inventory, the ID in kind of PMS equipment is encoded
4 modular design function points construction such as generation, realize that increment equipment account technical parameter obtains automatically, storage equipment batch is endowed
And the mobile operation of Physical ount, it supports the asset count based on ID in kind, retired the optimization of business lean such as scrap.
5) retired processing data modeling
Retired disposition includes that equipment is retired, scraps the service links such as disposition, shown in Figure 5.
1. the retired link of equipment, check it is retired or to write-off equipment material object ID in information system corresponding information it is accurate
Property, fulfil discarding of fixed assets examination and approval procedures.Equipment to asset of equipments being completed scrapping process, handle waste and old material transfer and
It is put in storage formality, by waste and old material stock management function in ERP system, association material object ID corresponds to waste and old material information, completes
Waste and old material storage;
2. scrapping disposition link, managed in ERP system by waste and old material outbound, association material object ID corresponds to junk standing
Breath completes waste and old material outbound.
In the retired disposition stage, optimize and revise equipment is retired, scrap disposition etc. core business process, formed material object ID providing
Produce the closed loop application in full production cycle business.2 typical cases such as waste and old material stock management, waste and old material outbound management are completed to set
Function point construction is counted, the retired storage of the equipment based on ID in kind is realized, scraps disposition outbound.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art
For member, without departing from the technical principles of the invention, several improvements and modifications, these improvements and modifications can also be made
Also it should be regarded as protection scope of the present invention.
Claims (6)
1. the asset life cycle Data Modeling Method based on SG-CIM model, characterized in that the following steps are included:
S1, in the power grid asset planning and designing stage:
According to the project plan, project WBS entity is constructed;
According to project equipment detailed list of materials, material essential information entity is generated;
The corresponding relationship of combing project WBS entity and material essential information entity between the two generates goods and materials procurement request,
S2, the purchase of goods and materials stage:
According to purchase of goods and materials application, bidding document is generated;
After calling for bid successfully, according to the goods and materials contract of signing, material object ID is generated,
After goods and materials are manufactured, equipment technical parameters are associated with ID in kind;
It is put in storage after cargo check, joins information association material object ID for checking and accepting;
S3, Construction Phase:
When goods and materials outbound delivery, neck material information is verified according to ID in kind, completes goods and materials delivery outbound business;
When engineering construction, material object ID recording device information is scanned;
When final acceptance of construction, field device material object ID is scanned, checks acceptance of work scene inventory checking;
S4, the operation and maintenance stage:
When putting equipment in service, scanning material object ID obtains facility information, generating device account;
When O&M overhauls, material object ID is generated to storage equipment;
S5, the retired disposition stage:
When equipment is retired, the id information accuracy in kind of checking apparatus handles waste and old material and transfers and be put in storage,
When scrapping processing, corresponding waste and old material information is obtained according to ID in kind, completes waste and old material outbound.
2. the asset life cycle Data Modeling Method according to claim 1 based on SG-CIM model, characterized in that
It include WBS encoded attributes in WBS entity.
3. the asset life cycle Data Modeling Method according to claim 1 based on SG-CIM model, characterized in that
Material essential information includes COM code.
4. the asset life cycle Data Modeling Method according to claim 1 based on SG-CIM model, characterized in that
The corresponding relationship of combing project WBS entity and material essential information entity between the two includes improving WBS coding, materiel code pass
Connection relationship.
5. the asset life cycle Data Modeling Method according to claim 1 based on SG-CIM model, characterized in that
It include WBS coding, COM code, device numbering, power system resource number, fixed assets coding, waste and old material in ID in kind
Coding and ID number in kind.
6. the asset life cycle Data Modeling Method according to claim 1 based on SG-CIM model, characterized in that
Include acceptance and delivery list of goods number, contract number and COM code attribute in acceptance and delivery list of goods.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811503389.6A CN110009172B (en) | 2018-12-10 | 2018-12-10 | Asset full life cycle data modeling method based on SG-CIM model |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811503389.6A CN110009172B (en) | 2018-12-10 | 2018-12-10 | Asset full life cycle data modeling method based on SG-CIM model |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110009172A true CN110009172A (en) | 2019-07-12 |
CN110009172B CN110009172B (en) | 2022-08-05 |
Family
ID=67165087
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811503389.6A Active CN110009172B (en) | 2018-12-10 | 2018-12-10 | Asset full life cycle data modeling method based on SG-CIM model |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110009172B (en) |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110503404A (en) * | 2019-08-27 | 2019-11-26 | 中国联合网络通信集团有限公司 | Asset Tag generation method, device, equipment and storage medium |
CN110796427A (en) * | 2019-09-09 | 2020-02-14 | 国网浙江省电力有限公司经济技术研究院 | BIM technology-based full-process control method for physical assets of power distribution network |
CN110991595A (en) * | 2019-12-04 | 2020-04-10 | 中国南方电网有限责任公司 | Coding processing method and device of equipment, coding management system and computer equipment |
CN111090827A (en) * | 2019-11-12 | 2020-05-01 | 中广核工程有限公司 | Full life cycle management system and method for nuclear power instrument |
CN111460018A (en) * | 2020-03-31 | 2020-07-28 | 金现代信息产业股份有限公司 | Object ID data link method and system |
CN111488996A (en) * | 2020-03-27 | 2020-08-04 | 天津市普迅电力信息技术有限公司 | Enterprise vehicle behavior tracking method based on physical id |
CN111639768A (en) * | 2020-04-26 | 2020-09-08 | 国网安徽省电力有限公司 | Power grid physical asset decommissioning management and control system |
CN111844131A (en) * | 2020-07-10 | 2020-10-30 | 上海有个机器人有限公司 | Method and device for robot asset management, electronic equipment and storage medium |
CN112116363A (en) * | 2020-09-16 | 2020-12-22 | 国网安徽省电力有限公司 | Stock equipment source tracing and code assigning method |
CN112561141A (en) * | 2020-12-04 | 2021-03-26 | 国网天津市电力公司电力科学研究院 | Physical ID differentiation optimization configuration method for power distribution internet of things |
CN112766849A (en) * | 2021-01-20 | 2021-05-07 | 浙江浙能电力股份有限公司 | Method and system for managing digital tags of full life cycles of associated storage materials |
CN113297434A (en) * | 2021-07-27 | 2021-08-24 | 中国石油天然气集团有限公司 | Material gene code generation method and system |
CN113506096A (en) * | 2021-09-08 | 2021-10-15 | 国网浙江省电力有限公司 | Inter-system interface method based on industrial internet identification analysis system |
CN114219407A (en) * | 2021-12-21 | 2022-03-22 | 中通服供应链管理有限公司 | Material full life cycle management system and method |
CN114971560A (en) * | 2022-05-31 | 2022-08-30 | 曾晨 | Material coding system and method based on full life cycle management |
CN115994516A (en) * | 2023-03-24 | 2023-04-21 | 中国石油天然气集团有限公司 | Supply chain data braiding method and system |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080243921A1 (en) * | 2007-03-30 | 2008-10-02 | Charles Edwin Ellisor | System and Method for Managing IT Assets |
CN102142111A (en) * | 2010-02-03 | 2011-08-03 | 上海市电力公司 | Asset life information integrated control method and device suitable for power system |
-
2018
- 2018-12-10 CN CN201811503389.6A patent/CN110009172B/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080243921A1 (en) * | 2007-03-30 | 2008-10-02 | Charles Edwin Ellisor | System and Method for Managing IT Assets |
CN102142111A (en) * | 2010-02-03 | 2011-08-03 | 上海市电力公司 | Asset life information integrated control method and device suitable for power system |
Cited By (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110503404A (en) * | 2019-08-27 | 2019-11-26 | 中国联合网络通信集团有限公司 | Asset Tag generation method, device, equipment and storage medium |
CN110796427A (en) * | 2019-09-09 | 2020-02-14 | 国网浙江省电力有限公司经济技术研究院 | BIM technology-based full-process control method for physical assets of power distribution network |
CN111090827A (en) * | 2019-11-12 | 2020-05-01 | 中广核工程有限公司 | Full life cycle management system and method for nuclear power instrument |
CN111090827B (en) * | 2019-11-12 | 2023-06-27 | 中广核工程有限公司 | Full life cycle management system and method for nuclear power instrument |
CN110991595A (en) * | 2019-12-04 | 2020-04-10 | 中国南方电网有限责任公司 | Coding processing method and device of equipment, coding management system and computer equipment |
CN110991595B (en) * | 2019-12-04 | 2024-03-19 | 中国南方电网有限责任公司 | Encoding processing method and device of equipment, encoding management system and computer equipment |
CN111488996A (en) * | 2020-03-27 | 2020-08-04 | 天津市普迅电力信息技术有限公司 | Enterprise vehicle behavior tracking method based on physical id |
CN111460018A (en) * | 2020-03-31 | 2020-07-28 | 金现代信息产业股份有限公司 | Object ID data link method and system |
CN111639768A (en) * | 2020-04-26 | 2020-09-08 | 国网安徽省电力有限公司 | Power grid physical asset decommissioning management and control system |
CN111844131A (en) * | 2020-07-10 | 2020-10-30 | 上海有个机器人有限公司 | Method and device for robot asset management, electronic equipment and storage medium |
CN111844131B (en) * | 2020-07-10 | 2022-03-08 | 上海有个机器人有限公司 | Method and device for robot asset management, electronic equipment and storage medium |
CN112116363A (en) * | 2020-09-16 | 2020-12-22 | 国网安徽省电力有限公司 | Stock equipment source tracing and code assigning method |
CN112561141A (en) * | 2020-12-04 | 2021-03-26 | 国网天津市电力公司电力科学研究院 | Physical ID differentiation optimization configuration method for power distribution internet of things |
CN112766849A (en) * | 2021-01-20 | 2021-05-07 | 浙江浙能电力股份有限公司 | Method and system for managing digital tags of full life cycles of associated storage materials |
CN113297434B (en) * | 2021-07-27 | 2021-11-09 | 中国石油天然气集团有限公司 | Material gene code generation method and system |
CN113297434A (en) * | 2021-07-27 | 2021-08-24 | 中国石油天然气集团有限公司 | Material gene code generation method and system |
CN113506096A (en) * | 2021-09-08 | 2021-10-15 | 国网浙江省电力有限公司 | Inter-system interface method based on industrial internet identification analysis system |
CN114219407A (en) * | 2021-12-21 | 2022-03-22 | 中通服供应链管理有限公司 | Material full life cycle management system and method |
CN114971560A (en) * | 2022-05-31 | 2022-08-30 | 曾晨 | Material coding system and method based on full life cycle management |
CN114971560B (en) * | 2022-05-31 | 2023-08-15 | 曾晨 | Material coding system and method based on full life cycle management |
CN115994516A (en) * | 2023-03-24 | 2023-04-21 | 中国石油天然气集团有限公司 | Supply chain data braiding method and system |
Also Published As
Publication number | Publication date |
---|---|
CN110009172B (en) | 2022-08-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110009172A (en) | Asset life cycle Data Modeling Method based on SG-CIM model | |
CN107831750B (en) | IMES intelligent manufacturing execution system | |
CN110334950B (en) | Iron tower intelligent production and group management and control system | |
CN107067233A (en) | The Heterogeneous ERP System of business finance integration | |
CN106127557A (en) | A kind of ecommerce information management system | |
CN110222937A (en) | A kind of novel production and marketing emerging system applied to steel and iron manufacturing | |
CN105243518A (en) | Municipal engineering measurement management system and method thereof | |
CN104166920A (en) | Online biding method and system | |
CN104978696A (en) | Electronic acceptance and handover method based on BIM technology | |
CN112633970A (en) | Intelligent purchasing platform | |
CN113656505B (en) | Digitization of distributed project management system and method for synchronizing data thereof | |
CN108665125A (en) | The method and system of harmful influence supervision are realized based on flow dynamic configuration | |
CN109242375A (en) | A kind of e-commerce system and method based on Internet of Things | |
CN109886628A (en) | Handling of goods and materials platform and method | |
Rahayu et al. | Designing green warehouse systems based on enterprise resource planning for the leather tanning industry | |
CN115170090A (en) | Project management method and device, electronic equipment and readable storage medium | |
CN114781795A (en) | Enterprise Resource Planning (ERP) -based comprehensive purchasing management system and management method | |
CN109816317A (en) | Project Abroad logistic information management system | |
CN114154862A (en) | Engineering cost automatic allocation method and system based on engineering whole-process management | |
CN113409028A (en) | Power grid material examination system | |
CN108710922B (en) | Intelligent imported waste information management system and method based on information fusion | |
CN114926232B (en) | Material purchasing system, method, controller and storage medium | |
US20220004984A1 (en) | Industry workflow of distributed manufacturing, incorporating OEM part manufacturing outsourcing, web workflow coupled with real-world workflow integrations and distributed ledger technology functionality. | |
JP2005202768A (en) | Waste information management system | |
Patalas-Maliszewska et al. | Sustainable business model integrated with the enterprise resource planning system: SBM-ERP |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |