CN108914744A CN201710203040.XA CN201710203040A CN108914744A CN 108914744 A CN108914744 A CN 108914744A CN 201710203040 A CN201710203040 A CN 201710203040A CN 108914744 A CN108914744 A CN 108914744A
Authority
CN
China
Prior art keywords
football pitch
construction technology
soil
base
pipe network
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710203040.XA
Other languages
Chinese (zh)
Other versions
CN108914744B (en
Inventor
赵会娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Panchina Emerging Sports Industry Ltd By Share Ltd
Original Assignee
Beijing Panchina Emerging Sports Industry Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Panchina Emerging Sports Industry Ltd By Share Ltd filed Critical Beijing Panchina Emerging Sports Industry Ltd By Share Ltd
Priority to CN201710203040.XA priority Critical patent/CN108914744B/en
Publication of CN108914744A publication Critical patent/CN108914744A/en
Application granted granted Critical
Publication of CN108914744B publication Critical patent/CN108914744B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C13/00Pavings or foundations specially adapted for playgrounds or sports grounds; Drainage, irrigation or heating of sports grounds
    • E01C13/02Foundations, e.g. with drainage or heating arrangements
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C13/00Pavings or foundations specially adapted for playgrounds or sports grounds; Drainage, irrigation or heating of sports grounds
    • E01C13/08Surfaces simulating grass ; Grass-grown sports grounds
    • E01C13/083Construction of grass-grown sports grounds; Drainage, irrigation or heating arrangements therefor

Abstract

The invention discloses a kind of construction technologies in football pitch, it is characterized in that:Include the following steps, S1, earth excavation original soil rammed;S2, grid is set up;S3, supertronic;S4, it is laid with sodium-based bentonite waterproof carpet;S5, backfill rammed earth;S6, french drain and installation spray collecting system are excavated;S7, paving graded broken stone layer;S8, it is laid with loess coarse sands layer;S9, it is laid with planting soil coarse sands layer;S10, the natural grass layer of plantation.If the force of rain is excessive, two way water pump is opened, the rainwater of rainwater and football pitch surface in french drain is pumped into spray general pipeline by pipe network and spray head, is then discharged in tank, accelerates the drainage speed in football pitch, to prevent football pitch ponding.When dry weather, directly the water in tank can be transported in pipe network, through spray head spray on lawn, recycling for water is carried out, saved water resource.Due to the effect of one-way membrane, rainwater can be pumped into pipe network, cannot but be flowed out out of pipe network, and the soil erosion of the second base is reduced.

Description

A kind of construction technology in football pitch
Technical field
The present invention relates to the realm of building construction, and in particular to a kind of construction technology in football pitch.
Background technique
The traditional football pitch that China uses at present easily causes water or large area water in weather rainfall substantially, such as Fruit football player is trained or competes at this moment, can be because of training caused by ponding or difficulty of competing, to influence football fortune The performance of technical level is mobilized, while can also increase the damaged condition of pitch.
The patent that existing authorized announcement date is September in 2015 16, Authorization Notice No. is CN204644828U, which disclose A kind of not water type football pitch comprising the sheet-like textile object for being inlaid with pedaline laying is pasted onto and adopts by traditional football pitch With by cobble by being built on the integral hardened ground or ground with many infiltration gaps or gap of bonding rolloff Not water type football pitch.
The shortcomings that technical solution, is:Although it is basic in weather rainfall to can be effectively solved traditional football pitch The problem of equal water easy-storing or large area water, but when irregularly the moisture storage capacity in infiltration gap or gap reaches saturation, still can Ponding is caused to influence the performance of technical level of football player;And since infiltration gap or gap are by cobble by bonding Made of rolloff is integral, so the seepage velocity in infiltration gap or gap is slower, when encountering the weather for having larger precipitation The case where still resulting in ponding generation.
Summary of the invention
In view of the deficiencies of the prior art, the present invention intends to provide a kind of construction technology in football pitch, this is applied The football pitch that work technique is produced has preferable drainage, reduces the surface gathered water in football pitch.
To achieve the above object, the present invention provides following technical solutions:
A kind of construction technology in football pitch, includes the following steps,
S1, earth excavation original soil rammed:Using excavator earth excavation, roller layered rolling, the wet waterside in side are used after transporting It rolls, reaches compactness greater than 90%;
S2, grid is set up:Football field areas establishes rectangle grid using contour interval in absolute altitude figure as side length, every 15 degree If a radiation grid, small timber is nailed on each angle, indicates the absolute altitude of present position;
S3, supertronic:It according to grid bracing wire inspection and adjusts place gradient roller or is manually tamped, reach compactness Greater than 90%, the first base is formed;
S4, it is laid with sodium-based bentonite waterproof carpet:Sodium-based bentonite waterproof carpet is laid with from top to bottom, and is added gasket with steel nail by it It is fixed, overlapping part and nail hole sealing compound encapsulation process, to form waterproof layer;
S5, backfill rammed earth:The soil of excavation is backfilled, the second base is formed, the compactness of the second base is greater than 90%;
S6, french drain and installation spray collecting system are excavated:French drain is excavated on the second substrate, and installation is equipped with spray head in french drain Pipe network is connected to by pipe network with spray general pipeline, and pipe network is equipped with inlet opening, and inlet opening is equipped with for unidirectionally by the unidirectional of water flow Film, water can enter pipe network by inlet opening, and spray one end general pipeline is equipped with two way water pump, two way water pump will spray general pipeline with Tank connection, fertilizer applicator, relief valve and pressure gauge are mounted on spray general pipeline;
S7, paving graded broken stone layer:The gravel particle diameter of metalling is 30 ~ 50mm;
S8, it is laid with loess coarse sands layer:The middle husky peat soil with 5% of incorporation 30% ~ 40% in loess;
S9, it is laid with planting soil coarse sands layer:It after laying, is rolled, first horizontal pressure 2 ~ 3 times, then end compression 2 times, is ground with road roller Must be regular from a side to the other side when pressure, roll next time must and it is last roll 1/3 overlapping, up to closely knit Degree is 70% ~ 80%;With wide 60cm, the long 2cm of tooth, the creeper of between cog 2cm, by earth's surface 2cm rake pine wait sow;
S10, the natural grass layer of plantation:Grass seeds is sowed grass seeds by duster in earth's surface.
By using above-mentioned technical proposal, after raining, rainwater is flowed into french drain by metalling, realizes water storage, It ensures that there are certain water-holding capacity in the second base and lawn, extends the interval time that need to be watered to lawn, reduce simultaneously The possibility of football pitch surface area water.
If the force of rain is excessive, two way water pump is opened, by pipe network and spray head by the rain of rainwater and football pitch surface in french drain Water is pumped into spray general pipeline, is then discharged in tank, is accelerated the drainage speed in football pitch, to prevent football pitch product Water.When dry weather, directly the water in tank can be transported in pipe network, through spray head spray on lawn, carry out water Recycle, saved water resource.Due to the effect of one-way membrane, rainwater can be pumped into pipe network, cannot but be flowed out out of pipe network, Reduce the soil erosion of the second base.
Due to sodium-based bentonite waterproof carpet meeting water-swellable, therefore the waterproof layer formed by sodium-based bentonite waterproof carpet can be to it Automatic " healing " of defect above or breakage, can auto-mending seepage point, to reach perfect waterproof effect.And plant Root system can penetrate sodium-based bentonite waterproof carpet, on sodium-based bentonite waterproof carpet waterproof effect without influence.
Waterproof layer can prevent the first base of rain erosion, so that the first base is kept the state of compacting, prevent it due to aqueous Amount is excessive and collapses, and keeps football pitch ground solid, prolongs its service life.And water flow can be stored within french drain by the waterproof layer It is interior, recycle water flow adequately.
Level ground initial stage is supported on lawn, growth stimulator can be added in the water in spray general pipeline by fertilizer applicator, accelerate lawn Cheng Ping. And can be flowed into tank by the growth stimulator that rain drop erosion is fallen, in watering next time, these growth stimulators can still spray and arrive Lawn is long, to take full advantage of growth stimulator.
It after the compacting of planting soil coarse sands layer, can reduce due to the phenomenon that rain drop erosion leads to soil erosion generation, make to plant soil Coarse sands layer has preferable storage fertilizer.
The further setting of the present invention is:Before step S 4, the polystyrene bubble of upper 5mm thickness is laid in the first base Foam plate.
By using above-mentioned technical proposal, only plant root breathing can generate heat, and polystyrene foam plate has preferably Insulation effect, by football pitch implants root respiration generate heat lock in football field areas as far as possible, thus Improve the temperature of football field areas, the life seedling speed of speeding-up football field.The probability that lawn is freezed to death in winter can be reduced simultaneously.
The further setting of the present invention is:Before step S4, vibration power generation plate is installed on polystyrene foam plate, and will The charging end of vibration power generation plate connection battery.
By using above-mentioned technical proposal, the pressing and vibration carried out on football pitch can be converted to electricity by vibration power generation plate It can be carried out storage, to take full advantage of energy.Waterproof layer can reduce the vibration power generation plate time under water, reduce vibration hair The probability of battery plate waterlogged damage.
The further setting of the present invention is:Fever battery plate is installed on vibration power generation plate, fever battery plate connects battery Discharge end, by fever battery plate by football pitch temperature control at 10 degrees Celsius ~ 15 degrees Celsius.
By using above-mentioned technical proposal, fever battery plate fever is driven to fever battery plate power supply by battery, thus Cold season controls lawn temperature in suitable temperature, so that lawn be made to keep green.Lawn can be made to have obviously in early spring simultaneously Growth vigor.The battery plate that generates heat simultaneously can also prevent from reducing due to the rupture of winter excessively cold caused spray collecting system To the maintenance frequency and maintenance cost of spray collecting system.Polystyrene foam plate can reduce the thermal energy damage that fever battery plate gives out Thermal energy is all used for lawn heating, so that the energy be made more fully to be utilized by wound as far as possible.
The further setting of the present invention is:After vibration power generation plate is mounted in the first base, on vibration power generation plate Bearing plate is covered, plant growth inhibitor is stirred into backfill, and the backfill is backfilling on bearing plate and is tamped, is formed Third base, waterproof layer are located above third base.
By using above-mentioned technical proposal, when the root growth on lawn is to third base, lawn has become level ground and completes trimming, Lawn root touches plant growth inhibitor at this time, can inhibit the speed of growth on lawn, when extending the interval that lawn need to trim Between.Facilitate maintenance of the later period to lawn.The growth stimulator apply and at lawn growth initial stage to lawn and pouring are to lawn Water is blocked in above waterproof layer, be will not influence inhibitor and is stored in third base, it is ensured that plant growth inhibitor has Effect property and dose.
The further setting of the present invention is:Plant growth inhibitor is wrapped with release membranes, release membranes with a thickness of 0.002mm or 0.004mm or 0.008mm, the plant growth inhibitor dosage in each release membranes are equal.
By using above-mentioned technical proposal, the thickness of release membranes is different therefore the time of its decomposition is different, to keep plant raw It produces inhibitor gradually to release after lawn is trimmed at level ground, inhibits regrowing for lawn, extend what lawn need to trim Interval time.Facilitate maintenance of the later period to lawn.
The further setting of the present invention is:In step s 9,6 ~ 7kg lime will be mixed in every 100 square metres of planting soil Powder disinfection, and be crushed together with middle sand, peat soil, cultivated soil of planting, it is sieved, removes gravelstone sundries and weeds root, then spray a certain amount of Herbicide after ted, treated planting soil is stacked by 3m*3m a pile.
By using above-mentioned technical proposal, the ph value of planting soil is adjusted by pulverized limestone, planting soil ph value is adjusted to weak Alkalinity reduces weeds, guarantees the healthy growth on lawn.Husky and peat soil water imbibition can make planting soil not hardened in simultaneously, and Certain air penetrability is kept, lawn is made not stop growing since planting soil is hardened, so that the growth year on lawn is maintained, Also making simultaneously can be movable in football pitch as early as possible after rain.
The further setting of the present invention is:Grass seeds be English grass and English ryegrass mixed seeding, English grass and The weight ratio of English ryegrass is 7:3.
By using above-mentioned technical proposal, English grass has good wear resistance, can provide suitable friction Power, recovery capability and insect resistace are stronger.He can produce fine and close turf simultaneously, protect turfgrass rootstock from damage, survival Rate is high.And English ryegrass root system is stupefied, and turf speed is fast.By English grass and English ryegrass mixed seeding, for many years Raw rye grass can make lawn come into operation as early as possible, and English grass can make lawn continued propagation in use, generate cause Close turf facilitates the maintenance in lawn later period.Simultaneously because there is the biggish degree of packing in the root of English ryegrass to soil, It can also play the role of protecting English grass root, when making to run in football pitch, lawn is not easy to be uncovered by shoe tack, facilitates The maintenance in later period.
The further setting of the present invention is:Before step S10, i.e., before grass seeds is sowed grass seeds by duster, grass seeds was soaked in preparatory one to two day Enter in water, and 2% ~ 3% paper pulp and 3% ~ 5% pigment are added in water.
By using above-mentioned technical proposal, paper pulp can increase the viscosity of grass seeds, and grass seeds is made to be adhered to ground by paper pulp, subtract A possibility that small grass seeds takes away football pitch by flowing water and strong wind, to improve the rooting rate of grass seeds.Pigment can check grass simultaneously The uniformity that kind is sowed grass seeds by duster makes the more neat of lawn growth, the later period is facilitated to build.
The further setting of the present invention is:After step S10, football pitch is all covered with non-woven fabrics, and fixed with bamboo stick, Immediately fertilising is gone and buy Chinese medicine for emergence after 7 ~ 10 days.
By using above-mentioned technical proposal, one side non-woven fabrics can prevent watering or rainy day heavy rain from drifting away grass seeds, another Aspect non-woven fabrics can also keep the temperature football pitch, and grass seeds is promoted to germinate.Immediately fertilising laxative can prevent browse moth after emergence And morbidity, improve its survival rate.
The present invention has the following advantages that:
1, there is preferable drainage, football pitch ponding can be prevented, and extra water is recycled, for pouring next time It fills, takes full advantage of water resource;
2, the mechanical energy for trampling vibration is converted into electric energy, and converts electrical energy into thermal energy control lawn temperature, realize the energy Distributed use;
3, there is preferable heat insulating ability, football pitch temperature can be controlled in suitable temperature during the cold season, reduce the death on lawn Rate and the probability for spraying the tracheal rupture that catchments;
4, plant growth can be effectively controlled, inhibits plant growth after trimming at level ground, extends the interval time that need to be cut the grass on a lawn.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of embodiment.
Appended drawing reference:1, the first base;2, the second base;3, french drain;4, pipe network;5, general pipeline is sprayed;6, two way water pump;7, Tank;8, metalling;9, loess coarse sands layer;10, planting soil coarse sands layer;11, natural grass layer is planted;12, polystyrene foam Plate;13, vibration power generation plate;14, generate heat battery plate;15, waterproof layer;16, third base;17, bearing plate.
Specific embodiment
Referring to attached drawing, the present invention will be further described.
A kind of construction technology in football pitch, includes the following steps,
S1, earth excavation original soil rammed:Using excavator earth excavation, roller layered rolling, the wet waterside in side are used after transporting It rolls, reaches compactness greater than 90%;
S2, grid is set up:Football field areas establishes rectangle grid using contour interval in absolute altitude figure as side length, every 15 degree If a radiation grid, small timber is nailed on each angle, indicates the absolute altitude of present position;
S3, supertronic:As shown in Figure 1, according to grid bracing wire inspection and adjust place gradient roller or manually tamped, Reach compactness greater than 90%, forms the first base 1;
S4, the polystyrene foam plate 12 that upper 5mm thickness is laid in the first base 1;
S5, vibration power generation plate 13 is installed on polystyrene foam plate 12, and vibration power generation plate 13 is connected to the charging of battery End;
S6, fever battery plate 14 is installed on vibration power generation plate 13, fever battery plate 14 connects the discharge end of battery, in cold season Section is controlled football pitch temperature at 10 degrees Celsius ~ 15 degrees Celsius by fever battery plate 14;
S7, bearing plate 17 is covered on fever battery plate 14, plant growth inhibitor is stirred into backfill, plant growth inhibits Agent is wrapped with release membranes, the plant with a thickness of 0.002mm or 0.004mm or 0.008mm, in each release membranes of release membranes Object growth inhibition agent dose is equal, which is backfilling on bearing plate 17 and is tamped, and forms third base;Release membranes are by that can drop The starch material of solution is made;
S8, it is laid with sodium-based bentonite waterproof carpet:Sodium-based bentonite waterproof carpet is laid with from top to bottom, and is added gasket with steel nail by it It is fixed, overlapping part and nail hole sealing compound encapsulation process, to form waterproof layer 15;
S9, backfill rammed earth:The soil of excavation is backfilled, the second base 2 is formed, the compactness of the second base 2 is greater than 90%;
S10, french drain 3 and installation spray collecting system are excavated:French drain 3 is excavated in the second base 2, is installed and is equipped in french drain 3 Pipe network 4 is connected to by the pipe network 4 of spray head with spray general pipeline 5, and pipe network 4 is equipped with inlet opening, and inlet opening is equipped with for unidirectionally passing through The one-way membrane of water flow, water can enter pipe network 4 by inlet opening, and spray 5 one end general pipeline is equipped with two way water pump 6, two-way water Spray general pipeline 5 is connected to by pump 6 with tank 7, and fertilizer applicator, relief valve and pressure gauge are mounted on spray general pipeline 5;
S11, paving graded broken stone layer 8:The gravel particle diameter of metalling 8 is 30 ~ 50mm;
S12, it is laid with loess coarse sands layer 9:The middle husky peat soil with 5% of incorporation 30% ~ 40% in loess;
S13, it is laid with planting soil coarse sands layer 10:
The disinfection of 6 ~ 7kg pulverized limestone will be mixed in every 100 square metres of planting soil, and be broken together with middle sand, peat soil, cultivated soil of planting Broken, sieving removes gravelstone sundries and weeds root, then teds after spraying a certain amount of herbicide, and treated, and planting soil presses 3m*3m A pile is stacked;
It is laid on loess coarse sands layer after stacking 4 ~ 5 days;
It after laying, is rolled with road roller, first horizontal pressure 2 ~ 3 times, then end compression 2 times, it must be regular by one when rolling The lateral other side, roll next time must and it is last roll 1/3 overlapping, until compactness is 70% ~ 80%;
With wide 60cm, the long 2cm of tooth, the creeper of between cog 2cm, by earth's surface 2cm rake pine wait sow;
S14, the natural grass layer 11 of plantation:It is 7 by weight ratio:3 English grass and Perennial Ryegrass Seed mixing;In grass seeds Before sowing grass seeds by duster, grass seeds was immersed in the water in preparatory one to two day, and 2% ~ 3% paper pulp and 3% ~ 5% pigment are added in water;It will be careless Kind is sowed grass seeds by duster in earth's surface;Football pitch is all covered with non-woven fabrics, and is fixed with bamboo stick, immediately fertilising laxative of emerging after 7 ~ 10 days.
Finally it should be noted that, the one-way membrane in text is the prior art, is such as the special of CN102691175A in notification number Just be specifically disclosed in benefit, no matter how unidirectional film component is arranged, as long as itself be able to achieve water flow unidirectionally pass through it is minimum It is required that thus being no longer subject to disclosure to specific formula.
The above is only a preferred embodiment of the present invention, protection scope of the present invention is not limited merely to above-mentioned implementation Example, all technical solutions belonged under thinking of the present invention all belong to the scope of protection of the present invention.It should be pointed out that for the art Those of ordinary skill for, several improvements and modifications without departing from the principles of the present invention, these improvements and modifications It should be regarded as protection scope of the present invention.

Claims (10)

1. a kind of construction technology in football pitch, it is characterized in that:Include the following steps,
S1, earth excavation original soil rammed:Using excavator earth excavation, roller layered rolling, the wet waterside in side are used after transporting It rolls, reaches compactness greater than 90%;
S2, grid is set up:Football field areas establishes rectangle grid using contour interval in absolute altitude figure as side length, every 15 degree If a radiation grid, small timber is nailed on each angle, indicates the absolute altitude of present position;
S3, supertronic:It according to grid bracing wire inspection and adjusts place gradient roller or is manually tamped, reach compactness Greater than 90%, the first base is formed(1);
S4, it is laid with sodium-based bentonite waterproof carpet:Sodium-based bentonite waterproof carpet is laid with from top to bottom, and is added gasket with steel nail by it It is fixed, overlapping part and nail hole sealing compound encapsulation process, to form waterproof layer(15);
S5, backfill rammed earth:The soil of excavation is backfilled, the second base is formed(2), the second base(2)Compactness be greater than 90%;
S6, french drain is excavated(3)And installation spray collecting system:In the second base(2)Upper excavation french drain(3), in french drain(3)Interior peace It is installed with the pipe network of spray head(4), by pipe network(4)With spray general pipeline(5)Connection, pipe network(4)It is equipped with inlet opening, is set on inlet opening Have for unidirectionally by the one-way membrane of water flow, water can to enter pipe network by inlet opening(4), general pipeline will be sprayed(5)One end installation There is two way water pump(6), two way water pump(6)General pipeline will be sprayed(5)With tank(7)Connection, by fertilizer applicator, relief valve and pressure gauge It is mounted on spray general pipeline(5)On;
S7, paving graded broken stone layer(8):Metalling(8)Gravel particle diameter be 30 ~ 50mm;
S8, it is laid with loess coarse sands layer(9):The middle husky peat soil with 5% of incorporation 30% ~ 40% in loess;
S9, it is laid with planting soil coarse sands layer(10):It after laying, is rolled with road roller, first horizontal pressure 2 ~ 3 times, then end compression 2 Time, when rolling must it is regular from a side to the other side, roll next time must and last time roll 1/3 overlapping, directly It is 70% ~ 80% to compactness;With wide 60cm, the long 2cm of tooth, the creeper of between cog 2cm, by earth's surface 2cm rake pine wait sow;
S10, the natural grass layer of plantation(11):Grass seeds is sowed grass seeds by duster in earth's surface.
2. a kind of construction technology in football pitch according to claim 1, it is characterized in that:Before step S 4, in the first base Layer(1)The polystyrene foam plate of 5mm thickness in upper laying(12).
3. a kind of construction technology in football pitch according to claim 2, it is characterized in that:Before step S4, in polystyrene Cystosepiment(12)Upper installation vibration power generation plate(13), and by vibration power generation plate(13)Connect the charging end of battery.
4. a kind of construction technology in football pitch according to claim 3, it is characterized in that:To generate heat battery plate(14)It is installed to shake Dynamic power generation plate(13)On, generate heat battery plate(14)The discharge end for connecting battery passes through the battery plate that generates heat(14)By football pitch temperature control System is at 10 degrees Celsius ~ 15 degrees Celsius.
5. a kind of construction technology in football pitch according to claim 4, it is characterized in that:By vibration power generation plate(13)Installation In the first base(1)After upper, in vibration power generation plate(13)Upper covering bearing plate(17), plant growth suppression is stirred into backfill Preparation, and the backfill is backfilling into bearing plate(17)Upper compacting forms third base, waterproof layer(15)Positioned at third base (16)Top.
6. a kind of construction technology in football pitch according to claim 5, it is characterized in that:Plant growth inhibitor is wrapped with Release membranes, release membranes with a thickness of 0.002mm or 0.004mm or 0.008mm, the plant growth in each release membranes inhibits Agent dose is equal.
7. a kind of construction technology in football pitch according to claim 1, it is characterized in that:In step s 9, by every 100 squares Incorporation 6 ~ 7kg pulverized limestone disinfection in the planting soil of rice, and be crushed together with middle sand, peat soil, cultivated soil of planting, it is sieved, removes gravelstone Sundries and weeds root, then tedded after spraying a certain amount of herbicide, treated, and planting soil is stacked by 3m*3m a pile.
8. a kind of construction technology in football pitch according to claim 1, it is characterized in that:Grass seeds is English grass and many years The weight ratio of raw rye grass mixed seeding, English grass and English ryegrass is 7:3.
9. a kind of construction technology in football pitch according to claim 1, it is characterized in that:Before step S10, i.e., sprayed in grass seeds Before broadcasting, grass seeds was immersed in the water in preparatory one to two day, and 2% ~ 3% paper pulp and 3% ~ 5% pigment are added in water.
10. a kind of construction technology in football pitch according to claim 1, it is characterized in that:After step S10, non-woven fabrics is used All covering football pitchs, and fixed with bamboo stick, immediately fertilising laxative of emerging after 7 ~ 10 days.
CN201710203040.XA 2017-03-30 2017-03-30 Football field construction process Active CN108914744B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710203040.XA CN108914744B (en) 2017-03-30 2017-03-30 Football field construction process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710203040.XA CN108914744B (en) 2017-03-30 2017-03-30 Football field construction process

Publications (2)

Publication Number Publication Date
CN108914744A true CN108914744A (en) 2018-11-30
CN108914744B CN108914744B (en) 2021-07-13

Family

ID=64402593

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710203040.XA Active CN108914744B (en) 2017-03-30 2017-03-30 Football field construction process

Country Status (1)

Country Link
CN (1) CN108914744B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112942017A (en) * 2021-03-03 2021-06-11 浙江省一建建设集团有限公司 Football field anchoring type mixed lawn and construction method thereof
CN113605173A (en) * 2021-08-09 2021-11-05 广东亚设体育产业有限公司 Sponge football field integral solution method
CN114145188A (en) * 2021-11-17 2022-03-08 广州星卫草业股份有限公司 Construction method for transforming common green land into natural lawn football field

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1199799A (en) * 1998-05-28 1998-11-25 中国灌排技术开发公司 Forced fast drainage method and system for stadium
CN101967789A (en) * 2010-10-19 2011-02-09 张汝栋 Lawn ecological-water circulating system
CN103031795A (en) * 2011-09-30 2013-04-10 泛华建设集团有限公司 Golf course putting green construction method
CN203428981U (en) * 2013-05-22 2014-02-12 广东开源环境科技有限公司 Anti-seepage structure on bottom of constructed wetland pool
CN205617192U (en) * 2016-04-20 2016-10-05 北京泛华新兴体育产业股份有限公司 Pipe drainage system is used in football court
CN205884241U (en) * 2016-06-21 2017-01-18 钟高明 Artificial grass and natural careless sprinkler irrigation system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1199799A (en) * 1998-05-28 1998-11-25 中国灌排技术开发公司 Forced fast drainage method and system for stadium
CN101967789A (en) * 2010-10-19 2011-02-09 张汝栋 Lawn ecological-water circulating system
CN103031795A (en) * 2011-09-30 2013-04-10 泛华建设集团有限公司 Golf course putting green construction method
CN203428981U (en) * 2013-05-22 2014-02-12 广东开源环境科技有限公司 Anti-seepage structure on bottom of constructed wetland pool
CN205617192U (en) * 2016-04-20 2016-10-05 北京泛华新兴体育产业股份有限公司 Pipe drainage system is used in football court
CN205884241U (en) * 2016-06-21 2017-01-18 钟高明 Artificial grass and natural careless sprinkler irrigation system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112942017A (en) * 2021-03-03 2021-06-11 浙江省一建建设集团有限公司 Football field anchoring type mixed lawn and construction method thereof
CN112942017B (en) * 2021-03-03 2022-05-27 浙江省一建建设集团有限公司 Football field anchoring type mixed lawn and construction method thereof
CN113605173A (en) * 2021-08-09 2021-11-05 广东亚设体育产业有限公司 Sponge football field integral solution method
CN114145188A (en) * 2021-11-17 2022-03-08 广州星卫草业股份有限公司 Construction method for transforming common green land into natural lawn football field
CN114145188B (en) * 2021-11-17 2023-10-13 广州星卫草业股份有限公司 Construction method for reforming common green land into natural lawn football field

Also Published As

Publication number Publication date
CN108914744B (en) 2021-07-13

Similar Documents

Publication Publication Date Title
CN106900342B (en) Integrated semi-lithologic high slope vegetation reconstruction protection method
CN104264692B (en) A kind of side slope ecological renovation method
CN101949147B (en) Desert soil moisture conservation method and application
CN105230323B (en) A kind of growth-promoting binary stereoscopic configurations pattern against corrosion suitable for feldspathic sandstone small watershed
CN104196006B (en) Desertification soil remediation method
CN105220698A (en) A kind of rock slope ecological protection method
CN104770257B (en) Method for recovering vegetation through micropore thin films
CN101818499A (en) Revegetation system on steep rocky slopes and implementing method thereof
CN208266847U (en) Quickly repair structure in Gullied suitable for Canal in Loess Area
CN108093729A (en) Side-slope greening and protection method
CN108914744A (en) A kind of construction technology in football pitch
CN106013624A (en) Technical method of green sponge roof modified on basis of grass planting plate
CN112136408B (en) Greening method suitable for sand abrupt slope in high-altitude area
CN101886394B (en) Method for treating shallow disease of expansive soil slope
CN111802183A (en) Ecological slope protection and vertical greening process
CN110447481B (en) Granule spray-seeding construction method
CN101457525B (en) Loess slope heavy layer flaking diseases treatment method
CN202954277U (en) Three-dimensional geonet ecological roadbed side ditch
CN101979780A (en) Quick curing method for powdery soil slope
CN104823675A (en) Production method for pure turf without culture substrate
CN111484278A (en) Ecological concrete, ecological protection slope and construction method of ecological protection slope
CN110547151A (en) Method for treating desert by using straws
CN101775808B (en) Plant net slope protection method
CN113133380B (en) Ecological restoration method for side slopes and abandoned mines in cold and dry areas
CN114931069A (en) Ecological restoration anti-erosion fiber spray-seeding method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant