One kind is based on group's nature simulation method of building a framework Download PDFInfo
- Publication number
- CN107926503A CN107926503A CN201711136371.2A CN201711136371A CN107926503A CN 107926503 A CN107926503 A CN 107926503A CN 201711136371 A CN201711136371 A CN 201711136371A CN 107926503 A CN107926503 A CN 107926503A
- Authority
- CN
- China
- Prior art keywords
- pit
- framework
- cross bar
- fixed column
- building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Cultivation Of Plants (AREA)
Abstract
The invention discloses one kind based on group's nature simulation method of building a framework, it is related to ecological restoration technical field.Comprise the following steps:Reconnoitre pit landforms and data mapping;Clear up pit;Mounting hole is set;Plugged and fixed column;Overlap cross bar;It is laid with silk screen;Filling planting soil;Planting plants;Periodic maintenance.The present invention builds a framework, lapping and transplanting planting soil to provide good external condition for plant growth, and then simulate the process of the succession of community, realize that pit is multiple green, change the ecological environment in pit according to the topography and geomorphology in pit in pit.
Description
Technical field
The invention belongs to ecological restoration technical field, more particularly to one kind based on group's nature simulation method of building a framework.
Background technology
As people are produced the demand of mine resources, substantial amounts of mine, but mine is produced and leaves afterwards largely
Pit, cause no small influence to local ecological environment;And reclaim work of the China to mine starts from 20th century 50
Age, its national mine recovery engineering have reached the 11% of the whole nation, but the problem of due to reality technology, for answering for mine
It is green still to there is many to have the problem of to be solved.
The present invention is directed to the multiple green problem in mine pit, there is provided and one kind is based on group's nature simulation method of building a framework, its
Built a framework according to the landform in pit, so for vegetation growth good material conditions are provided, with reach the succession of community with
Recover the purpose of pit greening, change the ecological environment of locality.
The content of the invention
It is an object of the invention to provide one kind based on group's nature simulation method of building a framework, pass through the landform according to pit
Landforms, build a framework in pit, and lapping and transplanting planting soil to provide good external condition, Jin Ermo for plant growth
Intend the process of the succession of community, solve the problem of existing pit ecological environment is poor, and multiple green technology is difficult to overcome.
In order to solve the above technical problems, the present invention is achieved by the following technical solutions:
The present invention, based on group's nature simulation method of building a framework, comprises the following steps to be a kind of:
Step 1, reconnoitres pit landforms and data mapping:The topography and geomorphology in pit is observed, and measures the height in pit
Journey and the gradient;
Step 2, clears up pit:Glidder in pit and weeds are cleared up, and to the concave regions in pit
Carry out smooth;
Step 3, sets mounting hole:Pit is carried out according to the data measured to be uniformly arranged mounting hole, the depth of mounting hole
For 25cm, a diameter of 18cm of mounting hole;
Step 4, plugged and fixed column:Fixed column is inserted into mounting hole, and fixed column is reinforced by mixed mud;
Step 5, overlaps cross bar:Cross bar is overlapped in fixed column, makes the frame that fixed column is formed with cross bar into a ladder,
Staggeredly latticed is formed between cross bar;
Step 6, is laid with silk screen:It is laid with silk screen above cross bar, and by silk screen firmly on cross bar;
Step 7, filling planting soil:The filling planting soil on silk screen;
Step 8, planting plants:Liana is planted on planting soil, and broadcasts sowing the seed of liana;
Step 9, periodic maintenance:Periodic logging is carried out to the upgrowth situation of plant, and is periodically applied fertilizer to plant.
Further, a diameter of 14cm of the fixed column in the step 4.
Further, the planting soil in the step 7 is equal by plantation loam, composite fertilizer, water-retaining agent and peat soil
It is even to mix.
Further, the thickness of the planting soil is 15cm, and the particle of the planting soil is 5mm.
Further, the liana in the step 8 is Bermuda grass, alfalfa, Boston ivy and climbing fig.
The invention has the advantages that:
1st, built a framework, can be effectively provided preferably for the growth of vegetation to pit by the landforms according to pit
Material base, avoids the uneven influence brought to plant growth in pit.
2nd, the present invention by being laid with silk screen, transplanting planting soil on the top of the shelf, and carries out vegetation plantation, is drilled to simulate group
Replace, pit is carried out again green, can effectively change the present situation in pit, improve the ecological environment in pit.
Certainly, implement any of the products of the present invention and do not necessarily require achieving all the advantages described above at the same time.
Brief description of the drawings
In order to illustrate the technical solution of the embodiments of the present invention more clearly, embodiment will be described below required
Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the present invention, for ability
For the those of ordinary skill of domain, without creative efforts, it can also be obtained according to these attached drawings other attached
Figure.
Fig. 1 is a kind of process flow chart based on group's nature simulation method of building a framework of the present invention;
Fig. 2 is the structure diagram of the present invention.
In attached drawing, parts list represented by the reference numerals is as follows:
1- mounting holes, 2- fixed columns, 3- cross bars, 4- planting soils.
Embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete
Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, those of ordinary skill in the art are obtained all other without creative efforts
Embodiment, belongs to the scope of protection of the invention.
In the description of the present invention, it is to be understood that term " perforate ", " on ", " under ", " thickness ", " top ", " in ",
Indicating position or the position relationship such as " length ", " interior ", " surrounding ", are for only for ease of the description present invention and simplify description, without
It is that the component of instruction or hint meaning or element must have specific orientation, with specific azimuth configuration and operation, therefore not
It is understood that as limitation of the present invention.
As shown in Figs. 1-2, the present invention is comprised the following steps to be a kind of based on group's nature simulation method of building a framework:
Step 1, reconnoitres pit landforms and data mapping:The topography and geomorphology in pit is observed, and measures the height in pit
Journey and the gradient;The data measured are subjected to effective plan of analysis, mounting hole 1 is arranged to pit according to actual conditions.
Step 2, clears up pit:Glidder in pit and weeds are cleared up, and to the concave regions in pit
Carry out smooth;The turquoise in pit and weeds are avoided to impact the safety of shelf and the growth of plant.
Step 3, sets mounting hole 1:Pit is carried out according to the data measured to be uniformly arranged mounting hole 1, mounting hole 1
Depth is 25cm, a diameter of 18cm of mounting hole 1;Stabilization of the mounting hole 1 for fixed column 2 in pit provides solid base
Plinth.
Step 4, plugged and fixed column 2:Fixed column 2 is inserted into mounting hole 1, and fixed column 2 is added by mixed mud
Gu;The basis of support is provided for the overlap joint of cross bar 3.
Step 5, overlaps cross bar 3:Cross bar 3 is overlapped in fixed column 2, makes the frame of fixed column 2 and the composition of cross bar 3 into rank
Scalariform, is conducive to plant and is grown on ladder platform, avoids planting soil 4 and slides into pit hole bottom along the pit gradient, horizontal
Staggeredly latticed is formed between bar 3.
Step 6, is laid with silk screen:It is laid with silk screen above cross bar 3, and by silk screen firmly on cross bar 3, this silk screen is
Metal product, can effectively prevent planting soil 4 from falling on pit table under between the grid that cross bar 3 is formed by the interception of silk screen
Face, and provide platform for the growth of plant.
Step 7, filling planting soil 4:The filling planting soil 4 on silk screen.
Step 8, planting plants:Liana is planted on planting soil 4, and broadcasts sowing the seed of liana;Liana
Easily growth, and fertility can cover mine using existing resource in early period by force.
Step 9, periodic maintenance:Periodic logging is carried out to the upgrowth situation of plant, and is periodically applied fertilizer to plant.
Wherein, a diameter of 14cm of the fixed column 2 in step 4.
Wherein, the planting soil 4 in step 7 is uniformly mixed by plantation loam, composite fertilizer, water-retaining agent and peat soil;
Abundant resource can be provided for the growth of plant.
Wherein, the thickness of planting soil 4 is 15cm, and the particle of planting soil is 5mm.
Wherein, the liana in step 8 is Bermuda grass, alfalfa, Boston ivy and climbing fig.
In the description of this specification, the description of reference term " one embodiment ", " example ", " specific example " etc. means
At least one implementation of the present invention is contained in reference to the embodiment or example particular features, structures, materials, or characteristics described
In example or example.In the present specification, schematic expression of the above terms may not refer to the same embodiment or example.
Moreover, particular features, structures, materials, or characteristics described can close in any one or more embodiments or example
Suitable mode combines.
Present invention disclosed above preferred embodiment is only intended to help and illustrates the present invention.Preferred embodiment is not detailed
All details are described, are not limited the invention to the specific embodiments described.Obviously, according to the content of this specification,
It can make many modifications and variations.This specification is chosen and specifically describes these embodiments, is in order to preferably explain the present invention
Principle and practical application so that skilled artisan can be best understood by and utilize the present invention.The present invention is only
Limited by claims and its four corner and equivalent.
Claims (5)
1. one kind is based on group's nature simulation method of building a framework, it is characterised in that:Comprise the following steps:
Step 1, reconnoitres pit landforms and data mapping:The topography and geomorphology in pit is observed, and measure pit elevation and
The gradient;
Step 2, clears up pit:Glidder in pit and weeds are cleared up, and the concave regions in pit are carried out
It is smooth;
Step 3, sets mounting hole (1):Pit is carried out according to the data measured to be uniformly arranged mounting hole (1), mounting hole (1)
Depth be 25cm, a diameter of 18cm of mounting hole (1);
Step 4, plugged and fixed column (2):By in fixed column (2) insertion mounting hole (1), and by mixed mud to fixed column (2) into
Row is reinforced;
Step 5, overlap joint cross bar (3):Cross bar (3) is overlapped in fixed column (2), the frame for making fixed column (2) be formed with cross bar (3)
Put up stepped, staggeredly latticed is formed between cross bar (3);
Step 6, is laid with silk screen:It is laid with silk screen above cross bar (3), and by silk screen firmly on cross bar (3);
Step 7, filling planting soil (4):The filling planting soil (4) on silk screen;
Step 8, planting plants:Liana is planted on planting soil (4), and broadcasts sowing the seed of liana;
Step 9, periodic maintenance:Periodic logging is carried out to the upgrowth situation of plant, and is periodically applied fertilizer to plant.
It is 2. according to claim 1 a kind of based on group's nature simulation method of building a framework, it is characterised in that the step 4
In the fixed column (2) a diameter of 14cm.
It is 3. according to claim 1 a kind of based on group's nature simulation method of building a framework, it is characterised in that the step 7
In the planting soil (4) be to be uniformly mixed by plantation loam, composite fertilizer, water-retaining agent and peat soil.
4. one kind according to claim 1 or 3 is based on group's nature simulation method of building a framework, it is characterised in that the kind
The thickness for planting native (4) is 15cm, and the particle of the planting soil is 5mm.
It is 5. according to claim 1 a kind of based on group's nature simulation method of building a framework, it is characterised in that the step 8
In the liana be Bermuda grass, alfalfa, Boston ivy and climbing fig.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711136371.2A CN107926503A (en) | 2017-11-16 | 2017-11-16 | One kind is based on group's nature simulation method of building a framework |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711136371.2A CN107926503A (en) | 2017-11-16 | 2017-11-16 | One kind is based on group's nature simulation method of building a framework |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107926503A true CN107926503A (en) | 2018-04-20 |
Family
ID=61931455
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711136371.2A Pending CN107926503A (en) | 2017-11-16 | 2017-11-16 | One kind is based on group's nature simulation method of building a framework |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107926503A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109819712A (en) * | 2019-03-05 | 2019-05-31 | 胡鹏程 | One kind repairing remodeling method for gardens pit |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2770315Y (en) * | 2004-12-27 | 2006-04-12 | 河海大学 | Landscape type multi-step artificial wet-land slope protection system |
CN201080611Y (en) * | 2007-09-20 | 2008-07-02 | 安徽省建设工程勘察设计院 | Rock texture slope stereo afforestation frame work |
CN205035813U (en) * | 2015-08-11 | 2016-02-17 | 重庆任甲生物科技有限公司 | Ecological treatment system that softens in stereoplasm abrupt slope |
CN205421285U (en) * | 2016-02-03 | 2016-08-03 | 深圳市鹏森环境绿化工程有限公司 | Slope protection brick and slope planting system thereof |
CN105839590A (en) * | 2016-02-26 | 2016-08-10 | 重庆三峡学院 | Contour planting ecological management method and structural body thereof in medium-steep soil slope drawdown area |
-
2017
- 2017-11-16 CN CN201711136371.2A patent/CN107926503A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2770315Y (en) * | 2004-12-27 | 2006-04-12 | 河海大学 | Landscape type multi-step artificial wet-land slope protection system |
CN201080611Y (en) * | 2007-09-20 | 2008-07-02 | 安徽省建设工程勘察设计院 | Rock texture slope stereo afforestation frame work |
CN205035813U (en) * | 2015-08-11 | 2016-02-17 | 重庆任甲生物科技有限公司 | Ecological treatment system that softens in stereoplasm abrupt slope |
CN205421285U (en) * | 2016-02-03 | 2016-08-03 | 深圳市鹏森环境绿化工程有限公司 | Slope protection brick and slope planting system thereof |
CN105839590A (en) * | 2016-02-26 | 2016-08-10 | 重庆三峡学院 | Contour planting ecological management method and structural body thereof in medium-steep soil slope drawdown area |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109819712A (en) * | 2019-03-05 | 2019-05-31 | 胡鹏程 | One kind repairing remodeling method for gardens pit |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203290006U (en) | Big tree salt and alkali prevention planting structure | |
CN103074900B (en) | Ecological restoration method for rocky slope | |
CN107237334B (en) | A kind of road foundation execavated rockmass frame gird type slope protection code builds the construction method of plant biological bag greening | |
CN104396522B (en) | A kind of method of Techniques of Ecological Protection in Expressway Side Slope | |
CN211657035U (en) | A easily climb rattan structure for arid barren area rock matter side slope ecological remediation | |
CN105830732A (en) | Shrub and grass combined grass spray-seeding grassing operation method | |
CN103597988B (en) | One is first filled with and is executed winter wheat topdressing method afterwards | |
CN108040765A (en) | One kind answers green and construction method based on raw basin formula rock side slope is planted | |
CN104294829A (en) | Rock slope combined type protective structure and method | |
CN107926503A (en) | One kind is based on group's nature simulation method of building a framework | |
CN104488652A (en) | Method for cultivating Paris polyphylla by using grape forest lands | |
CN205530295U (en) | Side slope | |
CN104770270A (en) | Shrub planting method in slope protection and seedling protecting cover thereof | |
CN205232777U (en) | Integrated sleeve pipe fertilizer injection unit that fruit tree drilling was fertilizied | |
CN105103698B (en) | Soil preparation method for improving production performance of soil in sandy soil matrix greenhouse | |
CN205161064U (en) | Farmland machinery carries on platform | |
CN106489465A (en) | A kind of in heavy salinized the method for recovering sheep's hay vegetation in the north | |
CN105409419A (en) | Method for drilling and fertilization for fruit trees and integrated sleeve fertilization device thereof | |
CN209194501U (en) | A kind of environmental protection preventing and fixing sand device | |
CN108005092A (en) | It is a kind of to be used for the multiple green safety device of slope surface and its method | |
CN102612885A (en) | Technology method for effectively improving coastal tidal flat lands with agro-forestry model and application therefore | |
CN110485404A (en) | A kind of ecological restoration of mine system and method | |
CN110495355A (en) | A kind of Xinjiang region sesame under-film drip irrigation water-fertilizer integral cultural method | |
CN102535483B (en) | Slope engineering greening shed | |
CN206423290U (en) | Multi-functional celery seeder drip irrigation appliance |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180420 |
|
RJ01 | Rejection of invention patent application after publication |