A kind of high steep rock side-slope greening safeguard structure Download PDFInfo
- Publication number
- CN104264697B CN104264697B CN201410562898.1A CN201410562898A CN104264697B CN 104264697 B CN104264697 B CN 104264697B CN 201410562898 A CN201410562898 A CN 201410562898A CN 104264697 B CN104264697 B CN 104264697B
- Authority
- CN
- China
- Prior art keywords
- slope
- rock side
- bar
- conjunction
- plant
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G2/00—Vegetative propagation
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
- E02D17/202—Securing of slopes or inclines with flexible securing means
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0075—Textiles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/40—Miscellaneous comprising stabilising elements
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Botany (AREA)
- Developmental Biology & Embryology (AREA)
- Environmental Sciences (AREA)
- Cultivation Of Plants (AREA)
Abstract
The invention discloses a kind of high steep rock side-slope greening safeguard structure, belong to Slope greening field of engineering technology. Including two layers of cloth material layer, between described two layers of cloth material layer, form several separate space for filling plant seed and nutriment soil. By this safeguard structure, ensure that plant quickly climbs up by holding on to required nutrient substance, in separate space, the Climbing Plant of growth accelerates domatic covering, rock side-slope is also had certain protective action by GSZ simultaneously, can make simultaneously toe, Po Ding, domatic on plant on climb lower extension, tangle and tangle, cover whole domatic, so the present invention defines the ecosystem built by Climbing Plant on rock side-slope, thus realizing the long-acting ecological protection to the steep rock side-slope of height.
Description
Technical field
The present invention relates to a kind of high steep rock side-slope greening safeguard structure, belong to Slope greening field of engineering technology.
Background technology
At present, the situation that domestic height steep rock side-slope greening technique ubiquity vegetation survival rate is low. When adopt slope top toe plant setting groove is set, by plant Climbing Plant green side slope time, owing to the geological conditions of the steep rock side-slope of height is severe, and manage and support difficulty, Climbing Plant growing nutrient is bad, and domatic vegetation coverage is low, cause time serious that Climbing Plant is dead, cause again green inconspicuous. When adopting alien earth sparging, restriction due to the steep rock side-slope landform of height, it is easy to cause the raw base material of planting just sprayed to glide, if run into heavy showers stay domatic on plant raw base material will lack less, not only cause soil erosion, and do not have certain landscape effect.
Summary of the invention
For solving the problems referred to above, the present invention provides a kind of simple in construction, high steep rock side-slope greening safeguard structure easy to use.
The present invention solves that its problem be the technical scheme is that
A kind of high steep rock side-slope greening safeguard structure, including two layers of cloth material layer, forms several separate space for filling plant seed and nutriment soil between described two layers of cloth material layer.
Preferably, described separate space is formed by suturing with thread management.
Preferably, also include being arranged on outside described cloth material layer and can be combined with each other in conjunction with bar.
Further, described in conjunction with bar is provided with mutually corresponding buckle and draw-in groove.
Further, also include for connecting adjacent two card articles in conjunction with bar, in �� shape, in conjunction with bar is provided with the hole clipping that may pass through described card article.
Further, described in conjunction with bar is provided with the through hole that can be inserted into holdfast.
The invention has the beneficial effects as follows: the process of greening side slope can be accelerated on the one hand, the vegetation on the other hand with vigorous vitality is suitable for the side slope of new excavation than seed, it is effectively improved the domatic severe geological conditions of rock side-slope, improve Climbing Plant to domatic green coverage speed, rock side-slope is carried out effective ecological protection.By this safeguard structure, ensure that plant quickly climbs up by holding on to required nutrient substance, in separate space, the Climbing Plant of growth accelerates domatic covering, rock side-slope is also had certain protective action by GSZ simultaneously, can make simultaneously toe, Po Ding, domatic on plant on climb lower extension, tangle and tangle, cover whole domatic, so the present invention defines the ecosystem built by Climbing Plant on rock side-slope, thus realizing the long-acting ecological protection to the steep rock side-slope of height.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the invention will be further described:
Fig. 1 is the front view of the present invention;
Fig. 2 is the structural representation in conjunction with bar;
Fig. 3 is present invention scheme of installation in side slope.
In figure: 1, cloth material layer; 2, separate space; 3, in conjunction with bar; 4, buckle; 5, draw-in groove; 6, card article; 7, hole clipping; 8, holdfast; 9, through hole.
Detailed description of the invention
A kind of high steep rock side-slope greening safeguard structure as shown in accompanying drawing 1 to 3, including two layers of cloth material layer 1, for instance adopt geotextiles, form several separate space 2 for filling plant seed and nutriment soil between described two layers of cloth material layer 1.
Described separate space 2 can be formed by suturing with thread management, also adopts alternate manner, including be arranged on outside described cloth material layer 1 and can be combined with each other in conjunction with bar 3. Described in conjunction with bar 3 is provided with mutually corresponding buckle 4 and draw-in groove 5, during installation, it is only necessary to mutually draw close two from the both sides of cloth material layer 1 respectively in conjunction with bar 3, be then combined with draw-in groove 5 by buckle 4, can complete easily and fast to install. Can being made up of resin material in conjunction with bar 3, have certain intensity and softness, its length can be actually needed and be set, and sliceable, and motility is big, it is possible to surrounds square separate space 2, it is also possible to surrounds the separate space 2 of triangle.
Also include for connecting adjacent two card articles 6 in conjunction with bar 3, in �� shape, in conjunction with bar 3 is provided with the hole clipping 7 that may pass through described card article 6. To strengthen the cooperation intensity between two basic change bar 3, improve the steadiness of whole safeguard structure.
Described in conjunction with being provided with the through hole 9 that can be inserted into holdfast 8 on bar 3, holdfast 8 inserts on abrupt slope through after through hole 9, has both facilitated holdfast 8 to install, simultaneously because have certain intensity in conjunction with bar 3, by increasing capacitance it is possible to increase the installation strength of holdfast 8.
Make the previous protective structure of certain specification, such as separate space 2 is of a size of 100 �� 100 (mm), first two geotextiles are placed on GSZ one on the other, then according to the size of GSZ mesh is stitched into some separate space 2, the mode sewed up is less costly, adopt higher in conjunction with the mode then work efficiency of bar 3, can select according to the size of safeguard structure. Each separate space 2 puts into the nutrient matrix needed for the soil containing Climbing Plant seed and plant growing, cultivate at culturing base, when vegetation is broken ground, takes root, form vegetation in flakes, by whole safeguard structure together with soil, vegetation, it is fixed to top, slope and the toe place of rock side-slope. Before construction, first have to remove the danger stone on surface, abrupt slope, tophus, Pumex, remove former domatic on be an impediment to the hay of plant growing, floating root, fragmentary herbaceous plant and rubbish. Execute man-hour requirement and be close to domatic paving from the top down, after paving with holdfast 8 rifle vertically domatic holdfast 8 is anchored in domatic on, local has concavo-convex place to need to add holdfast 8, makes it combine closely with domatic rock mass as far as possible.
The above; it is only the present invention preferably detailed description of the invention; but protection scope of the present invention is not limited thereto; any those familiar with the art is in the technical scope that the invention discloses; it is equal to replacement according to technical scheme and inventive concept thereof or is changed, all should be encompassed within protection scope of the present invention.
Claims (2)
1. one kind high steep rock side-slope greening safeguard structure, it is characterized in that, including two layers of cloth material layer, several separate space for filling plant seed and nutriment soil are formed between described two layers of cloth material layer, described separate space is formed by suturing with thread management, be provided with outside cloth material layer can be combined with each other in conjunction with bar, adjacent two are connected to the card article in �� shape in conjunction with bar, in conjunction with bar is provided with the hole clipping that may pass through described card article, grid is formed in conjunction with bar after being connected by card article, described in conjunction with bar is provided with the through hole that can be inserted into holdfast.
2. a kind of high steep rock side-slope greening safeguard structure according to claim 1, it is characterised in that described in conjunction with being provided with mutually corresponding buckle and draw-in groove on bar.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410562898.1A CN104264697B (en) | 2014-10-21 | 2014-10-21 | A kind of high steep rock side-slope greening safeguard structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410562898.1A CN104264697B (en) | 2014-10-21 | 2014-10-21 | A kind of high steep rock side-slope greening safeguard structure |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104264697A CN104264697A (en) | 2015-01-07 |
CN104264697B true CN104264697B (en) | 2016-06-08 |
Family
ID=52156261
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410562898.1A Expired - Fee Related CN104264697B (en) | 2014-10-21 | 2014-10-21 | A kind of high steep rock side-slope greening safeguard structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104264697B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105714835B (en) * | 2016-01-29 | 2018-04-20 | 宏大国源(芜湖)资源环境治理有限公司 | Protective device is afforested on a kind of abrupt slope |
CN107491645A (en) * | 2017-08-22 | 2017-12-19 | 金加洲 | The method and device of defense |
CN111455974B (en) * | 2020-03-04 | 2022-05-20 | 温州大学 | Vacuum preloading flocculation drainage method for transverse drainage plate combined geotextile |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2561208Y (en) * | 2002-06-07 | 2003-07-23 | 华清青生态环保科技(北京)有限公司 | Multihole plant growth bricks |
CN201428134Y (en) * | 2009-05-08 | 2010-03-24 | 南通东升艾克土工合成材料有限公司 | Warp-knitted reinforced coating geotextile |
CN204080832U (en) * | 2014-10-21 | 2015-01-07 | 宏大国源(芜湖)资源环境治理有限公司 | A kind of high steep rock side-slope greening safeguard structure |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3030604B2 (en) * | 1995-02-03 | 2000-04-10 | 西武建設株式会社 | Inside slope structure of waste disposal site |
-
2014
- 2014-10-21 CN CN201410562898.1A patent/CN104264697B/en not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2561208Y (en) * | 2002-06-07 | 2003-07-23 | 华清青生态环保科技(北京)有限公司 | Multihole plant growth bricks |
CN201428134Y (en) * | 2009-05-08 | 2010-03-24 | 南通东升艾克土工合成材料有限公司 | Warp-knitted reinforced coating geotextile |
CN204080832U (en) * | 2014-10-21 | 2015-01-07 | 宏大国源(芜湖)资源环境治理有限公司 | A kind of high steep rock side-slope greening safeguard structure |
Also Published As
Publication number | Publication date |
---|---|
CN104264697A (en) | 2015-01-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102498875B (en) | Method for constructing shrub and grass plant communities on rocky slope and application thereof | |
CN104255280B (en) | A kind of high precipitous rock slope vegetation implantation methods | |
CN103290854B (en) | Fast construction method of rock slope protection | |
CN102511272A (en) | Revegetation method for mine slopes | |
CN111011093A (en) | High rainfall rapid and steep rocky slope greening method | |
CN104756725B (en) | Method for planting river bank water-land ecotone vegetation | |
CN110593281A (en) | High-steep rock slope ecological protection system and construction method thereof | |
CN109169014A (en) | A kind of the Northeast's magnesite mining junkyard temporarily plants raw restorative procedure | |
CN104264697B (en) | A kind of high steep rock side-slope greening safeguard structure | |
CN102523970A (en) | Quick ecological rehabilitation method for steep rock slope | |
CN104770270B (en) | Shrub planting and establishing method and its seedling protecting cover in a kind of side slope protection | |
CN204837235U (en) | Plant and give birth to bag | |
CN204080832U (en) | A kind of high steep rock side-slope greening safeguard structure | |
CN105594409A (en) | Ecological restoration method of steep slope | |
CN102660958B (en) | Method for protecting ecology of slope through sprinkling irrigation of CS (carbon steel) mixed fibers | |
CN105493807A (en) | Vegetation plantation method preventing water and soil loss | |
CN211849496U (en) | High steep rock slope ecological protection system | |
CN201821698U (en) | Plant-climbing rack for ecological rehabilitation | |
CN109156205B (en) | Planting unit suitable for vegetation restoration of desert | |
KR100949714B1 (en) | Mixed soil composition greening slopeside and greening method of slopeside using the same | |
CN203537920U (en) | Rocky slope fast greening structure | |
CN1807772A (en) | Greening construction structure using single-layered, multilayered nonwoven fabric to protect slope groundmass | |
CN213625622U (en) | Ecological remediation slope surface structure on mine | |
CN210580341U (en) | Plant and grow blanket | |
CN203523412U (en) | Construction structure of landscape engineering of abandoned mine rock faces and abrupt slopes |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160608 Termination date: 20191021 |
|
CF01 | Termination of patent right due to non-payment of annual fee |