CN108463295A - 用于制造高压管的方法 - Google Patents
用于制造高压管的方法 Download PDFInfo
- Publication number
- CN108463295A CN108463295A CN201680074532.7A CN201680074532A CN108463295A CN 108463295 A CN108463295 A CN 108463295A CN 201680074532 A CN201680074532 A CN 201680074532A CN 108463295 A CN108463295 A CN 108463295A
- Authority
- CN
- China
- Prior art keywords
- tube
- inner tube
- outer tube
- diameter
- stretching
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21C—MANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES, PROFILES OR LIKE SEMI-MANUFACTURED PRODUCTS OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
- B21C1/00—Manufacture of metal sheets, wire, rods, tubes or like semi-manufactured products by drawing
- B21C1/16—Metal drawing by machines or apparatus in which the drawing action is effected by means other than drums, e.g. by a longitudinally-moved carriage pulling or pushing the work or stock for making metal sheets, rods or tubes
- B21C1/22—Metal drawing by machines or apparatus in which the drawing action is effected by means other than drums, e.g. by a longitudinally-moved carriage pulling or pushing the work or stock for making metal sheets, rods or tubes specially adapted for making tubular articles
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21C—MANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES, PROFILES OR LIKE SEMI-MANUFACTURED PRODUCTS OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
- B21C37/00—Manufacture of metal sheets, rods, wire, tubes, profiles or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
- B21C37/06—Manufacture of metal sheets, rods, wire, tubes, profiles or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of tubes or metal hoses; Combined procedures for making tubes, e.g. for making multi-wall tubes
- B21C37/15—Making tubes of special shape; Making tube fittings
- B21C37/154—Making multi-wall tubes
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L57/00—Protection of pipes or objects of similar shape against external or internal damage or wear
- F16L57/02—Protection of pipes or objects of similar shape against external or internal damage or wear against cracking or buckling
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L58/00—Protection of pipes or pipe fittings against corrosion or incrustation
- F16L58/02—Protection of pipes or pipe fittings against corrosion or incrustation by means of internal or external coatings
- F16L58/04—Coatings characterised by the materials used
- F16L58/08—Coatings characterised by the materials used by metal
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L9/00—Rigid pipes
- F16L9/14—Compound tubes, i.e. made of materials not wholly covered by any one of the preceding groups
- F16L9/147—Compound tubes, i.e. made of materials not wholly covered by any one of the preceding groups comprising only layers of metal and plastics with or without reinforcement
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Metal Extraction Processes (AREA)
- Rigid Pipes And Flexible Pipes (AREA)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202111225506.9A CN114130844A (zh) | 2015-12-18 | 2016-12-16 | 用于制造高压管的方法 |
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE102015122297.3A DE102015122297A1 (de) | 2015-12-18 | 2015-12-18 | Verfahren zum Herstellen eines Hochdruckrohres |
| DE102015122297.3 | 2015-12-18 | ||
| PCT/EP2016/081554 WO2017103189A1 (de) | 2015-12-18 | 2016-12-16 | Verfahren zum herstellen eines hochdruckrohres |
Related Child Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202111225506.9A Division CN114130844A (zh) | 2015-12-18 | 2016-12-16 | 用于制造高压管的方法 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN108463295A true CN108463295A (zh) | 2018-08-28 |
Family
ID=57589038
Family Applications (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202111225506.9A Pending CN114130844A (zh) | 2015-12-18 | 2016-12-16 | 用于制造高压管的方法 |
| CN201680074532.7A Pending CN108463295A (zh) | 2015-12-18 | 2016-12-16 | 用于制造高压管的方法 |
Family Applications Before (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202111225506.9A Pending CN114130844A (zh) | 2015-12-18 | 2016-12-16 | 用于制造高压管的方法 |
Country Status (7)
| Country | Link |
|---|---|
| US (1) | US20200130035A1 (enExample) |
| EP (1) | EP3389887B1 (enExample) |
| JP (3) | JP2019503868A (enExample) |
| CN (2) | CN114130844A (enExample) |
| DE (1) | DE102015122297A1 (enExample) |
| ES (1) | ES2907679T3 (enExample) |
| WO (1) | WO2017103189A1 (enExample) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113454378A (zh) * | 2019-02-22 | 2021-09-28 | 山特维克原料技术德国公开股份有限公司 | 管结构和用于制造这种管结构的方法 |
| CN116833246A (zh) * | 2023-05-30 | 2023-10-03 | 歌尔股份有限公司 | 复合管材的加工方法、复合管材及电子产品 |
Families Citing this family (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE102015122296A1 (de) * | 2015-12-18 | 2017-06-22 | Sandvik Materials Technology Deutschland Gmbh | Sensor für eine Hochdruckleitung sowie Verfahren zu seiner Herstellung |
| CN108890235B (zh) * | 2018-08-22 | 2023-05-05 | 江苏众信绿色管业科技有限公司 | 一种钢衬不锈钢沟槽件及其制造方法 |
| US11826805B2 (en) * | 2019-03-01 | 2023-11-28 | Bhaven Chakravarti | Systems and methods for production of metallurgically bonded clad billet and products thereof, and metallurgically bonded clad billet |
| US11826804B2 (en) * | 2019-03-01 | 2023-11-28 | Bhaven Chakravarti | Systems and methods for production of metallurgically bonded clad billet and products thereof, and metallurgically bonded clad billet |
| JP7637585B2 (ja) | 2020-10-22 | 2025-02-28 | 株式会社日立製作所 | 伸線加工方法 |
| US12440879B2 (en) | 2020-10-22 | 2025-10-14 | Hitachi, Ltd. | Wire drawing method and wire drawing device |
| CN117531864B (zh) * | 2024-01-09 | 2024-03-29 | 太原理工大学 | 一种双金属无缝复合管高效率制备方法 |
| CN120243674B (zh) * | 2025-04-10 | 2025-12-02 | 广东龙丰精密铜管有限公司 | 一种半硬态铜管的制备工艺 |
Citations (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4125924A (en) * | 1977-04-04 | 1978-11-21 | United States Steel Corporation | Method of producing composite metal pipe |
| JPS58104363A (ja) * | 1981-12-17 | 1983-06-21 | Nissan Motor Co Ltd | デイ−ゼルエンジンの燃料噴射管およびその製造方法 |
| EP0445904A2 (de) * | 1990-03-08 | 1991-09-11 | MANNESMANN Aktiengesellschaft | Verfahren zur Herstellung eines metallischen, dickwandigen Hochdruckrohres |
| DE4130524C1 (enExample) * | 1991-09-13 | 1993-01-07 | W.C. Heraeus Gmbh, 6450 Hanau, De | |
| GB2265961A (en) * | 1992-04-09 | 1993-10-13 | Usui Kokusai Sangyo Kk | Pipes |
| GB2312486A (en) * | 1996-04-22 | 1997-10-29 | Usui Kokusai Sangyo Kk | High pressure fuel injection pipe for diesel internal combustion engine |
| JPH11166464A (ja) * | 1997-09-30 | 1999-06-22 | Usui Internatl Ind Co Ltd | 高圧燃料噴射管の製造方法および高圧燃料噴射管 |
| US20020008133A1 (en) * | 2000-06-14 | 2002-01-24 | Katsuhiro Imasaki | Two-layer clad pipe and method for making the same |
| CN1748890A (zh) * | 2004-09-16 | 2006-03-22 | 龙尼星钢铁公司 | 输送管线用双金属管的制造系统及方法 |
| EP2738380A1 (de) * | 2012-11-28 | 2014-06-04 | TI Automotive (Heidelberg) GmbH | Kraftstoffleitung |
Family Cites Families (20)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE869644C (de) * | 1951-03-02 | 1953-03-05 | Johannes Schwarz | Festigkeitserhoehung von unlegierten und legierten gezogenen Rohren |
| BE816851A (fr) * | 1973-07-30 | 1974-10-16 | Procede pour empecher les auto-soudures au cours du recuit de l'acier en lots | |
| US4558721A (en) * | 1982-09-28 | 1985-12-17 | Apx Group Inc. | Double walled tubing |
| JP2575624B2 (ja) * | 1985-07-25 | 1997-01-29 | 臼井国際産業 株式会社 | 高圧燃料噴射管用厚肉細径重合金属管の製造方法 |
| JPS6427716A (en) * | 1987-07-21 | 1989-01-30 | Nippon Steel Corp | Manufacture of corrosion resistant duplex tube |
| JPH0688049B2 (ja) * | 1987-11-06 | 1994-11-09 | 日本鋼管株式会社 | 内面平滑性に優れた継目無管の製造方法 |
| JPH0760315A (ja) * | 1993-08-30 | 1995-03-07 | Sumitomo Metal Ind Ltd | 炭化物被覆工具の再生方法 |
| JPH07199507A (ja) * | 1993-12-29 | 1995-08-04 | Showa Alum Corp | 感光体基盤用アルミニウム管の製造方法 |
| JP3841372B2 (ja) * | 1997-02-26 | 2006-11-01 | 臼井国際産業株式会社 | 高圧燃料噴射管およびその製造方法 |
| JP3872385B2 (ja) * | 2002-06-13 | 2007-01-24 | 株式会社神戸製鋼所 | 溝付きプラグ |
| AU2003902440A0 (en) * | 2003-05-20 | 2003-06-05 | Cladtek International Pty Ltd | Production of clad pipes |
| JP4265380B2 (ja) * | 2003-11-13 | 2009-05-20 | 住友金属工業株式会社 | 引抜鋼管の製造方法、およびこの方法により製造された引抜鋼管 |
| US7596848B2 (en) * | 2004-04-12 | 2009-10-06 | United States Steel Corporation | Method for producing bimetallic line pipe |
| JP2005342744A (ja) * | 2004-06-01 | 2005-12-15 | Sanalloy Industry Co Ltd | 焼結耐摩耗工具とその製造方法 |
| JP4998975B2 (ja) * | 2006-04-20 | 2012-08-15 | 臼井国際産業株式会社 | ディーゼルエンジン用高圧燃料噴射管 |
| CN101234406A (zh) * | 2007-02-01 | 2008-08-06 | 偃师市安力电力设备有限公司 | 复合管的制造方法 |
| BRPI1002661A2 (pt) * | 2010-03-15 | 2012-11-27 | Bundy Refrigeracao Brasil Ind E Com Ltda | processo da junção do tubo bimetálico com terminais de cobre e produto obtido |
| JP5333401B2 (ja) * | 2010-10-04 | 2013-11-06 | 新日鐵住金株式会社 | 金属二重管の製造方法 |
| JP5796516B2 (ja) * | 2011-03-03 | 2015-10-21 | 新日鐵住金株式会社 | 金属二重管の製造方法 |
| CN103191940A (zh) * | 2013-04-02 | 2013-07-10 | 中南大学 | 一种换热金属复合管的制备方法 |
-
2015
- 2015-12-18 DE DE102015122297.3A patent/DE102015122297A1/de active Pending
-
2016
- 2016-12-16 CN CN202111225506.9A patent/CN114130844A/zh active Pending
- 2016-12-16 JP JP2018532130A patent/JP2019503868A/ja active Pending
- 2016-12-16 CN CN201680074532.7A patent/CN108463295A/zh active Pending
- 2016-12-16 EP EP16815842.6A patent/EP3389887B1/de active Active
- 2016-12-16 US US16/061,460 patent/US20200130035A1/en not_active Abandoned
- 2016-12-16 ES ES16815842T patent/ES2907679T3/es active Active
- 2016-12-16 WO PCT/EP2016/081554 patent/WO2017103189A1/de not_active Ceased
-
2021
- 2021-07-21 JP JP2021120563A patent/JP7543222B2/ja active Active
-
2024
- 2024-06-20 JP JP2024099324A patent/JP2024147565A/ja not_active Withdrawn
Patent Citations (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4125924A (en) * | 1977-04-04 | 1978-11-21 | United States Steel Corporation | Method of producing composite metal pipe |
| JPS58104363A (ja) * | 1981-12-17 | 1983-06-21 | Nissan Motor Co Ltd | デイ−ゼルエンジンの燃料噴射管およびその製造方法 |
| EP0445904A2 (de) * | 1990-03-08 | 1991-09-11 | MANNESMANN Aktiengesellschaft | Verfahren zur Herstellung eines metallischen, dickwandigen Hochdruckrohres |
| DE4130524C1 (enExample) * | 1991-09-13 | 1993-01-07 | W.C. Heraeus Gmbh, 6450 Hanau, De | |
| GB2265961A (en) * | 1992-04-09 | 1993-10-13 | Usui Kokusai Sangyo Kk | Pipes |
| GB2312486A (en) * | 1996-04-22 | 1997-10-29 | Usui Kokusai Sangyo Kk | High pressure fuel injection pipe for diesel internal combustion engine |
| JPH11166464A (ja) * | 1997-09-30 | 1999-06-22 | Usui Internatl Ind Co Ltd | 高圧燃料噴射管の製造方法および高圧燃料噴射管 |
| US20020008133A1 (en) * | 2000-06-14 | 2002-01-24 | Katsuhiro Imasaki | Two-layer clad pipe and method for making the same |
| CN1748890A (zh) * | 2004-09-16 | 2006-03-22 | 龙尼星钢铁公司 | 输送管线用双金属管的制造系统及方法 |
| EP2738380A1 (de) * | 2012-11-28 | 2014-06-04 | TI Automotive (Heidelberg) GmbH | Kraftstoffleitung |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113454378A (zh) * | 2019-02-22 | 2021-09-28 | 山特维克原料技术德国公开股份有限公司 | 管结构和用于制造这种管结构的方法 |
| CN116833246A (zh) * | 2023-05-30 | 2023-10-03 | 歌尔股份有限公司 | 复合管材的加工方法、复合管材及电子产品 |
Also Published As
| Publication number | Publication date |
|---|---|
| US20200130035A1 (en) | 2020-04-30 |
| EP3389887B1 (de) | 2022-02-09 |
| WO2017103189A1 (de) | 2017-06-22 |
| EP3389887A1 (de) | 2018-10-24 |
| JP2021181120A (ja) | 2021-11-25 |
| CN114130844A (zh) | 2022-03-04 |
| JP2024147565A (ja) | 2024-10-16 |
| JP2019503868A (ja) | 2019-02-14 |
| JP7543222B2 (ja) | 2024-09-02 |
| DE102015122297A1 (de) | 2017-06-22 |
| ES2907679T3 (es) | 2022-04-26 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN108463295A (zh) | 用于制造高压管的方法 | |
| CN101687232B (zh) | 通过冷轧法进行的超薄壁金属管的制造方法 | |
| US7895870B2 (en) | Method for producing ultra thin wall metallic tube with cold working process | |
| WO2005068098A9 (ja) | 継目無管の製造方法 | |
| CN102056687A (zh) | 用于制造大钢管的方法 | |
| CN100493762C (zh) | 模具、阶梯金属管的制造方法及阶梯金属管 | |
| RU2656901C2 (ru) | Способ изготовления бесшовной металлической трубы | |
| CN113441553B (zh) | 一种无缝管及其冷轧方法 | |
| CN101524722A (zh) | 用冷加工法制造超薄壁金属管的方法 | |
| RU2461436C1 (ru) | Способ изготовления тонкостенных корпусов переменного сечения | |
| RU2538792C1 (ru) | Способ ротационной вытяжки тонкостенных оболочек с утолщениями | |
| RU2426617C1 (ru) | Способ изготовления тонкостенных оболочек | |
| RU2722939C1 (ru) | Способ изготовления осесимметричных деталей сложного профиля | |
| RU2420367C1 (ru) | Способ ротационной вытяжки тонкостенных деталей сложного профиля | |
| RU2341348C2 (ru) | Способ изготовления одногофрового сильфона | |
| WO2011093055A1 (ja) | 小径薄肉管の製造方法 | |
| KR20170100262A (ko) | 고강도 동 합금의 관형 부재 제조방법 | |
| RU2391162C2 (ru) | Способ изготовления тонкостенных труб | |
| RU2799823C1 (ru) | Способ изготовления стальных сложнопрофильных оболочек | |
| CN100393433C (zh) | 金属管的冷轧方法 | |
| KR100724231B1 (ko) | 다이, 층이 지어진 금속관의 제조방법 및 층이 지어진금속관 | |
| RU2319559C1 (ru) | Способ изготовления проволоки | |
| KR20100004840A (ko) | 냉간 추신법에 의한 초박 금속관의 제조 방법 | |
| SU1731332A1 (ru) | Способ изготовлени холодноволоченых прецизионных труб | |
| RU2391161C2 (ru) | Способ изготовления тонкостенных труб |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| CB02 | Change of applicant information |
Country or region after: Germany Address after: Werlte Applicant after: Heruimai Co.,Ltd. Address before: Dusseldorf Applicant before: SANDVIK MATERIALS TECHNOLOGY DEUTSCHLAND GmbH Country or region before: Germany |
|
| CB02 | Change of applicant information | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180828 |
|
| RJ01 | Rejection of invention patent application after publication |