CN111861366A - Project-ground intelligent auditing system and computer - Google Patents

Project-ground intelligent auditing system and computer Download PDF

Info

Publication number
CN111861366A
CN111861366A CN202010514586.9A CN202010514586A CN111861366A CN 111861366 A CN111861366 A CN 111861366A CN 202010514586 A CN202010514586 A CN 202010514586A CN 111861366 A CN111861366 A CN 111861366A
Authority
CN
China
Prior art keywords
project
audit
auditing
data
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010514586.9A
Other languages
Chinese (zh)
Inventor
龚新琴
范浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yuanguang Software Co Ltd
Original Assignee
Yuanguang Software Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yuanguang Software Co Ltd filed Critical Yuanguang Software Co Ltd
Priority to CN202010514586.9A priority Critical patent/CN111861366A/en
Publication of CN111861366A publication Critical patent/CN111861366A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F40/00Handling natural language data
    • G06F40/10Text processing
    • G06F40/103Formatting, i.e. changing of presentation of documents
    • G06F40/106Display of layout of documents; Previewing
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F40/00Handling natural language data
    • G06F40/10Text processing
    • G06F40/166Editing, e.g. inserting or deleting
    • G06F40/186Templates
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes
    • G06Q40/12Accounting
    • G06Q40/125Finance or payroll

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • Finance (AREA)
  • Human Resources & Organizations (AREA)
  • Accounting & Taxation (AREA)
  • General Engineering & Computer Science (AREA)
  • Audiology, Speech & Language Pathology (AREA)
  • General Health & Medical Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Computational Linguistics (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Artificial Intelligence (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • Development Economics (AREA)
  • Data Mining & Analysis (AREA)
  • Technology Law (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses an intelligent auditing system capable of researching projects, which comprises a project declaration management subsystem and a project auditing management subsystem; the project declaration management subsystem is used for providing a project list template, receiving and checking project list files edited based on the project list template and project exploitable data corresponding to the project list files; and the project audit management subsystem carries out audit operation and feedback on the reported declaration data according to the formulated respective audit content and rule. The intelligent auditing system also comprises a project auditing report management subsystem, a project auditing display subsystem, a project comprehensive statistics and display subsystem. According to the invention, a set of intelligent auditing tools is developed on the basis of template specification, flow optimization, quantitative standard and rule refinement, and the auditing efficiency of the reserve items is improved.

Description

Project-ground intelligent auditing system and computer
Technical Field
The invention relates to the technical field of electronic information and computers, in particular to an intelligent auditing system and a computer capable of researching projects.
Background
Taking the field of power transmission and transformation as an example, the researched projects relate to more than ten types, including power grid infrastructure, productive technical improvement, productive major repair, small-sized infrastructure, production auxiliary technical improvement, production auxiliary major repair, marketing investment, fixed asset retail, informationized projects and the like.
The materials of the project report which can be researched comprise a project report which can be researched, a project recommendation, a project investment estimate book and the like, and the format of the document which needs to be processed is mainly an unstructured file such as Word, Excel and the like. At present, no good method for auditing a large number of unstructured files in the market is available, the examination and the application are processed manually, and the work difficulty is very high.
Disclosure of Invention
The invention aims to provide an intelligent auditing system capable of researching projects, which can intelligently and automatically carry out standard auditing on the researched projects, ensure the quality of reserve project data and improve the auditing efficiency of the reserve projects. The invention is realized by the following technical scheme:
an intelligent auditing system for project development is characterized by comprising a project declaration management subsystem and a project auditing management subsystem; the project declaration management subsystem is used for providing a project list template, receiving and checking project list files edited based on the project list template and project exploitable data corresponding to the project list files; and the project audit management subsystem carries out audit operation on the reported declaration data and feeds back audit opinions according to the formulated respective audit contents and rules.
As a specific technical solution, the project declaration management subsystem includes:
The project list template creating module is used for creating project list templates of different types aiming at the projects of different types;
the project list template storage module is used for storing the created project list template and calling the project list template;
the item list template export module is used for selecting and exporting the item list template corresponding to the item type from the item list template storage module;
the item list importing module imports the item list checking module after filling information according to the item list template;
the project list checking module is used for checking whether the imported project list file is consistent with a project list template corresponding to the selected project classification and checking whether the content of the project list file is filled according to the template requirement rule, if so, the project list file is imported into the declaration data management module, otherwise, the project list file is imported in failure;
the project searchable data uploading module is used for uploading the searchable data corresponding to the project list file;
and the declaration data management module is used for storing, reporting and deleting declaration data, wherein the declaration data comprises the item list file and corresponding investigatable data, and is also used for recording the declaration state of the item and reporting the declaration data passing the examination to the item auditing management subsystem.
As a specific technical solution, when the item-searchable data uploading module uploads the searchable data corresponding to the item list file, the item reporting status of "unreported" and "returned" is allowed to be uploaded, and meanwhile, whether the searchable data meets the following rules is checked: when the project is reported for the first time, whether the total investment in the project list file is consistent with the total investment or the total amount in the investigatable data or not is judged, and uploading is not allowed if the total investment is inconsistent with the total amount in the investigatable data; and the non-initial uploading is not checked.
As a specific technical scheme, the project audit management subsystem comprises the following modules:
the data integrity auditing module is used for auditing whether the declaration data is complete or not through a set integrity auditing rule, if so, the declaration data is transferred to a financial compliance auditing module, and if not, the declaration data management module is used for recording defects and returning the declaration data to the project declaration management subsystem;
the financial compliance auditing module audits whether the declaration data is complete or not according to the set financial compliance auditing rule, if so, the declaration data is transferred to a project economy auditing module, otherwise, the declaration data management module records defects and returns the declaration data to the project declaration management subsystem;
The project economy auditing module is used for auditing whether the declaration data is complete or not according to a set project economy auditing rule, if so, the declaration data passes the auditing of the project auditing management subsystem, otherwise, the declaration data management module records defects and returns the declaration data to the project declaration management subsystem;
the audit progress recording module records the progress of the execution of the audit process of the declaration data;
the audit result recording module records the audit result of the specific audit items in the audit process of the declared data;
and the auditing history recording module records the auditing operation executed in the process of auditing the declared data.
As a further technical solution, the project-developed intelligent audit system further includes a project audit report management subsystem, which is used for generating a project audit report for the project which is completed with audit.
As a specific technical solution, the project audit report management subsystem includes the following modules:
the report template creating module is used for creating corresponding audit report templates aiming at different project types, storing and calling the audit report templates;
the report data information acquisition module acquires data information of the items which are checked;
and the report generation module writes the acquired data information of the item which is subjected to the audit into the matched audit report template to generate the audit report of the item.
As a further technical solution, the project-developed intelligent auditing system further includes a project auditing display subsystem, which actively calls auditing information and displays the auditing information according to the received query request.
As a specific technical scheme, the project auditing and displaying subsystem comprises the following modules:
the audit information calling module is used for responding to the query request or acquiring audit information of the project audit management subsystem according to a set time point;
and the display module is used for displaying according to a set mode according to the acquired examination information of the project examination management subsystem.
As a specific technical solution, the display module includes:
the audit progress display unit displays the audit progress in a progress bar mode;
the auditing result display unit is used for displaying the corresponding auditing results of the auditing rules;
the investment estimation auditing result display unit is used for summarizing and displaying the project auditing and the economic benefit data of the detailed data of the specific project;
and the audit history display unit is used for displaying the audit history track of the project.
As a specific technical scheme, the audit result display unit displays all the conditions of non-inspection, all inspection, non-inspection and suspected inspection according to different font colors through a rule classification tree and distinctively displays the conditions of non-inspection, all inspection and suspected inspection; the auditing result display unit supports and supports exporting the checking result, and assists the business department to carry out offline rectification; the auditing result display unit supports the content of the inspection detail through viewing, and can clearly and specifically examine the content which does not pass.
As a further technical scheme, the project-developed intelligent auditing system further comprises a project comprehensive statistics and display subsystem, which is used for carrying out real-time statistical analysis on auditing result data and project data of all projects and visually displaying the overall situation of the projects by using a chart.
As a specific technical solution, the project comprehensive statistics and display subsystem includes the following modules:
the progress classification counting module counts the number of plan items, the number of unreported items, the number of reported items, the number of returned items and the number of passed items under each project classification in a plan year in a graphic mode;
the project classification statistical module is used for displaying the total number of projects, the total declared amount, the total approved amount, the total reduction amount and the total increase amount under different project classifications by using paging labels, and providing the proportion of the graphic display amount and the reduction amount in the total declared amount;
the amount classification statistical module is used for displaying the distribution of the total amount of the trial decrease and the total amount of the trial increase under different project classifications by using paging labels under different expense types and displaying the distribution by using a graphic;
and the audit problem distribution statistical module is used for counting the audit problem type distribution of the project and displaying the problem type distribution of the project under different project classifications in the audit.
The invention also discloses a computer system which is characterized by operating the intelligent auditing system capable of researching the project.
According to the invention, a set of intelligent auditing tools is developed on the basis of standardizing the template, optimizing the flow, quantizing the standard and refining the rules, and the specific rules are audited by means of 'unstructured analysis', 'semantic word segmentation' and the like, so that the quality of the reserve project data is ensured, the efficiency of auditing the reserve project is improved, and the investment precision accuracy is also favorably ensured.
Drawings
Fig. 1 is a block diagram of an intelligent audit system for project research according to an embodiment of the present invention.
Fig. 2 is a flowchart illustrating that the report data is reviewed at four levels and a report is generated in the project-applicable intelligent review system according to the embodiment of the present invention.
Fig. 3 is an exemplary diagram of the first-level audit rule classification for reporting the data to be audited and the second-level audit rule under each first-level audit rule classification in the project-researched intelligent audit system provided by the embodiment of the present invention.
Fig. 4 is an exemplary diagram illustrating an audit result displaying unit, which displays the audit result according to different font colors through a rule classification tree in the project-researched intelligent audit system provided by the embodiment of the present invention.
Fig. 5 is an exemplary diagram of an audit result presentation unit supporting a review of details of a project in an intelligent audit system that is capable of researching projects according to an embodiment of the present invention.
Fig. 6 is an exemplary diagram of an intelligent review system for project research, in which a review result display unit expands the inspection details and views "review source file", "review result", "review description" and "review details" in the project research provided by the embodiment of the present invention.
Fig. 7 is an exemplary diagram of a project comprehensive statistics and display subsystem performing billboard display on all project real-time statistics, analysis, and audit result data and project data in the project-researched intelligent audit system provided in the embodiment of the present invention.
Detailed Description
The method of the present invention will be described in further detail with reference to the accompanying drawings.
As shown in fig. 1, the project-developed intelligent audit system provided in this embodiment includes a project declaration management subsystem, a project audit report management subsystem, a project audit display subsystem, a project comprehensive statistics and display subsystem. The following is a detailed description of each subsystem:
the project declaration management subsystem is used for providing a project list template, receiving and checking project list files edited based on the project list template and project exploitable data corresponding to the project list files. Specifically, the project declaration management subsystem includes:
1.1, an item list template creating module, which is used for creating different types of item list templates aiming at different types of items, storing the created item list templates and calling the created item list templates; item classifications include, but are not limited to: power grid capital construction, productive technical improvement, productive major repair, small-sized capital construction, production auxiliary technical improvement, production auxiliary major repair, marketing investment, fixed asset retail, informatization project and the like;
1.2, an item list template exporting module, which is used for selecting and exporting the item list template of the corresponding item type from the item list template storage module;
1.3, an item list importing module, importing an item list checking module after filling information according to the item list template;
1.4, an item list checking module, which is used for checking whether the imported item list file is consistent with an item list template corresponding to the selected item classification, and checking whether the content of the item list file is filled according to a template requirement rule, if so, importing the item list file into a reporting data management module, otherwise, importing the item list file fails;
1.5, a project researched data uploading module, configured to upload researched data corresponding to the project list file, where the project declared as "unreported" or "returned" can be uploaded, the researched data includes but is not limited to a feasibility study report/project recommendation, an investment estimate/investment estimate list, a research review comment, and other data, and the file format includes but is not limited to word, excel, PDF, ceb, and a picture format (JPG, GIF, PNG, JPEG, BMP); when the searchable material of the project is uploaded, whether the searchable material of the project meets the requirements of the business rules is automatically checked, and the rules include, but are not limited to, for example: when the project is reported for the first time, checking whether the total investment (ten thousand yuan) in the project list is consistent with the total investment (ten thousand yuan) in the project recommendation and the total sum (ten thousand yuan) in the project investment estimation table in the research report, and if the total investment (ten thousand yuan) is inconsistent, not allowing the report; uploading for non-initial time and not checking;
1.6, a reporting data management module, which is used for storing, reporting and deleting reporting data, wherein the reporting data comprises the item list file and corresponding investigatable data, and is also used for recording item reporting states, such as 'not reported', 'returned', and the like; deleting the item list file of the unreported and returned item information, and automatically deleting the researched data uploaded by the item; the project list file and the exploitable data which pass the rule check are automatically reported to the project audit management subsystem.
The project audit management subsystem is used for carrying out at least one level of audit operation on the reported declaration data; the auditing process in this embodiment includes four levels: project initial examination, project management department examination and examination, business department examination and comprehensive examination and examination. Specifically, the project audit management subsystem of each level can formulate respective audit content and rules, the audit operation is to solidify and package a complex business logic and audit rule model, and an automatic analysis mode is adopted to realize intelligent audit of data integrity, financial compliance and project economy and feed back audit opinions in time. The project audit management subsystem supports a mode of combining automatic audit and manual audit.
In this embodiment, the audit rules include a first-level audit rule classification and a second-level audit rule classification, where the first-level audit rule classification (the "rule classification" in fig. 2) includes data integrity audit, financial compliance audit, and project economy audit, and each first-level audit rule classification includes a plurality of second-level audit rules (the "audit focus" in fig. 2), which is shown in fig. 2. Based on this, the project audit management subsystem provided in this embodiment includes the following modules:
2.1, a data integrity auditing module, which audits whether the declaration data is complete through a set integrity auditing rule, if so, the declaration data is transferred to a financial compliance auditing module, otherwise, the declaration data management module records defects and returns the declaration data to a project declaration management subsystem;
2.2, the financial compliance auditing module audits whether the declaration data is complete according to the set financial compliance auditing rule, if so, the declaration data is transferred to a project economy auditing module, otherwise, the declaration data management module records defects and returns the declaration data to a project declaration management subsystem;
2.3, a project economy auditing module, which audits whether the declaration data is complete according to a set project economy auditing rule, if so, audits through a project auditing management subsystem, otherwise, records defects and returns the declaration data to a declaration data management module of the project declaration management subsystem;
In addition, the project audit management subsystem provided by this embodiment further includes:
2.4, an audit progress recording module, which records the progress of the execution of the audit process of the declaration data, such as 'not audited', 'audit completed', 'returned', 'audit in progress' and the like; wherein "audit completed" may in turn include which level of "audit completed";
2.5, an audit result recording module, for recording the audit result of the specific audit item in the process of reporting the audit of the data, such as 'pass', 'fail', 'item reminder', 'suspected item reminder', etc.;
and 2.6, an audit history recording module records the audit operation executed in the process of auditing the declared data.
And thirdly, the project audit report management subsystem is used for generating a project audit report for the project which is audited. Specifically, the project audit report management subsystem comprises the following modules:
3.1, a report template creating module, which creates corresponding audit report templates aiming at different project types, stores and calls the audit report templates;
3.2, a report data information acquisition module acquires data information of the item which is checked;
and 3.3, the report generating module writes the acquired data information of the item which is subjected to the audit into the matched audit report template to generate an audit report of the item, and can print, export or query the issued report on line, so that the report format specification and the content accuracy are ensured.
And fourthly, the project audit display subsystem actively calls audit information and displays the audit information according to the received query request. Specifically, the project audit display subsystem comprises the following modules:
4.1, an audit information calling module, which is used for responding to the query request or acquiring the audit information of the project audit management subsystem according to the set time point;
4.2, the display module displays the acquired review information of the project review management subsystem according to a set mode; more specifically, the display module comprises:
4.2.1, an audit progress display unit, which displays the audit progress in a progress bar mode, for example: the method comprises the following steps of 'non-auditing', 'auditing in process', 'returned', 'initial auditing pass', 'project management department auditing confirmation pass', 'professional department auditing confirmation pass' and 'comprehensive auditing pass', wherein for the condition in the process of auditing, the specific progress is displayed in the form of a progress bar, and the form is as follows:
the explanatory text comprises the following components: { percentage progress of inspection } is inspecting …;
check progress percentage = number of rules that completed audit/total number of audit rules.
4.2.2, an audit result display unit, configured to display a corresponding audit result of each audit rule, where the embodiment specifically includes:
Firstly, displaying an audit result of the first-level rule classification: the conditions of all non-inspection, all inspection passing, inspection non-passing and suspected inspection are displayed according to different font colors;
and displaying the auditing result of the secondary rule classification: and displaying and distinguishing the conditions of all non-inspection, all inspection passing, inspection non-passing and suspected according to different font colors.
All the inspection rules under each secondary classification are displayed, and the conditions of all non-inspection, all inspection passing, inspection non-passing and suspected inspection are displayed according to different font colors through a rule classification tree, which is shown in fig. 4. The audit result display unit supports the content of the detail of the through-viewing check, and can clearly and specifically examine the content which does not pass, as shown in fig. 5. The examination details are developed, and "review source file", "review result", "review description" and "review details" can be viewed, as shown in fig. 6.
Further, for the treatment of suspected items: the examination result is a suspected item, and further manual judgment is needed; the system automatically positions the suspicious problems, provides 'inspection content' to support penetration, pops up and displays content information of manual judgment, and assists the manual judgment.
In addition, the auditing result display unit supports and exports the checking result, and assists the business department to carry out offline rectification;
and 4.2.3, an investment estimation audit result display unit, which is used for summarizing and displaying the project audit and the economic benefit data of the detailed project detail data, wherein the economic benefit data comprises the total amount of the audit reduction (increase) and the detailed expense of the detailed audit reduction (increase).
Specifically, the total amount of the project, the total declared amount, the total approved amount, the total audited amount and the total audited amount are summarized according to project categories (including but not limited to power grid infrastructure, productive technology improvement, productive overhaul, small infrastructure, productive auxiliary technology improvement, productive auxiliary overhaul, marketing investment, fixed asset retail, information project and the like). In addition, according to specific projects, the declaration amount, the approval amount, the balance, the difference of construction project fees, the difference of installation project fees, the difference of demolition project fees, the difference of equipment purchase fees, the difference of other fees, the difference of basic reserve fees and the like of the target project are inquired and analyzed.
And 4.2.4, an audit history display unit, which is used for displaying the audit history track of the project and supporting the checking of the overall process audit record of the project, wherein the overall process audit record comprises the number of audits in each stage, the number of problems found in each audit, the number of rollback times, the total amount of rollback money, the number of data integrity problems, the number of financial compliance problems, the number of economic problems of the project and the like, so that the quality and the work effect of the audit project are reflected, and the performance assessment is assisted.
And a project comprehensive statistics and display subsystem, which is used for performing real-time statistics analysis on the auditing result data and the project data of all the projects, visually displaying the overall situation of the projects by using rich charts, and assisting in decision analysis, and is shown in fig. 7. Specifically, the project integration statistics and presentation subsystem includes the following modules:
5.1, a progress classification statistical module for counting the number of planned items, the number of unreported items, the number of reported items, the number of returned items, the number of items passing initial review, the number of items passing review by the project management department, the number of items passing review by the professional department and the number of items passing comprehensive review under each project classification in a planned year in a graphic mode, and following the review progress of the reserve project in real time.
5.2, a project classification statistical module displays the total number of projects, total declared amount, total approved amount, total observed subtraction amount and total observed addition amount under different project classifications by using paging labels, provides the proportion of the graphic display amount and the total observed subtraction (observed addition) amount to the total declared amount, and visually displays the project auditing scale and economic benefit;
5.3, the sum classifying and counting module displays the distribution of the total amount to be checked and subtracted under different project classifications and the total amount to be checked and added under different expense types by using paging labels and displays the distribution by using a graphic;
And 5.4, a checking problem distribution statistical module, project checking problem type distribution, displaying the problem type distribution of projects under different project classifications in checking, for example, counting the number and proportion of problems of each problem type by taking the integrity of the data, the financial compliance and the economy of the projects as dimensions, and providing graphic display. In addition, aiming at the distribution of the ten problems before the project is audited, the quantity and the description of the problems ranked in the ten problems in the auditing process under different project classifications are displayed by using the paging labels, the analysis and decision of the management layer are assisted, and the management of the reserve projects is standardized.
The above embodiments are merely provided for full disclosure and not for limitation, and any replacement of equivalent technical features based on the gist of the present invention without creative efforts should be considered as the scope of the present disclosure.

Claims (13)

1. An intelligent auditing system for project development is characterized by comprising a project declaration management subsystem and a project auditing management subsystem; the project declaration management subsystem is used for providing a project list template, receiving and checking project list files edited based on the project list template and project exploitable data corresponding to the project list files; and the project audit management subsystem carries out audit operation and feedback on the reported declaration data according to the formulated respective audit content and rule.
2. An intelligent audit system according to claim 1 wherein the project declaration management subsystem includes:
the project list template creating module is used for creating project list templates of different types aiming at the projects of different types;
the project list template storage module is used for storing the created project list template and calling the project list template;
the item list template export module is used for selecting and exporting the item list template corresponding to the item type from the item list template storage module;
the item list importing module imports the item list checking module after filling information according to the item list template;
the project list checking module is used for checking whether the imported project list file is consistent with a project list template corresponding to the selected project classification and checking whether the content of the project list file is filled according to the template requirement rule, if so, the project list file is imported into the declaration data management module, otherwise, the project list file is imported in failure;
the project searchable data uploading module is used for uploading the searchable data corresponding to the project list file;
and the declaration data management module is used for storing, reporting and deleting declaration data, wherein the declaration data comprises the item list file and corresponding investigatable data, and is also used for recording the declaration state of the item and reporting the declaration data passing the examination to the item auditing management subsystem.
3. The intelligent auditing system of claim 2, where when the project researched data upload module uploads the corresponding research data of the project manifest file, the project declared as "unreported" or "returned" allows upload, and checks whether the research data satisfies the following rules: when the project is reported for the first time, whether the total investment in the project list file is consistent with the total investment or the total amount in the investigatable data or not is judged, and uploading is not allowed if the total investment is inconsistent with the total amount in the investigatable data; and the non-initial uploading is not checked.
4. The intelligent audit system according to claim 2 wherein the project audit management subsystem includes the following modules:
the data integrity auditing module is used for auditing whether the declaration data is complete or not through a set integrity auditing rule, if so, the declaration data is transferred to a financial compliance auditing module, and if not, the declaration data management module is used for recording defects and returning the declaration data to the project declaration management subsystem;
the financial compliance auditing module audits whether the declaration data is complete or not according to the set financial compliance auditing rule, if so, the declaration data is transferred to a project economy auditing module, otherwise, the declaration data management module records defects and returns the declaration data to the project declaration management subsystem;
The project economy auditing module is used for auditing whether the declaration data is complete or not according to a set project economy auditing rule, if so, the declaration data passes the auditing of the project auditing management subsystem, otherwise, the declaration data management module records defects and returns the declaration data to the project declaration management subsystem;
the audit progress recording module records the progress of the execution of the audit process of the declaration data;
the audit result recording module records the audit result of the specific audit items in the audit process of the declared data;
and the auditing history recording module records the auditing operation executed in the process of auditing the declared data.
5. The intelligent auditing system of any one of claims 1 to 4 further comprising a project audit report management subsystem for generating a project audit report for a project for which an audit is completed.
6. The intelligent audit system according to claim 5 wherein the project audit report management subsystem includes the following modules:
the report template creating module is used for creating corresponding audit report templates aiming at different project types, storing and calling the audit report templates;
the report data information acquisition module acquires data information of the items which are checked;
And the report generation module writes the acquired data information of the item which is subjected to the audit into the matched audit report template to generate the audit report of the item.
7. The intelligent auditing system of claim 4, further comprising a project audit presentation subsystem that invokes and presents audit information either proactively or in response to a received query request.
8. The intelligent audit system according to claim 7 wherein the project audit presentation subsystem includes the following modules:
the audit information calling module is used for responding to the query request or acquiring audit information of the project audit management subsystem according to a set time point;
and the display module is used for displaying according to a set mode according to the acquired examination information of the project examination management subsystem.
9. An intelligent auditing system according to claim 8 where the presentation module includes:
the audit progress display unit displays the audit progress in a progress bar mode;
the auditing result display unit is used for displaying the corresponding auditing results of the auditing rules;
the investment estimation auditing result display unit is used for summarizing and displaying the project auditing and the economic benefit data of the detailed data of the specific project;
And the audit history display unit is used for displaying the audit history track of the project.
10. The intelligent auditing system of claim 9 where the audit result presentation unit presents all non-checkings, all checkings passed, checkings failed, suspected conditions by a rule classification tree, distinctively presenting in different font colors; the auditing result display unit supports and exports the checking result; the auditing result display unit supports the content of the detail of the through-viewing inspection.
11. The intelligent auditing system of claim 9 further comprising a project integration statistics and presentation subsystem for statistically analyzing audit result data and project data in real-time for all projects and visually presenting the overall condition of the project as a graph.
12. The intelligent auditing system of claim 11 where the project integration statistics and presentation subsystem includes the following modules:
the progress classification counting module counts the number of plan items, the number of unreported items, the number of reported items, the number of returned items and the number of passed items under each project classification in a plan year in a graphic mode;
the project classification statistical module is used for displaying the total number of projects, the total declared amount, the total approved amount, the total reduction amount and the total increase amount under different project classifications by using paging labels, and providing the proportion of the graphic display amount and the reduction amount in the total declared amount;
The amount classification statistical module is used for displaying the distribution of the total amount of the trial decrease and the total amount of the trial increase under different project classifications by using paging labels under different expense types and displaying the distribution by using a graphic;
and the audit problem distribution statistical module is used for counting the audit problem type distribution of the project and displaying the problem type distribution of the project under different project classifications in the audit.
13. A computer system, characterized in that it runs an intelligent auditing system exploitable for the items according to claims 1-12.
CN202010514586.9A 2020-06-08 2020-06-08 Project-ground intelligent auditing system and computer Pending CN111861366A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010514586.9A CN111861366A (en) 2020-06-08 2020-06-08 Project-ground intelligent auditing system and computer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010514586.9A CN111861366A (en) 2020-06-08 2020-06-08 Project-ground intelligent auditing system and computer

Publications (1)

Publication Number Publication Date
CN111861366A true CN111861366A (en) 2020-10-30

Family

ID=72987493

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010514586.9A Pending CN111861366A (en) 2020-06-08 2020-06-08 Project-ground intelligent auditing system and computer

Country Status (1)

Country Link
CN (1) CN111861366A (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112365236A (en) * 2020-11-16 2021-02-12 浪潮云信息技术股份公司 Method for handling recommended item list applied to investment item handling system
CN112417835A (en) * 2020-11-18 2021-02-26 云南电网有限责任公司信息中心 Intelligent inspection method and system for purchase file based on natural language processing technology
CN112862426A (en) * 2021-01-15 2021-05-28 北京致远互联软件股份有限公司 Process flow method based on machine automation task
CN113095647A (en) * 2021-04-01 2021-07-09 中国汽车技术研究中心有限公司 Vehicle inspection system
CN113177865A (en) * 2021-01-26 2021-07-27 张作中 Intellectual property project application process monitoring method and system
CN113506092A (en) * 2021-07-15 2021-10-15 远光软件股份有限公司 Method and device for managing research and development adding items, storage medium and electronic equipment
CN113570332A (en) * 2021-07-16 2021-10-29 国网河南省电力公司经济技术研究院 Charging facility project reward fund examination and approval system
CN113610594A (en) * 2021-07-26 2021-11-05 航天信息系统工程(北京)有限公司 Equipment price reporting data processing method and system
CN113689198A (en) * 2021-08-31 2021-11-23 远光软件股份有限公司 Project file generation method and device, storage medium and terminal equipment
CN113962565A (en) * 2021-10-26 2022-01-21 广东省技术经济研究发展中心 Project scoring method and system based on big data and readable storage medium
CN114066423A (en) * 2021-11-24 2022-02-18 中车青岛四方机车车辆股份有限公司 Management system and method for rail transit vehicle products
WO2022134767A1 (en) * 2020-12-23 2022-06-30 Shanghai Weilian Information Technology Co., Ltd. Method, apparatus and device for auditing data based on blockchain, and storage medium
CN115239292A (en) * 2022-07-21 2022-10-25 北京铭研医药研究有限公司 Information processing method and system for medicine research and development and production verification
CN115660589A (en) * 2022-10-25 2023-01-31 国网北京市电力公司 Business auditing method, device, equipment, computer readable medium and program product
CN116894646A (en) * 2023-07-28 2023-10-17 湖南巨为科技有限公司 Fine management system for technological project declaration flow

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101990208A (en) * 2009-07-31 2011-03-23 中国移动通信集团公司 Automatic data checking method, system and equipment
CN102637214A (en) * 2012-04-28 2012-08-15 中国工商银行股份有限公司 Method and system for synchronizing general data among database services
WO2015131457A1 (en) * 2014-03-03 2015-09-11 深圳市百能信息技术有限公司 Method and system for automatically auditing pcb project file
CN105373885A (en) * 2015-11-10 2016-03-02 国网福建省电力有限公司 Electric power engineering design review and technical economic evaluation information system
CN106802841A (en) * 2017-01-19 2017-06-06 四川奥诚科技有限责任公司 Data extract analytic method, device and server
CN109858751A (en) * 2018-12-26 2019-06-07 中国大唐集团科学技术研究院有限公司 Power engineering Evaluating Projects System
CN110930121A (en) * 2019-11-28 2020-03-27 成都中科大旗软件股份有限公司 Industry integration management system based on wisdom travel

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101990208A (en) * 2009-07-31 2011-03-23 中国移动通信集团公司 Automatic data checking method, system and equipment
CN102637214A (en) * 2012-04-28 2012-08-15 中国工商银行股份有限公司 Method and system for synchronizing general data among database services
WO2015131457A1 (en) * 2014-03-03 2015-09-11 深圳市百能信息技术有限公司 Method and system for automatically auditing pcb project file
CN105373885A (en) * 2015-11-10 2016-03-02 国网福建省电力有限公司 Electric power engineering design review and technical economic evaluation information system
CN106802841A (en) * 2017-01-19 2017-06-06 四川奥诚科技有限责任公司 Data extract analytic method, device and server
CN109858751A (en) * 2018-12-26 2019-06-07 中国大唐集团科学技术研究院有限公司 Power engineering Evaluating Projects System
CN110930121A (en) * 2019-11-28 2020-03-27 成都中科大旗软件股份有限公司 Industry integration management system based on wisdom travel

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
范超: "电网项目储备审核流程优化研究——以S电网公司为例", 《商业会计》, pages 32 - 34 *

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112365236A (en) * 2020-11-16 2021-02-12 浪潮云信息技术股份公司 Method for handling recommended item list applied to investment item handling system
CN112417835A (en) * 2020-11-18 2021-02-26 云南电网有限责任公司信息中心 Intelligent inspection method and system for purchase file based on natural language processing technology
CN112417835B (en) * 2020-11-18 2023-11-14 云南电网有限责任公司信息中心 Intelligent purchasing file examination method and system based on natural language processing technology
WO2022134767A1 (en) * 2020-12-23 2022-06-30 Shanghai Weilian Information Technology Co., Ltd. Method, apparatus and device for auditing data based on blockchain, and storage medium
CN112862426A (en) * 2021-01-15 2021-05-28 北京致远互联软件股份有限公司 Process flow method based on machine automation task
CN113177865A (en) * 2021-01-26 2021-07-27 张作中 Intellectual property project application process monitoring method and system
CN113095647A (en) * 2021-04-01 2021-07-09 中国汽车技术研究中心有限公司 Vehicle inspection system
CN113095647B (en) * 2021-04-01 2023-01-06 中国汽车技术研究中心有限公司 Vehicle inspection system
CN113506092A (en) * 2021-07-15 2021-10-15 远光软件股份有限公司 Method and device for managing research and development adding items, storage medium and electronic equipment
CN113570332A (en) * 2021-07-16 2021-10-29 国网河南省电力公司经济技术研究院 Charging facility project reward fund examination and approval system
CN113610594B (en) * 2021-07-26 2024-05-24 航天信息系统工程(北京)有限公司 Equipment review price data processing method and system
CN113610594A (en) * 2021-07-26 2021-11-05 航天信息系统工程(北京)有限公司 Equipment price reporting data processing method and system
CN113689198A (en) * 2021-08-31 2021-11-23 远光软件股份有限公司 Project file generation method and device, storage medium and terminal equipment
CN113962565A (en) * 2021-10-26 2022-01-21 广东省技术经济研究发展中心 Project scoring method and system based on big data and readable storage medium
CN113962565B (en) * 2021-10-26 2024-05-21 广东省技术经济研究发展中心 Item scoring method and system based on big data and readable storage medium
CN114066423A (en) * 2021-11-24 2022-02-18 中车青岛四方机车车辆股份有限公司 Management system and method for rail transit vehicle products
CN115239292A (en) * 2022-07-21 2022-10-25 北京铭研医药研究有限公司 Information processing method and system for medicine research and development and production verification
CN115660589B (en) * 2022-10-25 2023-06-13 国网北京市电力公司 Business auditing method, device, equipment and computer readable medium
CN115660589A (en) * 2022-10-25 2023-01-31 国网北京市电力公司 Business auditing method, device, equipment, computer readable medium and program product
CN116894646A (en) * 2023-07-28 2023-10-17 湖南巨为科技有限公司 Fine management system for technological project declaration flow

Similar Documents

Publication Publication Date Title
CN111861366A (en) Project-ground intelligent auditing system and computer
Munappy et al. Data management challenges for deep learning
CN110990474A (en) Regional industry image analysis method and device
CN103971192A (en) Intelligent lab managing system
CN114118980A (en) Intelligent checking method and system for digital achievements of building design
US20110093309A1 (en) System and method for predictive categorization of risk
CN112800755A (en) Data management method and system
CN115809653A (en) Intelligent contract auditing method and system
CN110688381B (en) Software product and software method for product process record tracing
CN115269874A (en) Intelligent contract examination method based on natural language understanding
US20040243631A1 (en) System or method for gathering and utilizing information
CN111798086A (en) Universal intelligent assessment method for industry system units
CN114722789B (en) Data report integrating method, device, electronic equipment and storage medium
CN116402334A (en) Multimode data compliance analysis and intelligent evaluation method and device
CN113610594B (en) Equipment review price data processing method and system
Budiman et al. The Telegram notification system for improving library services Universitas Negeri Semarang
Vukašinović et al. Application of knowledge management system to injection mold design and manufacturing in small enterprises
US20090187438A1 (en) Method for review appraisals
CN117078169B (en) Digital power-saving system in energy supply chain field
TWI550531B (en) Enterprise resource planning performance evaluation system and method
CN116306555A (en) Self-help pre-evaluation system for high enterprise declaration
CN117952325B (en) Standardized information management system
JP2005215782A (en) Consolidated management information generation system, consolidated management information generation method, and consolidated management information generation program
Fukumura et al. Proposal for a Maintenance Management System Using Point Clouds
Eder et al. Towards improving data interoperability for the reconstruction of existing buildings

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination