CN109797920B CN201910092446.4A CN201910092446A CN109797920B CN 109797920 B CN109797920 B CN 109797920B CN 201910092446 A CN201910092446 A CN 201910092446A CN 109797920 B CN109797920 B CN 109797920B
Authority
CN
China
Prior art keywords
putty
construction
wall
paint
coating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910092446.4A
Other languages
Chinese (zh)
Other versions
CN109797920A (en
Inventor
方春红
方志颖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Pinhong Coating Co ltd
Original Assignee
Zhejiang Pinhong Coating Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Pinhong Coating Co ltd filed Critical Zhejiang Pinhong Coating Co ltd
Priority to CN201910092446.4A priority Critical patent/CN109797920B/en
Publication of CN109797920A publication Critical patent/CN109797920A/en
Application granted granted Critical
Publication of CN109797920B publication Critical patent/CN109797920B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Application Of Or Painting With Fluid Materials (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention discloses an indoor decoration construction method which comprises the steps of approach preparation, construction preparation, base layer construction, putty plastering, polishing, priming paint coating, latex paint and finish paint coating construction and acceptance inspection. By adopting the technology, the obtained coating surface has good quality, uniform and consistent color, no phenomena of efflorescence, color biting, flowing drop, pimples and the like, no sand holes and no brush marks, and the straightness allowable deviation of decorative lines and color separation lines is within 1 mm; the inside and outside corners and the splicing decoration have good quality, the outside corners and the inside corners are consistent in smoothness and straightness, the running rule and the clearance gauge are smaller than 1mm, and the splicing is tight and has no seam when observed at a position 1m away from the seam, and no sand holes, brush lines, flow drops and pimples exist; the obtained indoor coated surface is firm, practical and beautiful, and is suitable for popularization and application.

Description

Indoor decoration construction method
Technical Field
The invention belongs to the technical field of interior decoration, and particularly relates to an interior decoration construction method which is suitable for renovating interior decoration of an old house and constructing in a new house.
Background
With the improvement of living quality, the requirements on living environment are higher and higher, the coating decoration of indoor wall surfaces and the like is widely popularized, but the coating construction has many problems, particularly the quality problems of unsmooth surface, uneven color, sand holes, lines brushing and the like in the renovation of old houses, so that in order to update and optimize the indoor coating construction process of houses, a plurality of technical personnel research the high-quality indoor coating construction in order to ensure that the coated surfaces are firm, practical and beautiful.
Disclosure of Invention
In view of the above problems in the prior art, the present invention aims to provide an indoor finishing construction method capable of ensuring the coated surface to be firm, practical and beautiful, and the method is suitable for the renovation of the inner decoration surface of the old house and the indoor construction of the new house.
The indoor decoration construction method comprises the steps of approach preparation, construction preparation, base layer construction, plastering putty, polishing, priming paint coating, latex paint and finish paint coating construction and acceptance inspection, and is characterized by specifically comprising the following steps:
1) entering to prepare to implement coating construction contents, confirming construction processes, and stacking materials such as paint and the like according to requirements when entering to the field;
2) the construction preparation comprises the steps of firstly, inspecting indoor decorated coatings such as gypsum boards, walls and top surface layers, and treating the decorated coatings which do not conform to the coating;
3) the construction of the base layer comprises the steps of cleaning and repairing the base layer, and then cleaning and patching putty; then treating the internal and external corners, the nail holes and the moist positions;
4) putty for plastering surface
Firstly, the interior wall putty including waterproof putty, leveling putty and smooth surface putty is prepared, the plasterboard surface layer and the plastering surface layer are scraped in batches, the planeness of the plasterboard surface layer is high, the plasterboard surface layer is not required to be leveled by the leveling putty, leveling the plastering surface layer with leveling putty, filling with smooth putty, scraping with iron plate, drawing with 1m ruler for several times, after the smooth surface putty is batched, longitudinal and transverse detection, repair and strickling are carried out by using the aluminum alloy ruler at any time, the wall surface putty is batched and strickled to the ground, the installation position of the skirting line is required to be detected and strickled by adopting the aluminum alloy ruler with the length of more than 2m, the straightness error is required to be less than 2mm, the installation of the skirting line is ensured to be smooth and straight, putty is applied twice, when the second time of putty is applied, the putty must be applied after the first time of putty is completely dried, and when the second time of putty is fully applied, the putty must be pressed into a polish;
5) the base layer or the putty is polished after being dried, when in polishing, the rough gauze is firstly used for primary polishing, then a scraper knife is used for leveling the plastering on the convex part of the surface, then the putty is used for filling, and after being dried, the abrasive paper is used for polishing;
6) cleaning floating ash on the base surface layer by using a feather duster after priming paint is coated until no floating ash exists on the base surface layer, and uniformly coating or spraying the priming paint to ensure that the priming paint completely permeates into the base layer, thereby increasing the firmness;
7) the construction of latex primer and finish paint construction emulsion paint is 1 bottom and 2 surfaces, before painting, the construction site is cleaned comprehensively for one time, floating ash on a ceiling and a wall facade is removed, painting construction is carried out, primer roller painting, finish paint brush painting and finish paint spraying are carried out, stable gestures and spraying amount are kept during spraying, the construction is uniform from top to bottom and from left to right, the overall spraying condition is checked after the spraying is carried out for the 1 st time, no problem is found during the checking, and the spraying is carried out for the 2 nd time after the surface is dried;
8) and (6) checking and accepting.
The indoor decoration construction method is characterized in that the method is suitable for old house renovation and coating construction and new house indoor coating construction, the construction before old house renovation and coating and the customer verify the number of articles and the integrity of the articles, and the articles are registered and signed by the two parties; and (4) checking and accepting the base layer of the coating surface with a client before the indoor coating construction of the new house.
The indoor decoration construction method is characterized in that the flatness, the perpendicularity of the internal and external corners and the hollowing of the painted surface in the step 2) are checked as follows: and (3) checking the flatness by using an aluminum alloy guiding rule with the length of two meters, and knocking the top surface of the wall by using a hand-pulled air drum hammer to check the air drum.
The indoor decoration construction method is characterized in that when indoor decorated surface layers such as gypsum boards, walls and top surface layers are inspected in the step 2), cracks are found in the original wall surfaces and the original top surfaces, cracking prevention treatment and reinforcement are firstly carried out, and the specific cracking prevention treatment method comprises the following steps: firstly, pasting the pipeline grooves once by using the dacron cloth, wherein the dacron cloth pasted with the pipeline grooves is at least 5cm larger than the plastering surface of the pipeline grooves, the dacron cloth or the grid cloth is used for performing repair plastering and anti-cracking treatment on the pipeline grooves, and then the whole wall surface is pasted once by using the dacron cloth or the grid cloth, and the lap joint of the dacron cloth or the grid cloth pasted with the whole wall surface is not less than 5 cm; the anti-cracking reinforcing treatment method comprises cleaning the original seam, caulking the seam with strong putty, and scraping and sticking the mesh tape with the strong putty and the mesh tape, wherein the width is 60-80mm, and the thickness is not less than 2 mm.
The indoor decoration construction method is characterized in that the maximum thickness of the leveling putty in the step 4) is not more than 20mm, and the smooth surface putty is not more than 3 mm; and in the putty scraping process, the putty is inspected by lighting a tungsten iodine lamp, and the putty is inspected by lighting at night, so that the wall surface and the top surface are smooth, the final polishing is consistent with the light source irradiation direction, and shadows are not generated during lighting irradiation.
The indoor decoration construction method is characterized in that after the primary polishing in the step 5) is finished, 240# dry sand is used for polishing once along a straight line, and finally 320# dry sand is used for polishing horizontally and straight till the surface is flat and smooth, so that sand marks cannot be generated; and (5) smoothing and polishing the internal corner by using 240# sand matched with an internal corner ruler tool.
The indoor finishing construction method is characterized in that the dosage of the intermediate-spraying primer in the step 6) is the minimum dosage capable of covering the basal plane, and the coating area per liter is 12-15 square meters, preferably 13 square meters.
The indoor finishing construction method is characterized in that wool is firstly used for brushing the internal and external corners during primer roller coating or brushing construction in the step 7), and then fine hair rollers are used for criss-cross full roller brushing without roller leakage and brush leakage; after the primer is coated in a roller manner, wall paste is scraped for 1 time, when the wall paste is scraped for one time, the wall paste is stirred uniformly, a plastic batch board is used for calendaring for 1 time, the operation is carried out from top to bottom and from left to right without scraping and scratching, and after the operation is dried, the wall paste is polished to be smooth by No. 800 abrasive paper; when the first surface paint is constructed by adopting a roller coating method, the operation method is the same as that of the primer; and (5) spraying the second surface paint by a color spraying machine.
By adopting the technology, the invention has the following beneficial effects:
1) by adopting the technology, the obtained coating surface has good quality, uniform and consistent color, no phenomena of efflorescence, color biting, flowing drop, pimples and the like, no sand holes and no brush marks, and the straightness allowable deviation of decorative lines and color separation lines is within 1 mm;
2) by adopting the technology, the internal and external corners and the abutted seam decoration have good quality, the external corners and the internal corners are consistent in straight degree, the running rule and the clearance gauge are smaller than 1mm, the abutted seam is tight and has no seam when observed at a position 1m away from the seam, and no sand holes, brush lines, flow drops and pimples are formed;
3) by adopting the technology, the pollution is greatly reduced by the protection measures of workers during construction, and the obtained indoor coated surface is firm, practical and attractive and is suitable for popularization and application.
Detailed Description
The invention is further described with reference to the following examples, but the scope of the invention is not limited thereto:
the invention relates to an indoor decoration coating construction method, which is a novel coating construction method obtained by updating and optimizing a house indoor coating construction process to ensure that a coated surface is firm, practical and attractive, and is suitable for renovating an old house interior decoration surface and constructing a new house interior, and the process flow is as follows: the method comprises the following steps of entering preparation, construction preparation, base layer construction, two times of putty plastering, polishing, priming, latex paint coating and acceptance inspection, and specifically comprises the following steps:
1) approach preparation
1.1 the old house and the old apartment should be confirmed with the customer to verify the quantity of the articles and the integrity of the articles before coating, registered and signed by both parties;
1.2 coating the base layer of the veneer on the surface of a client before coating the new house and apartment;
1.3, finishing construction contents, confirming construction flows, and signing on a cross-connect list after the confirmation of the two parties;
1.4, the paint materials are piled in the field, the paint materials are preferably piled in a room with little or no furniture, any paint materials cannot be piled in a wet area, the piling position is far away from a fire source, the paint materials are piled in a room with floor tiles, and ground protection measures are taken; the paint, the emulsion paint, the putty and the related auxiliary materials are orderly stacked in a classified manner;
2) preparation for construction
2.1 gypsum board surface layer inspection and treatment:
a reinforced loose gypsum board
When the gypsum board joint is small, carrying out external V-shaped chamfering treatment and cleaning, wherein the gap is 4-6 mm; all gaps among gypsum boards must be scraped for 2 times by caulking paste (hair-pulling base) (the 1 st time is dried and then embedded for 2 times); pasting Shile paper (kraft paper) on the joints of the gypsum boards for 1 time by using white glue; after the L-shaped corners of the gypsum board are batched by using strong putty, the gypsum board is pasted with a grid tape for strengthening treatment, and the gypsum board surface layer is subjected to standard treatment through the steps, so that the cracking prevention work is basically in place, and the cracking probability is reduced to the minimum;
b, visually inspecting whether the gypsum board is damaged or not, whether the gypsum board cracks or not and whether the screws are higher than the surface of the gypsum board or not, wherein the screw spacing meets the standard requirements that the edge distance is not more than 20cm and the middle distance is not more than 30cm, and manually inspecting to ensure that the gypsum board is not loosened and the screws are screwed tightly;
2.2 inspection and treatment of wall and roof coverings
a, checking the flatness, the perpendicularity of a male corner and a female corner and hollowing of a coated surface; the inspection method comprises the steps of inspecting the flatness by using an aluminum alloy guiding rule with the length of two meters, and knocking the top surface of the wall by using a hand-pulled hollow-drum hammer to inspect hollowing;
the plastering layer of the original wall surface and the original top surface is comprehensively checked, and the inferior putty and the paint material are removed before the construction on the construction site; the repaired plastering layer is rechecked, wherein the repaired line pipe groove is subjected to rework treatment in time when the repaired line pipe groove does not meet the standard requirement, and the wall surface and the top surface are subjected to anti-cracking treatment when slight irregular small cracks are found in the original wall surface and the top surface in the inspection; when regular cracks are found, the cracks must be reinforced; meanwhile, in order to prevent the new batch of putty from delaminating from the old substrate, the wall surface and the top surface of the old substrate must be brushed once by using an interface agent before the batch of putty, wherein the interface agent comprises a rough culture room and a calcium silicate board (also called a cement board), which are used for preventing the low-quality base layer from being removed and are not removed;
b, if no other transition (covering) measures exist at the junctions of the new and old structures and different materials of the ceiling, the gypsum partition and the background wall, cracking prevention reinforcement treatment should be carried out, reinforcing iron pieces and hanging iron pieces in the ceiling and the wood partition should be subjected to rust prevention treatment, the self-tapping screw rust prevention treatment for fixing the gypsum board should be carried out twice, and the self-tapping screw holes are coated by painting with a pen and dipping rust prevention paint in the 1 st time without missing coating; 2, the screw holes are repaired by mixing gypsum powder with the antirust paint for the second time, and the water-based putty cannot be used;
c cracking caused by building settlement
New (old) plastering face, new and old wall face joint portion, different material juncture wall chase fracture, through the later stage decoration and finishing overall process, standardize the basic construction of water and electricity, clay worker and carpenter as the prerequisite, the fracture auxiliary means of preventing of rethread coating worker later stage series takes precautions against:
the part to be reinforced is provided with a junction of a new structure and an old structure made of different materials; plastering regular old cracks on the surface; a plastering layer joint part for jointing a new wall and an old wall on the same vertical surface; the joint of the gypsum board and the wood line; other larger gaps.
The anti-cracking reinforcement treatment method comprises cleaning the original (old) seam (the seam should be enlarged and deepened when the seam is too small), caulking the seam with strong putty, and scraping and sticking the mesh tape with strong putty and grid tape, wherein the width is 60-80mm, and the thickness is not less than 2 mm;
the anti-cracking treatment method comprises the following steps of firstly pasting the pipeline groove by using the dacron cloth through glue for 1 time, pasting the wall groove for the pipeline groove repairing plastering anti-cracking treatment (the dacron cloth for pasting the pipeline groove is larger than the plastering surface of the pipeline groove by more than 5 cm), pasting the whole wall surface by using the dacron cloth or the grid cloth for 1 time, wherein the lapping of the dacron cloth or the grid cloth for pasting the whole wall surface is not less than 5cm, and the dacron cloth or the grid cloth pasting method comprises the following steps: firstly, rolling glue on a pasted wall surface in a roller way, then covering the certified cloth or the gridding cloth, and then pressing and fixing by using a batch board;
d treatment of non-conforming surfaces
The surface layer of the gypsum board has quality which does not meet the requirement of coating, and related personnel are requested to carry out finishing or reworking in time until the base layer is coated and then the coating operation is carried out;
uneven parts of wall and top surface layers: removing the uneven part of the base layer, rolling and coating the depressed part with an interface agent once, filling and leveling with plastering gypsum after drying, beating off the depressed part with a local hollow drum, cleaning, coating with the interface agent once, and leveling with the plastering gypsum after drying; the perpendicularity of the internal corner and the external corner is not straight, and the internal corner and the external corner need to be repaired and perpendicular by plastering gypsum;
3) the method reasonably protects the articles in the field which accords with the coating operation so as to meet the coating requirement.
3 base course construction
3.1 base layer cleaning
a, cleaning a base layer, rolling and coating the base layer once by using an interface agent, adding water according to the use specification proportion of a product when the interface agent is used, and uniformly rolling and coating by using a rough roller;
b, repairing the defects of the unfilled corner, hole and the like of the base layer (the plastering surface) by using cement mortar or polymer cement mortar or high-strength putty in a mass ratio of 1:3 before repairing, cleaning and coating the base layer (the plastering surface), when a large area is hollowed, completely shoveling off the hollow part, cleaning, re-making the base layer, if the area is locally hollowed, repairing by using epoxy resin injected with low viscosity, repairing fine cracks by using putty, and leveling by using sand paper after drying; for large cracks, the crack parts can be chiseled into a V shape, a waterproof layer is made after cleaning, cement mortar with the mass ratio of 1:2.5 is filled, the cement mortar is ground and leveled by cement mortar paper after drying, holes with the diameter less than 3mm on the surface of a base layer are leveled by polymer cement putty, holes with the diameter more than 3mm adopt a water leakage source, GBS bi-component synthetic polymer waterproof paint is brushed twice to ensure that the leakage is prevented, if dust and powder exist in wall plastering, a broom, a brush and high-pressure water are used for washing; dirt such as grease and the like is cleaned by a neutral detergent; when residual mortar is present, the mortar is removed by using a tool such as a shovel or a scraper; cleaning the mould on the wall surface by using a steel wire brush, washing by using a high-pressure water gun, and drying;
and c, local putty plastering is pasted and repaired, the flatness and smoothness of a plastering layer of the wall surface meet the coating requirement, the plastering for filling the putty and the local putty can be omitted, and the plastered putty is easy to batch and polish, has better strength and durability, and further has good cohesiveness, durability and water resistance. When the putty is scraped, the inclination angle of a tool is controlled to be 45 degrees and the force is uniformly applied to ensure that the putty is full, and in order to avoid excessive shrinkage of the putty and cracking and falling of the putty, the putty is not scraped repeatedly by excessively thickening and excessively repeating once coating so as to avoid the phenomenon that a coil skin falls off, and gaps are filled and filled;
c treating the internal and external corners
And (3) constructing the internal and external corners, embedding the external corner strips into the external corner positions after the external corners are fully screeded by leveling putty, screeding the leveling putty, leveling the external corners on the wall surface, and contrasting by infrared rays at any time to ensure that the external corners are vertical. Constructing internal corners, namely, filling and leveling the non-straight parts of the internal corners after stirring the internal corner lines with leveling putty powder and water, leveling the non-straight parts until the internal corners are vertical by using a special tool, and requiring an instrument to measure the lines to be vertical;
the construction quality of the internal and external corners is an important prerequisite for ensuring the overall quality of the emulsion paint, and the key point is whether the treatment of the internal and external corners can reach the standard or not. The requirement of the yin-yang corner gold coin is as follows: the internal corner is smooth, and the external corner is square, straight and straight;
the following tools are prepared for the inner wall surface putty engineering construction: the aluminum alloy with different lengths is specially supported by a plurality of pieces, 1 ink fountain, 1 internal corner twist, 1 plumb bob and other matched tools;
before whole putty is criticized and is scraped, make yin yang angle earlier, should do before the reentrant corner construction and play line work, the reentrant corner plays the line scope and includes: the reentrant corner of wall and the reentrant corner of wall and top surface, the thickness and the welt of the control putty of should trying to get to the greatest extent when playing the line play the line, and the reentrant corner is played the line and should be gone on simultaneously with the reentrant corner construction, if: when the wall A is constructed, a line is bounced on the wall B, putty is scraped on the wall A along the line B, and the putty is pulled along the line B by using an aluminum alloy internal corner special ruler. After the putty on the surface A is well scraped, the inside corner line of the surface B is flicked, and the wall on the surface B is constructed by the same method. After the putty is dried, the internal corners are finished to be qualified by rubbing the internal corners by using the internal corners, the construction method of the internal corners of the wall surface and the top surface is the same, namely, the putty is prepared by using white glue and model gypsum powder, the putty is batched on two sides of the original external corner, then the corner strips are pasted on the putty, and after a special aluminum alloy ruler is used for straightening, the redundant putty is shoveled (the external corner of the wall surface is locally protruded and is firstly subjected to foot rubbing treatment, hammer lines are hung along two plastering surfaces when the external corner is pasted, and the perpendicularity and the highest part of the external corner strip protruded out of the original wall are not more than 2 mm).
The treatment for nail holes and moisture was as follows: 1) dipping rust-proof iron red paint into the part with the nail holes by using a small writing brush, adding gypsum powder into the mixture after the mixture is dried, uniformly mixing the gypsum powder with the iron red rust-proof paint, and scraping and filling the rust-proof part by using a scraper knife; 2) The wet part is coated with waterproof paint for one time, and the next procedure is carried out after the waterproof paint is completely dried;
4 plastering putty
4.1 interior wall putty allotment, no matter waterproof putty or water-proof putty, whether leveling putty or smooth surface putty, the allotment method is the same basically, put into appropriate amount of clear water in the agitator during allotment earlier, then pour into the agitator slowly corresponding putty powder, stir evenly with small-size electric mixer, under the general condition, leveling putty should slightly transfer, smooth surface putty is slightly thin, the putty after the allotment should be used up in 1 hour, should do waste material processing more than 2 hours, must not stir again and use.
4.2 the interior wall putty of the present invention is mainly applied in batches on two major categories of facings. One is a gypsum board surface layer (containing a wood surface), and the other is a plastering surface layer; compared with a plastering surface layer, the wooden surface layer has higher flatness, and does not need to be leveled by leveling putty; leveling putty is needed to be used for leveling the plastering surface layer, and then smooth surface putty is fully prepared (due to the fact that the building plastering surface layer has large flatness error, the phenomenon of unevenness is serious);
4.3 after leveling putty and scraping by using a cast iron plate, vertically and horizontally pulling and leveling for multiple times by using a 1m ruler; and after the smooth putty is scraped, the aluminum alloy ruler is used for carrying out longitudinal and transverse detection, repair and strickling at any time. Wall putty is criticized and is scraped to ground, and the skirting line installation position must adopt the length 2m above aluminum alloy ruler to detect, draw criticize, and the straightness error should be less than 2mm to ensure that the skirting line installation is level and straight-through, should make the mark or reserve spool groove part when meeting the spool groove, do not criticize putty. The principle of 'thin and thick is suitable for installation', the maximum thickness of the leveling putty should not exceed 20mm, and the smooth surface putty should not exceed 3 mm. The interval time of each putty batch scraping is not too short, and the batch scraping is carried out for 1 time after the previous putty is basically dried and primarily corrected, so that the phenomenon that a putty layer is cracked and even falls off is avoided;
4.4 when the second time of putty coating, the second time of putty coating is carried out, the putty coating is carried out after the first time of putty coating is dried completely, (whether the sound is produced or not can be checked by hand feeling, whether the putty is whitened or not can be checked by naked eyes to judge whether the putty is dried completely or not), and when the second time of putty coating is carried out, the putty is polished;
4.5 in the putty coating process, lighting with a tungsten iodine lamp for checking, and checking with light at night to ensure that the wall surface and the top surface are smooth, wherein the final polishing for 1 time is consistent with the light source irradiation direction, no shadow is generated during light irradiation, and the wall surface and the top surface which are constructed to be qualified are subjected to the next 1 procedure of brushing latex primer;
the invention should pay attention to the following items when the inner wall putty is constructed:
1) newly build a wall and wait to carry out batch puttying work again after the plastering layer is dry, otherwise can lead to the difficult volatilization of wall moisture, the putty dries up more slowly.
2) When products made of wood head boards, density boards, multi-layer boards and the like need putty scraping, all the products are scraped by oil putty and polished for forming, and the products cannot be directly applied to water-based putty or a drawing method to prevent wood materials from expanding, decoloring and deforming due to moisture;
3) when the kitchen, the toilet and the exposed balcony are wall surface emulsion paints, waterproof putty construction is required, and other requirements and processes are the same;
5 grinding
5.1 the base layer or the putty is ground after being dried so as to avoid the influence of the adhesion of abrasive paper on the operation, the thickness of the abrasive paper is determined according to the hardness of the ground surface, the sand marks are reduced as much as possible, and otherwise, the final decorative effect of the pattern layer is influenced. The manual grinding is to wrap the sand paper (cloth) on a grinding machine and lightly push the sand paper (cloth) on the base layer, so that the sand paper (cloth) can not be pressed forcefully during grinding to prevent the motor from being damaged due to overload. When polishing, firstly, the rough gauze is used for primary polishing, and then, the fine gauze is used for polishing. The surface flatness is required, and the roughness and texture after polishing are basically consistent. And leveling the plastering of the convex part on the surface by using a scraper knife, filling the plastering by using putty, and polishing by using abrasive paper after drying. After polishing, removing surface dust in time so as to facilitate normal construction of the next process; fine grinding is carried out by using 240# dry sand for one time along a straight line, and then 320# dry sand is used for transverse and straight grinding until the surface is flat and smooth, so that sand marks cannot be produced; for the internal corner, the 240# sand must be used for smoothing and polishing by matching with an internal corner ruler tool.
6 priming
6.1, cleaning floating ash on the base surface layer by using a feather duster until no floating ash is left on the hands;
6.2 when spraying the priming paint, uniformly thin-coating or spraying once to ensure that the priming paint completely permeates into the base layer, thereby increasing the firmness;
the amount of the 6.3 spray-on primer is the minimum amount to cover a base surface, and the area coated is from about 12 to about 15 square meters per liter, preferably about 13 square meters.
7 construction of inner wall latex primer and finish
7.1 latex paint types and Properties
The latex paint is divided into an inner wall latex paint and an outer wall latex paint according to product types, wherein the inner wall latex paint belongs to non-waterproof paint and is suitable for indoor finishing with small air humidity; when the emulsion paint is used, it has matched priming paint and top-coat paint, the priming paint can raise the adhesion of top-coat paint, and can resist alkali and mildew, and the top-coat paint has the functions of decoration, wear-resisting and protection. The special functions and functions of the paint should be fully exerted during construction, and the action that only finishing paint is used and primer paint is not used is forbidden;
the latex paint construction process flow comprises the following steps: cleaning dust, coating primer on a roller (brush), polishing wall paste, polishing, protecting finished products, and spraying (or brushing) finish;
b, emulsion paint construction is carried out on 1 bottom and 2 surfaces. Before brushing, the construction site is cleaned comprehensively at one time, and floating ash on a ceiling and a wall vertical surface is removed for brushing construction:
the primer roller (brush) coating operation step is that latex paint is poured into a clean empty barrel, a proper amount of clear water is added, then the latex paint is poured and stirred, the water adding amount is controlled to be between 10% and 30% according to the manufacturer specification, construction season and construction process, generally, the water adding amount in winter or spraying is preferably 10% as the lower limit, and the water adding amount in summer or roller coating is preferably 30% as the upper limit, and the latex paint is fully stirred and then filtered by a filter screen (bucket) for later use. During construction, brushing the internal and external corners with wool, and then brushing the fine-hair rollers in a criss-cross and comprehensive manner without roller leakage and brush leakage; after the primer was roll coated, 1 additional batch of plaster was applied to fill the small a holes to improve the finish and overall feel. The wall paste scraping method comprises stirring wall paste, calendering with plastic plate for 1 time from top to bottom and from left to right, and polishing with No. 800 abrasive paper;
brushing finish paint: when the finish paint is constructed by adopting a roller coating method, the operation method is basically the same as that of the primer, the finish paint in the 2 nd time is coated by using a wool brush for brush arrangement during roller coating, so that the finish paint surface layer formed finally is ensured to be smooth and fine, the wool brush is immediately used for brush arrangement in a longitudinal and transverse manner after the emulsion paint roller is coated on the back of a wall, the action is fast, and the finish paint is directly discharged when hands are folded;
and (3) spraying finish paint: the machine spraying construction adopts high-pressure airless spraying with water of 10-15%, the method is easy to form a film, has fine and smooth texture and high working efficiency, and indoor finished products, semi-finished products, original doors, windows and the like must be effectively protected by a plastic film before spraying. During spraying, the gesture and the spraying (flow) amount should be kept stable, and the border coverage is uniform from top to bottom and from left to right. And (3) after the spraying for the 1 st time, checking the overall spraying condition, checking whether the surface is not problematic, and spraying for the 2 nd time after the surface is dried. The spraying quality requirements are that the paint film is uniform without penetrating bottom, no flow cone and smooth surface layer.
If the latex paint is colored, the color plate should be selected according to the design and the requirement of the owner, and the color plate should be signed and confirmed by the owner and then color-adjusted by a computer. After color mixing, the light color latex paint can be properly mixed with water according to the specific construction conditions, the water mixing amount is controlled to be within 20 percent, the dark color latex paint can not be mixed with water, the color difference is prevented, the color latex paint needs to be uniformly stirred before use, and the construction can be carried out after the color latex paint is filtered by a filter screen (hopper). The construction method refers to the similar process, and when the local part is the color emulsion paint, the construction method is allowed to use a roller coating or brush coating method.
The latex paint construction of the invention should pay attention to: 1) when the kitchen, the toilet and the exposed balcony are made of emulsion paint, waterproof emulsion paint must be adopted, and common emulsion paint (containing priming paint and finish paint) is used for replacing extremely; 2) filtering the latex primer and the finish paint by using a filter screen (bucket), and prohibiting the unfiltered latex primer and the unfiltered finish paint from being put on a wall; 3) the wall and the top surface are plastered by roller (brush) and coated with alkali-resistant seal primer for 1 time without leaking coating and brushing, and the water mixing ratio is strictly controlled within an allowable range; 4) before the primer is constructed, the wall putty is dried, and the water content of a base layer is not more than 8%. When the indoor temperature is lower than 5 ℃, the construction of the emulsion paint is forbidden; 5) the boundary lines of the latex paint and the paint, the latex paint and the colored latex paint, the latex paint surface and the stone, the floor tile and the face brick are clear, and the straightness is in line with the requirement.
8 acceptance inspection
8.1 coating quality and inspection method
8.1.1 wall surface finish quality and test method, the results are shown in Table 1
TABLE 1 wall surface finish quality and test results
Figure 468334DEST_PATH_IMAGE001
8.1.2 inspection of internal and external corners and joints
TABLE 2 coating quality and inspection results for internal and external corners and joints
Figure 158073DEST_PATH_IMAGE002
As can be seen from tables 1 and 2, the wall surface top surface coating obtained by the coating construction method has good quality, uniform and consistent color, no phenomena of efflorescence, color biting, flowing drop, pimples and the like, no sand holes and no brush lines, and the straightness allowable deviation of the decorative lines and the color separation lines is within 1 mm; the inside and outside corners and the splicing decoration have good quality, the outside corners and the inside corners are consistent in smoothness and straightness, the running rule and the clearance gauge are smaller than 1mm, and the splicing is tight and has no seam when observed at a position 1m away from the seam, and no sand holes, brush lines, flow drops and pimples exist; the indoor coating surface is firm, practical and beautiful, and is suitable for popularization and application.

Claims (6)

1. An indoor decoration construction method comprises the steps of approach preparation, construction preparation, base layer construction, plastering putty, polishing, priming, latex paint and finish paint construction and acceptance inspection, and is characterized by comprising the following steps:
1) entering to prepare to implement coating construction contents, confirming the construction flow, and stacking the paint materials according to the requirement;
2) construction preparation is earlier examined indoor gypsum board, wall, top surface layer by the finish coat, handles not being conform to coating finish coat, when examining indoor gypsum board, wall, top surface layer by the finish coat, has the crack in discovery former wall, the top surface, prevents the fracture earlier and handles and consolidate, and specific anti-cracking treatment method is as follows: firstly, pasting the pipeline grooves once by using the dacron cloth, wherein the dacron cloth pasted with the pipeline grooves is at least 5cm larger than the plastering surface of the pipeline grooves, the dacron cloth or the grid cloth is used for performing repair plastering and anti-cracking treatment on the pipeline grooves, and then the whole wall surface is pasted once by using the dacron cloth or the grid cloth, and the lap joint of the dacron cloth or the grid cloth pasted with the whole wall surface is not less than 5 cm; the anti-cracking reinforcement treatment method comprises cleaning the original seam, caulking the seam with strong putty, and scraping and sticking the mesh tape with strong putty and mesh tape, wherein the width is 60-80mm, and the thickness is not less than 2 mm;
3) the construction of the base layer comprises the steps of cleaning and repairing the base layer, and then cleaning and patching putty; then treating the internal and external corners, the nail holes and the moist positions;
4) putty for plastering surface
Firstly, the interior wall putty including waterproof putty, leveling putty and smooth surface putty is prepared, the plasterboard surface layer and the plastering surface layer are scraped in batches, the planeness of the plasterboard surface layer is high, the plasterboard surface layer is not required to be leveled by the leveling putty, leveling the plastering surface layer with leveling putty, filling with smooth putty, scraping with iron plate, drawing with 1m ruler for several times, after the smooth surface putty is batched, longitudinal and transverse detection, repair and strickling are carried out by using the aluminum alloy ruler at any time, the wall surface putty is batched and strickled to the ground, the installation position of the skirting line is required to be detected and strickled by adopting the aluminum alloy ruler with the length of more than 2m, the straightness error is required to be less than 2mm, the installation of the skirting line is ensured to be smooth and straight, putty is applied twice, when the second time of putty is applied, the putty must be applied after being dried completely, and when the second time of putty is fully applied, the putty must be pressed and polished;
5) the base layer or the putty is polished after being dried, when in polishing, the rough gauze is firstly used for primary polishing, then a scraper knife is used for leveling the plastering on the convex part of the surface, then the putty is used for filling, and after being dried, the abrasive paper is used for polishing;
6) cleaning floating ash on the surface layer of the base by using a feather duster for coating primer until no floating ash exists on the surface layer, uniformly and thinly coating or spraying the primer to ensure that the primer completely permeates into the base layer, so that the firmness is increased, the dosage of the spraying type primer is the minimum dosage capable of covering the surface layer of the base, and the coating area per liter is 12-15 square meters;
7) the construction of latex primer and finish paint construction emulsion paint is 1 bottom and 2 surfaces, before painting, the construction site is firstly cleaned comprehensively, floating ash on a ceiling and a wall vertical surface is removed, painting construction is then carried out, primer roller painting, finish paint brushing and finish paint spraying are carried out, stable gestures and spraying amount are kept during spraying, the whole spraying condition is checked from top to bottom and from left to right, the border is uniform, the spraying condition is checked after the spraying is carried out for 1 time, the surface is dried and then sprayed for 2 times, the negative and positive corners are brushed by wool during primer roller painting or brushing construction, and then fine hair rollers are used for criss-cross comprehensive roller brushing, so that no roller leakage and brush leakage exist; after the primer is coated in a roller manner, wall paste is scraped for 1 time, when the wall paste is scraped for one time, the wall paste is stirred uniformly, a plastic batch board is used for calendaring for 1 time, the operation is carried out from top to bottom and from left to right without scraping and scratching, and after the operation is dried, the wall paste is polished to be smooth by No. 800 abrasive paper; when the first surface paint is constructed by adopting a roller coating method, the operation method is the same as that of the primer; the second surface paint is sprayed by adopting a machine;
8) and (6) checking and accepting.
2. The indoor finishing construction method of claim 1, wherein the method is applied to a renovating and finishing construction of an old house and an indoor finishing construction of a new house, the construction before the renovating and finishing of the old house is confirmed by a customer by checking the number of articles and the integrity of the articles, and the articles are registered and signed by both parties; and (4) checking and accepting the base layer of the coating surface with a client before the indoor coating construction of the new house.
3. The indoor finishing construction method according to claim 1, wherein the flatness, perpendicularity of internal and external corners and hollowing inspection methods of the coated surface in the step 2) are as follows: and (3) checking the flatness by using an aluminum alloy guiding rule with the length of two meters, and knocking the top surface of the wall by using a hand-pulled air drum hammer to check the air drum.
4. The indoor finishing construction method of claim 1, wherein the maximum thickness of the leveling putty in the step 4) is not more than 20mm, and the smooth putty is not more than 3 mm; and in the putty scraping process, the putty is inspected by lighting a tungsten iodine lamp, and the putty is inspected by lighting at night, so that the wall surface and the top surface are smooth, the final polishing is consistent with the light source irradiation direction, and shadows are not generated during lighting irradiation.
5. The indoor finishing construction method according to claim 1, wherein after the primary polishing in the step 5), the sand is polished by 240# dry sand straight, and finally the sand is polished by 320# dry sand straight until the surface is flat and smooth, so that no sand mark is generated; and (5) smoothing and polishing the internal corner by using 240# sand matched with an internal corner ruler tool.
6. The method of claim 1, wherein the amount of midspray primer applied in step 6) is a minimum amount to achieve coverage of a substrate surface, and wherein the application area is about 13 square meters per liter.
CN201910092446.4A 2019-01-30 2019-01-30 Indoor decoration construction method Active CN109797920B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910092446.4A CN109797920B (en) 2019-01-30 2019-01-30 Indoor decoration construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910092446.4A CN109797920B (en) 2019-01-30 2019-01-30 Indoor decoration construction method

Publications (2)

Publication Number Publication Date
CN109797920A CN109797920A (en) 2019-05-24
CN109797920B true CN109797920B (en) 2020-11-17

Family

ID=66560675

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910092446.4A Active CN109797920B (en) 2019-01-30 2019-01-30 Indoor decoration construction method

Country Status (1)

Country Link
CN (1) CN109797920B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110306800A (en) * 2019-07-25 2019-10-08 北京鑫源轩建筑装饰工程有限公司 A method of avoid coating in fitting-out work from cracking
CN111268983A (en) * 2019-12-02 2020-06-12 江苏吉邦材料科技有限公司 Application of closed-cell vitrified micro bubbles and light gypsum mortar using same and easy to detect bubble hollowing
CN111826038B (en) * 2020-06-30 2022-01-14 固克节能科技股份有限公司 Composite coating of cloud-flowing texture paint and construction method thereof
CN113863599A (en) * 2021-09-27 2021-12-31 上海宝冶建筑装饰有限公司 Indoor paint construction method based on theme park
CN114161512A (en) * 2021-11-29 2022-03-11 天地伟业技术有限公司 Inner spherical surface manufacturing device and method
CN114673313B (en) * 2022-03-23 2024-06-14 中恒创兴建设有限公司 Building interior wall surface decoration method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101363269A (en) * 2008-08-13 2009-02-11 中建五局第三建设有限公司 Construction method of anti-plastering putty for concrete structure wall
CN107989298A (en) * 2017-12-12 2018-05-04 安徽大富装饰股份有限公司 A kind of wall body decoration structure and construction method for extending old building
CN108193877A (en) * 2017-12-29 2018-06-22 上海聚通装饰集团有限公司 A kind of neat comb slot repairing chap preventing process

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101363269A (en) * 2008-08-13 2009-02-11 中建五局第三建设有限公司 Construction method of anti-plastering putty for concrete structure wall
CN107989298A (en) * 2017-12-12 2018-05-04 安徽大富装饰股份有限公司 A kind of wall body decoration structure and construction method for extending old building
CN108193877A (en) * 2017-12-29 2018-06-22 上海聚通装饰集团有限公司 A kind of neat comb slot repairing chap preventing process

Also Published As

Publication number Publication date
CN109797920A (en) 2019-05-24

Similar Documents

Publication Publication Date Title
CN109797920B (en) Indoor decoration construction method
CN109838065B (en) Floor tile ground paving construction method
CN103572845B (en) A kind of insulation clay reflective heat-insulation paint exterior wall heat-preserving system and construction technology thereof
CN103046709B (en) Building construction method of inner wall surface
CN101363269A (en) Construction method of anti-plastering putty for concrete structure wall
CN101886460B (en) Press polishing method of plastered mesh cloth of inner wall
US20100005743A1 (en) Flexible Cement Veneer
CN108343203A (en) A kind of metope anticracking batch embedding technology
CN101832015A (en) Construction process for outer wall metal fluorocarbon coating
CN104088416A (en) Gypsum heat preservation painting mortar construction process
CN112267628A (en) Construction method of plastering-free system for interior wall decoration of constructional engineering
CN113006397A (en) Construction method for square leveling of kitchen and bathroom space
CN103174274A (en) Stone material seamless polishing construction method
CN106284998A (en) Plastering on inner walls completely spreads fiberglass gridding cloth construction method
CN107989299A (en) A kind of coating application method of Assembled wall panels
CN110761507A (en) Construction method of external wall chopped false stone
CN113027055A (en) White clear water-imitating concrete facing process
CN110306819B (en) Method for repairing red brick outer wall of historic building
CN103291024A (en) Novel cement-based plastering mortar construction method
CN109853888A (en) A kind of historical building plucking wall surface construction technology
CN108083740A (en) Mortar and the two-in-one compound material of putty and preparation method thereof
CN102493486B (en) Anti-mildew treatment construction method for underground space latex paint engineering
CN112575978A (en) Aerated concrete block guniting and plastering construction method
CN112127752A (en) Construction process for installing and preventing leakage of outer flush type outer window
CN115491071B (en) Processing material of bare concrete facing and preparation method of bare concrete facing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant