CN107237334B - A kind of road foundation execavated rockmass frame gird type slope protection code builds the construction method of plant biological bag greening - Google Patents

A kind of road foundation execavated rockmass frame gird type slope protection code builds the construction method of plant biological bag greening Download PDF

Info

Publication number
CN107237334B
CN107237334B CN201710439356.9A CN201710439356A CN107237334B CN 107237334 B CN107237334 B CN 107237334B CN 201710439356 A CN201710439356 A CN 201710439356A CN 107237334 B CN107237334 B CN 107237334B
Authority
CN
China
Prior art keywords
plant biological
biological bag
soil
slope
plant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710439356.9A
Other languages
Chinese (zh)
Other versions
CN107237334A (en
Inventor
沈强儒
曹慧
毛建锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong University
Original Assignee
Jiangsu Xu Chen Transportation Technology Development Co Ltd
Nantong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Xu Chen Transportation Technology Development Co Ltd, Nantong University filed Critical Jiangsu Xu Chen Transportation Technology Development Co Ltd
Priority to CN201710439356.9A priority Critical patent/CN107237334B/en
Publication of CN107237334A publication Critical patent/CN107237334A/en
Application granted granted Critical
Publication of CN107237334B publication Critical patent/CN107237334B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00—Excavations; Bordering of excavations; Making embankments
    • E02D17/20—Securing of slopes or inclines
    • A—HUMAN NECESSITIES
    • A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00—Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02—Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Cultivation Of Plants (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

本发明公开了一种道路路基挖方边坡框格梁护坡码砌植生袋绿化的施工方法,包括如下步骤:施工准备——清理平整坡面——框格梁弹线分层——土壤准备——植生代装填基材的配制——植生袋装填基材——码砌植生袋——安装角钢固定——铺设无纺布——喷水养护——成活率及检测结果。本发明通过采用在挖方边坡框格梁内码砌植生袋绿化这一施工方法进行绿化固坡试验研究,将工程护坡和植物生态护坡结合起来,形成一个适合道路路基挖方边坡绿化防护的方法,有效增强了挖方边坡的稳定性和绿化美化效果,成功实现了挖方边坡土质贫瘠路须、土夹石或风化石质路段边坡的稳定及长久绿化。

The invention discloses a construction method for road subgrade excavation side slope frame lattice beam slope protection yard and planting bag greening, comprising the following steps: construction preparation - cleaning and leveling slope surface - frame lattice beam elastic line layering - soil preparation - - Preparation of planting generation filling base material - planting bag filling base material - building planting bag - installing angle steel fixing - laying non-woven fabric - water spray curing - survival rate and test results. In the present invention, the greening and slope-fixing test research is carried out by using the construction method of building greening bags in the frame beam of the excavation slope, and the engineering slope protection and the plant ecological slope protection are combined to form a method suitable for the greening protection of the roadbed excavation slope. , effectively enhance the stability of the excavation slope and the effect of greening and beautification, and successfully realize the stability and long-term greening of the excavated slope with barren soil, road mustard, soil mixed with stone or weathered stone.

Description

A kind of road foundation execavated rockmass frame gird type slope protection code builds the construction of plant biological bag greening Method
Technical field
The invention belongs to road construction fields, and in particular to a kind of road foundation execavated rockmass frame gird type slope protection code block plant life The construction method of bag greening.
Background technique
With the implementation of China's Economic Sustainable Development Strategy, a large amount of investments of the infrastructures such as road foundation and implementation, Destruction inevitably caused to original ecological environment in process of construction, especially excavation section soil property situation difference and rock Side slope, due to lacking the basis of plant growth, then often using engineering protections measures such as mortar rubble masonry pavement or anchoring shotcrete with wire mesh, no The vegetation being only destroyed cannot restore, and affect the ecological environment and landscape effect of road.Therefore, how to guarantee to dig The barren section of Fang Bianpo soil property, the stabilization of native horsestone or land waste matter section side slope and the permanent greening of realization, become road environment The new focus of protection and road construction.
Summary of the invention
Goal of the invention: in order to solve the deficiencies in the prior art, the present invention provides a kind of road foundation execavated rockmass sashes Beam slope protection code builds the construction method of plant biological bag greening.
Technical solution: a kind of road foundation execavated rockmass frame gird type slope protection code builds the construction method of plant biological bag greening, including --- clearing up smooth slope surface, --- sash beam snap the line is layered --- soil preparation --- and plants raw generation filling following steps: preparation of construction --- plant biological bag loads substrate, and --- code builds plant biological bag, and --- installation angle steel is fixed --- being laid with non-woven fabrics --- for the preparation of substrate Wet curing --- survival rate and testing result;Wherein:
In the sash beam snap the line layering, one is formed with ink fountain snap the line from sash surface to basal plane integral translation 5cm With the equirotal rectangle of sash beam aperture diameter, the "high" of rectangle is then pressed into every 20cm equal part;
The soil carries out taking soil in native field in preparing meeting taking for Testing index, and soil is taken to select fertile soil, ground Natural surface soil or the higher mellow soil of suitable plant growth, fertility within 50cm, and 5mm sieve is less than using sieve pore, soil is sieved;
In the preparation for planting raw generation filling substrate, peat soil, sawdust, alleviation will be mixed in proportion in the fine grained soil of sieving Compound fertilizer, soil stabilizer, these organic substrates of nitragin form the good substrate of trophic structure, while by substrate moisture rate Control is between 7%~9%;Specifically, every square of plant biological bag greening backing proportion dosage of thick 50cm is as follows: planting soil 0.35m3, peat soil 0.10m3, sawdust 50kg, alleviate compound fertilizer 0.75kg, soil stabilizer 0.5L, nitragin 25g;
In plant biological bag filling substrate, the substrate matched will be mixed and be packed into plant biological bag, and tighten sack when plumpness is up to 85%, and Each plant biological bag must load uniformly, and size turgor is consistent after filling, to guarantee that code block occlusion is closely knit, must also load part The plant biological bag of plumpness 50% is as " rotation of crops bag ";
The code is built in plant biological bag, and should sprinkle water in right amount basal plane before plant biological bag code block wetting, prevents plant biological bag from building code process Water loss inside middle bag body;Code should be in strict accordance with sash beam snap the line, as code tiling the plane reference line, often from bottom to up when building Mono- layer of 20cm;To guarantee that fissure of displacement occlusion is closely knit between layers, one " rotation of crops bag " must be placed at every layer;Each layer of code is finished building into The gap between plant biological bag and slope surface, plant biological bag and plant biological bag should be filled out tightly afterwards with soil, play and soil is avoided to air-dry, soil moisture conservation Effect;Every layer of plant biological bag code is finished building into must trample closely knit later, guarantee each layer all on a horizontal plane, each sash code is built After the completion, plant biological bag integrally should be in a facade, must not be uneven;When during plant biological bag code being built such as slope surface infiltration, Medium coarse sand and soil 1:1 need to be mixed with being embedded between plant biological bag and slope surface, form good permeable loaded filter, and in plant biological bag code Drain hole is set during building, is laid by " inner high outer low ";Drain hole uses the hard PVC pipe of diameter 5cm, and pvc pipe end is used Permeable geotextiles package, ejects superficial water in slope surface, in order to avoid impregnate plant biological bag for a long time and cause to cave in;
During the installation angle steel is fixed, according to originally played 5cm in sash beam line is perforated lines, by layout design It is required that then installing expansion bolt, then angle steel is welded on expansion bolt in the bottom and top perforating of sash beam, offset because planting The horizontal shear that raw bag natural subsidence and slope surface hydrostatic pressure generate;Apple green paint is sprayed in front and back sides after angle steel installation, Inhibit autoxidation, accomplishes antirust environmental protection;Angle steel installation is as being permanently fixed measure, it is ensured that upper next line, does when construction Coordinate to neat;
In the wet curing:
(1) maintenance plan is worked out according to the climatic characteristic of construction area, is in and sprouts and plant seedlings rank in vegetable seeds Section keeps humidity and balance nutrient;Reinforce the exercise to stress resistance of plant after vegetation Cheng Ping, gradually decreases watering, fertilising time Number, promotes the shrub Tree growth of deep-rootedness;
(2) plant biological bag can be shaped to three-dimensional lawn after conserving 30 days using farmland irrigation water substantially, according to climatic environment, Irregularly sprayed water;
(3) block should be mended in time, prevents lawn irregular such as plant biological bag locally sedimentation in maintenance processes;If any corner grass It, should the program request grass-seed on plant biological bag in time when level ground goes out careless non-uniform phenomenon.
As a preferred solution: should first complete water, the outer committee detection of soil test and ordering for plant biological bag in the preparation of construction Purchase, while the screening of plant substrate peat soil and sawdust should be completed, in case later period soil improvement.
As a preferred solution: removing stone and other all sundries that slope surface loosens in the smooth slope surface of cleaning, making slope Face reaches roadbed design slope ratio, is filled and led up and is treaded with soil at hollow, a smooth basal plane is formed after slope surface cleaning, apart from sash beam Outer surface 55cm.
As a preferred solution: the laying non-woven fabrics, is to cover non-woven fabrics after angle steel is installed, it is fast to build seedling Speed germination environment, carries out maintenance management.
As a preferred solution: after a growth period, planting and giving birth to frame gird type slope protection in the survival rate and testing result The bag coverage rate of afforestation vegetation, pest and disease damage disease incidence detected, visually, lawn growth is intensive, without withered and yellow, no Pest organism Evil, without continuous blank phenomenon, lawn coverage rate reaches 95% or more, and ecological protection effect is obvious.
The utility model has the advantages that the present invention by using execavated rockmass sash beam Internal Code build plant biological bag afforest this construction method into Row afforests solid slope experimental study, and project post-evaluation and plant ecological slope protection are combined, and forms a suitable road foundation excavation The method of side-slope greening and protection effectively enhances the stability of execavated rockmass and afforests and beautifies effect, is successfully realized excavation side The stabilization and permanent greening of the barren road palpus of slope soil property, native horsestone or land waste matter section side slope.
Specific advantage of the invention is as follows:
(1) present invention organically combines " project post-evaluation " and " plant ecological slope protection ", breaches traditional single engineering shield Slope mode, construction cost is low, and simple and convenient flexible, speed of application is fast, high-efficient.
(2) soil physico-chemical property after present invention improvement is loose, and plant emergence rate is high, and absorbing water solid soil nature can be good, plants Object root system such as " anchor pole ", which passes through plant biological bag, to be goed deep into side slope, is consolidated side slope, be can effectively prevent soil erosion.
(3) degradable after the plant biological bag many years in the present invention, it is pollution-free.
(4) present invention is suitable for the frame gird type slope protection of subgrade engineering excavation section soil property, native horsestone, land waste side slope, slope Rate is not suddenly in 1:0.75.
Detailed description of the invention
Fig. 1 is the construction technology process schematic diagram in the present invention.
Specific embodiment
The technical scheme in the embodiments of the invention will be clearly and completely described below, so that the technology of this field Personnel can better understand advantages and features of the invention, to make apparent boundary to protection scope of the present invention It is fixed.Embodiment described in the invention is only a part of the embodiment of the present invention, instead of all the embodiments, based on the present invention In embodiment, those of ordinary skill in the art's every other implementation obtained without making creative work Example, shall fall within the protection scope of the present invention.
Specific embodiment
A kind of road foundation execavated rockmass frame gird type slope protection code builds the construction method of plant biological bag greening, includes the following steps: --- clearing up smooth slope surface, --- matching for raw generation filling substrate is planted in sash beam snap the line layering --- soil preparation --- for preparation of construction System --- plant biological bag loads substrate, and --- code builds plant biological bag, and --- installation angle steel is fixed --- being laid with non-woven fabrics ---, and support by water spray Shield --- survival rate and testing result.
In the preparation of construction, water should be first completed, the order for outer the committee detection and plant biological bag that soil is tested, while should complete to plant The screening of object substrate peat soil and sawdust, in case later period soil improvement.
In the smooth slope surface of cleaning, stone and other all sundries that slope surface loosens are removed, so that slope surface is reached roadbed and sets Slope ratio is counted, is filled and led up and is treaded with soil at hollow, a smooth basal plane is formed after slope surface cleaning, apart from sash beam outer surface 55cm.
In the sash beam snap the line layering, one is formed with ink fountain snap the line from sash surface to basal plane integral translation 5cm With the equirotal rectangle of sash beam aperture diameter, the "high" of rectangle is then pressed into every 20cm equal part;The purpose that does so one is Plant biological bag later period code has certain datum level when building, and constructs convenient for horizontal hanging wire, and layering code is built.Secondly it is smooth to be to maintain facade, It is not easy to collapse, convenient in place fixed when the later period installs angle steel.
The soil carries out taking soil in native field in preparing meeting taking for Testing index, take it is native it is preferential select fertile soil, Natural surface soil or the higher mellow soil of suitable plant growth, fertility within the 50cm of face.To guarantee the fineness of soil in plant growth In optimum range, 5mm sieve must be less than using sieve pore and soil is sieved.
In the preparation for planting raw generation filling substrate, to guarantee the normal growth and development of plant, grass-seed germination percentage is improved, is filled The wooden survival rate should carry out soil improvement according to the correlation report that testing agency provides.It will be mixed in proportion in the fine grained soil of sieving Peat soil, sawdust alleviate the organic substrates such as compound fertilizer, the soil stabilizer formation good substrate of trophic structure, specific content As shown in every square of plant biological bag of the following table 1 (thick 50cm) greening backing proportion scale.Simultaneously by the control of substrate moisture rate 7%~ Between 9%, optimum moisture content usually live micro-judgment is scattered with the agglomerating landing of hand bun and is limited.It is different from natural soils It is to mix that there is higher stability than natural soils with the substrate after improvement.
The every square of plant biological bag of table 1 (thick 50cm) greening backing matches dosage
In plant biological bag filling substrate, the substrate matched will be mixed and be packed into plant biological bag, and tighten sack when plumpness is up to 85%, and Each plant biological bag must load uniformly, and size turgor is consistent after filling, to guarantee that code block occlusion is closely knit, must also load part The plant biological bag of plumpness 50% is as " rotation of crops bag ".
The code is built in plant biological bag, and should sprinkle water in right amount basal plane before plant biological bag code block wetting, prevents plant biological bag from building code process Water loss inside middle bag body.Code should be in strict accordance with sash beam snap the line, as code tiling the plane reference line, often from bottom to up when building Mono- layer of 20cm.To guarantee that fissure of displacement occlusion is closely knit between layers, one " rotation of crops bag " must be placed at every layer.Each layer of code is finished building into The gap between plant biological bag and slope surface, plant biological bag and plant biological bag should be filled out tightly afterwards with soil, play and soil is avoided to air-dry, soil moisture conservation Effect.Every layer of plant biological bag code is finished building into must trample closely knit later, guarantee each layer all on a horizontal plane.Each sash code is built After the completion, plant biological bag integrally should be in a facade, must not be uneven.
When during plant biological bag code being built such as slope surface infiltration, medium coarse sand and soil 1:1 need to be mixed match be embedded in plant biological bag and Between slope surface, good permeable loaded filter is formed, and drain hole is set during plant biological bag code is built, by " inner high outer low " cloth If.Drain hole uses the hard PVC pipe of diameter 5cm, and pvc pipe end wrapped up with permeable geotextiles, and the purpose done so can be Superficial water ejects in slope surface, in order to avoid impregnate plant biological bag for a long time and cause to cave in.
During the installation angle steel is fixed, according to originally played 5cm in sash beam line is perforated lines, by layout design It is required that then installing expansion bolt, then angle steel is welded on expansion bolt in the bottom and top perforating of sash beam, offset because planting The horizontal shear that raw bag natural subsidence and slope surface hydrostatic pressure generate.Apple green paint is sprayed in front and back sides after angle steel installation, Inhibit autoxidation, accomplishes antirust environmental protection.Angle steel installation is as being permanently fixed measure, it is ensured that upper next line, does when construction Coordinate to neat.
In the laying non-woven fabrics, after angle steel is installed, non-woven fabrics is covered, builds seedling fast germination environment, into Row maintenance management.
In the wet curing:
(1) maintenance plan is worked out according to the climatic characteristic of construction area, is in and sprouts and plant seedlings rank in vegetable seeds Section should focus on and keep humidity and balance nutrient.Reinforce the exercise to stress resistance of plant after vegetation Cheng Ping, gradually decreases and pour Water, fertilizer application frequency promote the shrub Tree growth of deep-rootedness.
(2) plant biological bag can be shaped to three-dimensional lawn after conserving 30 days using farmland irrigation water substantially, at this time according to weather Environment is irregularly sprayed water.
(3) block should be mended in time such as the locally sedimentation of discovery plant biological bag in maintenance processes.Prevent lawn irregular;If any side It, should the program request grass-seed on plant biological bag in time when angle lawn goes out careless non-uniform phenomenon.
In the survival rate and testing result, after a growth period, to frame gird type slope protection plant biological bag afforestation vegetation Coverage rate, pest and disease damage disease incidence detected, visually, lawn growth is intensive, without withered and yellow, no disease pest and weed, without continuous empty Bai Xianxiang.Lawn coverage rate reaches 95% or more, and ecological protection effect is obvious.
A, technological principle of the invention is as follows:
Plant biological bag is using special equipment, according to specific production technology, by design requirement grass seeds, chemical fertilizer, water-retaining agent It is colonized on degradable non-woven fabrics Deng according to certain density, by the compound positioning process of machine rolling and needle thorn, is formed Certain specification pocket shape product.Plant biological bag slope greening not only can guarantee that slope surface water and soil not easily runed off, but also can be slope plant Growth provides somatomedin, is a kind of scientific means of defence premised on restoration of the ecosystem.
It is that the plant substrate prepared in proportion is packed into plant biological bag that frame gird type slope protection code, which builds plant biological bag greening construction engineering method, Being built into together along slope surface horizontal slice, dislocation code block afterwards is that purpose shock resistance is superior with water and soil conservation and earth's surface greening Vertical planting system fixes the shearing force that angle steel bears horizontal direction under slope surface hydrostatic pressure in plant biological bag greening system; Later period plant and its root system pass through plant biological bag such as anchor pole gos deep into side slope generating powerful tractive force;Make entire plant biological bag coating It is combined together with slope surface, forms the slope protection system an of entirety, to achieve the effect that firm side slope and beautify the environment.
B, quality control is as follows in the present invention:
1 standard criterion that should be executed
(1) " roads engineering quality check evaluation criterion " (JTGF80/1-2004).
(2) " highway engineering construction technical specification of security " (JTGF90-2015).
(3) " landscape engineering and acceptance specification " (DB11/T212-2009).
(4) " Ecological Protection for Road Slope engineering construction and checking and accepting technology modular " (DB44/T499-2008).
(5) " agricultural irrigation water quality standard " (GB5084-2005).
Other standards require to be shown in Table 2~table 4.
2 soil physico-chemical characteristic list of table
Index Numerical value Detection method Remarks
PH value 5.5~8.5 Electrode method The detection of the academy of agricultural sciences Wai Wei
Soil moisture content 7%~9% Drying method The detection of the academy of agricultural sciences Wai Wei
The content of organic matter > 20g/kg External heat The detection of the academy of agricultural sciences Wai Wei
The configuration of 3 plant biological bag seed of table and quality requirement
The detection project and test stone of 4 slope vegetation of table
The control of 2 mass
To guarantee that frame gird type slope protection code builds the quality of plant biological bag greening construction, effective quality pipe must be carried out to work progress Reason.Quality management includes raw material quality management, code builds process quality management, maintenance quality manages three aspects.
1) raw material quality management
(1) since the producer of production plant biological bag is numerous, plant biological bag is that grass-seed is colonized on non-woven fabrics, therefore to select in addition Select the germination percentage that qualified producer guarantees grass-seed, it is ensured that quality.
(2) plant biological bag must guarantee aeration-drying during transportation, and dry shady place should be placed on when being transported to building site, whole It stacks and covers together.
(3) the greening auxiliary material such as compound fertilizer, water-retaining agent, root-inducing powder used in constructing should have the quality certificates.
2) plant biological bag code builds quality management
(1) plant biological bag code block should meet drawing requirement, closely sturdy with slope surface, fixed.
(2) it will be faced outwardly with seed when plant biological bag code builds construction.
3) maintenance quality management
(1) maintenance 30 days early periods of plant biological bag is it is ensured that the moisture that germination grows.
Non-woven fabrics is opened after (2) 15 days, guarantees nursery stock normal growth.
Passage is applied fertilizer after (3) 45 days, guarantees that plant growth nutrient is sufficient;Also foliage spray can be carried out according to actual conditions. Periodically, it targetedly sprays insecticide, guarantees plant health growth.
Safety measure in the present invention is as follows:
(1) before constructing specialty work technical safety measures should be worked out, detailed rules and regulations are formulateeed and implemented in conjunction with construction concrete condition, and It confides a technological secret to construction personnel, does regular, irregular safety inspection.
(2) it wears Safety Belt when high altitude operation personnel operation, safety belt " height hangs low use " lies in secured place, forbids double Layer operation.
(3) mechanical equipment must be functional, and operator's certificate is complete, and machinery must have commander special messenger when site operation.
C, the environmental protection measure in the present invention is as follows:
(1) special laws and regulations of the country about environmental protection should be carried out, special environmental protection is targetedly worked out Scheme is reinforced communication and education, is executed conscientiously.
(2) company " career safety & health and environmentally friendly system " is executed, targetedly efforts at environmental protection system is established and improve, implements Responsibility system is equipped with personal management.
(3) for the drinking water source in construction infection region, the water source points such as river, irrigation canals and ditches should be arranged safeguard measure, prevent It is polluted when construction.
(4) discarded non-woven fabrics etc. should focus on, and must not arbitrarily abandon.
(5) after Practical Completion, timely site clearing rubbish accomplishes that civilization is withdrawn from the arena.
D, resource-effective as follows in the present invention:
It is that road slope protects skill that sash beam code, which builds plant biological bag for geotechnics, new-soil technology, biotechnology organic assembling, Art forms vertical planting slope surface by building plant biological bag in sash beam Internal Code, and plant biological bag implants root system penetrates pocket and penetrates slope surface, Like being implanted into slopes without several anchor poles, it is firm to consolidate, single stiff instead of traditional structure type as environmental-protection process Bricklaying slope protection, concrete revetment, economize on resources compared with similar thick photoresist sows grass seeds by duster slope protection, equipment investment it is few, low cost is raw State protection effect is good, and popularization and application foreground is extensive.
E, the economic benefit in the present invention is as follows:
The sash beam slope protection ecologic protection of road foundation excavation section soil property, Tu Jiashi, land waste side slope generally uses class Type has: thick photoresist is sowed grass seeds by duster, three dimensional network is sowed grass seeds by duster, plant biological bag etc., and in terms of engineering cost, by contrast, thick photoresist is sowed grass seeds by duster construction Unit price is that code builds 1.6 times of plant biological bag greening construction, and sow grass seeds by duster unit price of constructing of three dimensional network is the 1.07 of code block plant biological bag greening construction Times.In terms of complexity of constructing, the requirement that thick photoresist is sowed grass seeds by duster and three dimensional network is sowed grass seeds by duster to equipment investment is high, working procedure is more, Construction technology is more complex, and thick photoresist sows grass seeds by duster and manages and protects costly, molding slow effect.The greening of execavated rockmass sash beam code plant biological bag Construction equipment less investment, easy construction is at low cost, and plant emergence rate is high, and slope greening lasts are stablized, and is shown in Table 5.And most Outstanding feature is that plant biological bag construction can not only afforest and beautify road domain environment, moreover it is possible to effectively prevent sandslide, be worth pushing away Extensively.
5 excavation section sash of table video recording slope protection ecologic protection form compares
F, the environmental benefit in the present invention is as follows:
Since plant biological bag can effectively improve the humidity and temperature of soil, humus is gathered, to the improved effect of soil It is fairly obvious;Plant survival rate is high, pest and disease damage is few, rate of yielding positive results is high, life cycle extends, and later period lawn planting is fast, green Environmental protection, purification air, dust suction noise control.
The present invention by using execavated rockmass sash beam Internal Code build plant biological bag afforest this construction method afforest it is solid Slope experimental study combines project post-evaluation and plant ecological slope protection, forms a suitable road foundation execavated rockmass greening The method of protection effectively enhances the stability of execavated rockmass and afforests and beautifies effect, it is poor to be successfully realized execavated rockmass soil property The stabilization and permanent greening of lean road palpus, native horsestone or land waste matter section side slope.

Claims (5)

1. the construction method that a kind of road foundation execavated rockmass frame gird type slope protection code builds plant biological bag greening, it is characterised in that: including --- clearing up smooth slope surface, --- sash beam snap the line is layered the filling of --- soil preparation --- plant biological bag to following steps: preparation of construction --- plant biological bag loads substrate, and --- code builds plant biological bag, and --- installation angle steel is fixed --- being laid with non-woven fabrics --- for the preparation of substrate Wet curing --- survival rate and testing result;Wherein:
In the sash beam snap the line layering, one and frame are formed with ink fountain snap the line from sash surface to basal plane integral translation 5cm Then the "high" of rectangle is pressed every 20cm equal part by the same rectangle of lattice beam caliber size;
The soil carries out taking soil in native field in preparing meeting taking for Testing index, take soil select fertile soil, ground 50cm with Interior nature surface soil or the higher mellow soil of suitable plant growth, fertility, and 5mm sieve is less than using sieve pore, soil is sieved;
In the preparation of plant biological bag filling substrate, will be mixed in proportion in the fine grained soil of sieving peat soil, sawdust, alleviate it is compound These organic substrates of fertilizer, soil stabilizer, nitragin form the good substrate of trophic structure, while substrate moisture rate being controlled Between 7%~9%;Specifically, every square of plant biological bag greening backing proportion dosage of thick 50cm is as follows: planting soil 0.35m3、 Peat soil 0.10m3, sawdust 50kg, alleviate compound fertilizer 0.75kg, soil stabilizer 0.5L, nitragin 25g;
In plant biological bag filling substrate, the substrate matched will be mixed and be packed into plant biological bag, and tighten sack when plumpness is up to 85%, and each Plant biological bag must load uniformly, and size turgor is consistent after filling, and to guarantee that code block occlusion is closely knit, it is full must also to load part The plant biological bag of degree 50% is as " rotation of crops bag ";
The code is built in plant biological bag, and should sprinkle water in right amount basal plane before plant biological bag code block wetting, prevents plant biological bag from building bag during code Water loss inside body;Code should be in strict accordance with sash beam snap the line, as code tiling the plane reference line when building, every 20cm from bottom to up One layer;To guarantee that fissure of displacement occlusion is closely knit between layers, one " rotation of crops bag " must be placed at every layer;Each layer of code is answered after the completion of building Gap between plant biological bag and slope surface, plant biological bag and plant biological bag is filled out tightly with soil, plays and soil is avoided to air-dry, the work of soil moisture conservation With;Every layer of plant biological bag code is finished building into must trample closely knit later, guarantee each layer all on a horizontal plane, each sash code finishes building Cheng Hou, plant biological bag integrally should be in a facades, must not be uneven;When during plant biological bag code being built such as slope surface infiltration, need Medium coarse sand and soil 1:1 are mixed with being embedded between plant biological bag and slope surface, form good permeable loaded filter, and build in plant biological bag code Drain hole is set in the process, is laid by " inner high outer low ";Drain hole uses the hard PVC pipe of diameter 5cm, and pvc pipe end is with thoroughly Water and soil work cloth package, ejects superficial water in slope surface, in order to avoid impregnate plant biological bag for a long time and cause to cave in;
During the installation angle steel is fixed, according to originally played 5cm in sash beam line is perforated lines, by Design Requirement Drawing In the bottom and top perforating of sash beam, then expansion bolt is installed, then angle steel is welded on expansion bolt, offsets because of plant biological bag The horizontal shear that natural subsidence and slope surface hydrostatic pressure generate;Apple green paint is sprayed in front and back sides after angle steel installation, is inhibited Autoxidation accomplishes antirust environmental protection;Angle steel installation is as being permanently fixed measure, it is ensured that upper next line, accomplishes whole when construction It is neat to coordinate;
In the wet curing:
(1) maintenance plan is worked out according to the climatic characteristic of construction area, is in and sprouts and plant seedlings stage, guarantor in vegetable seeds Hold humidity and balance nutrient;Reinforce the exercise to stress resistance of plant after vegetation Cheng Ping, gradually decrease watering, fertilizer application frequency, promotees Into the shrub Tree growth of deep-rootedness;
(2) plant biological bag uses field irrigation, and with that can form solid lawn after water curing 30 days, according to climatic environment, progress is indefinite Phase water spray;
(3) block should be mended in time, prevents lawn irregular such as plant biological bag locally sedimentation in maintenance processes;Go out if any corner lawn It, should the program request grass-seed on plant biological bag in time when careless non-uniform phenomenon.
2. road foundation execavated rockmass frame gird type slope protection code according to claim 1 builds the construction method of plant biological bag greening, It is characterized by: should first complete water in the preparation of construction, the order for outer the committee detection and plant biological bag that soil is tested, while answering At the screening of plant substrate peat soil and sawdust, in case later period soil improvement.
3. road foundation execavated rockmass frame gird type slope protection code according to claim 1 builds the construction method of plant biological bag greening, It is characterized by: removing stone and other all sundries that slope surface loosens in the smooth slope surface of cleaning, slope surface being made to reach roadbed Slope ratio is designed, is filled and led up and is treaded with soil at hollow, a smooth basal plane is formed after slope surface cleaning, apart from sash beam outer surface 55cm。
4. road foundation execavated rockmass frame gird type slope protection code according to claim 1 builds the construction method of plant biological bag greening, It is characterized by: the laying non-woven fabrics, is to cover non-woven fabrics after angle steel is installed, builds seedling fast germination environment, Carry out maintenance management.
5. road foundation execavated rockmass frame gird type slope protection code according to claim 1 builds the construction method of plant biological bag greening, It is characterized by: in the survival rate and testing result, after a growth period, to frame gird type slope protection plant biological bag afforestation vegetation Coverage rate, pest and disease damage disease incidence detected, visually, lawn growth is intensive, without withered and yellow, no disease pest and weed, without continuous Blank phenomenon, lawn coverage rate reach 95% or more, and ecological protection effect is obvious.
CN201710439356.9A 2017-06-12 2017-06-12 A kind of road foundation execavated rockmass frame gird type slope protection code builds the construction method of plant biological bag greening Active CN107237334B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710439356.9A CN107237334B (en) 2017-06-12 2017-06-12 A kind of road foundation execavated rockmass frame gird type slope protection code builds the construction method of plant biological bag greening

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710439356.9A CN107237334B (en) 2017-06-12 2017-06-12 A kind of road foundation execavated rockmass frame gird type slope protection code builds the construction method of plant biological bag greening

Publications (2)

Publication Number Publication Date
CN107237334A CN107237334A (en) 2017-10-10
CN107237334B true CN107237334B (en) 2019-04-02

Family

ID=59987906

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710439356.9A Active CN107237334B (en) 2017-06-12 2017-06-12 A kind of road foundation execavated rockmass frame gird type slope protection code builds the construction method of plant biological bag greening

Country Status (1)

Country Link
CN (1) CN107237334B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108071094A (en) * 2017-11-15 2018-05-25 深圳市华茂建设工程有限公司 A kind of construction method of protective slope structure
CN108338035A (en) * 2018-02-05 2018-07-31 合肥百绿盛农业科技有限公司 A kind of implantation methods of highway planting slope surface cuckoo and Euonymus japonicus
CN108677871A (en) * 2018-05-28 2018-10-19 南昌工程学院 A kind of construction method of assembled grass planting concrete precast block and its ecological revetment
CN110284509A (en) * 2019-06-26 2019-09-27 中铁二十三局集团第三工程有限公司 Anchored frame beam slope protection construction technique in road engineering
JP7230716B2 (en) * 2019-07-11 2023-03-01 オムロン株式会社 Information processing device and index value calculation method
CN113417298B (en) * 2021-05-22 2022-11-08 山东高速工程建设集团有限公司 Construction method for greening road excavation slope by stacking plant growth bags
CN116290028A (en) * 2023-04-06 2023-06-23 德州市公路工程总公司 Ecological spray anchor protection structure for reverse installation of plant-growing bags with reserved holes and construction method
CN117868175A (en) * 2024-02-06 2024-04-12 中交第四航务工程局有限公司 A rock slope greening structure and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202509512U (en) * 2012-03-29 2012-10-31 中铁第四勘察设计院集团有限公司 Green protecting structure for deep cutting of high-speed railway
CN103628489A (en) * 2013-12-05 2014-03-12 长沙理工大学 Highway side slope reinforced structure
CN104186233A (en) * 2014-08-15 2014-12-10 申新山 Frame beam slope greening method and frame beam slope greening facility
CN106703054A (en) * 2017-01-23 2017-05-24 杭州江润科技有限公司 Ecological slope protection structure of road cutting side slope and construction method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004197472A (en) * 2002-12-19 2004-07-15 Sango:Kk Frame body for forming slope frame and slope frame construction method using it

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202509512U (en) * 2012-03-29 2012-10-31 中铁第四勘察设计院集团有限公司 Green protecting structure for deep cutting of high-speed railway
CN103628489A (en) * 2013-12-05 2014-03-12 长沙理工大学 Highway side slope reinforced structure
CN104186233A (en) * 2014-08-15 2014-12-10 申新山 Frame beam slope greening method and frame beam slope greening facility
CN106703054A (en) * 2017-01-23 2017-05-24 杭州江润科技有限公司 Ecological slope protection structure of road cutting side slope and construction method

Also Published As

Publication number Publication date
CN107237334A (en) 2017-10-10

Similar Documents

Publication Publication Date Title
CN106900342B (en) Integrated semi-lithologic high slope vegetation reconstruction protection method
CN104255280B (en) Vegetation planting method on high and steep rocky slope
CN101761086B (en) Three-dimensional net greening technique for roadbed side slope
CN108589743B (en) Ecological geogrid for slope protection
CN103340114B (en) The multilayer vegetation bag that a kind of burlap is made
CN107700429B (en) Device for preventing runoff scouring and erosion on slopes and method for preventing runoff scouring and erosion on slopes
CN107382608A (en) A kind of vegetation is multiple green to sow grass seeds by duster auxiliary material, sow grass seeds by duster material and the multiple green construction method of vegetation without native composite fibre
CN101748719A (en) Method of vegetation restoration and reconstruction of bare rock slope in East China
CN101818499A (en) Revegetation system on steep rocky slopes and implementing method thereof
CN106900322A (en) The engineering wound-surface Ecological recovery technology of moss crust
CN102359113A (en) Integrally-cast cement pervious concrete ecological protection slope and construction method thereof
CN107237334A (en) A kind of road foundation execavated rockmass frame gird type slope protection code builds the construction method of plant biological bag greening
CN111316850A (en) High and steep slope vegetation and planting method thereof
CN110565660A (en) Spraying construction method for slope greening
CN108093729A (en) Side-slope greening and protection method
CN101507391B (en) Rock slope-surface ecology treatment method
CN110485441A (en) It repairs with leaching net formula ecological slope protection structure and its construction method of sowing grass seeds by duster in mine
CN108547307A (en) Protecting slope ecology method based on artificial loam
CN113235623A (en) Thick-layer base material foreign soil spray-seeding structure suitable for ecological restoration of high and steep slope and construction method thereof
CN113170705A (en) Hydrothermal balance degraded alpine meadow repair material
CN206800419U (en) A kind of ecological revetment
CN111802181A (en) A plant support method for cold regions
CN111484278A (en) Ecological concrete, ecological protection slope and construction method of ecological protection slope
CN101886394A (en) A Method for Treating Shallow Layer Diseases of Expansive Soil Slopes
CN113914261A (en) Reservoir engineering concrete precast block ecological slope protection construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190123

Address after: 226000 Jiangsu city of Nantong province sik Road No. 9

Applicant after: NANTONG University

Applicant after: JIANGSU XUCHEN TRAFFIC TECHNOLOGY DEVELOPMENT CO.,LTD.

Address before: 226000 Room 3426, Building 3, Jiangcheng R&D Park, 1088 Jiangcheng Road, Sutong Science and Technology Industrial Park, Nantong City, Jiangsu Province

Applicant before: JIANGSU XUCHEN TRAFFIC TECHNOLOGY DEVELOPMENT CO.,LTD.

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230113

Address after: 226000 No. 9 Siyuan Road, Chongchuan District, Nantong City, Jiangsu Province

Patentee after: NANTONG University

Address before: 226000 Jiangsu city of Nantong province sik Road No. 9

Patentee before: NANTONG University

Patentee before: JIANGSU XUCHEN TRAFFIC TECHNOLOGY DEVELOPMENT CO.,LTD.