CN107503425A CN201710561477.0A CN201710561477A CN107503425A CN 107503425 A CN107503425 A CN 107503425A CN 201710561477 A CN201710561477 A CN 201710561477A CN 107503425 A CN107503425 A CN 107503425A
Authority
CN
China
Prior art keywords
blanket
eco
drainage ditch
plant
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710561477.0A
Other languages
Chinese (zh)
Inventor
何新杰
殷金岩
任国香
陈晓敏
刘建华
许建新
彭召良
单朴
宋凤鸣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Techand Ecology and Environment Co Ltd
Original Assignee
Shenzhen Techand Ecology and Environment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Techand Ecology and Environment Co Ltd filed Critical Shenzhen Techand Ecology and Environment Co Ltd
Priority to CN201710561477.0A priority Critical patent/CN107503425A/en
Publication of CN107503425A publication Critical patent/CN107503425A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F1/00Methods, systems, or installations for draining-off sewage or storm water
    • E03F1/002Methods, systems, or installations for draining-off sewage or storm water with disposal into the ground, e.g. via dry wells
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G20/00Cultivation of turf, lawn or the like; Apparatus or methods therefor
    • A01G20/10Pre-cultivated sod or turf; Apparatus therefor
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F3/00Biological treatment of water, waste water, or sewage
    • C02F3/32Biological treatment of water, waste water, or sewage characterised by the animals or plants used, e.g. algae
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/04Pipes or fittings specially adapted to sewers

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Water Supply & Treatment (AREA)
  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Biotechnology (AREA)
  • Botany (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Microbiology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Environmental Sciences (AREA)
  • Cultivation Of Plants (AREA)

Abstract

The invention discloses a kind of construction method of eco-drainage ditch, is by blanket by first pre-implantation;Then the vegetation blanket is layed in gutter bottom and/or the side wall of excavation, the plant blanket of pre- training shaping is layed in gutter, root system of plant need only be waited to penetrate gutter bottom and/or side wall, eco-drainage ditch is plastic, so it is fast to build eco-drainage ditch shaping speed using the method for the invention, root system of plant penetrates gutter bottom and/or side wall, solid soil can be realized, soil erosion caused by preventing current scour, and plant being capable of absorption cleaning water body, and the obtained eco-drainage ditch of structure can permeable subterranean water, maintain the ecological balance stable.And the construction cost of the eco-drainage ditch is low, the high gutter of vegetal cover degree can be obtained quickly.

Description

A kind of construction method of eco-drainage ditch
Technical field
The present invention relates to technical field of drainage, and in particular to a kind of construction method of eco-drainage ditch.
Background technology
The gutter general soil newly excavated is exposed, causes water muddy during rain drop erosion, in addition have partly because Soil losses cause situations such as gutter downstream occlusion.If hardened with cement to gutter, it cannot be guaranteed that underground water The abundant supply divided, and destroy original ecological balance.So current environmental gutter has been increasingly becoming one kind and become Gesture, environmental gutter are by the way that in gutter planting aquatic plants, come fixing soil, while plant can also purifying water body.
Environmental gutter is made at present still has many technical barriers.First, for process aspect, nature is passed through State, artificial growth and the mode of sowing, which cultivate some plants and can play a part of solid soil preventing and treating, washes away, but shaping speed It is slower, it is impossible to the defects of playing the effect got instant result, plant and higher cost of labor.Second, from the aspects of plant, in water Ditch does not have a plant grown in the case of water, excess moisture can not be grown well in the case of either soaking for a long time or It is dead;The plant that can grow in the case of soaking in ditch excess moisture or for a long time, can not in the case of the arid of ditch Growth or dead well;Indivedual plant growth rates are too fast, and excessive height stops ditch draining;Vegetal cover degree is not enough made Cause original plant extremely complete into weed growth is too fast, manually cut weeds maintenance and increase cost;Plants landscape effect is unstable, season Section change plant, which substitutes, causes solid native filtering function forfeiture of plant etc..
Want really to promote environmental gutter, it is necessary to find a kind of structure for the eco-drainage ditch that can solve the problem that above mentioned problem Construction method.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of construction method of the fast eco-drainage ditch of shaping speed.
The technical solution used in the present invention is:
A kind of construction method of eco-drainage ditch, comprises the following steps:
Pre-implantation is by blanket;
Excavate gutter;
The vegetation blanket of pre- training shaping is layed in the gutter bottom and/or side wall.
In some preferred embodiments, foreign bamboo grass is contained in the plant of the vegetation blanket.
In some preferred embodiments, the pre-implantation is included by the step of blanket:
Base blanket is impregnated with fertilizer solution;
Plant stem section or plant seedlings are broadcasted sowing on the base blanket.
In some further preferred embodiments, the plant stem section includes foreign bamboo grass blade section.
In some further preferred embodiments, the base blanket is artificial fibrous layer.
In some embodiments still more preferably, the artificial fiber layer is in non-woven fabrics, maintenance blanket, felt It is any.
It is described to be broadcast sowing plant stem section or plant seedlings on the base blanket the step of in some preferred embodiments String is mixed with plant stem section or plant seedlings, is then sown on the base blanket.
In some further preferred embodiments, the string is palm, hemp, rice straw, wheat straw, coconut palm At least one of case fibre.
In some preferred embodiments, base blanket, which is impregnated with after fertilizer solution, also to be included the base blanket being layed in cultivation Step in matrix.
The beneficial effects of the invention are as follows:
The invention provides a kind of construction method of eco-drainage ditch, is by blanket by first pre-implantation;Then by the plant Gutter bottom and/or the side wall of excavation are layed in by blanket, the plant blanket of pre- training shaping is layed in gutter, plant need only be waited Root system penetrates gutter bottom and/or side wall, and eco-drainage ditch is plastic, so building ecology using the method for the invention Gutter shaping speed is fast, and root system of plant penetrates gutter bottom and/or side wall, it is possible to achieve Gu soil, prevents current scour from leading The soil erosion of cause, and plant can absorption cleaning water body, and the obtained eco-drainage ditch of structure can permeable subterranean water, Maintain the ecological balance stable.And the construction cost of the eco-drainage ditch is low, the high draining of vegetal cover degree can be obtained quickly Ditch.
Embodiment
With reference to embodiment, the invention will be further described.
Embodiment 1:
(1) pre-implantation is by blanket
Base blanket is taken, is impregnated with fertilizer solution, the base blanket is artificial fibrous layer, and in the present embodiment, the base blanket is Non-woven fabrics, foreign bamboo grass blade section is broadcasted sowing on the base blanket.Vegetation blanket shaping in 40 days is cultivated, the root system of foreign bamboo grass passes through base blanket, will Plant and base blanket are fixed together.
(2) gutter is excavated
Gutter is excavated, the depth for digging ditch is 40cm, and bottom of trench width is 50cm, and slope is than 1:1.
(3) vegetation blanket is laid
The vegetation blanket that polylith is trained to shaping in advance is layed in the gutter bottom and side wall, foreign bamboo grass after 15-25 days Root system penetrates gutter bottom and side wall, and plant blanket is fixed, and obtained eco-drainage ditch vegetation coverage can approach 100%.Foreign bamboo grass strong stress resistance, drought-enduring and moisture-proof, there is water in gutter or survival, foreign bamboo can be grown when not having water Grass penetrate after gutter bottom and side wall can fixing soil, prevent erosion, additionally it is possible to purifying water body.And foreign bamboo grass with There is colour system change in season, and landscape effect is good, and foreign bamboo grass vegetation blanket can prevent other weed growths, optimizes landscape.
Low using this method structure eco-drainage ditch cost, foreign bamboo grass vegetation blanket can be trained in advance in advance, directly bring use, So after the vegetation blanket of pre- training shaping is layed in into gutter, it is only necessary to 15-25 days, the draining high with regard to vegetal cover degree can be obtained Ditch.
Embodiment 2:
(1) pre-implantation is by blanket
Base blanket is taken, is impregnated with fertilizer solution, is layed on the thick plant cultivation medias of 1cm, the base blanket is artificial fine Layer is tieed up, in the present embodiment, the base blanket is maintenance blanket, takes foreign bamboo grass seedling and string to mix, and is then sown in described On base blanket, the string is palm and coir fibre.Vegetation blanket shaping in 32 days is cultivated, the root system of foreign bamboo grass passes through base blanket, Plant and base blanket are fixed together.
(2) gutter is excavated
Gutter is excavated, the depth for digging ditch is 60cm, and width 30cm, slope is than 1:1.
(3) vegetation blanket is laid
The vegetation blanket that polylith is trained to shaping in advance is layed in the gutter bottom and side wall, foreign bamboo grass after 15-25 days Root system penetrates gutter bottom and side wall, and plant blanket is fixed, and obtained eco-drainage ditch vegetation coverage can approach 100%.Foreign bamboo grass strong stress resistance, drought-enduring and moisture-proof, there is water in gutter or survival, foreign bamboo can be grown when not having water Grass penetrate after gutter bottom and side wall can fixing soil, prevent erosion, additionally it is possible to purifying water body.And foreign bamboo grass with There is colour system change in season, and landscape effect is good, and foreign bamboo grass vegetation blanket can prevent other weed growths, optimizes landscape.
Embodiment 3:
(1) pre-implantation is by blanket
Base blanket is taken, is impregnated with fertilizer solution, is layed on the thick plant cultivation medias of 1cm, the base blanket is artificial fine Layer is tieed up, in the present embodiment, the base blanket is felt, takes foreign bamboo grass blade section and string to mix, is then sown in the base On blanket, the string is hemp, rice straw, wheat straw.Vegetation blanket shaping in 35 days is cultivated, the root system of foreign bamboo grass passes through base Blanket, plant and base blanket are fixed together.
(2) gutter is excavated
Gutter is excavated, the depth for digging ditch is 50cm, and width 40cm, slope is than 1:1.
(3) vegetation blanket is laid
The vegetation blanket that polylith is trained to shaping in advance is layed in the gutter bottom and side wall, foreign bamboo grass after 15-25 days Root system penetrates gutter bottom and side wall, and plant blanket is fixed, and obtained eco-drainage ditch vegetation coverage can approach 100%.Foreign bamboo grass strong stress resistance, drought-enduring and moisture-proof, there is water in gutter or survival, foreign bamboo can be grown when not having water Grass penetrate after gutter bottom and side wall can fixing soil, prevent erosion, additionally it is possible to purifying water body.And foreign bamboo grass with There is colour system change in season, and landscape effect is good, and foreign bamboo grass vegetation blanket can prevent other weed growths, optimizes landscape.

Claims (9)

1. a kind of construction method of eco-drainage ditch, it is characterised in that comprise the following steps:
Pre-implantation is by blanket;
Excavate gutter;
The vegetation blanket of pre- training shaping is layed in the gutter bottom and/or side wall.
2. the construction method of eco-drainage ditch according to claim 1, it is characterised in that contain in the plant of the vegetation blanket There is foreign bamboo grass.
3. the construction method of eco-drainage ditch according to claim 1, it is characterised in that the step of pre-implantation is by blanket Including:
Base blanket is impregnated with fertilizer solution;
Plant stem section or plant seedlings are broadcasted sowing on the base blanket.
4. the construction method of eco-drainage ditch according to claim 3, it is characterised in that the plant stem section includes foreign bamboo Grass blade section.
5. the construction method of eco-drainage ditch according to claim 3, it is characterised in that the base blanket is artificial fiber Layer.
6. the construction method of eco-drainage ditch according to claim 5, it is characterised in that the artificial fiber layer is nonwoven Any of cloth, maintenance blanket, felt.
7. the construction method of the eco-drainage ditch according to claim any one of 3-6, it is characterised in that described in the base The step of plant stem section or plant seedlings are broadcasted sowing on blanket is to mix string with plant stem section or plant seedlings, is then broadcasted sowing On the base blanket.
8. the construction method of eco-drainage ditch according to claim 7, it is characterised in that the string be palm, At least one of hemp, rice straw, wheat straw, coir fibre.
9. the construction method of the eco-drainage ditch according to claim any one of 3-6, it is characterised in that base blanket is impregnated with fertilizer Also include the step base blanket being layed on cultivation matrix after material solution.
CN201710561477.0A 2017-07-11 2017-07-11 A kind of construction method of eco-drainage ditch Pending CN107503425A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710561477.0A CN107503425A (en) 2017-07-11 2017-07-11 A kind of construction method of eco-drainage ditch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710561477.0A CN107503425A (en) 2017-07-11 2017-07-11 A kind of construction method of eco-drainage ditch

Publications (1)

Publication Number Publication Date
CN107503425A true CN107503425A (en) 2017-12-22

Family

ID=60678886

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710561477.0A Pending CN107503425A (en) 2017-07-11 2017-07-11 A kind of construction method of eco-drainage ditch

Country Status (1)

Country Link
CN (1) CN107503425A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110122199A (en) * 2019-05-06 2019-08-16 深圳市铁汉生态环境股份有限公司 Careless blanket, careless blanket formative technology and landscape device
CN112841015A (en) * 2021-01-06 2021-05-28 西安理工大学 Saline-alkali soil ecological drainage ditch structure and rapid construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102011379A (en) * 2010-10-22 2011-04-13 上海交通大学 Pollution control method of farmland drainage in plain tidal river network area
CN102356725A (en) * 2011-08-31 2012-02-22 湖南天泉科技开发有限公司 Production method of ecological grass mat
CN203716271U (en) * 2014-02-25 2014-07-16 中交第一公路勘察设计研究院有限公司 Ecological drainage ditch based on water quality on-line monitoring
CN203716273U (en) * 2014-02-25 2014-07-16 中交第一公路勘察设计研究院有限公司 Multifunctional ecological draining gutter
CN204539762U (en) * 2015-01-21 2015-08-12 深圳市铁汉生态环境股份有限公司 A kind of numb coconut palm geotechnical grid stereo plant carpet repaired for side slope
CN204875668U (en) * 2015-05-26 2015-12-16 深圳市铁汉生态环境股份有限公司 Thin layer plant blanket

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102011379A (en) * 2010-10-22 2011-04-13 上海交通大学 Pollution control method of farmland drainage in plain tidal river network area
CN102356725A (en) * 2011-08-31 2012-02-22 湖南天泉科技开发有限公司 Production method of ecological grass mat
CN203716271U (en) * 2014-02-25 2014-07-16 中交第一公路勘察设计研究院有限公司 Ecological drainage ditch based on water quality on-line monitoring
CN203716273U (en) * 2014-02-25 2014-07-16 中交第一公路勘察设计研究院有限公司 Multifunctional ecological draining gutter
CN204539762U (en) * 2015-01-21 2015-08-12 深圳市铁汉生态环境股份有限公司 A kind of numb coconut palm geotechnical grid stereo plant carpet repaired for side slope
CN204875668U (en) * 2015-05-26 2015-12-16 深圳市铁汉生态环境股份有限公司 Thin layer plant blanket

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110122199A (en) * 2019-05-06 2019-08-16 深圳市铁汉生态环境股份有限公司 Careless blanket, careless blanket formative technology and landscape device
CN112841015A (en) * 2021-01-06 2021-05-28 西安理工大学 Saline-alkali soil ecological drainage ditch structure and rapid construction method thereof

Similar Documents

Publication Publication Date Title
CN108834462B (en) Vegetation configuration method for preventing and treating water and soil loss of dry-hot valley gully development area
CN105103843A (en) Vegetation configuration method for preventing water and soil loss of mine dump of dry-hot valley
CN104542220A (en) Plant-growing meshwork carpet for slope restoration and slope restoration method
KR100729417B1 (en) Cutting area greening structure and soil spray greening method
CN105917903B (en) A kind of soil thin layer stony cut slope corrodes the soil and water conservation method on abrupt slope
CN105993789A (en) North America holly tender branch cutting fast asexual propagation method
CN108476649A (en) A kind of gardens abrupt slope plant landscape method
KR100654174B1 (en) A seed line net for greening
CN103210812A (en) Olive ridge culturing method
CN109168391A (en) A kind of method of iron tailings soil
CN112449786A (en) Novel nest type soil fixation and salt elimination soil improvement system and construction method thereof
CN108934702A (en) A kind of breeding method of moderate saline-alkali soil straight-bar Chinese tallow tree seedling
AU2010345507A1 (en) Vegetation element for greening artificial or natural surfaces having low and/or high plants and method for producing the vegetation element
CN209435883U (en) A kind of salt-soda soil cultivation of plants structure
CN105052492A (en) Cultivating method for wild bletilla striata variety
CN107503425A (en) A kind of construction method of eco-drainage ditch
CN113216222A (en) Green plant ecological side slope protection system with communication structure and construction method thereof
CN205337116U (en) Straw fixes sand store water and plants blanket
CN108040737A (en) A kind of root system limits grape field getting fat forcing culture method
KR20150137523A (en) Fruit excellent tree seedling production method using the small network
CN110679373A (en) Planting and maintaining method for nursery stock in muck area
CN214070574U (en) Novel nest type soil fixation and salt discharge soil improvement system
CN105766297A (en) Dry land planting method of willow herb
CN109699380A (en) A kind of diversiform-leaved poplar is nursed young plants in hothouses method
KR100580927B1 (en) Method manufacturing vegetation mat using of porous film

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination