Summary of the invention
Goal of the invention: in order to solve the deficiencies in the prior art, the present invention provides a kind of road foundation execavated rockmass sashes
Beam slope protection code builds the construction method of plant biological bag greening.
Technical solution: a kind of road foundation execavated rockmass frame gird type slope protection code builds the construction method of plant biological bag greening, including
--- clearing up smooth slope surface, --- sash beam snap the line is layered --- soil preparation --- and plants raw generation filling following steps: preparation of construction
--- plant biological bag loads substrate, and --- code builds plant biological bag, and --- installation angle steel is fixed --- being laid with non-woven fabrics --- for the preparation of substrate
Wet curing --- survival rate and testing result;Wherein:
In the sash beam snap the line layering, one is formed with ink fountain snap the line from sash surface to basal plane integral translation 5cm
With the equirotal rectangle of sash beam aperture diameter, the "high" of rectangle is then pressed into every 20cm equal part;
The soil carries out taking soil in native field in preparing meeting taking for Testing index, and soil is taken to select fertile soil, ground
Natural surface soil or the higher mellow soil of suitable plant growth, fertility within 50cm, and 5mm sieve is less than using sieve pore, soil is sieved;
In the preparation for planting raw generation filling substrate, peat soil, sawdust, alleviation will be mixed in proportion in the fine grained soil of sieving
Compound fertilizer, soil stabilizer, these organic substrates of nitragin form the good substrate of trophic structure, while by substrate moisture rate
Control is between 7%~9%;Specifically, every square of plant biological bag greening backing proportion dosage of thick 50cm is as follows: planting soil
0.35m3, peat soil 0.10m3, sawdust 50kg, alleviate compound fertilizer 0.75kg, soil stabilizer 0.5L, nitragin 25g;
In plant biological bag filling substrate, the substrate matched will be mixed and be packed into plant biological bag, and tighten sack when plumpness is up to 85%, and
Each plant biological bag must load uniformly, and size turgor is consistent after filling, to guarantee that code block occlusion is closely knit, must also load part
The plant biological bag of plumpness 50% is as " rotation of crops bag ";
The code is built in plant biological bag, and should sprinkle water in right amount basal plane before plant biological bag code block wetting, prevents plant biological bag from building code process
Water loss inside middle bag body;Code should be in strict accordance with sash beam snap the line, as code tiling the plane reference line, often from bottom to up when building
Mono- layer of 20cm;To guarantee that fissure of displacement occlusion is closely knit between layers, one " rotation of crops bag " must be placed at every layer;Each layer of code is finished building into
The gap between plant biological bag and slope surface, plant biological bag and plant biological bag should be filled out tightly afterwards with soil, play and soil is avoided to air-dry, soil moisture conservation
Effect;Every layer of plant biological bag code is finished building into must trample closely knit later, guarantee each layer all on a horizontal plane, each sash code is built
After the completion, plant biological bag integrally should be in a facade, must not be uneven;When during plant biological bag code being built such as slope surface infiltration,
Medium coarse sand and soil 1:1 need to be mixed with being embedded between plant biological bag and slope surface, form good permeable loaded filter, and in plant biological bag code
Drain hole is set during building, is laid by " inner high outer low ";Drain hole uses the hard PVC pipe of diameter 5cm, and pvc pipe end is used
Permeable geotextiles package, ejects superficial water in slope surface, in order to avoid impregnate plant biological bag for a long time and cause to cave in;
During the installation angle steel is fixed, according to originally played 5cm in sash beam line is perforated lines, by layout design
It is required that then installing expansion bolt, then angle steel is welded on expansion bolt in the bottom and top perforating of sash beam, offset because planting
The horizontal shear that raw bag natural subsidence and slope surface hydrostatic pressure generate;Apple green paint is sprayed in front and back sides after angle steel installation,
Inhibit autoxidation, accomplishes antirust environmental protection;Angle steel installation is as being permanently fixed measure, it is ensured that upper next line, does when construction
Coordinate to neat;
In the wet curing:
(1) maintenance plan is worked out according to the climatic characteristic of construction area, is in and sprouts and plant seedlings rank in vegetable seeds
Section keeps humidity and balance nutrient;Reinforce the exercise to stress resistance of plant after vegetation Cheng Ping, gradually decreases watering, fertilising time
Number, promotes the shrub Tree growth of deep-rootedness;
(2) plant biological bag can be shaped to three-dimensional lawn after conserving 30 days using farmland irrigation water substantially, according to climatic environment,
Irregularly sprayed water;
(3) block should be mended in time, prevents lawn irregular such as plant biological bag locally sedimentation in maintenance processes;If any corner grass
It, should the program request grass-seed on plant biological bag in time when level ground goes out careless non-uniform phenomenon.
As a preferred solution: should first complete water, the outer committee detection of soil test and ordering for plant biological bag in the preparation of construction
Purchase, while the screening of plant substrate peat soil and sawdust should be completed, in case later period soil improvement.
As a preferred solution: removing stone and other all sundries that slope surface loosens in the smooth slope surface of cleaning, making slope
Face reaches roadbed design slope ratio, is filled and led up and is treaded with soil at hollow, a smooth basal plane is formed after slope surface cleaning, apart from sash beam
Outer surface 55cm.
As a preferred solution: the laying non-woven fabrics, is to cover non-woven fabrics after angle steel is installed, it is fast to build seedling
Speed germination environment, carries out maintenance management.
As a preferred solution: after a growth period, planting and giving birth to frame gird type slope protection in the survival rate and testing result
The bag coverage rate of afforestation vegetation, pest and disease damage disease incidence detected, visually, lawn growth is intensive, without withered and yellow, no Pest organism
Evil, without continuous blank phenomenon, lawn coverage rate reaches 95% or more, and ecological protection effect is obvious.
The utility model has the advantages that the present invention by using execavated rockmass sash beam Internal Code build plant biological bag afforest this construction method into
Row afforests solid slope experimental study, and project post-evaluation and plant ecological slope protection are combined, and forms a suitable road foundation excavation
The method of side-slope greening and protection effectively enhances the stability of execavated rockmass and afforests and beautifies effect, is successfully realized excavation side
The stabilization and permanent greening of the barren road palpus of slope soil property, native horsestone or land waste matter section side slope.
Specific advantage of the invention is as follows:
(1) present invention organically combines " project post-evaluation " and " plant ecological slope protection ", breaches traditional single engineering shield
Slope mode, construction cost is low, and simple and convenient flexible, speed of application is fast, high-efficient.
(2) soil physico-chemical property after present invention improvement is loose, and plant emergence rate is high, and absorbing water solid soil nature can be good, plants
Object root system such as " anchor pole ", which passes through plant biological bag, to be goed deep into side slope, is consolidated side slope, be can effectively prevent soil erosion.
(3) degradable after the plant biological bag many years in the present invention, it is pollution-free.
(4) present invention is suitable for the frame gird type slope protection of subgrade engineering excavation section soil property, native horsestone, land waste side slope, slope
Rate is not suddenly in 1:0.75.
Specific embodiment
A kind of road foundation execavated rockmass frame gird type slope protection code builds the construction method of plant biological bag greening, includes the following steps:
--- clearing up smooth slope surface, --- matching for raw generation filling substrate is planted in sash beam snap the line layering --- soil preparation --- for preparation of construction
System --- plant biological bag loads substrate, and --- code builds plant biological bag, and --- installation angle steel is fixed --- being laid with non-woven fabrics ---, and support by water spray
Shield --- survival rate and testing result.
In the preparation of construction, water should be first completed, the order for outer the committee detection and plant biological bag that soil is tested, while should complete to plant
The screening of object substrate peat soil and sawdust, in case later period soil improvement.
In the smooth slope surface of cleaning, stone and other all sundries that slope surface loosens are removed, so that slope surface is reached roadbed and sets
Slope ratio is counted, is filled and led up and is treaded with soil at hollow, a smooth basal plane is formed after slope surface cleaning, apart from sash beam outer surface 55cm.
In the sash beam snap the line layering, one is formed with ink fountain snap the line from sash surface to basal plane integral translation 5cm
With the equirotal rectangle of sash beam aperture diameter, the "high" of rectangle is then pressed into every 20cm equal part;The purpose that does so one is
Plant biological bag later period code has certain datum level when building, and constructs convenient for horizontal hanging wire, and layering code is built.Secondly it is smooth to be to maintain facade,
It is not easy to collapse, convenient in place fixed when the later period installs angle steel.
The soil carries out taking soil in native field in preparing meeting taking for Testing index, take it is native it is preferential select fertile soil,
Natural surface soil or the higher mellow soil of suitable plant growth, fertility within the 50cm of face.To guarantee the fineness of soil in plant growth
In optimum range, 5mm sieve must be less than using sieve pore and soil is sieved.
In the preparation for planting raw generation filling substrate, to guarantee the normal growth and development of plant, grass-seed germination percentage is improved, is filled
The wooden survival rate should carry out soil improvement according to the correlation report that testing agency provides.It will be mixed in proportion in the fine grained soil of sieving
Peat soil, sawdust alleviate the organic substrates such as compound fertilizer, the soil stabilizer formation good substrate of trophic structure, specific content
As shown in every square of plant biological bag of the following table 1 (thick 50cm) greening backing proportion scale.Simultaneously by the control of substrate moisture rate 7%~
Between 9%, optimum moisture content usually live micro-judgment is scattered with the agglomerating landing of hand bun and is limited.It is different from natural soils
It is to mix that there is higher stability than natural soils with the substrate after improvement.
The every square of plant biological bag of table 1 (thick 50cm) greening backing matches dosage
In plant biological bag filling substrate, the substrate matched will be mixed and be packed into plant biological bag, and tighten sack when plumpness is up to 85%, and
Each plant biological bag must load uniformly, and size turgor is consistent after filling, to guarantee that code block occlusion is closely knit, must also load part
The plant biological bag of plumpness 50% is as " rotation of crops bag ".
The code is built in plant biological bag, and should sprinkle water in right amount basal plane before plant biological bag code block wetting, prevents plant biological bag from building code process
Water loss inside middle bag body.Code should be in strict accordance with sash beam snap the line, as code tiling the plane reference line, often from bottom to up when building
Mono- layer of 20cm.To guarantee that fissure of displacement occlusion is closely knit between layers, one " rotation of crops bag " must be placed at every layer.Each layer of code is finished building into
The gap between plant biological bag and slope surface, plant biological bag and plant biological bag should be filled out tightly afterwards with soil, play and soil is avoided to air-dry, soil moisture conservation
Effect.Every layer of plant biological bag code is finished building into must trample closely knit later, guarantee each layer all on a horizontal plane.Each sash code is built
After the completion, plant biological bag integrally should be in a facade, must not be uneven.
When during plant biological bag code being built such as slope surface infiltration, medium coarse sand and soil 1:1 need to be mixed match be embedded in plant biological bag and
Between slope surface, good permeable loaded filter is formed, and drain hole is set during plant biological bag code is built, by " inner high outer low " cloth
If.Drain hole uses the hard PVC pipe of diameter 5cm, and pvc pipe end wrapped up with permeable geotextiles, and the purpose done so can be
Superficial water ejects in slope surface, in order to avoid impregnate plant biological bag for a long time and cause to cave in.
During the installation angle steel is fixed, according to originally played 5cm in sash beam line is perforated lines, by layout design
It is required that then installing expansion bolt, then angle steel is welded on expansion bolt in the bottom and top perforating of sash beam, offset because planting
The horizontal shear that raw bag natural subsidence and slope surface hydrostatic pressure generate.Apple green paint is sprayed in front and back sides after angle steel installation,
Inhibit autoxidation, accomplishes antirust environmental protection.Angle steel installation is as being permanently fixed measure, it is ensured that upper next line, does when construction
Coordinate to neat.
In the laying non-woven fabrics, after angle steel is installed, non-woven fabrics is covered, builds seedling fast germination environment, into
Row maintenance management.
In the wet curing:
(1) maintenance plan is worked out according to the climatic characteristic of construction area, is in and sprouts and plant seedlings rank in vegetable seeds
Section should focus on and keep humidity and balance nutrient.Reinforce the exercise to stress resistance of plant after vegetation Cheng Ping, gradually decreases and pour
Water, fertilizer application frequency promote the shrub Tree growth of deep-rootedness.
(2) plant biological bag can be shaped to three-dimensional lawn after conserving 30 days using farmland irrigation water substantially, at this time according to weather
Environment is irregularly sprayed water.
(3) block should be mended in time such as the locally sedimentation of discovery plant biological bag in maintenance processes.Prevent lawn irregular;If any side
It, should the program request grass-seed on plant biological bag in time when angle lawn goes out careless non-uniform phenomenon.
In the survival rate and testing result, after a growth period, to frame gird type slope protection plant biological bag afforestation vegetation
Coverage rate, pest and disease damage disease incidence detected, visually, lawn growth is intensive, without withered and yellow, no disease pest and weed, without continuous empty
Bai Xianxiang.Lawn coverage rate reaches 95% or more, and ecological protection effect is obvious.
A, technological principle of the invention is as follows:
Plant biological bag is using special equipment, according to specific production technology, by design requirement grass seeds, chemical fertilizer, water-retaining agent
It is colonized on degradable non-woven fabrics Deng according to certain density, by the compound positioning process of machine rolling and needle thorn, is formed
Certain specification pocket shape product.Plant biological bag slope greening not only can guarantee that slope surface water and soil not easily runed off, but also can be slope plant
Growth provides somatomedin, is a kind of scientific means of defence premised on restoration of the ecosystem.
It is that the plant substrate prepared in proportion is packed into plant biological bag that frame gird type slope protection code, which builds plant biological bag greening construction engineering method,
Being built into together along slope surface horizontal slice, dislocation code block afterwards is that purpose shock resistance is superior with water and soil conservation and earth's surface greening
Vertical planting system fixes the shearing force that angle steel bears horizontal direction under slope surface hydrostatic pressure in plant biological bag greening system;
Later period plant and its root system pass through plant biological bag such as anchor pole gos deep into side slope generating powerful tractive force;Make entire plant biological bag coating
It is combined together with slope surface, forms the slope protection system an of entirety, to achieve the effect that firm side slope and beautify the environment.
B, quality control is as follows in the present invention:
1 standard criterion that should be executed
(1) " roads engineering quality check evaluation criterion " (JTGF80/1-2004).
(2) " highway engineering construction technical specification of security " (JTGF90-2015).
(3) " landscape engineering and acceptance specification " (DB11/T212-2009).
(4) " Ecological Protection for Road Slope engineering construction and checking and accepting technology modular " (DB44/T499-2008).
(5) " agricultural irrigation water quality standard " (GB5084-2005).
Other standards require to be shown in Table 2~table 4.
2 soil physico-chemical characteristic list of table
| Index |
Numerical value |
Detection method |
Remarks |
| PH value |
5.5~8.5 |
Electrode method |
The detection of the academy of agricultural sciences Wai Wei |
| Soil moisture content |
7%~9% |
Drying method |
The detection of the academy of agricultural sciences Wai Wei |
| The content of organic matter |
> 20g/kg |
External heat |
The detection of the academy of agricultural sciences Wai Wei |
The configuration of 3 plant biological bag seed of table and quality requirement
The detection project and test stone of 4 slope vegetation of table
The control of 2 mass
To guarantee that frame gird type slope protection code builds the quality of plant biological bag greening construction, effective quality pipe must be carried out to work progress
Reason.Quality management includes raw material quality management, code builds process quality management, maintenance quality manages three aspects.
1) raw material quality management
(1) since the producer of production plant biological bag is numerous, plant biological bag is that grass-seed is colonized on non-woven fabrics, therefore to select in addition
Select the germination percentage that qualified producer guarantees grass-seed, it is ensured that quality.
(2) plant biological bag must guarantee aeration-drying during transportation, and dry shady place should be placed on when being transported to building site, whole
It stacks and covers together.
(3) the greening auxiliary material such as compound fertilizer, water-retaining agent, root-inducing powder used in constructing should have the quality certificates.
2) plant biological bag code builds quality management
(1) plant biological bag code block should meet drawing requirement, closely sturdy with slope surface, fixed.
(2) it will be faced outwardly with seed when plant biological bag code builds construction.
3) maintenance quality management
(1) maintenance 30 days early periods of plant biological bag is it is ensured that the moisture that germination grows.
Non-woven fabrics is opened after (2) 15 days, guarantees nursery stock normal growth.
Passage is applied fertilizer after (3) 45 days, guarantees that plant growth nutrient is sufficient;Also foliage spray can be carried out according to actual conditions.
Periodically, it targetedly sprays insecticide, guarantees plant health growth.
Safety measure in the present invention is as follows:
(1) before constructing specialty work technical safety measures should be worked out, detailed rules and regulations are formulateeed and implemented in conjunction with construction concrete condition, and
It confides a technological secret to construction personnel, does regular, irregular safety inspection.
(2) it wears Safety Belt when high altitude operation personnel operation, safety belt " height hangs low use " lies in secured place, forbids double
Layer operation.
(3) mechanical equipment must be functional, and operator's certificate is complete, and machinery must have commander special messenger when site operation.
C, the environmental protection measure in the present invention is as follows:
(1) special laws and regulations of the country about environmental protection should be carried out, special environmental protection is targetedly worked out
Scheme is reinforced communication and education, is executed conscientiously.
(2) company " career safety & health and environmentally friendly system " is executed, targetedly efforts at environmental protection system is established and improve, implements
Responsibility system is equipped with personal management.
(3) for the drinking water source in construction infection region, the water source points such as river, irrigation canals and ditches should be arranged safeguard measure, prevent
It is polluted when construction.
(4) discarded non-woven fabrics etc. should focus on, and must not arbitrarily abandon.
(5) after Practical Completion, timely site clearing rubbish accomplishes that civilization is withdrawn from the arena.
D, resource-effective as follows in the present invention:
It is that road slope protects skill that sash beam code, which builds plant biological bag for geotechnics, new-soil technology, biotechnology organic assembling,
Art forms vertical planting slope surface by building plant biological bag in sash beam Internal Code, and plant biological bag implants root system penetrates pocket and penetrates slope surface,
Like being implanted into slopes without several anchor poles, it is firm to consolidate, single stiff instead of traditional structure type as environmental-protection process
Bricklaying slope protection, concrete revetment, economize on resources compared with similar thick photoresist sows grass seeds by duster slope protection, equipment investment it is few, low cost is raw
State protection effect is good, and popularization and application foreground is extensive.
E, the economic benefit in the present invention is as follows:
The sash beam slope protection ecologic protection of road foundation excavation section soil property, Tu Jiashi, land waste side slope generally uses class
Type has: thick photoresist is sowed grass seeds by duster, three dimensional network is sowed grass seeds by duster, plant biological bag etc., and in terms of engineering cost, by contrast, thick photoresist is sowed grass seeds by duster construction
Unit price is that code builds 1.6 times of plant biological bag greening construction, and sow grass seeds by duster unit price of constructing of three dimensional network is the 1.07 of code block plant biological bag greening construction
Times.In terms of complexity of constructing, the requirement that thick photoresist is sowed grass seeds by duster and three dimensional network is sowed grass seeds by duster to equipment investment is high, working procedure is more,
Construction technology is more complex, and thick photoresist sows grass seeds by duster and manages and protects costly, molding slow effect.The greening of execavated rockmass sash beam code plant biological bag
Construction equipment less investment, easy construction is at low cost, and plant emergence rate is high, and slope greening lasts are stablized, and is shown in Table 5.And most
Outstanding feature is that plant biological bag construction can not only afforest and beautify road domain environment, moreover it is possible to effectively prevent sandslide, be worth pushing away
Extensively.
5 excavation section sash of table video recording slope protection ecologic protection form compares
F, the environmental benefit in the present invention is as follows:
Since plant biological bag can effectively improve the humidity and temperature of soil, humus is gathered, to the improved effect of soil
It is fairly obvious;Plant survival rate is high, pest and disease damage is few, rate of yielding positive results is high, life cycle extends, and later period lawn planting is fast, green
Environmental protection, purification air, dust suction noise control.
The present invention by using execavated rockmass sash beam Internal Code build plant biological bag afforest this construction method afforest it is solid
Slope experimental study combines project post-evaluation and plant ecological slope protection, forms a suitable road foundation execavated rockmass greening
The method of protection effectively enhances the stability of execavated rockmass and afforests and beautifies effect, it is poor to be successfully realized execavated rockmass soil property
The stabilization and permanent greening of lean road palpus, native horsestone or land waste matter section side slope.