CN107152145A - A kind of stone material flooring construction method - Google Patents
A kind of stone material flooring construction method Download PDFInfo
- Publication number
- CN107152145A CN107152145A CN201710421162.6A CN201710421162A CN107152145A CN 107152145 A CN107152145 A CN 107152145A CN 201710421162 A CN201710421162 A CN 201710421162A CN 107152145 A CN107152145 A CN 107152145A
- Authority
- CN
- China
- Prior art keywords
- plate
- stone material
- stone
- paving
- skirting board
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/02—Flooring or floor layers composed of a number of similar elements
- E04F15/08—Flooring or floor layers composed of a number of similar elements only of stone or stone-like material, e.g. ceramics, concrete; of glass or with a top layer of stone or stone-like material, e.g. ceramics, concrete or glass
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F19/00—Other details of constructional parts for finishing work on buildings
- E04F19/02—Borders; Finishing strips, e.g. beadings; Light coves
- E04F19/04—Borders; Finishing strips, e.g. beadings; Light coves for use between floor or ceiling and wall, e.g. skirtings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F19/00—Other details of constructional parts for finishing work on buildings
- E04F19/02—Borders; Finishing strips, e.g. beadings; Light coves
- E04F19/04—Borders; Finishing strips, e.g. beadings; Light coves for use between floor or ceiling and wall, e.g. skirtings
- E04F19/0459—Borders; Finishing strips, e.g. beadings; Light coves for use between floor or ceiling and wall, e.g. skirtings characterised by the fixing method
- E04F19/0477—Plinths fixed by means of adhesive
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F19/00—Other details of constructional parts for finishing work on buildings
- E04F19/02—Borders; Finishing strips, e.g. beadings; Light coves
- E04F19/04—Borders; Finishing strips, e.g. beadings; Light coves for use between floor or ceiling and wall, e.g. skirtings
- E04F2019/0404—Borders; Finishing strips, e.g. beadings; Light coves for use between floor or ceiling and wall, e.g. skirtings characterised by the material
- E04F2019/0418—Borders; Finishing strips, e.g. beadings; Light coves for use between floor or ceiling and wall, e.g. skirtings characterised by the material of stone or stone like material, e.g. ceramics, concrete; of glass
Abstract
The invention discloses a kind of stone material flooring construction method, belong to the realm of building construction, its technical scheme is as follows, by preparation of construction, clear up basic unit, look for absolute altitude, snap the line, examination is spelled and examination row, paving screed-coat mortar, paving stone plate, the cementation of fissures, wiping seam, maintenance, patch skirting board, waxing are effectively constructed to stone material flooring, it is efficiently modified arrangement and method for construction, effect is connected with improving, the advantage of service life is improved.
Description
Technical field
The present invention relates to the realm of building construction, more particularly to a kind of stone material flooring construction method.
Background technology
Stone material flooring refers to the flooring that its surface material is done by stone material, and it is also belong to block flooring one
Kind;The scope of block flooring is relatively wide, such as stone material, colored glaze floor tile, Anti-slid floor tile;Their main distinction is
Block flooring be refer to and stone material, colored glaze floor tile, Anti-slid floor tile etc. general designation, and stone material flooring directly refers to its surface layer
Material material therefor.
The today constantly lifted in current people's daily life level, decorated and selected in building now using stone material flooring
Increasingly favored in selecting.
But stone material bottom plate and stone material skirting board installation effect are poor when the construction overall in construction at present, especially
Stone material skirting board is larger due to weight itself, and due to stone material meta-alkalescence, causes connection effect poor, when connection effect is bad
Very easy generation comes off, and causes stone material flooring using effect poor.
The content of the invention
It is an object of the invention to provide a kind of stone material flooring construction method, it, which has, improves integrated connection effect, improves
The advantage of service life.
A kind of stone material flooring construction method, comprises the following steps:
Step one:Preparation of construction:Stone plate, building material, construction equipment, instrument processing prepare;
Step 2:Clear up basic unit:Substrate surface debris is cleared up, and skin patching is smooth;
Step 3:Look for absolute altitude, snap the line:Elevation line is introduced in from passageway unification toward each room, is played on room bed course orthogonal
Control cross hairs, and lead to metope bottom, be used as check and control stone material Board position criterion;
Step 4:Examination is spelled and examination row:Examination spelling is carried out to the stone plate in each room before laying, and is numbered successively;
Step 5:Spread screed-coat mortar:Surface layer screed-coat thickness is made by horizontal line, cross hairs has been drawn, lay cement mortar levelling
Layer;
Using 1:3 dry cement mortar, denseness until pinch agglomerating with hand, it is not loose untill;Watering moistening bed course, sweeps before paving
The ratio of mud for 0.4~0.5 plain-water slurry once, then big thick stick is scraped after completing, is made real toward the mortar that paves at doorway from inner, use
Trowel is levelling, and its thickness is higher by by the fixed 1~2mm of screed-coat thickness of horizontal line;
Step 6:Spread stone plate:First indulging paving and horizontal paving in room inwards from doorway by line position, several make standard, and then subregion is by row
Row, line position are paved;
Step 7:The cementation of fissures, wiping seam:After plate has paved 1~2h start, first by the color of sheet material be tuned into white cement and pigment with
Sheet material tone it is close 1:1 thin cement slurry, loading smallmouth kettle, which blows slowly, to be poured into the gap between plate, and the slurries flowed in tape edge are used
In ox horn scraper feeding seam, untill full;
After 1~2h, then slurry wiping seam is dipped in cotton yarn group to plain smooth, the slurries sticked in plate face are cleaned with wet loose thread conveniently;
Joint gap the greater, first with 1:Then 1 cement mortar or fine sand joint filling reuse the water of same color to 2/3 thickness of slab
Mud mill base is embedding to wipe closely knit, and cleans the mortar in plate face with wet loose thread;
Step 8:Maintenance:After the complete 24h of wiping seam of being in the milk, covered using the sawdust totally moistened, wet curing is no less than 7d;
Step 9:Paste skirting board:By the pre-brush water moistening of skirt back, dry;
The rendering layer of metope is struck off, until base putty layer, metope clean it up;
Strike off discharging base putty layer, it is ensured that the flatness of base putty layer surface;
Stone material skirting board and metope use structure glue, and structure glue thickness is slightly less than or equal to depth of plastering;
Between stone material skirting board, and between stone material skirting board and metope, marble glue is used;
Interim good support, supporting time at least 24 hours are fixed away from metope side to stone material skirting board;
Step 10:Waxing:When binder course strength of cement mortar reaches requirement, each procedure completion no longer upper people, waxed,
Comprise the following steps:
Pickling is entered to stone plate, stone material skirting board;
To the stone plate after pickling, stone material skirting board, progress, which is dried, cleans;
Wax, kerosene are pressed 1:4 weight ratio is put into heating in bucket, melted at a temperature of 120~130 DEG C, after incorporation rosin
It is tuned into scattered paste shape standby;
Wax is stained with cloth or clean flax silk and is evenly coated in stone plate, on stone material skirting board, after wax is dry, with being surrounded by burlap or fine canvas
Wooden unit replace oilstone, polished on the mill of stone mill, until terrazzo surface it is smooth it is clean it is bright untill, strike-on of laying equal stress on
Wax, polishing one time.
By using above-mentioned technical proposal, structure glue passes through mica to the good connecting effect of stone material during bonding
Glue and outside are directly preliminary more than the progress of stone material skirting board to be connected, and enables structure glue to have longer time holding initial
Connection status so that later stage structure glue solidification after can keep preferable connection status for a long time, effectively raise connection
Effect, improve service life.
Further, step 2:The dust stratification of substrate surface, greasy dirt, laitance and debris are cleaned out, to local convex-concave not
Prosposition is put, and by convex chipping, recess uses 1:3 mortar filling-in.
By using above-mentioned technical proposal, effectively scraggly position is quickly handled, it is overall without carrying out
Whole reparations, improves the efficiency of construction.
Further, step 4:The gap between plate, verification plate and the phase at metope, post, hole etc. are examined in examination after spelling
Mutual position, then the once row of being tried, spread dry sand band in room, and thickness is not less than 30mm, stone plate is sequenced, and examination is numbered after sequencing
Pile up neatly, and remove abrasive band.
By using above-mentioned technical proposal, arrangement for the first time is effectively spliced into pattern by stone plate, effective to improve
Aesthetic measure, and the modification in later stage is reduced, efficiency of construction is improved, and effectively marked, it is easy to later stage rearrangement, and again
Carry out second to arrange, effective simulation concrete bonds the state after stone plate, be convenient for modification, improve construction effect.
Further, step 6:Paving before plate is soaked in advance dry in the shade after it is standby, by line position first from doorway inwards indulge paving with
In room it is horizontal paving several make standard, then subregion by ranks, line position pave;When there is middle colonnade interior, first colonnade is completed, then
Outwards laid along colonnade both sides;
Plate corner is lain on the levelling cement sand bed of dry completed simultaneously during paving, after first examination paving is suitable, plate is opened
Block pours the plain-water slurry that one layer of ratio of mud is 0.5 in cement mortar, and plate is lightly then directed to original position and put down, rubber is used
The sheeting caps that hammer or wooden mallet touch are put on plate makes plate plain, levelling with iron spirit level according to horizontal line, makes plate corner smooth,
Opposite joint, to flower meet the requirements;After having spread, then spread to both sides and direction of retreat order edge, untill having spread, between stone plate
Gap width be not more than 1mm.
By using above-mentioned technical proposal, the installation effect of stone plate is effectively raised, the flatness after construction is improved,
Gap is reduced, the service life in later stage is improved.
Further, step 6:It was found that space, stone plate is started with row laying again after mortar mending reality.
By using above-mentioned technical proposal, the effective connection space for reducing stone plate, it is ensured that energy after stone plate is fixed
There is good support, improve service life.
Further, step 9:When skirting board at external corner is at 45 ° intersecting, plate one end should be cut in a pre-installation at 45 °
Angle.
By using above-mentioned technical proposal, it is easy to the skirting board at balcony to be installed.
In summary, the invention has the advantages that:
1st, Optimizing Construction Scheme effectively raises the efficiency of construction;
2nd, stone plate and skirt board mounting structure firmly, stably, effectively improve service life;
Change, made up conveniently when the 3rd, constructing, improve efficiency of construction.
Brief description of the drawings
Fig. 1 is the construction process figure of the present embodiment.
Embodiment
The present invention is described in further detail below in conjunction with accompanying drawing.
A kind of stone material flooring construction method, comprises the following steps:
Step one:Preparation of construction:Stone plate, building material, construction equipment, instrument processing prepare, and are effectively easy to people to carry out
The construction in later stage, improves efficiency of construction.
Step 2:Clear up basic unit:Substrate surface debris is cleared up, and skin patching is smooth, by the dust stratification of substrate surface, greasy dirt,
Laitance and debris are cleaned out, and to local rough and uneven in surface position, by convex chipping, recess uses 1:3 mortar filling-in;
Effectively scraggly position is quickly handled, without carrying out overall whole reparation, the efficiency of construction is improved,
Avoiding the surface of out-of-flatness causes stone plate installation unstable.
Step 3:Look for absolute altitude, snap the line:Elevation line is introduced in from passageway unification toward each room, bullet is mutual on room bed course
Vertical control cross hairs, and metope bottom is led to, it is used as the criterion for checking and controlling stone material Board position.
Step 4:Examination is spelled and examination row:Examination spelling is carried out to the stone plate in each room before laying, and is numbered successively, just
Arranged in design and later stage;
The gap between plate, verification plate and the mutual alignment at metope, post, hole etc. are examined in examination after spelling, then are once tried
Row, the paving dry sand band in room, thickness is not less than 30mm, stone plate is sequenced, and numbering is piled up neatly after examination is sequenced, and removes sand
Band;
Arrangement is effectively spliced into pattern by stone plate for the first time, effectively improves aesthetic measure, and the modification in reduction later stage,
Efficiency of construction is improved, and is effectively marked, is easy to later stage rearrangement, and carries out second of arrangement, effective simulation again
State after concrete binding stone plate, is convenient for modification, improves construction effect.
Step 5:Spread screed-coat mortar:Surface layer screed-coat thickness is made by horizontal line, cross hairs has been drawn, lay cement mortar
Screed-coat.
Using 1:3 dry cement mortar, denseness until pinch agglomerating with hand, it is not loose untill;Watering moistening pad before paving
Layer, was sweeping plain-water slurry that the ratio of mud is 0.4~0.5 once, then from inner toward the mortar that paves at doorway, big thick stick, bat is scraped after completing
Real, levelling with trowel, its thickness is higher by by the fixed 1~2mm of screed-coat thickness of horizontal line;
Effectively raise levelling effect, it is ensured that surface can keep smooth when laying, be easy to stone plate effectively to be spread
If improving the efficiency of construction in later stage.
Step 6:Spread stone plate:First indulging paving and horizontal paving in room inwards from doorway by line position, several make standard, and then subregion is pressed
Ranks, line position are paved;
Paving before plate is soaked in advance dry in the shade after it is standby, by line position first from doorway inwards indulge paving and room in it is horizontal spread several make standard,
Then subregion is paved by ranks, line position;When there is middle colonnade interior, first colonnade is completed, then outwards laid along colonnade both sides,
Arranged by rule, be convenient for people to be arranged, improved arrangement efficiency, and also allow for people and changed in real time, improved
Laying effect;
Plate corner is lain on the levelling cement sand bed of dry completed simultaneously during paving, after first examination paving is suitable, plate is opened
Block pours the plain-water slurry that one layer of ratio of mud is 0.5 in cement mortar, and plate is lightly then directed to original position and put down, rubber is used
The sheeting caps that hammer or wooden mallet touch are put on plate makes plate plain, levelling with iron spirit level according to horizontal line, makes plate corner smooth,
Opposite joint, to flower meet the requirements;After having spread, then spread to both sides and direction of retreat order edge, untill having spread, between stone plate
Gap width be not more than 1mm;
The installation effect of stone plate is effectively raised, the flatness after construction is improved, gap is reduced, the use longevity in later stage is improved
Life;
It was found that space, stone plate is started with row laying again after mortar mending reality;
The effective connection space for reducing stone plate, it is ensured that stone plate can have good support after fixing, and improve and use the longevity
Life.
Step 7:The cementation of fissures, wiping seam:Start after plate has paved 1~2h, first adjusted by the color white cement and pigment of sheet material
Into close with sheet material tone 1:1 thin cement slurry, loading smallmouth kettle, which blows slowly, to be poured into the gap between plate, flows the slurry in tape edge
Liquid is with ox horn scraper feeding seam, untill full;
After 1~2h, then slurry wiping seam is dipped in cotton yarn group to plain smooth, the slurries sticked in plate face are cleaned with wet loose thread conveniently;
Joint gap the greater, first with 1:Then 1 cement mortar or fine sand joint filling reuse the water of same color to 2/3 thickness of slab
Mud mill base is embedding to wipe closely knit, and cleans the mortar in plate face with wet loose thread;
Ensure that the gap between stone plate keeps less situation, improve the effect of laying, improve service life, and it is also effective
Improve effect attractive in appearance.
Step 8:Maintenance:After the complete 24h of wiping seam of being in the milk, covered using the sawdust totally moistened, wet curing is no less than 7d,
Effective maintenance stone plate, improves laying effect.
Step 9:Paste skirting board:By the pre-brush water moistening of skirt back, dry;
The rendering layer of metope is struck off, until base putty layer, metope clean it up;
Strike off discharging base putty layer, it is ensured that the flatness of base putty layer surface;
Stone material skirting board and metope use structure glue, and structure glue thickness is slightly less than or equal to depth of plastering;
Between stone material skirting board, and between stone material skirting board and metope, marble glue is used;
Interim good support, supporting time at least 24 hours are fixed away from metope side to stone material skirting board;
Structure glue is directly more than stone material skirt during bonding to the good connecting effect of stone material by mica glue and outside
Plate progress is preliminary to be connected, and enables structure glue to have longer time to keep initial connection status, so that in later stage structure
Preferable connection status can be kept for a long time after gelling is solid, the effect of connection is effectively raised, and improve service life;
When skirting board at external corner is at 45 ° intersecting, plate one end should be cut into 45° angle in a pre-installation, be easy to the skirt at balcony
Plate is installed.
Step 10:Waxing:When binder course strength of cement mortar reaches requirement, each procedure completion no longer upper people, carry out
Waxing, comprises the following steps:
Pickling is entered to stone plate, stone material skirting board;
To the stone plate after pickling, stone material skirting board, progress, which is dried, is cleaned, and the effective alkaline environment for neutralizing stone plate is improved
The service life in later stage, improves bond effect;
Wax, kerosene are pressed 1:4 weight ratio is put into heating in bucket, melted at a temperature of 120~130 DEG C, after incorporation rosin
It is tuned into scattered paste shape standby;
Wax is stained with cloth or clean flax silk and is evenly coated in stone plate, on stone material skirting board, after wax is dry, with being surrounded by burlap or fine canvas
Wooden unit replace oilstone, polished on the mill of stone mill, until terrazzo surface it is smooth it is clean it is bright untill, strike-on of laying equal stress on
Wax, polishing one time, it is ensured that the finish of stone material plate surface, improve decorative effect.
This specific embodiment is only explanation of the invention, and it is not limitation of the present invention, people in the art
Member can make the modification without creative contribution to the present embodiment as needed after this specification is read, but as long as at this
All protected in the right of invention by Patent Law.
Claims (6)
1. a kind of stone material flooring construction method, it is characterized in that:Comprise the following steps:
Step one:Preparation of construction:Stone plate, building material, construction equipment, instrument processing prepare;
Step 2:Clear up basic unit:Substrate surface debris is cleared up, and skin patching is smooth;
Step 3:Look for absolute altitude, snap the line:Elevation line is introduced in from passageway unification toward each room, is played on room bed course orthogonal
Control cross hairs, and lead to metope bottom, be used as check and control stone material Board position criterion;
Step 4:Examination is spelled and examination row:Examination spelling is carried out to the stone plate in each room before laying, and is numbered successively;
Step 5:Spread screed-coat mortar:Surface layer screed-coat thickness is made by horizontal line, cross hairs has been drawn, lay cement mortar levelling
Layer;
Using 1:3 dry cement mortar, denseness until pinch agglomerating with hand, it is not loose untill;Watering moistening bed course, sweeps before paving
The ratio of mud for 0.4~0.5 plain-water slurry once, then big thick stick is scraped after completing, is made real toward the mortar that paves at doorway from inner, use
Trowel is levelling, and its thickness is higher by by the fixed 1~2mm of screed-coat thickness of horizontal line;
Step 6:Spread stone plate:First indulging paving and horizontal paving in room inwards from doorway by line position, several make standard, and then subregion is by row
Row, line position are paved;
Step 7:The cementation of fissures, wiping seam:After plate has paved 1~2h start, first by the color of sheet material be tuned into white cement and pigment with
Sheet material tone it is close 1:1 thin cement slurry, loading smallmouth kettle, which blows slowly, to be poured into the gap between plate, and the slurries flowed in tape edge are used
In ox horn scraper feeding seam, untill full;
After 1~2h, then slurry wiping seam is dipped in cotton yarn group to plain smooth, the slurries sticked in plate face are cleaned with wet loose thread conveniently;
Joint gap the greater, first with 1:Then 1 cement mortar or fine sand joint filling reuse the water of same color to 2/3 thickness of slab
Mud mill base is embedding to wipe closely knit, and cleans the mortar in plate face with wet loose thread;
Step 8:Maintenance:After the complete 24h of wiping seam of being in the milk, covered using the sawdust totally moistened, wet curing is no less than 7d;
Step 9:Paste skirting board:By the pre-brush water moistening of skirt back, dry;
The rendering layer of metope is struck off, until base putty layer, metope clean it up;
Strike off discharging base putty layer, it is ensured that the flatness of base putty layer surface;
Stone material skirting board and metope use structure glue, and structure glue thickness is slightly less than or equal to depth of plastering;
Between stone material skirting board, and between stone material skirting board and metope, marble glue is used;
Interim good support, supporting time at least 24 hours are fixed away from metope side to stone material skirting board;
Step 10:Waxing:When binder course strength of cement mortar reaches requirement, each procedure completion no longer upper people, waxed,
Comprise the following steps:
Pickling is entered to stone plate, stone material skirting board;
To the stone plate after pickling, stone material skirting board, progress, which is dried, cleans;
Wax, kerosene are pressed 1:4 weight ratio is put into heating in bucket, melted at a temperature of 120~130 DEG C, after incorporation rosin
It is tuned into scattered paste shape standby;
Wax is stained with cloth or clean flax silk and is evenly coated in stone plate, on stone material skirting board, after wax is dry, with being surrounded by burlap or fine canvas
Wooden unit replace oilstone, polished on the mill of stone mill, until terrazzo surface it is smooth it is clean it is bright untill, strike-on of laying equal stress on
Wax, polishing one time.
2. a kind of stone material flooring construction method according to claim 1, it is characterized in that:Step 2:By substrate surface
Dust stratification, greasy dirt, laitance and debris are cleaned out, and to local rough and uneven in surface position, by convex chipping, recess uses 1:3 mortar filling-in.
3. a kind of stone material flooring construction method according to claim 2, it is characterized in that:Step 4:Inspection panel after examination is spelled
Gap between block, verification plate and the mutual alignment at metope, post, hole etc., then the once row of being tried, spread dry sand in room
Band, thickness is not less than 30mm, and stone plate is sequenced, and numbering is piled up neatly after examination is sequenced, and removes abrasive band.
4. a kind of stone material flooring construction method according to claim 3, it is characterized in that:Step 6:It is before paving that plate is pre-
First soak it is standby after drying in the shade, by line position first from doorway inwards indulge paving and room in it is horizontal paving several make standard, then subregion press ranks, line
Pave position;When there is middle colonnade interior, first colonnade is completed, then outwards laid along colonnade both sides;
Plate corner is lain on the levelling cement sand bed of dry completed simultaneously during paving, after first examination paving is suitable, plate is opened
Block pours the plain-water slurry that one layer of ratio of mud is 0.5 in cement mortar, and plate is lightly then directed to original position and put down, rubber is used
The sheeting caps that hammer or wooden mallet touch are put on plate makes plate plain, levelling with iron spirit level according to horizontal line, makes plate corner smooth,
Opposite joint, to flower meet the requirements;After having spread, then spread to both sides and direction of retreat order edge, untill having spread, between stone plate
Gap width be not more than 1mm.
5. a kind of stone material flooring construction method according to claim 4, it is characterized in that:Step 6:It was found that space, by stone
Material plate is started with row laying again after mortar mending reality.
6. a kind of stone material flooring construction method according to claim 5, it is characterized in that:Step 9:Skirt at external corner
When plate is at 45 ° intersecting, plate one end should be cut into 45° angle in a pre-installation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710421162.6A CN107152145A (en) | 2017-06-07 | 2017-06-07 | A kind of stone material flooring construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710421162.6A CN107152145A (en) | 2017-06-07 | 2017-06-07 | A kind of stone material flooring construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107152145A true CN107152145A (en) | 2017-09-12 |
Family
ID=59794856
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710421162.6A Pending CN107152145A (en) | 2017-06-07 | 2017-06-07 | A kind of stone material flooring construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107152145A (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107663053A (en) * | 2017-10-24 | 2018-02-06 | 河北晨阳工贸集团有限公司 | A kind of soft and graceful soft rock is attached to the construction technology in the decoration of flooring |
CN107859283A (en) * | 2017-10-11 | 2018-03-30 | 詹焕辉 | A kind of building(Ground)The construction method of face skirting waterproof |
CN108385932A (en) * | 2018-03-09 | 2018-08-10 | 北京市建筑工程装饰集团有限公司 | The laying method of macroplate stone material |
CN109017109A (en) * | 2018-07-27 | 2018-12-18 | 苏州金螳螂文化发展股份有限公司 | A kind of water knife parquets board manufacturing method and water knife parquets pavement construction method |
CN109826404A (en) * | 2019-01-29 | 2019-05-31 | 台州铭星装饰工程股份有限公司 | A kind of wall decoration technique |
CN110130642A (en) * | 2019-05-27 | 2019-08-16 | 西安市鑫龙建筑装饰工程(集团)有限公司 | A kind of stone floor construction technology |
CN111203987A (en) * | 2020-01-20 | 2020-05-29 | 深圳市奇信集团股份有限公司 | Stone floor construction method |
CN113494163A (en) * | 2021-07-29 | 2021-10-12 | 杭州良工装饰有限公司 | Indoor ground construction method |
CN113833230A (en) * | 2021-10-18 | 2021-12-24 | 中国建筑第四工程局有限公司 | Shale brick terrace construction process in koji making and fermentation room |
CN114293733A (en) * | 2021-12-07 | 2022-04-08 | 苏州金螳螂文化发展股份有限公司 | Surface wax baking treatment process for decorative floor |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1093137A (en) * | 1993-04-02 | 1994-10-05 | 王有忠 | Flooring and polishing technology of granite and marble floor |
CN102505831A (en) * | 2011-12-22 | 2012-06-20 | 深圳市深装总装饰工程工业有限公司 | Construction method for paving plasters on ground and manmade stone |
CN104047410A (en) * | 2014-06-11 | 2014-09-17 | 江南园林有限公司 | Stone paving construction method |
CN105178559A (en) * | 2015-10-08 | 2015-12-23 | 哈尔滨世纪天诚装饰工程有限公司 | Novel construction method for granite ground |
CN106760366A (en) * | 2016-11-11 | 2017-05-31 | 袁云秀 | Based on the construction technology for improving marble hybrid procedure in furniture exhibition room |
-
2017
- 2017-06-07 CN CN201710421162.6A patent/CN107152145A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1093137A (en) * | 1993-04-02 | 1994-10-05 | 王有忠 | Flooring and polishing technology of granite and marble floor |
CN102505831A (en) * | 2011-12-22 | 2012-06-20 | 深圳市深装总装饰工程工业有限公司 | Construction method for paving plasters on ground and manmade stone |
CN104047410A (en) * | 2014-06-11 | 2014-09-17 | 江南园林有限公司 | Stone paving construction method |
CN105178559A (en) * | 2015-10-08 | 2015-12-23 | 哈尔滨世纪天诚装饰工程有限公司 | Novel construction method for granite ground |
CN106760366A (en) * | 2016-11-11 | 2017-05-31 | 袁云秀 | Based on the construction technology for improving marble hybrid procedure in furniture exhibition room |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107859283A (en) * | 2017-10-11 | 2018-03-30 | 詹焕辉 | A kind of building(Ground)The construction method of face skirting waterproof |
CN107663053A (en) * | 2017-10-24 | 2018-02-06 | 河北晨阳工贸集团有限公司 | A kind of soft and graceful soft rock is attached to the construction technology in the decoration of flooring |
CN107663053B (en) * | 2017-10-24 | 2020-07-31 | 河北晨阳工贸集团有限公司 | Construction process for pasting soft and beautiful soft stone in indoor floor decoration |
CN108385932A (en) * | 2018-03-09 | 2018-08-10 | 北京市建筑工程装饰集团有限公司 | The laying method of macroplate stone material |
CN108385932B (en) * | 2018-03-09 | 2023-08-25 | 北京市建筑工程装饰集团有限公司 | Paving method for large plate stone |
CN109017109A (en) * | 2018-07-27 | 2018-12-18 | 苏州金螳螂文化发展股份有限公司 | A kind of water knife parquets board manufacturing method and water knife parquets pavement construction method |
CN109826404A (en) * | 2019-01-29 | 2019-05-31 | 台州铭星装饰工程股份有限公司 | A kind of wall decoration technique |
CN110130642A (en) * | 2019-05-27 | 2019-08-16 | 西安市鑫龙建筑装饰工程(集团)有限公司 | A kind of stone floor construction technology |
CN111203987A (en) * | 2020-01-20 | 2020-05-29 | 深圳市奇信集团股份有限公司 | Stone floor construction method |
CN113494163A (en) * | 2021-07-29 | 2021-10-12 | 杭州良工装饰有限公司 | Indoor ground construction method |
CN113833230A (en) * | 2021-10-18 | 2021-12-24 | 中国建筑第四工程局有限公司 | Shale brick terrace construction process in koji making and fermentation room |
CN114293733A (en) * | 2021-12-07 | 2022-04-08 | 苏州金螳螂文化发展股份有限公司 | Surface wax baking treatment process for decorative floor |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107152145A (en) | A kind of stone material flooring construction method | |
CN107254954A (en) | Ground paving ceramic tile construction technology | |
CN109838065A (en) | A kind of ground brick flooring paving construction method | |
CN101565997A (en) | Construction method for large-area irregular floor tile | |
CN105178559A (en) | Novel construction method for granite ground | |
CN109797920B (en) | Indoor decoration construction method | |
CN109826396A (en) | A kind of construction method of A grades of fire prevention artistic floors | |
CN108343203A (en) | A kind of metope anticracking batch embedding technology | |
CN103174274A (en) | Stone material seamless polishing construction method | |
CN107130766A (en) | One kind crystallization envelope seamless stone floor construction method of glaze | |
CN110656753A (en) | Concrete grindstone terrace | |
CN104120855A (en) | Construction method for paving ground tile floor | |
CN108625252A (en) | Urban road laying construction method | |
CN108797943A (en) | A kind of laying process of solid wooden floor board | |
CN104120860A (en) | Construction method for cement mortar ground leveling | |
CN108385932A (en) | The laying method of macroplate stone material | |
CN109138423A (en) | External wall thermal insulation/decoration integration board construction technology | |
CN207194343U (en) | The tapestry brick paving structure of autoclave aerated concrete building block exterior wall | |
CN209509431U (en) | A kind of facing paving structure of wet area | |
CN111962348A (en) | Concrete floor construction process | |
CN102094494A (en) | Construction process for paving S-shaped tiles on roof with slope of more than 60 degrees | |
CN203834826U (en) | Novel staircase water drip tank | |
CN109025109A (en) | A kind of construction technology coating inner wall of building face | |
CN111255191A (en) | Semi-pre-pasted ceramic tile and paving method thereof | |
CN211949245U (en) | Roof stone flashing structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170912 |
|
RJ01 | Rejection of invention patent application after publication |