CN109819712A - One kind repairing remodeling method for gardens pit - Google Patents
One kind repairing remodeling method for gardens pit Download PDFInfo
- Publication number
- CN109819712A CN109819712A CN201910076053.4A CN201910076053A CN109819712A CN 109819712 A CN109819712 A CN 109819712A CN 201910076053 A CN201910076053 A CN 201910076053A CN 109819712 A CN109819712 A CN 109819712A
- Authority
- CN
- China
- Prior art keywords
- pit
- sole piece
- vegetation
- soil
- gardens
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
The present invention relates to gardens remodeling method fields, and it discloses one kind and repairs remodeling method for gardens pit, including pit is planned and layout-waste barren rock cleaning-soil is filled with and step is reconnoitred and safeguarded in soil remediation-discharge drainage facility laying-vegetation plantation with transplanting-periodicity.This is used for gardens pit and repairs remodeling method, it is filled with by soil and soil remediation, keep the soil in pit more regular, and the laying of plumbing facility is carried out before planting vegetation, vegetation is planted in cooperation planting bag later, improve the plantation survival rate of vegetation, pass through the effect of lateral frame, and fitting projection block and bayonet, help to carry out planting bag into neat arrangement, making planting bag, whole arrangement process is more convenient when in use, by the effect for encouraging device, for the vegetation being grown on inclined pit, it can play the role of helping vegetation upper growth along the vertical direction, bring better prospect of the application.
Description
Technical field
The present invention relates to gardens remodeling method fields, specially a kind of to repair remodeling method for gardens pit.
Background technique
After the exploitation of stone pit, usually come at biggish environmental problem, thus to the research of stone pit ecological recovery with
It practices corresponding also more deep, wherein it is in widespread attention that transformation is repaired in gardens pit;Existing repair for gardens pit changes
It makes method and there are certain drawbacks when in use, the plantation firstly, for vegetation is more difficult, it is difficult to survive in pit,
Secondary, whole arrangement process is more inconvenient when in use for planting bag, is unfavorable for the integrated planning plantation of vegetation, in addition, for planting
, since pit tilts, it is unfavorable for growing on vegetation vertical direction in growth course, for this purpose, it is proposed that a kind of be used for gardens mine
Repair remodeling method in hole.
Summary of the invention
(1) the technical issues of solving
In view of the deficiencies of the prior art, the present invention provides one kind for gardens pit repair remodeling method, have for
The plantation survival rate of vegetation is higher, and whole arrangement process is more convenient when in use for planting bag, is conducive to vegetation vertical direction
The advantages of upper growth, solve be conventionally used to gardens pit repair remodeling method the plantation for vegetation it is more difficult, in mine
It is difficult to survive in hole, whole arrangement process is more inconvenient when in use for planting bag, is unfavorable for growing on vegetation vertical direction
Problem.
(2) technical solution
Plantation survival rate to realize above-mentioned vegetation is higher, and whole arrangement process is more convenient when in use for planting bag,
Be conducive to the purpose grown on vegetation vertical direction, the invention provides the following technical scheme: a kind of repair for gardens pit changes
Method is made, including pit planning is filled with and soil remediation-discharge drainage facility laying-with layout-waste barren rock cleaning-soil
Vegetation plantation and transplanting-periodicity prospecting and maintenance step, the specific steps are as follows:
(1) pit planning and layout: the entirety in pit is reconnoitred and measured, and grass is carried out to the monnolithic case in pit
Figure is drawn, and is laid with discharge drainage facility according to drawing and is carried out whole planning and layout with vegetation plantation;
(2) waste barren rock is cleared up: the waste barren rock in pit is dug out, it is ensured that and it is more smooth in pit, in order to the later period
The plantation of vegetation;
(3) soil is filled with and soil remediation: will be inserted soil in pit, is suitably loosened the soil and be uniformly laid with soil, make soil
Surface is more regular;
(4) discharge drainage facility is laid with: water pipe and spray head are configured according to the planning in above-mentioned (1) with layout, it is ensured that
It is subsequent that plant is irrigated;
(5) vegetation plantation and transplanting: planting bag is arranged in pit, the root of vegetation is assigned in the upper end of planting bag
Outer surface, then be placed on device is encouraged on vegetation, and be inserted into lower end in planting bag, encouraging device after assigning protects sapling
Hold the direction of growth on vertical direction;
(6) periodically prospecting and maintenance: the upgrowth situation of vegetation is periodically reconnoitred, and is safeguarded in time, with complete
At the reparation and transformation in gardens pit.
Preferably, lateral frame, the inside of the planting bag are provided on the outside of planting bag described in the step (5)
It is provided with planting soil, a side external surface of the lateral frame is provided with protruding block, the other side appearance of the lateral frame
Face is provided with bayonet relative to the side of protruding block.
Preferably, the lateral frame is wrapped in the surrounding of planting bag, is fixed between the planting bag and lateral frame
Connection is fixedly connected between the protruding block and lateral frame, and the shape of the protruding block matches with the shape of bayonet.
Preferably, the upper end outer surface of the lateral frame is provided with fixation hole close to corner, and the fixation hole runs through
In the upper end outer surface of lateral frame, the quantity of the fixation hole is several groups, and the fixation hole is arranged in array.
Preferably, growth encourage device described in step (5) includes the first sole piece, and the interior aspect face of first sole piece is set
It is equipped with arc port, the first upper mass is provided with above first sole piece, is set between first upper mass and the first sole piece
It is equipped with pilot pin, the upper end outer surface of first upper mass is provided with above pilot pin beats cushion block, and described first
The interior aspect face of upper mass is provided with the first position-limiting drum, and a side external surface of first sole piece is provided with the second sole piece, institute
The side external surface for stating the first upper mass is provided with the second upper mass, and a side external surface of first position-limiting drum is provided with second
Position-limiting drum, the outer surface of second sole piece are provided with card slot, are provided with fixture block on the inside of the card slot.
Preferably, the pilot pin is through the upper end outer surface of the first sole piece, between the pilot pin and the first sole piece
To be flexibly connected, it is fixedly connected between the upper end of the pilot pin and the lower end outer surface of the first upper mass, the pilot pin
Quantity be several groups, pilot pin circular array arrangement, described beat is fixed company between cushion block and the first upper mass
It connects, described to beat cushion block corresponding with the arrangement position of pilot pin.
Preferably, second sole piece, the second upper mass and the second position-limiting drum respectively with the first sole piece, the first upper mass with
Arrangement between first position-limiting drum is symmetrical, to be fixedly connected between first sole piece and fixture block, first sole piece and the
It is flexibly connected with card slot between two sole pieces by fixture block, the connection type between second upper mass, the first upper mass and the
Connection type between one sole piece, the second sole piece is similar.
(3) beneficial effect
Compared with prior art, the present invention provides one kind repairs remodeling method for gardens pit, has following beneficial
Effect:
1, this is used for gardens pit and repairs remodeling method, is filled with by soil and soil remediation, make soil in pit compared with
To be regular, and the laying of plumbing facility is carried out before planting vegetation, vegetation is planted in cooperation planting bag later, compared to
It is planted in survival rate on ore to significantly improve, is conducive to the growth of the vegetation in gardens, promote reparation and correctional effect.
2, this is used for gardens pit and repairs remodeling method, by the effect of lateral frame, and fitting projection block and bayonet,
Carry out planting bag arrangement during, the protruding block of adjacent lateral frame is embedded in bayonet respectively so that lateral frame it
Between neatly arrange, then fixed screw rod is penetrated into soil by fixation hole, fixes the position of entire lateral frame, for
The arrangement of planting bag is more neat, is conducive to the planning and plantation of subsequent vegetation.
3, this is used for gardens pit and repairs remodeling method, and by encouraging the effect of device, vegetation is being planted in planting bag
Upper end outer surface after, by the second sole piece, the second upper mass and the second position-limiting drum respectively together in the first sole piece, the first upper mass with
The side of first position-limiting drum, while ensuring vegetation between the second position-limiting drum and the first position-limiting drum, pad is beaten in same mistake
Block makes pilot pin through in soil, the entire setting position that encourages is fixed, and is conducive to the upper life along the vertical direction of later period vegetation
It is long.
Detailed description of the invention
Fig. 1 is the flow chart of the present embodiment;
Fig. 2 is the schematic diagram of the pit part of the present embodiment;
Fig. 3 is the schematic diagram of the planting bag of the present embodiment;
Fig. 4 is the front section view of the planting bag of the present embodiment;
Fig. 5 is the structural schematic diagram of the growth encourage device of the present embodiment;
The first sole piece and the top view at the second sole piece that Fig. 6 is the present embodiment.
In figure: 1, lateral frame;2, planting bag;3, planting soil;4, protruding block;5, bayonet;6, fixation hole;7, dress is encouraged
It sets;8, the first sole piece;9, arc port;10, the first upper mass;11, pilot pin;12, cushion block is beaten;13, the first position-limiting drum;14,
Second sole piece;15, the second upper mass;16, the second position-limiting drum;17, fixture block;18, card slot.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Fig. 1-6 is please referred to, one kind repairing remodeling method, including pit planning and layout-waste barren rock for gardens pit
Cleaning-soil is filled with to be walked with transplanting-periodicity prospecting with maintenance with soil remediation-discharge drainage facility laying-vegetation plantation
Suddenly, the specific steps are as follows:
Pit planning and layout: the entirety in pit is reconnoitred and is measured, and to the monnolithic case in pit into
Vehicle timespace diagram is drawn, and according to drawing by discharge drainage facility be laid with vegetation plantation carry out whole planning with
Layout;
(1) waste barren rock is cleared up: the waste barren rock in pit is dug out, it is ensured that and it is more smooth in pit, in order to the later period
The plantation of vegetation;
(2) soil is filled with and soil remediation: will be inserted soil in pit, is suitably loosened the soil and be uniformly laid with soil, make soil
Surface is more regular;
(3) discharge drainage facility is laid with: water pipe and spray head are configured according to the planning in above-mentioned (1) with layout, it is ensured that
It is subsequent that plant is irrigated;
(4) vegetation plantation and transplanting: planting bag is arranged in pit, the root of vegetation is assigned in the upper end of planting bag
Outer surface, then be placed on device is encouraged on vegetation, and be inserted into lower end in planting bag, encouraging device after assigning protects sapling
Hold the direction of growth on vertical direction;
(5) periodically prospecting and maintenance: the upgrowth situation of vegetation is periodically reconnoitred, and is safeguarded in time, with complete
At the reparation and transformation in gardens pit.
The outside of planting bag 2 in step (5) is provided with lateral frame 1, and the inside of planting bag 2 is provided with planting soil 3,
One side external surface of lateral frame 1 is provided with protruding block 4, side of another side external surface of lateral frame 1 relative to protruding block 4
It is provided with bayonet 5;Lateral frame 1 is wrapped in the surrounding of planting bag 2, is fixedly connected between planting bag 2 and lateral frame 1, convex
To be fixedly connected between bittiness 4 and lateral frame 1, the shape of protruding block 4 matches with the shape of bayonet 5;Lateral frame 1 it is upper
End outer surface is provided with fixation hole 6 close to corner, fixation hole 6 through the upper end outer surface of lateral frame 1, fixation hole 6
Quantity is several groups, and fixation hole 6 is arranged in array;Growth encourage device 7 in step (5) includes the first sole piece 8, the first sole piece 8
Interior aspect face is provided with arc port 9, and the top of the first sole piece 8 is provided with the first upper mass 10, the first upper mass 10 and first
Pilot pin 11 is provided between sole piece 8, the upper end outer surface of the first upper mass 10 is provided with close to the top of pilot pin 11 beats
Cushion block 12, the interior aspect face of the first upper mass 10 are provided with the first position-limiting drum 13, and a side external surface of the first sole piece 8 is provided with
Second sole piece 14, a side external surface of the first upper mass 10 are provided with the second upper mass 15, the side appearance of the first position-limiting drum 13
Face is provided with the second position-limiting drum 16, and the outer surface of the second sole piece 14 is provided with card slot 18, and the inside of card slot 18 is provided with fixture block 17;
Pilot pin 11 is flexibly connected, pilot pin through the upper end outer surface of the first sole piece 8 between pilot pin 11 and the first sole piece 8
To be fixedly connected between 11 upper end and the lower end outer surface of the first upper mass 10, the quantity of pilot pin 11 is several groups, positioning
The arrangement of 11 circular array of needle beats between cushion block 12 and the first upper mass 10 to be fixedly connected, beats cushion block 12 and pilot pin
11 arrangement position is corresponding;Second sole piece 14, the second upper mass 15 and the second position-limiting drum 16 respectively with the first sole piece 8, first
Arrangement between upper mass 10 and the first position-limiting drum 13 is symmetrical, is fixedly connected between the first sole piece 8 and fixture block 17, the first bottom
It is flexibly connected by fixture block 17 with card slot 18 between block 8 and the second sole piece 14, between the second upper mass 15, the first upper mass 10
Connection type between connection type and the first sole piece 8, the second sole piece 14 is similar, convenient for encourage device 7 dismantling with merge.
When work, user reconnoitres and measures to the entirety in pit, and carries out sketch to the monnolithic case in pit and draw
System, and discharge drainage facility is laid with according to drawing and carries out whole planning and layout with vegetation plantation, user again will be in pit
Waste barren rock dig out, it is ensured that it is more smooth in pit, in order to the plantation of later period vegetation, then again will in pit insert soil
Earth suitably loosens the soil and is uniformly laid with soil, keeps soil surface more regular, by water pipe and spray head according to prior planning and layout
It is configured, it is ensured that subsequent to irrigate plant, planting bag 2 is arranged in pit by user, and the root of vegetation is assigned
In the upper end outer surface of planting bag 2, assign makes sapling keep the direction of growth on vertical direction by encouraging device 7 later, makes
User is by the second sole piece 14, the second upper mass 15 and the second position-limiting drum 16 respectively together in the first sole piece 8, the first upper mass 10 and
The side of one position-limiting drum 13, while ensuring vegetation between the second position-limiting drum 16 and the first position-limiting drum 13, same cross of user is struck
It beats and beats cushion block 12, make pilot pin 11 through in soil, entire 7 position of device that encourages is fixed, later period vegetation edge is conducive to
It is grown on vertical direction, user's periodically prospecting and maintenance periodically reconnoitres the upgrowth situation of vegetation, and in time
Maintenance, to complete the reparation and transformation in gardens pit.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (7)
1. one kind repairs remodeling method for gardens pit, it is characterised in that: planned including pit clear with layout-waste barren rock
Reason-soil is filled with and soil remediation-discharge drainage facility laying-vegetation plantation reconnoitres with transplanting-periodicity and safeguards step,
Specific step is as follows:
(1) pit planning and layout: being reconnoitred and measured to the entirety in pit, and is carried out sketch to the monnolithic case in pit and drawn
System, and discharge drainage facility is laid with according to drawing and carries out whole planning and layout with vegetation plantation;
(2) waste barren rock is cleared up: the waste barren rock in pit is dug out, it is ensured that and it is more smooth in pit, in order to later period vegetation
Plantation;
(3) soil is filled with and soil remediation: will be inserted soil in pit, is suitably loosened the soil and be uniformly laid with soil, make soil surface
It is more regular;
(4) discharge drainage facility is laid with: water pipe and spray head being configured according to the planning in above-mentioned (1) with layout, it is ensured that subsequent
Plant is irrigated;
(5) vegetation plantation and transplanting: planting bag is arranged in pit, the upper end appearance in planting bag is assigned into the root of vegetation
Face, then be placed on device is encouraged on vegetation, and be inserted into lower end in planting bag, device is encouraged after assigning makes sapling keep perpendicular
The upward direction of growth of histogram;
(6) periodically prospecting and maintenance: the upgrowth situation of vegetation is periodically reconnoitred, and is safeguarded in time, with the garden of completing
The reparation and transformation in woods pit.
2. according to claim 1 a kind of for gardens pit reparation remodeling method, it is characterised in that: the step (5)
Described in planting bag (2) on the outside of be provided with lateral frame (1), be provided with planting soil on the inside of the planting bag (2)
(3), a side external surface of the lateral frame (1) is provided with protruding block (4), another side external surface of the lateral frame (1)
Side relative to protruding block (4) is provided with bayonet (5).
3. according to claim 2 a kind of for gardens pit reparation remodeling method, it is characterised in that: the lateral frame
(1) it is wrapped in the surrounding of planting bag (2), is fixedly connected between the planting bag (2) and lateral frame (1), the protruding block
(4) to be fixedly connected between lateral frame (1), the shape of the protruding block (4) matches with the shape of bayonet (5).
4. according to claim 2 a kind of for gardens pit reparation remodeling method, it is characterised in that: the lateral frame
(1) upper end outer surface is provided with fixation hole (6) close to corner, upper end of the fixation hole (6) through lateral frame (1)
The quantity of outer surface, the fixation hole (6) is several groups, and the fixation hole (6) is arranged in array.
5. according to claim 1 a kind of for gardens pit reparation remodeling method, it is characterised in that: institute in step (5)
The growth encourage device (7) stated includes the first sole piece (8), and the interior aspect face of first sole piece (8) is provided with arc port (9), institute
It states and is provided with above the first sole piece (8) the first upper mass (10), set between first upper mass (10) and the first sole piece (8)
It is equipped with pilot pin (11), the upper end outer surface of first upper mass (10) is provided with above pilot pin (11) beats pad
The interior aspect face of block (12), first upper mass (10) is provided with the first position-limiting drum (13), and the one of first sole piece (8)
Side external surface is provided with the second sole piece (14), and a side external surface of first upper mass (10) is provided with the second upper mass
(15), a side external surface of first position-limiting drum (13) is provided with the second position-limiting drum (16), outside second sole piece (14)
Surface is provided with card slot (18), is provided with fixture block (17) on the inside of the card slot (18).
6. according to claim 5 a kind of for gardens pit reparation remodeling method, it is characterised in that: the pilot pin
(11) it through the upper end outer surface of the first sole piece (8), is flexibly connected between the pilot pin (11) and the first sole piece (8),
To be fixedly connected between the upper end of the pilot pin (11) and the lower end outer surface of the first upper mass (10), the pilot pin (11)
Quantity be several groups, pilot pin (11) circular array arrangement is described to beat cushion block (12) and the first upper mass (10)
Between to be fixedly connected, it is described that beat cushion block (12) corresponding with the arrangement position of pilot pin (11).
7. according to claim 5 a kind of for gardens pit reparation remodeling method, it is characterised in that: second sole piece
(14), the second upper mass (15) and the second position-limiting drum (16) are limited with the first sole piece (8), the first upper mass (10) with first respectively
Arrangement between cylinder (13) is symmetrical, is fixedly connected between first sole piece (8) and fixture block (17), first sole piece
(8) it is flexibly connected with card slot (18) between the second sole piece (14) by fixture block (17), second upper mass (15), on first
Connection type between portion's block (10) is similar to the connection type between the first sole piece (8), the second sole piece (14).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910076053.4A CN109819712A (en) | 2019-03-05 | 2019-03-05 | One kind repairing remodeling method for gardens pit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910076053.4A CN109819712A (en) | 2019-03-05 | 2019-03-05 | One kind repairing remodeling method for gardens pit |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109819712A true CN109819712A (en) | 2019-05-31 |
Family
ID=66862445
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910076053.4A Pending CN109819712A (en) | 2019-03-05 | 2019-03-05 | One kind repairing remodeling method for gardens pit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109819712A (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010112160A (en) * | 2008-10-07 | 2010-05-20 | Koizumi Jute Mills Ltd | Ground surface protection material and ground surface protection structure |
CN106900195A (en) * | 2017-02-21 | 2017-06-30 | 河海大学 | One kind fetches earth an ecological restoring method |
CN206354070U (en) * | 2017-01-05 | 2017-07-28 | 中交和美环境生态建设有限公司 | Greening environment-friendly plant growth bag |
CN107401174A (en) * | 2016-12-07 | 2017-11-28 | 青海富腾生态科技有限公司 | A kind of unstable hill afforestating administering method |
CN206808274U (en) * | 2017-04-07 | 2017-12-29 | 潍坊市怡鑫园林工程有限公司 | A kind of pit soil remediation fixed support structure |
CN206956743U (en) * | 2017-07-11 | 2018-02-02 | 云南交投集团公路建设有限公司 | A kind of low-carbon ecological guard system of rock slope |
CN107926503A (en) * | 2017-11-16 | 2018-04-20 | 安徽金联地矿科技有限公司 | One kind is based on group's nature simulation method of building a framework |
CN107950310A (en) * | 2017-12-08 | 2018-04-24 | 安徽金联地矿科技有限公司 | A kind of discarded pit exploitation reparation pattern and evaluation method |
-
2019
- 2019-03-05 CN CN201910076053.4A patent/CN109819712A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010112160A (en) * | 2008-10-07 | 2010-05-20 | Koizumi Jute Mills Ltd | Ground surface protection material and ground surface protection structure |
CN107401174A (en) * | 2016-12-07 | 2017-11-28 | 青海富腾生态科技有限公司 | A kind of unstable hill afforestating administering method |
CN206354070U (en) * | 2017-01-05 | 2017-07-28 | 中交和美环境生态建设有限公司 | Greening environment-friendly plant growth bag |
CN106900195A (en) * | 2017-02-21 | 2017-06-30 | 河海大学 | One kind fetches earth an ecological restoring method |
CN206808274U (en) * | 2017-04-07 | 2017-12-29 | 潍坊市怡鑫园林工程有限公司 | A kind of pit soil remediation fixed support structure |
CN206956743U (en) * | 2017-07-11 | 2018-02-02 | 云南交投集团公路建设有限公司 | A kind of low-carbon ecological guard system of rock slope |
CN107926503A (en) * | 2017-11-16 | 2018-04-20 | 安徽金联地矿科技有限公司 | One kind is based on group's nature simulation method of building a framework |
CN107950310A (en) * | 2017-12-08 | 2018-04-24 | 安徽金联地矿科技有限公司 | A kind of discarded pit exploitation reparation pattern and evaluation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204728349U (en) | A kind of precipitous rock slope ecological greening system | |
CN205475263U (en) | High steep slope planting structure of open -air metallic ore | |
CN101258814B (en) | Planting hole and method for using planting hole to green rock slope and breakage mountain body | |
CN108040544A (en) | A kind of agricultural planting digging apparatus for reducing difficulty | |
CN110249813B (en) | Method for greening high and steep rocky slope in mining pit | |
CN105191733A (en) | Slope hole planting greening method | |
CN112273126A (en) | Slope punching planting and greening method | |
CN206517796U (en) | A kind of fertilizer apparatus suitable for economic forest trees | |
CN109819712A (en) | One kind repairing remodeling method for gardens pit | |
CN209277174U (en) | High gradient slope large size arbor plants solid slope system | |
CN202514355U (en) | Novel vertical greening planting device | |
CN210216308U (en) | River course bank protection greenbelt | |
CN104264697B (en) | A kind of high steep rock side-slope greening safeguard structure | |
CN1807772A (en) | Greening construction structure using single-layered, multilayered nonwoven fabric to protect slope groundmass | |
CN208273687U (en) | A kind of ecological environment repair system | |
CN207135713U (en) | Planting fruit trees equipment | |
CN213267925U (en) | Ecological slope in gardens | |
CN206005133U (en) | A kind of salt-soda soil phytoremediation structure | |
CN205755343U (en) | A kind of scraper device for cigarette ground rib skinning | |
CN212753570U (en) | Synchronous planter of halaxylon ammodendron cistanche | |
CN204080832U (en) | A kind of high steep rock side-slope greening safeguard structure | |
CN2802954Y (en) | Underground water filling device for crop | |
CN209652901U (en) | A kind of restoration of the ecosystem structure for building stones mining area | |
CN216973009U (en) | A grass planting brick for ecological garden construction | |
CN206015690U (en) | A kind of plant pad Ecological Retaining Wall for mine phytoremediation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190531 |
|
RJ01 | Rejection of invention patent application after publication |