CN107926503A - One kind is based on group's nature simulation method of building a framework - Google Patents

One kind is based on group's nature simulation method of building a framework Download PDF

Info

Publication number
CN107926503A
CN107926503A CN201711136371.2A CN201711136371A CN107926503A CN 107926503 A CN107926503 A CN 107926503A CN 201711136371 A CN201711136371 A CN 201711136371A CN 107926503 A CN107926503 A CN 107926503A
Authority
CN
China
Prior art keywords
pit
framework
cross bar
fixed column
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711136371.2A
Other languages
Chinese (zh)
Inventor
张传琦
牛杏杏
明桂林
孙忠伟
王代飞
秦月琴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI JINLIAN GEOLOGY AND MINERAL RESOURCES TECHNOLOGY Co Ltd
Original Assignee
ANHUI JINLIAN GEOLOGY AND MINERAL RESOURCES TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI JINLIAN GEOLOGY AND MINERAL RESOURCES TECHNOLOGY Co Ltd filed Critical ANHUI JINLIAN GEOLOGY AND MINERAL RESOURCES TECHNOLOGY Co Ltd
Priority to CN201711136371.2A priority Critical patent/CN107926503A/en
Publication of CN107926503A publication Critical patent/CN107926503A/en
Pending legal-status Critical Current

Links

Landscapes

  • Cultivation Of Plants (AREA)

Abstract

The invention discloses one kind based on group's nature simulation method of building a framework, it is related to ecological restoration technical field.Comprise the following steps:Reconnoitre pit landforms and data mapping;Clear up pit;Mounting hole is set;Plugged and fixed column;Overlap cross bar;It is laid with silk screen;Filling planting soil;Planting plants;Periodic maintenance.The present invention builds a framework, lapping and transplanting planting soil to provide good external condition for plant growth, and then simulate the process of the succession of community, realize that pit is multiple green, change the ecological environment in pit according to the topography and geomorphology in pit in pit.

Description

One kind is based on group's nature simulation method of building a framework
Technical field
The invention belongs to ecological restoration technical field, more particularly to one kind based on group's nature simulation method of building a framework.
Background technology
As people are produced the demand of mine resources, substantial amounts of mine, but mine is produced and leaves afterwards largely Pit, cause no small influence to local ecological environment;And reclaim work of the China to mine starts from 20th century 50 Age, its national mine recovery engineering have reached the 11% of the whole nation, but the problem of due to reality technology, for answering for mine It is green still to there is many to have the problem of to be solved.
The present invention is directed to the multiple green problem in mine pit, there is provided and one kind is based on group's nature simulation method of building a framework, its Built a framework according to the landform in pit, so for vegetation growth good material conditions are provided, with reach the succession of community with Recover the purpose of pit greening, change the ecological environment of locality.
The content of the invention
It is an object of the invention to provide one kind based on group's nature simulation method of building a framework, pass through the landform according to pit Landforms, build a framework in pit, and lapping and transplanting planting soil to provide good external condition, Jin Ermo for plant growth Intend the process of the succession of community, solve the problem of existing pit ecological environment is poor, and multiple green technology is difficult to overcome.
In order to solve the above technical problems, the present invention is achieved by the following technical solutions:
The present invention, based on group's nature simulation method of building a framework, comprises the following steps to be a kind of:
Step 1, reconnoitres pit landforms and data mapping:The topography and geomorphology in pit is observed, and measures the height in pit Journey and the gradient;
Step 2, clears up pit:Glidder in pit and weeds are cleared up, and to the concave regions in pit Carry out smooth;
Step 3, sets mounting hole:Pit is carried out according to the data measured to be uniformly arranged mounting hole, the depth of mounting hole For 25cm, a diameter of 18cm of mounting hole;
Step 4, plugged and fixed column:Fixed column is inserted into mounting hole, and fixed column is reinforced by mixed mud;
Step 5, overlaps cross bar:Cross bar is overlapped in fixed column, makes the frame that fixed column is formed with cross bar into a ladder, Staggeredly latticed is formed between cross bar;
Step 6, is laid with silk screen:It is laid with silk screen above cross bar, and by silk screen firmly on cross bar;
Step 7, filling planting soil:The filling planting soil on silk screen;
Step 8, planting plants:Liana is planted on planting soil, and broadcasts sowing the seed of liana;
Step 9, periodic maintenance:Periodic logging is carried out to the upgrowth situation of plant, and is periodically applied fertilizer to plant.
Further, a diameter of 14cm of the fixed column in the step 4.
Further, the planting soil in the step 7 is equal by plantation loam, composite fertilizer, water-retaining agent and peat soil It is even to mix.
Further, the thickness of the planting soil is 15cm, and the particle of the planting soil is 5mm.
Further, the liana in the step 8 is Bermuda grass, alfalfa, Boston ivy and climbing fig.
The invention has the advantages that:
1st, built a framework, can be effectively provided preferably for the growth of vegetation to pit by the landforms according to pit Material base, avoids the uneven influence brought to plant growth in pit.
2nd, the present invention by being laid with silk screen, transplanting planting soil on the top of the shelf, and carries out vegetation plantation, is drilled to simulate group Replace, pit is carried out again green, can effectively change the present situation in pit, improve the ecological environment in pit.
Certainly, implement any of the products of the present invention and do not necessarily require achieving all the advantages described above at the same time.
Brief description of the drawings
In order to illustrate the technical solution of the embodiments of the present invention more clearly, embodiment will be described below required Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the present invention, for ability For the those of ordinary skill of domain, without creative efforts, it can also be obtained according to these attached drawings other attached Figure.
Fig. 1 is a kind of process flow chart based on group's nature simulation method of building a framework of the present invention;
Fig. 2 is the structure diagram of the present invention.
In attached drawing, parts list represented by the reference numerals is as follows:
1- mounting holes, 2- fixed columns, 3- cross bars, 4- planting soils.
Embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained all other without creative efforts Embodiment, belongs to the scope of protection of the invention.
In the description of the present invention, it is to be understood that term " perforate ", " on ", " under ", " thickness ", " top ", " in ", Indicating position or the position relationship such as " length ", " interior ", " surrounding ", are for only for ease of the description present invention and simplify description, without It is that the component of instruction or hint meaning or element must have specific orientation, with specific azimuth configuration and operation, therefore not It is understood that as limitation of the present invention.
As shown in Figs. 1-2, the present invention is comprised the following steps to be a kind of based on group's nature simulation method of building a framework:
Step 1, reconnoitres pit landforms and data mapping:The topography and geomorphology in pit is observed, and measures the height in pit Journey and the gradient;The data measured are subjected to effective plan of analysis, mounting hole 1 is arranged to pit according to actual conditions.
Step 2, clears up pit:Glidder in pit and weeds are cleared up, and to the concave regions in pit Carry out smooth;The turquoise in pit and weeds are avoided to impact the safety of shelf and the growth of plant.
Step 3, sets mounting hole 1:Pit is carried out according to the data measured to be uniformly arranged mounting hole 1, mounting hole 1 Depth is 25cm, a diameter of 18cm of mounting hole 1;Stabilization of the mounting hole 1 for fixed column 2 in pit provides solid base Plinth.
Step 4, plugged and fixed column 2:Fixed column 2 is inserted into mounting hole 1, and fixed column 2 is added by mixed mud Gu;The basis of support is provided for the overlap joint of cross bar 3.
Step 5, overlaps cross bar 3:Cross bar 3 is overlapped in fixed column 2, makes the frame of fixed column 2 and the composition of cross bar 3 into rank Scalariform, is conducive to plant and is grown on ladder platform, avoids planting soil 4 and slides into pit hole bottom along the pit gradient, horizontal Staggeredly latticed is formed between bar 3.
Step 6, is laid with silk screen:It is laid with silk screen above cross bar 3, and by silk screen firmly on cross bar 3, this silk screen is Metal product, can effectively prevent planting soil 4 from falling on pit table under between the grid that cross bar 3 is formed by the interception of silk screen Face, and provide platform for the growth of plant.
Step 7, filling planting soil 4:The filling planting soil 4 on silk screen.
Step 8, planting plants:Liana is planted on planting soil 4, and broadcasts sowing the seed of liana;Liana Easily growth, and fertility can cover mine using existing resource in early period by force.
Step 9, periodic maintenance:Periodic logging is carried out to the upgrowth situation of plant, and is periodically applied fertilizer to plant.
Wherein, a diameter of 14cm of the fixed column 2 in step 4.
Wherein, the planting soil 4 in step 7 is uniformly mixed by plantation loam, composite fertilizer, water-retaining agent and peat soil; Abundant resource can be provided for the growth of plant.
Wherein, the thickness of planting soil 4 is 15cm, and the particle of planting soil is 5mm.
Wherein, the liana in step 8 is Bermuda grass, alfalfa, Boston ivy and climbing fig.
In the description of this specification, the description of reference term " one embodiment ", " example ", " specific example " etc. means At least one implementation of the present invention is contained in reference to the embodiment or example particular features, structures, materials, or characteristics described In example or example.In the present specification, schematic expression of the above terms may not refer to the same embodiment or example. Moreover, particular features, structures, materials, or characteristics described can close in any one or more embodiments or example Suitable mode combines.
Present invention disclosed above preferred embodiment is only intended to help and illustrates the present invention.Preferred embodiment is not detailed All details are described, are not limited the invention to the specific embodiments described.Obviously, according to the content of this specification, It can make many modifications and variations.This specification is chosen and specifically describes these embodiments, is in order to preferably explain the present invention Principle and practical application so that skilled artisan can be best understood by and utilize the present invention.The present invention is only Limited by claims and its four corner and equivalent.

Claims (5)

1. one kind is based on group's nature simulation method of building a framework, it is characterised in that:Comprise the following steps:
Step 1, reconnoitres pit landforms and data mapping:The topography and geomorphology in pit is observed, and measure pit elevation and The gradient;
Step 2, clears up pit:Glidder in pit and weeds are cleared up, and the concave regions in pit are carried out It is smooth;
Step 3, sets mounting hole (1):Pit is carried out according to the data measured to be uniformly arranged mounting hole (1), mounting hole (1) Depth be 25cm, a diameter of 18cm of mounting hole (1);
Step 4, plugged and fixed column (2):By in fixed column (2) insertion mounting hole (1), and by mixed mud to fixed column (2) into Row is reinforced;
Step 5, overlap joint cross bar (3):Cross bar (3) is overlapped in fixed column (2), the frame for making fixed column (2) be formed with cross bar (3) Put up stepped, staggeredly latticed is formed between cross bar (3);
Step 6, is laid with silk screen:It is laid with silk screen above cross bar (3), and by silk screen firmly on cross bar (3);
Step 7, filling planting soil (4):The filling planting soil (4) on silk screen;
Step 8, planting plants:Liana is planted on planting soil (4), and broadcasts sowing the seed of liana;
Step 9, periodic maintenance:Periodic logging is carried out to the upgrowth situation of plant, and is periodically applied fertilizer to plant.
It is 2. according to claim 1 a kind of based on group's nature simulation method of building a framework, it is characterised in that the step 4 In the fixed column (2) a diameter of 14cm.
It is 3. according to claim 1 a kind of based on group's nature simulation method of building a framework, it is characterised in that the step 7 In the planting soil (4) be to be uniformly mixed by plantation loam, composite fertilizer, water-retaining agent and peat soil.
4. one kind according to claim 1 or 3 is based on group's nature simulation method of building a framework, it is characterised in that the kind The thickness for planting native (4) is 15cm, and the particle of the planting soil is 5mm.
It is 5. according to claim 1 a kind of based on group's nature simulation method of building a framework, it is characterised in that the step 8 In the liana be Bermuda grass, alfalfa, Boston ivy and climbing fig.
CN201711136371.2A 2017-11-16 2017-11-16 One kind is based on group's nature simulation method of building a framework Pending CN107926503A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711136371.2A CN107926503A (en) 2017-11-16 2017-11-16 One kind is based on group's nature simulation method of building a framework

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711136371.2A CN107926503A (en) 2017-11-16 2017-11-16 One kind is based on group's nature simulation method of building a framework

Publications (1)

Publication Number Publication Date
CN107926503A true CN107926503A (en) 2018-04-20

Family

ID=61931455

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711136371.2A Pending CN107926503A (en) 2017-11-16 2017-11-16 One kind is based on group's nature simulation method of building a framework

Country Status (1)

Country Link
CN (1) CN107926503A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109819712A (en) * 2019-03-05 2019-05-31 胡鹏程 One kind repairing remodeling method for gardens pit

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2770315Y (en) * 2004-12-27 2006-04-12 河海大学 Landscape type multi-step artificial wet-land slope protection system
CN201080611Y (en) * 2007-09-20 2008-07-02 安徽省建设工程勘察设计院 Rock texture slope stereo afforestation frame work
CN205035813U (en) * 2015-08-11 2016-02-17 重庆任甲生物科技有限公司 Ecological treatment system that softens in stereoplasm abrupt slope
CN205421285U (en) * 2016-02-03 2016-08-03 深圳市鹏森环境绿化工程有限公司 Slope protection brick and slope planting system thereof
CN105839590A (en) * 2016-02-26 2016-08-10 重庆三峡学院 Contour planting ecological management method and structural body thereof in medium-steep soil slope drawdown area

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2770315Y (en) * 2004-12-27 2006-04-12 河海大学 Landscape type multi-step artificial wet-land slope protection system
CN201080611Y (en) * 2007-09-20 2008-07-02 安徽省建设工程勘察设计院 Rock texture slope stereo afforestation frame work
CN205035813U (en) * 2015-08-11 2016-02-17 重庆任甲生物科技有限公司 Ecological treatment system that softens in stereoplasm abrupt slope
CN205421285U (en) * 2016-02-03 2016-08-03 深圳市鹏森环境绿化工程有限公司 Slope protection brick and slope planting system thereof
CN105839590A (en) * 2016-02-26 2016-08-10 重庆三峡学院 Contour planting ecological management method and structural body thereof in medium-steep soil slope drawdown area

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109819712A (en) * 2019-03-05 2019-05-31 胡鹏程 One kind repairing remodeling method for gardens pit

Similar Documents

Publication Publication Date Title
CN203290006U (en) Big tree salt and alkali prevention planting structure
CN103074900B (en) Ecological restoration method for rocky slope
CN107237334B (en) A kind of road foundation execavated rockmass frame gird type slope protection code builds the construction method of plant biological bag greening
CN104396522B (en) A kind of method of Techniques of Ecological Protection in Expressway Side Slope
CN211657035U (en) A easily climb rattan structure for arid barren area rock matter side slope ecological remediation
CN105830732A (en) Shrub and grass combined grass spray-seeding grassing operation method
CN103597988B (en) One is first filled with and is executed winter wheat topdressing method afterwards
CN108040765A (en) One kind answers green and construction method based on raw basin formula rock side slope is planted
CN104294829A (en) Rock slope combined type protective structure and method
CN107926503A (en) One kind is based on group's nature simulation method of building a framework
CN104488652A (en) Method for cultivating Paris polyphylla by using grape forest lands
CN205530295U (en) Side slope
CN104770270A (en) Shrub planting method in slope protection and seedling protecting cover thereof
CN205232777U (en) Integrated sleeve pipe fertilizer injection unit that fruit tree drilling was fertilizied
CN105103698B (en) Soil preparation method for improving production performance of soil in sandy soil matrix greenhouse
CN205161064U (en) Farmland machinery carries on platform
CN106489465A (en) A kind of in heavy salinized the method for recovering sheep's hay vegetation in the north
CN105409419A (en) Method for drilling and fertilization for fruit trees and integrated sleeve fertilization device thereof
CN209194501U (en) A kind of environmental protection preventing and fixing sand device
CN108005092A (en) It is a kind of to be used for the multiple green safety device of slope surface and its method
CN102612885A (en) Technology method for effectively improving coastal tidal flat lands with agro-forestry model and application therefore
CN110485404A (en) A kind of ecological restoration of mine system and method
CN110495355A (en) A kind of Xinjiang region sesame under-film drip irrigation water-fertilizer integral cultural method
CN102535483B (en) Slope engineering greening shed
CN206423290U (en) Multi-functional celery seeder drip irrigation appliance

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180420

RJ01 Rejection of invention patent application after publication