CN109840737A - A kind of mine materials management system - Google Patents
A kind of mine materials management system Download PDFInfo
- Publication number
- CN109840737A CN109840737A CN201811639877.XA CN201811639877A CN109840737A CN 109840737 A CN109840737 A CN 109840737A CN 201811639877 A CN201811639877 A CN 201811639877A CN 109840737 A CN109840737 A CN 109840737A
- Authority
- CN
- China
- Prior art keywords
- materials
- unit
- goods
- module
- mine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- General Factory Administration (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention provides a kind of mine materials management systems, comprising: login and process center module, production and budget module, plan and examination module, batch control and evaluation module, statistics and settlement module, storehouse management module, capital management module, configuration management module and system management module;In line with spending throttling, reinforce the management objectives monitored, mining goods and materials are managed from many aspects, management is to manage on line under modified line;The closure data-link of design goods and materials and fund, realization data are monitored from clearing, certainly, are counted certainly.All using planning on line, apply, examination & approval, the variation of every goods and materials all has good grounds, and has account can be according to.The beneficial effects of the present invention are: realizing the management mine goods and materials of systematization, realizes the clearing certainly of data, from monitoring and from statistics, keep handling of goods and materials entry apparent, more convenient, improve control efficiency, and simplify workflow, save the working time.
Description
Technical field
The present invention relates to administrative skill and field more particularly to a kind of mine materials management systems.
Background technique
Handling of goods and materials is indispensable component part in enterprise production and operation management.Coal mine goods and materials and general enterprises institute
It is compared with goods and materials, there are the outstanding features such as wide in variety, expensive, be related to construction material, machine components, equipment, electromechanics
A major class of equipment, priming system, timber etc. more than 30, more than 10,000 groups.Each materials for coal mine buying annual cost generally more than hundred million yuan,
Even several hundred million yuan.But the handling of goods and materials of major part coal mine also rests on original manual management stage or simple system pipes at present
The needs of reason stage, but the epoch rapidly developed in information, this way to manage is far from meeting construction of coal mine and production
's.Therefore it needs to study a kind of new mine materials management system, to play digitlization to handling of goods and materials, rapid, net
The effects of network automates.
And this system materials for coal mine management system content covers material demand plan formulation, procurement plan production, goods and materials go out
The overall process of the handlings of goods and materials such as stock management, project management, material accounting, goods and materials analysis, by filling in daily storage bill out, from
The dynamic stock control for completing goods and materials, and multiple caliber is provided and carries out material statistics, required goods and materials report and system can be automatically generated
Analytical table is counted, effective material control is carried out.Cover goods and materials user of service, goods and materials planner, stock clerk, handling of goods and materials
The requirement of each objects such as personnel, financial staff, decision-making management personnel, by goods and materials application architecture on entire enterprise network,
Changing previous goods and materials system to be is the limitation realizing the accurate of electronic inventory and managing, and it is complete to reach really electronization
Face handling of goods and materials.Important component of the materials for coal mine management system as coal mine integrated information management platform, it realizes object
Digitlization, informationization and the networking of management work are provided, labour is simplified, realizes automation centered on computer, network
Change management.Goods and materials are inquired more correctly, easily and fast, reliably, and the management for leading body at a higher level, department provides accurate, tangible number
According to figure, really realize the digitlization and networking of all kinds of material informations in full mining area.
Summary of the invention
To solve the above-mentioned problems, the present invention provides a kind of mine materials management systems, comprising: homepage and process center
Module, production and budget module, plan and examination module, batch control and evaluation module and statistics and settlement module;
It logs in and process center module, including logs in unit and process center cell, log in unit and set that there are three types of permissions
User's login mode: materialman logs in, battle line leader logs in, mine leader logs in;User enters process center cell, stream after logging in
Journey center cell includes: new business unit, pending business unit, handles Service tracing unit and history service query unit,
New business unit establishes new business, handles module into related service, pending business unit, handle Service tracing unit and
History service query unit is used for pending business, handles business and history service is inquired;
Production and budget module, including generate planning unit, budget unit and production management unit;The generation plan is single
Member, for automatically generating manufacturing program of a year and manufacturing program of a month according to the production information filled in;The budget unit, packet
Include the budget to the budget of year production and to monthly production, the plan for generating according to planning unit is generated, in the works
Required goods and materials and fund carry out budget;The production management unit is produced, for real-time monitoring and records day reality in mine
Production yields and digging mine drilling depth data, convenient for counting the service condition of goods and materials;
Plan and examination module, including buying unit, examination unit and goods and materials transfer unit;The module receives production budget
After the manufacturing program of a year of module transmission and manufacturing program of a month, buying unit carries out statistical to materials needed in production plan
Class automatically generates procurement plan, convenient for buying;Checking and accepting unit is that the goods and materials purchased back are checked and accepted automatically, count and are put in storage,
And generate receipt;Goods and materials transfer unit, transfer application according to granted goods and materials, carry out goods and materials and transfer, make goods and materials between warehouse
Outbound is convenient in circulation;
Control and evaluation module are criticized, including material regulation unit, processing regulate and control unit and examine unit;The module receives production
What budget module was sent sends in year and monthly goods and materials budget and year and manufacturing program of a month and plan with module is checked and accepted
Procurement plan and receipt;Material regulation unit receives granted material requirements list, according to manufacturing program of a year and monthly life
Plan is produced, it is automatic to carry out goods and materials distribution, and issue to get respectively and notify constituent parts;Processing regulation unit, receives and processes certain list
The granted material requirements list in position and related processing drawing, and the goods and materials that material regulation unit distributes to certain unit are received, it will
The goods and materials are assigned to corresponding process unit and are processed;After processing is completed, processing regulation unit is issued to get and be notified to described
Certain unit;Unit is examined, for carrying out performance appraisal to constituent parts according to the goods and materials service condition of constituent parts, so as to relevant unit
Rewards and punishments are implemented to constituent parts;
Statistics and settlement module, including clearing unit, revocation clearing unit, tickets refunding and change unit and statistical query report list
Member;After the module receives the goods and materials distribution information for the constituent parts that batch control is sent with evaluation module, clearing unit is wait settle accounts, settle accounts
Three kinds of clearing states have been settled accounts in neutralization, according to preset Settlement Date, are automatically summarized the goods and materials of constituent parts monthly with volume;
Clearing unit is cancelled, the goods and materials occupied to processing carry out revocation settlement operations;Tickets refunding and change unit, for changing goods and materials unit price;System
Meter inquiry report unit, is used for multi-condition inquiry goods and materials relevant information map-integrated OA related to display, also shows or export budget
Goods and materials, budget spend fund, procurement plan, actual consumption goods and materials, stock in storage, spend fund, recycling goods and materials and processing goods and materials
Report is inquired in the control of aspect.
Further, it is additionally provided with flow nodes unit in the login and process center module, for the body according to user
Part push examination & approval task.
Further, complete goods and materials type and organization structure have also been included in the production and budget module.
Further, with examination module, it is to check and accept that examination unit, which is with the procurement plan after examining step by step, for the plan
Foundation.
Further, described batch control with evaluation module in, the goods and materials service condition include: goods and materials volume, recycle,
The case where being used outside goods and materials plan encashment ratio, accuracy rate and coverage rate and capital amount.
It further, further include storehouse management module, the storehouse management module includes mine directly under warehouse unit, sector storehouse
Library unit, the warehouse of station in mine unit, stock-taking administrative unit and inventory's prewarning unit;The storehouse management module for realizing
The coding of goods and materials, recycling, goes out storage statistics and query statistic at classification;Goods and materials are during transferring, from inside to outside step by step in each storehouse
It is turned in library unit, so that goods and materials carry out inventory's monitoring of Life cycle;Stock-taking administrative unit is used for real-time disk
The quantity in stock of point goods and materials, guarantees the consistency of on-line off-line goods and materials amount of storage;When quantity of inventory deficiency, inventory's prewarning unit
The storage condition of corresponding goods and materials is alarmed and shows, so that corresponding goods and materials are replenished in time.
It further, further include capital management module, including the daily account of sector, special fund special project account and sector's special project account
Family, the capital management module are used to manage the goods and materials usage amount of each department, realize and consume account amount using approach by goods and materials;
The goods and materials that constituent parts use every time will all be withholdd according to account rule deduct the corresponding goods and materials amount of money automatically from amount;Work as amount
When being finished, needs to apply for amount again just can enter batch control and received with evaluation module progress goods and materials;Using check as department's amount
The foundation of variation, the fund amount of each department are unified by management unit's budget allocation.
Further, further include configuration management module, for storehouse management module, capital management module, production with it is pre-
Module, plan is calculated to be configured with evaluation module and statistics with settlement module with examination module, batch control, setting report form statistics item,
Storehouse management and goods and materials attribute, fund special project account, consumption rule and process shunt.
It further, further include system management module, the system management module includes project configuration class administrative unit, uses
Family class administrative unit, rollback administrative unit and system configuration unit;The module is used to projects, project authority distribution, object
Standing breath, user information and department's information carry out automatic identification and classification;Wherein, it includes that goods and materials are checked and accepted that rollback administrative unit, which is directed to,
The maloperation occurred in the goods and materials turnover that storage, goods and materials neck material consumption and goods and materials are transferred carries out maloperation revocation, to improve the mine
The fault-tolerance of mountain material Management System.
Technical solution provided by the invention has the benefit that the management mine goods and materials for realizing systematization, realizes number
According to from clearing, from monitoring and from counting, keep handling of goods and materials entry apparent, more convenient, improve control efficiency, and simplify work
Make process, saves the working time.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples, in attached drawing:
Fig. 1 is a kind of mine materials management system diagram in the embodiment of the present invention;
Fig. 2 is the business process map in the embodiment of the present invention;
Fig. 3 is flow of material figure in the embodiment of the present invention;
Fig. 4 is the fund flow figure of capital management module in the embodiment of the present invention.
Specific embodiment
For a clearer understanding of the technical characteristics, objects and effects of the present invention, now control attached drawing is described in detail
A specific embodiment of the invention.
The embodiment provides a kind of mine materials management systems.
Fig. 1 and Fig. 2 are please referred to, Fig. 1 is a kind of mine materials management system diagram in the embodiment of the present invention, and Fig. 2 is the present invention
Business process map in embodiment, by Fig. 1 and Fig. 2 it is found that the mine materials management system specifically includes: login and process center
Module, production and budget module, plan and examination module, batch control and evaluation module, statistics and settlement module, storehouse management mould
Block, capital management module, configuration management module and system management module;
It logs in and process center module, including logs in unit and process center cell, log in unit and set that there are three types of permissions
User's login mode: materialman logs in, battle line leader logs in, mine leader logs in;User enters process center cell, stream after logging in
Journey center cell includes: new business unit, pending business unit, handles Service tracing unit and history service query unit,
New business unit establishes new business, handles module into related service, pending business unit, handle Service tracing unit and
History service query unit is used for pending business, handles business and history service is inquired;It is additionally provided with flow nodes unit,
For pushing examination & approval task according to the identity of user, realize that user's workflow examination and approval is customized.
Production and budget module, including generate planning unit, budget unit and production management unit;The generation plan is single
Member, for automatically generating manufacturing program of a year and manufacturing program of a month according to the production information filled in;The budget unit, packet
Include the budget to the budget of year production and to monthly production, the plan for generating according to planning unit is generated, in the works
Required goods and materials and fund carry out budget;The production management unit is produced, for real-time monitoring and records day reality in mine
Production yields and digging mine drilling depth data, convenient for counting the service condition of goods and materials;
Plan and examination module, including buying unit, examination unit and goods and materials transfer unit;The module receives production budget
After the manufacturing program of a year of module transmission and manufacturing program of a month, buying unit carries out statistical to materials needed in production plan
Class automatically generates procurement plan, convenient for buying;Checking and accepting unit is that the goods and materials purchased back are checked and accepted automatically, count and are put in storage,
And generate receipt;Goods and materials transfer unit, transfer application according to granted goods and materials, carry out goods and materials and transfer, make goods and materials between warehouse
Outbound is convenient in circulation;Complete goods and materials type and organization structure are included, also to meet administrator to any detail goods and materials
Or the plan of department's goods and materials.
Control and evaluation module are criticized, including material regulation unit, processing regulate and control unit and examine unit;The module receives production
What budget module was sent sends in year and monthly goods and materials budget and year and manufacturing program of a month and plan with module is checked and accepted
Procurement plan and receipt;Material regulation unit receives granted material requirements list, according to manufacturing program of a year and monthly life
Plan is produced, it is automatic to carry out goods and materials distribution, and issue to get respectively and notify constituent parts;Processing regulation unit, receives and processes certain list
The granted material requirements list in position and related processing drawing, and the goods and materials that material regulation unit distributes to certain unit are received, it will
The goods and materials are assigned to corresponding process unit and are processed;After processing is completed, processing regulation unit is issued to get and be notified to described
Certain unit;Unit is examined, for carrying out performance appraisal to constituent parts according to the goods and materials service condition of constituent parts, so as to relevant unit
Rewards and punishments are implemented to constituent parts;Wherein, the goods and materials service condition include: goods and materials volume, recycle, goods and materials plan encashment ratio,
The case where being used outside accuracy rate and coverage rate and capital amount;Each sector, base uploads material request according to practical goods and materials usage amount
Single, after examination & approval pass through step by step, material regulates and controls unit according to warehouse by the internal priority to outside, i.e. mine belongs to library > second level library > and stays
Mine station warehouse namely mine belong to library and are better than second level library, and second level library is better than the warehouse of station in mine, automatic to distribute material issuance task, into warehouse
Management module transfers goods and materials;
Statistics and settlement module, including clearing unit, revocation clearing unit, tickets refunding and change unit and statistical query report list
Member;After the module receives the goods and materials distribution information for the constituent parts that batch control is sent with evaluation module, clearing unit is wait settle accounts, settle accounts
Three kinds of clearing states have been settled accounts in neutralization, according to preset Settlement Date, are automatically summarized the goods and materials of constituent parts monthly with volume;
Clearing unit is cancelled, the goods and materials occupied to processing carry out revocation settlement operations;Tickets refunding and change unit, for changing goods and materials unit price;System
Meter inquiry report unit, is used for multi-condition inquiry goods and materials relevant information map-integrated OA related to display, also shows or export budget
Goods and materials, budget spend fund, procurement plan, actual consumption goods and materials, stock in storage, spend fund, recycling goods and materials and processing goods and materials
Report is inquired in the control of aspect;
Storehouse management module, including mine is directly under warehouse unit, sector's warehouse unit, the warehouse of station in mine unit, stock-taking
Administrative unit and inventory's prewarning unit;The storehouse management module is for realizing the coding of goods and materials, classification, recycling, out storage system
Meter and query statistic;Goods and materials are turned in each warehouse unit step by step from inside to outside during transferring, so as to goods and materials progress
The inventory of Life cycle monitors;Stock-taking administrative unit guarantees on-line off-line object for the quantity in stock of real time inventory goods and materials
Provide the consistency of amount of storage;When quantity of inventory deficiency, inventory's prewarning unit alarms and shows the storage condition of corresponding goods and materials,
So that corresponding goods and materials are replenished in time;
Capital management module, including the daily account of sector, special fund special project account and sector's special project account, the capital management
Module is used to manage the goods and materials usage amount of each department, realizes and consumes account amount using approach by goods and materials;Constituent parts use every time
Goods and materials will all be withholdd according to account rule deduct the corresponding goods and materials amount of money automatically from amount;When amount is finished, weight is needed
New application amount just can enter batch control and receive with evaluation module progress goods and materials;The foundation changed using check as department's amount, respectively
The fund amount of department is unified by management unit's budget allocation;
Configuration management module, for storehouse management module, capital management module, production and budget module, plan and test
It receives module, batch control to be configured with evaluation module and statistics with settlement module, setting report form statistics item, storehouse management and goods and materials category
Property, fund special project account, consumption rule and process shunt;
System management module, including project configuration class administrative unit, user class administrative unit, rollback administrative unit and system
Configuration unit;The module is used to carry out certainly projects, project authority distribution, material information, user information and department's information
Dynamic identification and classification;Wherein, rollback administrative unit is directed to the object transferred including goods and materials check and accepting storing, goods and materials neck material consumption and goods and materials
The maloperation occurred in money turnover carries out maloperation revocation, to improve the fault-tolerance of the mine materials management system.
User enters login and process center module, logs in the mine materials management system, according to business needs, select into
Enter the module for handling required business;The business module includes: production and budget module, plan and check and accept module, batch control and examine
Core module and statistics and settlement module;Production and budget module generate manufacturing program of a year and manufacturing program of a month, and to required
Goods and materials and fund carry out budget automatically;Plan receives the information that production is sent with budget module with module is checked and accepted, and is generated
Then procurement plan is carried out an acceptance inspection, counts and is put in storage to the goods and materials of buying, and generates receipt;Control is criticized to receive with evaluation module
Plan receives the information sent with module is checked and accepted, and is distributed automatically goods and materials, and according to goods and materials service condition, to constituent parts into
Row automatic examination;Statistics receives the information that batch control is sent with evaluation module with settlement module, carries out statistic of classification to goods and materials, goes forward side by side
The consumption fund of these goods and materials of row Automatic-settlement.Capital management module and storehouse management module are above-mentioned production and budget mould
Block, plan and examination module, batch control and evaluation module and statistics and settlement module provide support;Configuration management module and system pipes
Managing module is above-mentioned production and budget module, plan and examination module, batch control and evaluation module, statistics and settlement module, fund
Management module and storehouse management module provide support.
Referring to FIG. 3, Fig. 3 is flow of material figure in the embodiment of the present invention, need are purchased according to the purchasing plan of materials and equipment of formulation
The goods and materials wanted carry out an acceptance inspection to goods and materials, are put in storage flow of material and outbound processing between each warehouse.The goods and materials checked and accepted are put respectively
It enters mine station warehouse and mine belongs to library, transfer application by goods and materials, the warehouse of station in mine can be circulated by the goods and materials in warehouse belongs to library to mine
In;By material request, the warehouse of station in mine and mine are belonged into the flow of material in library to bill of material compartment library and second level library, to go out
Library.
Referring to FIG. 4, Fig. 4 is the fund flow figure of capital management module in the embodiment of the present invention, capital management module, packet
The daily account of sector, special fund special project account and sector's special project account are included, it is motor-driven and special in special fund special project account namely attached drawing 4
Account is realized for managing the goods and materials usage amount of each department and consumes account amount using approach by goods and materials;Capital management module connects
Midwifery produces the monthly estimate information that budget module uploads, and according to preset allocation rule, the automatic distribution of fund exists to each account
Each account progress moon is supplemented with money or day supplements with money, and according to fund application, the fund in motor-driven and special account can push area down
Young Pioneer's Day normal account and sector's special project account;According to the granted material requisition of sector, the daily account of sector and sector's special project account
According to account withhold rule deduct the corresponding goods and materials amount of money automatically;When amount is finished, need to apply for that amount just can enter again
Control is criticized to receive with evaluation module progress goods and materials.Wherein, motor-driven and special account specifically includes: fully mechanized mining, the digging motor-driven account of battle line,
Mine is motor-driven, the motor-driven account of the battle lines profession such as electromechanics, ventilation, anti-pinch and special big account;The daily account of sector specifically includes: comprehensive
It adopts, dig battle line sector quota account, fully mechanized mining, digging battle line limit account and other daily accounts of battle line sector;Sector is special
Account specifically includes: sector's special project account and digging battle line dig maintenance engineering account.
The beneficial effects of the present invention are: realize systematization management mine goods and materials, realize data from clearing, from monitoring and
From statistics, keep handling of goods and materials entry apparent, more convenient, control efficiency is improved, and simplify workflow, when saving work
Between.
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, it is all in spirit of the invention and
Within principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.
Claims (9)
1. a kind of mine materials management system, it is characterised in that: include:
Login and process center module, including unit and process center cell are logged in, login unit sets the user there are three types of permission
Login mode: materialman logs in, battle line leader logs in, mine leader logs in;User enters process center cell after logging in, in process
Heart unit includes: new business unit, pending business unit, handles Service tracing unit and history service query unit, is created
Business unit establishes new business, handles module into related service, pending business unit handles Service tracing unit and history
Service inquiry unit is used for pending business, handles business and history service is inquired;
Production and budget module, including generate planning unit, budget unit and production management unit;The generation planning unit,
For automatically generating manufacturing program of a year and manufacturing program of a month according to the production information filled in;The budget unit, including it is right
The budget that year produces and the budget to monthly production, the plan for being generated according to planning unit is generated, to institute in the works
The goods and materials and fund needed carry out budget;The production management unit is produced, for real-time monitoring and records day actual production in mine
Yield and digging mine drilling depth data, convenient for counting the service condition of goods and materials;
Plan and examination module, including buying unit, examination unit and goods and materials transfer unit;The module receives production budget module
After the manufacturing program of a year of transmission and manufacturing program of a month, buying unit carries out statistical classification to materials needed in production plan,
Procurement plan is automatically generated, convenient for buying;Check and accept unit be the goods and materials purchased back are checked and accepted automatically, counted and are put in storage, and
Generate receipt;Goods and materials transfer unit, transfer application according to granted goods and materials, carry out goods and materials and transfer, flow goods and materials between warehouse
Turn, is convenient for outbound;
Control and evaluation module are criticized, including material regulation unit, processing regulate and control unit and examine unit;The module receives production budget
What module was sent adopts in year and monthly goods and materials budget and year and manufacturing program of a month and plan with what examination module was sent
Purchase plan and receipt;Material regulation unit receives granted material requirements list, is counted according to manufacturing program of a year and monthly production
It draws, it is automatic to carry out goods and materials distribution, and issue to get respectively and notify constituent parts;Processing regulation unit, reception are processed certain unit and are obtained
Batch material requirements list and related processing drawing, and receive the goods and materials that material regulation unit distributes to certain unit, will be described
Goods and materials are assigned to corresponding process unit and are processed;After processing is completed, processing regulation unit, which issues, gets notice to certain described list
Position;Unit is examined, for carrying out performance appraisal to constituent parts according to the goods and materials service condition of constituent parts, so that relevant unit is to each
Unit implements rewards and punishments;
Statistics and settlement module, including clearing unit, revocation clearing unit, tickets refunding and change unit and statistical query report unit;It should
After module receives the goods and materials distribution information for the constituent parts that batch control is sent with evaluation module, clearing unit is wait settle accounts, settle accounts neutralization
Three kinds of clearing states have been settled accounts, according to preset Settlement Date, have automatically been summarized the goods and materials of constituent parts monthly with volume;Revocation
Clearing unit, the goods and materials occupied to processing carry out revocation settlement operations;Tickets refunding and change unit, for changing goods and materials unit price;Statistics is looked into
Ask report unit, be used for multi-condition inquiry goods and materials relevant information map-integrated OA related to display, also show or export budget goods and materials,
Budget spends fund, procurement plan, actual consumption goods and materials, stock in storage, spends fund, recycling goods and materials and machining object capital face
Control inquiry report.
2. a kind of mine materials management system as described in claim 1, it is characterised in that: the login and process center module
In be additionally provided with flow nodes unit, for according to the identity of user push examination & approval task.
3. a kind of mine materials management system as described in claim 1, it is characterised in that: the production is gone back with budget module
Complete goods and materials type and organization structure are included;The complete goods and materials type refers to that all goods and materials types all include
Inside;The organization structure refers to the subordinate relation of constituent parts in company.
4. a kind of mine materials management system as described in claim 1, it is characterised in that: in the plan and examination module,
Checking and accepting unit is using the procurement plan after examining step by step as acceptance basis.
5. a kind of mine materials management system as described in claim 1, it is characterised in that: in described batch of control and evaluation module,
The goods and materials service condition includes: goods and materials volume, recycle, goods and materials plan encashment ratio, accuracy rate and coverage rate and capital amount
The case where outer use.
6. a kind of mine materials management system as described in claim 1, it is characterised in that: further include storehouse management module, institute
Stating storehouse management module includes mine directly under warehouse unit, sector's warehouse unit, the warehouse of station in mine unit, stock-taking administrative unit
With inventory's prewarning unit;The storehouse management module is for realizing the coding of goods and materials, classification, recycling, out storage statistics and inquiry
Statistics;Goods and materials are turned in each warehouse unit step by step from inside to outside during transferring, so that goods and materials carry out full Life Cycle
The inventory of phase monitors;Stock-taking administrative unit guarantees on-line off-line goods and materials amount of storage for the quantity in stock of real time inventory goods and materials
Consistency;When quantity of inventory deficiency, inventory's prewarning unit alarms and shows the storage condition of corresponding goods and materials, so as to timely
Supplement corresponding goods and materials.
7. a kind of mine materials management system as described in claim 1, it is characterised in that: it further include capital management module, packet
The daily account of sector, special fund special project account and sector's special project account are included, the capital management module is used to manage the object of each department
Usage amount is provided, realizes and consumes account amount using approach by goods and materials;The goods and materials that constituent parts use every time will all withhold according to account
Rule deducts the corresponding goods and materials amount of money automatically from amount;When amount is finished, need to apply for amount again just can enter batch control
Goods and materials are carried out with evaluation module to receive;The foundation changed using check as department's amount, the fund amount of each department are unified by pipe
Manage unit budget distribution.
8. a kind of mine materials management system as described in claim 1, it is characterised in that: further include configuration management module, use
In to storehouse management module, capital management module, production and budget module, plan and check and accept module, batch control with evaluation module and
Statistics is configured with settlement module, setting report form statistics item, storehouse management and goods and materials attribute, fund special project account, consumption rule
Then shunted with process.
9. a kind of mine materials management system as described in claim 1, it is characterised in that: it further include system management module, institute
Stating system management module includes project configuration class administrative unit, user class administrative unit, rollback administrative unit and system configuration list
Member;The module is used to carry out automatic identification to projects, project authority distribution, material information, user information and department's information
And classification;Wherein, rollback administrative unit is directed to the goods and materials turnover transferred including goods and materials check and accepting storing, goods and materials neck material consumption and goods and materials
The maloperation of middle appearance carries out maloperation revocation, to improve the fault-tolerance of the mine materials management system.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811639877.XA CN109840737A (en) | 2018-12-29 | 2018-12-29 | A kind of mine materials management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811639877.XA CN109840737A (en) | 2018-12-29 | 2018-12-29 | A kind of mine materials management system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109840737A true CN109840737A (en) | 2019-06-04 |
Family
ID=66883515
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811639877.XA Pending CN109840737A (en) | 2018-12-29 | 2018-12-29 | A kind of mine materials management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109840737A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110262355A (en) * | 2019-07-06 | 2019-09-20 | 内蒙古智能煤炭有限责任公司 | Intelligent mine management system and method based on intelligent mine control platform |
CN110414925A (en) * | 2019-07-02 | 2019-11-05 | 北京科技大学 | A kind of digitalized production management system and method based on bargh |
CN111950964A (en) * | 2020-08-24 | 2020-11-17 | 贵州省矿山安全科学研究院 | Coal mine material comprehensive management platform |
CN113379195A (en) * | 2021-05-14 | 2021-09-10 | 南京智慧建筑研究院有限公司 | Management system of project under construction based on wisdom building |
CN113780720A (en) * | 2021-07-28 | 2021-12-10 | 广东电网有限责任公司佛山供电局 | Electric power material overall process management method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1421810A (en) * | 2001-11-28 | 2003-06-04 | 英业达股份有限公司 | Automatic processing system and method for logistic storage data inside the enterprise |
CN102073927A (en) * | 2010-12-30 | 2011-05-25 | 浪潮集团山东通用软件有限公司 | Cooperative office-based project type working plan management system |
CN104376450A (en) * | 2014-12-05 | 2015-02-25 | 深圳市中燃科技有限公司 | Material purchasing management system |
CN104899696A (en) * | 2015-06-16 | 2015-09-09 | 国网安徽省电力公司阜阳供电公司 | Transformer station material distribution control analysis application method |
CN105913211A (en) * | 2016-04-29 | 2016-08-31 | 国家电网公司 | Material managing and controlling system and method |
CN106372975A (en) * | 2016-08-31 | 2017-02-01 | 江苏恒创软件有限公司 | Invoice management system based on SOAP technology and ActiveX control technology |
CN108898360A (en) * | 2018-06-22 | 2018-11-27 | 中国能源建设集团安徽电力建设第工程有限公司 | A kind of power engineering wisdom building site integrated control information system |
-
2018
- 2018-12-29 CN CN201811639877.XA patent/CN109840737A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1421810A (en) * | 2001-11-28 | 2003-06-04 | 英业达股份有限公司 | Automatic processing system and method for logistic storage data inside the enterprise |
CN102073927A (en) * | 2010-12-30 | 2011-05-25 | 浪潮集团山东通用软件有限公司 | Cooperative office-based project type working plan management system |
CN104376450A (en) * | 2014-12-05 | 2015-02-25 | 深圳市中燃科技有限公司 | Material purchasing management system |
CN104899696A (en) * | 2015-06-16 | 2015-09-09 | 国网安徽省电力公司阜阳供电公司 | Transformer station material distribution control analysis application method |
CN105913211A (en) * | 2016-04-29 | 2016-08-31 | 国家电网公司 | Material managing and controlling system and method |
CN106372975A (en) * | 2016-08-31 | 2017-02-01 | 江苏恒创软件有限公司 | Invoice management system based on SOAP technology and ActiveX control technology |
CN108898360A (en) * | 2018-06-22 | 2018-11-27 | 中国能源建设集团安徽电力建设第工程有限公司 | A kind of power engineering wisdom building site integrated control information system |
Non-Patent Citations (2)
Title |
---|
刘铮: ""发电企业物资管理电子商务系统的研究与开发"", 《中国优秀硕士学位论文全文数据库 信息科技辑》 * |
徐艳萍: ""物流信息保障系统下应用二维条形码进行药品验收的研究与设计"", 《中国药物应用与监测》 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110414925A (en) * | 2019-07-02 | 2019-11-05 | 北京科技大学 | A kind of digitalized production management system and method based on bargh |
CN110262355A (en) * | 2019-07-06 | 2019-09-20 | 内蒙古智能煤炭有限责任公司 | Intelligent mine management system and method based on intelligent mine control platform |
CN110262355B (en) * | 2019-07-06 | 2022-03-01 | 内蒙古智能煤炭有限责任公司 | Smart mine management system and method based on smart mine management and control platform |
CN111950964A (en) * | 2020-08-24 | 2020-11-17 | 贵州省矿山安全科学研究院 | Coal mine material comprehensive management platform |
CN111950964B (en) * | 2020-08-24 | 2024-02-02 | 贵州省矿山安全科学研究院有限公司 | Comprehensive management system for coal mine materials |
CN113379195A (en) * | 2021-05-14 | 2021-09-10 | 南京智慧建筑研究院有限公司 | Management system of project under construction based on wisdom building |
CN113780720A (en) * | 2021-07-28 | 2021-12-10 | 广东电网有限责任公司佛山供电局 | Electric power material overall process management method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Tetiana et al. | Innovative methods of performance evaluation of energy efficiency projects | |
CN109840737A (en) | A kind of mine materials management system | |
CN109697550B (en) | Distribution network material plan management method and system | |
CN104504543A (en) | Project investment control and management system and use method thereof | |
CN102346880B (en) | Enterprise Resources Planning computer system and method | |
Siguenza-Guzman et al. | Using Time-Driven Activity-Based Costing to support library management decisions: A case study for lending and returning processes | |
CN101425159A (en) | Producing monitoring system for chinese traditional medicine corporation | |
CN102509181A (en) | Computer network system for enterprise purchasing management | |
CN108765123B (en) | Intelligent management system and method for logistics finance, statistics and reimbursement information | |
CN114331377A (en) | Project management system for counting by point location engineering quantity list | |
CN109582712A (en) | Goods and materials managing and control system | |
Averinа et al. | The integration of the Accounting System for implementing World Class Manufacturing (WCM) principles | |
Chiou | Transshipment problems in supply chain systems: review and extensions | |
CN115170090A (en) | Project management method and device, electronic equipment and readable storage medium | |
Molnar et al. | Selection process of ERP systems | |
JP2013114503A (en) | Cost price calculation device | |
Rawat | Today's inventory management systems: A tool in achieving best practices in indian business | |
CN115239309A (en) | Internal marketized settlement method and device and internal marketized settlement platform | |
Mughal et al. | Cloud based ERP system for SME industry | |
CN114418332A (en) | Intelligent operation system for daily chemical commerce and trade | |
Cao et al. | Applied research of activity-based costing under ERP environment | |
SHovALf | Information system planning and selection: A multiattribute theoretic approach | |
CN114066383B (en) | Bid management system based on mobile internet technology | |
Salmon | Controlling with SAP: Practical guide | |
Hayes et al. | A Goldilocks Problem: Identifying Suitable Asset Management Tools for Mid-Size Utilities |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190604 |