CN108343203A - A kind of metope anticracking batch embedding technology - Google Patents

A kind of metope anticracking batch embedding technology Download PDF

Info

Publication number
CN108343203A
CN108343203A CN201810145676.8A CN201810145676A CN108343203A CN 108343203 A CN108343203 A CN 108343203A CN 201810145676 A CN201810145676 A CN 201810145676A CN 108343203 A CN108343203 A CN 108343203A
Authority
CN
China
Prior art keywords
wall
metope
putty
cloth
anticracking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810145676.8A
Other languages
Chinese (zh)
Inventor
徐国俭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI JUTONG DECORATION GROUP Co Ltd
Original Assignee
SHANGHAI JUTONG DECORATION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI JUTONG DECORATION GROUP Co Ltd filed Critical SHANGHAI JUTONG DECORATION GROUP Co Ltd
Priority to CN201810145676.8A priority Critical patent/CN108343203A/en
Publication of CN108343203A publication Critical patent/CN108343203A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/02Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/02Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
    • E04F13/04Bases for plaster
    • E04F13/047Plaster carrying meshes

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Application Of Or Painting With Fluid Materials (AREA)

Abstract

The present invention relates to interior decoration, renovation process, especially a kind of metope anticracking batch embedding technology.Include the following steps:Step 1:Metope roots out original wall skin, cleaning dust;Step 2:Brushing interface treating agent;Step 3:One time putty repairs pore;Step 4:Wall grid cloth is pasted, compacting bonds;Step 5:Secondary putty thickness is levelling;Step 6:The levelling cover of putty essence three times;Step 7:It criticizes to scrape and polish flat.The present invention during wall construction by being added alkali resistant glass fibre open weave cloth, wall firmness can be increased, at old wall, wall pipeline fluting, unlike material wall or new and old wall stitching portion, wall the cracking phenomena that is also easy to produce of load bearing wall and non-load bearing wall intersection, play the role of being connected well and draw admittedly, originally larger extraneous stress is effectively dispersed into smaller stress, to mitigate crackle degree, postpone the time that crackle generates, increase the firmness and aesthetic measure of wall, extends wall usage time.

Description

A kind of metope anticracking batch embedding technology
Technical field
The present invention relates to interior decoration, renovation process, especially a kind of metope anticracking batch embedding technology.
Background technology
Metope processing in existing house decoration, generally comprises following steps:1, original metope processing:Root out original Beginning wall skin removes hollowing, and clears up dust;2, leveling:Thick leveling is carried out to metope using mending mortar, is reused Water proof putty or functional form Ecological putty carry out smart leveling to metope, and polishing putty keeps its surfacing smooth;3, surface Mopping is handled:Brush alkali-resistant primer or basement membrane, brush finish paint or wallpaper.
Such processing method is then not suitable with some old walls and special wall the building newly made not problem, It is specific as follows:1, for old wall of the remote past, typically brick wall and husky plastered wall, wind day long due to the use of the time It shines, metope structure is loose, and crack is easily generated during use;2, under certain conditions, the pipelines such as circuit or water route need It is embedded in wall, needs to sunken cord in wall internal recessing, destroy wall body structure to a certain extent, fluting position is easy out It splits;3, modern finishing mode is maked rapid progress, and can often encounter the wall of unlike material splicing, due to the use of to different metope materials Matter, seam crossing easy to produce crack;4, new and old metope junction, wall is variant, also easy tos produce crack;5, for new house and It says, as sedimentation has slight crackle at the beam and load bearing wall cross-stitch of light wall.
Invention content
For the above old wall and special wall, the present invention provides a kind of metope anticracking batch embedding technology, Ke Yizeng Add surface of wall intensity, prevent metope from cracking powder, keeps metope attractive and durable.
The technical scheme is that:
A kind of metope anticracking batch embedding technology, includes the following steps:
Step 1:Metope roots out original wall skin, cleaning dust;
Step 2:Brushing interface treating agent;
Step 3:One time putty repairs pore;
Step 4:Wall grid cloth is pasted, compacting bonds;
Step 5:Secondary putty thickness is levelling;
Step 6:The levelling cover of putty essence three times;
Step 7:It criticizes to scrape and polish flat.
The step 4 pastes glue specifically, uniformly brushing, and the compacting of grid coverage cloth bonds, then on grid cloth uniformly One layer of brushing stickup glue.
The grid cloth of the step 4 is alkali resistant glass fibre open weave cloth.
Lap width at least 50mm between the alkali resistant glass fibre open weave cloth.
Alkali resistant glass fibre open weave cloth pressure stubble overlap joint, lap width at least 50mm at metope inner corner trim.
Alkali resistant glass fibre open weave cloth pressure stubble overlap joint, lap width at least 200mm at metope external corner.
The present invention during wall construction by being added alkali resistant glass fibre open weave cloth, the product not only stable structure, intensity Height, alkaline resistance properties are good, have the features such as anti-corrosion, cracking resistance, can increase wall firmness, for old wall, wall pipeline At fluting, unlike material wall or new and old wall stitching portion, wall the cracking that is also easy to produce of load bearing wall and non-load bearing wall intersection Phenomenon plays the role of being connected well and draw admittedly, originally larger extraneous stress is effectively dispersed into smaller stress, will be originally It is issuable to be dispersed into many compared with minute crack compared with wide seam, to mitigate crackle degree, the time that crackle generates is postponed, is increased The firmness and aesthetic measure of wall extend wall usage time.In addition, the metope anticracking batch embedding technology of the present invention, construction It is simple and practicable, it is at low cost, efficient.
Description of the drawings
Fig. 1 is metope anticracking of the present invention batch embedding technology construction drawing.
Specific implementation mode
The technique effect of the design of the present invention, concrete structure and generation is described further below with reference to attached drawing, with It is fully understood from the purpose of the present invention, feature and effect.
With reference to figure 1, metope anticracking of the invention batch embedding technology includes the following steps:
Step 1:Metope roots out original wall skin, cleaning dust;The coat of plaster of newly constructed house metope is often not solid enough or environmentally friendly Not up to standard, continuing wall construction on this basis, there are greater risks and uncertain factor;If it is old house, wall The original finishing of body does not meet construction requirement, or due to the use of overlong time, more hollowing, crack, hole has occurred Equal metopes problem, also roots out its whole, until exposing original cement layer;If shovel wall has shoveled brick face layer, It needs first making cement to plaster, waits for that cement plaster conserves, filling-in and the local of cleaning must all allow it fully dry, wall moisture content 6% is should be less than, next process could be carried out.
Step 2:Brushing interface treating agent 11;Interface treating agent 11 for closing base, prevent because metope is loose, surface dust or The reasons such as overdrying and influence in next step construct, substrate surface can be made to become coarse, bonding of the cement mortar to base can be increased Power avoids coat of plaster hollowing from flaking, and to replace artificial chiseling treatment process, avoids causing since base interface is not easy bonding Coat of plaster hollowing, cracking, peel off the problems such as.Block the moisture content in screed-coat cement mortar not by concrete, aerating simultaneously Concrete absorbs quickly, to ensure the firm time and intensity of cement mortar.The construction environment palpus of brushing interface treating agent 11 Dry, relative humidity should be less than 70%, and well-ventilated, constructs and the temperature of environment is not lower than+5 DEG C.
Construction procedure is as follows:1)By interfacial agents:Water=4:1 to 3:1(Weight ratio)Ratio stirring be adjusted to butyrous, it is static 15 minutes, interfacial agents meeting retrogradation can be mixed well slightly water, you can use at this time;2)Interfacial agents after stirring evenly are pulled with mud It is applied in base, then pulls to push down mud and pulled out in base, you can formation thickness is the concavo-convex interface agent layers of 1-3mm 20;Or the method using Cylinder coating brush or mechanically spraying, spary are injected into convex-concave surface in pending substrate surface;3)It allows Coating surface is dried about 12 hours;4)Reinforce natural curing under ventilation condition, waits for that slurry is done solid work(Surface becomes grey black)And confirm complete After closing basal plane, subsequent process can be carried out.
Step 3:One time putty repairs pore;Using aqueous putty repairing hollowing, wire casing, hole, filleting gypsum carries out ditch Seam processing, makes wall surface levelling.Constructing the previous day will be to metope watering wetting, and immersing aerated blocks metope 8-10mm with water is advisable, and meets Weather is air-dried, metope still drying is not wet when plastering, should spray a water again before construction.
Step 4:One layer of stickup glue is uniformly brushed, the compacting of covering wall grid cloth 12 bonds, then on grid cloth 12 Even one layer of stickup glue of brushing.Metope grid cloth 12 is alkali resistant glass fibre open weave cloth 12, has stable structure, intensity is high, alkaline-resisting The features such as performance is good, anti-corrosion, cracking resistance.It is coated with one layer of alkali resistant glass fibre open weave cloth 12 on metope, linking well can be played and drawn admittedly Originally larger extraneous stress is effectively dispersed into smaller stress by effect, originally issuable will be disperseed compared with wide seam At many compared with minute crack, to mitigate crackle degree, the time that crackle generates is postponed, increases the firmness of wall and beautiful journey Degree extends wall usage time.
When construction, white glue with vinyl is applied to the position of required patch grid cloth 12 with rotary broom, brushes uniformly, guarantees to be coated onto grid All positions that cloth 12 pastes, not show-through base, thickness 2-3mm need not wait first passes dry, carry out 12 paving of grid cloth immediately; The alkali resistant glass fibre open weave cloth 12 cut in advance is tensed, posts up and has scraped in bottom white glue with vinyl, smooth, corrugationless is wanted in paving, It is scraped into bottom white glue with vinyl with roller, does not stay wrinkle, grid cloth 12 is straight uniformly, width is consistent;After 12 paving of grid cloth is smooth, Uniformly brush one layer of white glue with vinyl again on grid cloth 12 again, it is more secured so as to what is glued.There is the place of socket port not need on wall It avoids, directly spreads out by grid cloth 12, directly be cropped with wallpaper knife after parching.It smoothed out with roller, look for straight, holding Founder at negative and positive angle and verticality.It is uniform that white glue with vinyl will apply rolling, should not uneven distribution, otherwise can influence the flat of later stage Puttying Whole degree.When needing overlap joint, the lap width at least 50mm between alkali resistant glass fibre open weave cloth 12, alkaline-resisting glass at metope yin, yang angle Fine grid cloth pressure stubble overlaps, lap width at least 50mm at inner corner trim, lap width at least 200mm at external corner, to ensure grid cloth 12 layers of integral strength.
Grid cloth 12 open it is viscous after the completion of, the next step can just be carried out by having to equal parch completely.If cannot be stood after parching Plastering on inner walls construction is carried out, watering maintenance is carried out after 12 hours, ensures that surface wettability, curing time are no less than 3 days.Grid cloth 12 tensionings are smooth non-wrinkle, and face layer white glue with vinyl is smooth closely knit, and surface does not reveal grid cloth 12, no delamination hollowing.
Step 5:Secondary putty thickness levelling 13;Thickness levelling 13 is carried out using water proof putty, after levelling, flatness bumps difference is answered 3mm should be no more than.The flatness for applying measuring scale to measure metope before Puttying is criticized, to determine the method for wanting Puttying, flatness Poor metope can be scraped several times more in part;For inner corner trim, external corner or the very poor metope of flatness(Out-of-flatness degree is more than 5- 10mm)Or metope tilt it is serious, it is contemplated that first scrape a levelling gypsum and carry out levelling, gypsum is constructed Puttying again after parching, Putty cannot be scraped too thick, be easy to split.For the preferable face of flatness, flatness is within ± 3mm, and there is no need to thickness levelling 13 , directly carry out the essence levelling 14 of next step.
Step 6:Levelling 14 cover of putty essence three times;Select grain fineness higher and the harder putty essence of quality levelling 14, Certain white glue with vinyl can also be added in putty, can improve the hardness of putty.
Step 7:It criticizes to scrape and polish flat;It scraped and just proceeds by within 1-2 days putty polishing after putty.Polishing can be selected in night Between, it is illuminated close to metope with bulb(It is also required to daytime levelling with light bulb), smooth degree is checked in polishing.It uses as possible relatively thin Sand paper, No. 400-500 sand paper of the relatively soft putty of general quality, quality is harder to be preferred with No. 360-400, if sand Paper can slightly leave very much very deep sand trace, and mopping can not cover.Polishing, which finishes, will thoroughly clean a metope, in case dust is too many, Influence the adhesive force of paint.
Step 8:Apply priming and finishing coat 15.After the floating dust on the putty surface after cleaning polishing, priming can be applied.Bottom Paint is applied and is brushed one times, after it is parched(2-4 hours)It can carry out next step.Pay attention to priming paint is watered ratio, cannot convert Water is too many or very little, and priming paint is had to brush even, it is ensured that each place of metope brushes, if metope eats paint, amount is larger, and priming paint is most It is well suitable to add a little more water, it is uniform to guarantee to brush.Since the painting brushing effects of priming paint will have a direct impact on the effect of finishing coat, Therefore with the same quality roller of finishing coat.
Finishing coat will usually be brushed twice, every to be separated by 2-4 hours or more between(Depending on its surface drying time)Wait for that it is basic It is dry.Finishing coat not add excessive water, can influence the hardness of film thickness, feel and paint film, select better tool as possible, The hair of roller is not too short, but have to it is thin, brush out in this way the paint film come just can feel it is fine and smooth, brushing main attention corner, often Indirect stubble part and receipts paint direction in rolling, the processing in corner, most cases are brushed with spread pen or scrubbing brush, can be easy in this way Cause corner texture and whole face inconsistent, it visually can be variant.The paint that stub land side is met with often rolling when Cylinder coating brush has to receive It is even, cannot it is blocked up can not be excessively thin, not so can be caused because of uneven distribution reflective inconsistent;Often rolling direction is also consistent, not so The texture of every rolling rolled out can be caused inconsistent, reflecting angle will be different, visually will be variant.Second time finishing coat brush After complete, needing 1-2 days could be completely dry, and waterproof is should be noted that before coating parches completely, takes precautions against drought, is sun-proof, prevents paint film from going out Existing problem.
Step 8:It inspects for acceptance.Finished product wall surface answer vertical solid, smooth, yin and yang mixture, free from flaw, without hole, color uniformly, Paint film is full, it is also noted that the case where checking finished product protection.
Step 9:Metope conserves:4 hours will be dried after emulsion paint brushing is complete, but dry paint film reaches not yet To certain hardness, therefore, within 7-10 days there are not scouring or the movement of any contact metope.
Disclosed above is only the embodiment of the present invention, and still, the present invention is not limited to this, the technology of any this field What personnel can think variation should all fall into protection scope of the present invention.

Claims (6)

1. a kind of metope anticracking batch embedding technology, which is characterized in that include the following steps:
Step 1:Metope roots out original wall skin, cleaning dust;
Step 2:Brushing interface treating agent(11);
Step 3:One time putty repairs pore;
Step 4:Paste wall grid cloth(12), compacting, bonding;
Step 5:Secondary putty thickness is levelling(13);
Step 6:Putty essence is levelling three times(14)Cover;
Step 7:It criticizes to scrape and polish flat.
2. metope anticracking according to claim 1 batch embedding technology, which is characterized in that the step 4 is specifically, first uniformly apply One layer of stickup glue of brush, grid coverage cloth(12)Compacting bonds, then in grid cloth(12)It is upper uniformly to brush one layer of glue Water.
3. metope anticracking according to claim 1 batch embedding technology, which is characterized in that the grid cloth of the step 4(12)For Alkali resistant glass fibre open weave cloth(12).
4. metope anticracking according to claim 3 batch embedding technology, which is characterized in that the alkali resistant glass fibre open weave cloth(12)It Between lap width at least 50mm.
5. metope anticracking according to claim 3 batch embedding technology, which is characterized in that alkali resistant glass fibre open weave cloth at metope inner corner trim (12)Press stubble overlap joint, lap width at least 50mm.
6. metope anticracking according to claim 3 batch embedding technology, which is characterized in that alkali resistant glass fibre open weave cloth at metope external corner (12)Press stubble overlap joint, lap width at least 200mm.
CN201810145676.8A 2018-02-12 2018-02-12 A kind of metope anticracking batch embedding technology Pending CN108343203A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810145676.8A CN108343203A (en) 2018-02-12 2018-02-12 A kind of metope anticracking batch embedding technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810145676.8A CN108343203A (en) 2018-02-12 2018-02-12 A kind of metope anticracking batch embedding technology

Publications (1)

Publication Number Publication Date
CN108343203A true CN108343203A (en) 2018-07-31

Family

ID=62959468

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810145676.8A Pending CN108343203A (en) 2018-02-12 2018-02-12 A kind of metope anticracking batch embedding technology

Country Status (1)

Country Link
CN (1) CN108343203A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109403568A (en) * 2018-10-29 2019-03-01 重庆辞旧迎新装饰设计工程有限公司 The anti-aliquation cracking resistance exfoliation process of metope
CN109723191A (en) * 2018-11-21 2019-05-07 温州市东日建筑装饰工程有限公司 A kind of finishing wall finiss coating method and preparation method
CN109930856A (en) * 2019-04-02 2019-06-25 浙江力唯装饰设计工程有限公司 A kind of the old and new's wall concatenation construction method
CN110306800A (en) * 2019-07-25 2019-10-08 北京鑫源轩建筑装饰工程有限公司 A method of avoid coating in fitting-out work from cracking
CN110499875A (en) * 2019-09-02 2019-11-26 深圳名家设计事务所有限公司 A kind of anticracking metope and its wall building technique
CN111677280A (en) * 2020-03-13 2020-09-18 福清市景士兰涂料有限公司 Construction method of exterior wall coating
CN112376931A (en) * 2020-11-22 2021-02-19 袁利峰 Construction method for building wall decoration
CN113653354A (en) * 2021-07-15 2021-11-16 朱柏树 Construction method for reconstructing external wall
CN115405060A (en) * 2022-08-24 2022-11-29 浮峰峰 Method for combining ceramic tile and putty at bealock

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006291561A (en) * 2005-04-11 2006-10-26 Kowa Chem Ind Co Ltd Exposed concrete finishing method applied to siding board surface
CN101591485A (en) * 2009-06-10 2009-12-02 巨匠建设集团有限公司 A kind of anti-cracking putty for building and constructional method thereof
CN103321442A (en) * 2013-06-14 2013-09-25 浙江建设职业技术学院 Self-compensating repair structure and process for internal stress cracking of inner wall heat insulating wall surface
CN106049780A (en) * 2016-06-17 2016-10-26 广州发展环保建材有限公司 Plastering-free construction technique for high-precision brickwork
CN107130750A (en) * 2017-06-10 2017-09-05 东莞市华美乐建材超市有限公司 A kind of brushing method of pair of putty layer

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006291561A (en) * 2005-04-11 2006-10-26 Kowa Chem Ind Co Ltd Exposed concrete finishing method applied to siding board surface
CN101591485A (en) * 2009-06-10 2009-12-02 巨匠建设集团有限公司 A kind of anti-cracking putty for building and constructional method thereof
CN103321442A (en) * 2013-06-14 2013-09-25 浙江建设职业技术学院 Self-compensating repair structure and process for internal stress cracking of inner wall heat insulating wall surface
CN106049780A (en) * 2016-06-17 2016-10-26 广州发展环保建材有限公司 Plastering-free construction technique for high-precision brickwork
CN107130750A (en) * 2017-06-10 2017-09-05 东莞市华美乐建材超市有限公司 A kind of brushing method of pair of putty layer

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘勇: "《外墙外保温墙面裂缝成因及质量控制》", 31 May 2011, 西南交通大学出版社 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109403568A (en) * 2018-10-29 2019-03-01 重庆辞旧迎新装饰设计工程有限公司 The anti-aliquation cracking resistance exfoliation process of metope
CN109723191A (en) * 2018-11-21 2019-05-07 温州市东日建筑装饰工程有限公司 A kind of finishing wall finiss coating method and preparation method
CN109930856A (en) * 2019-04-02 2019-06-25 浙江力唯装饰设计工程有限公司 A kind of the old and new's wall concatenation construction method
CN110306800A (en) * 2019-07-25 2019-10-08 北京鑫源轩建筑装饰工程有限公司 A method of avoid coating in fitting-out work from cracking
CN110499875A (en) * 2019-09-02 2019-11-26 深圳名家设计事务所有限公司 A kind of anticracking metope and its wall building technique
CN111677280A (en) * 2020-03-13 2020-09-18 福清市景士兰涂料有限公司 Construction method of exterior wall coating
CN112376931A (en) * 2020-11-22 2021-02-19 袁利峰 Construction method for building wall decoration
CN112376931B (en) * 2020-11-22 2022-07-15 浙江至方建设有限公司 Building wall decoration construction method
CN113653354A (en) * 2021-07-15 2021-11-16 朱柏树 Construction method for reconstructing external wall
CN115405060A (en) * 2022-08-24 2022-11-29 浮峰峰 Method for combining ceramic tile and putty at bealock
CN115405060B (en) * 2022-08-24 2023-10-27 浮峰峰 Method for combining ceramic tile and putty at bealock

Similar Documents

Publication Publication Date Title
CN108343203A (en) A kind of metope anticracking batch embedding technology
CN101363269A (en) Construction method of plastering-free concrete structure wall putty
CN109797920B (en) Indoor decoration construction method
CN108179889A (en) One kind repaiies white washed wall face anticracking hollowing technique
CN107152145A (en) A kind of stone material flooring construction method
CN107044196A (en) A kind of concrete is plastered face emulsion paint brushing technique
CN102061798B (en) Construction method of epoxy self-leveling floor with concrete sealing curing agent and thereof
CN103821296A (en) Wall plastering technique for aerated concrete block filler wall
CN109826396A (en) A kind of construction method of A grades of fire prevention artistic floors
US9617737B2 (en) Waterproof decorative sheath system for walls of moist environments, and method for making it
CN107989299A (en) A kind of coating application method of Assembled wall panels
CN102094496A (en) Method for manufacturing imitation brick wall
CN107386681A (en) Puttying and the construction technology of brush emulsion paint
JP2009114047A (en) Method for polishing concrete floor
CN109853888A (en) A kind of historical building plucking wall surface construction technology
CN106869428A (en) A kind of heat insulating reflecting colored mortar construction technology
CN203834826U (en) Novel staircase water drip tank
CN205777261U (en) A kind of flexbile base half glue wallpaper barbola work structure
CN108179858A (en) A kind of artificial stone paving structure and its laying method
CN116537473A (en) Construction method for plastering inner wall of building
CN110409725A (en) A kind of interior decoration method
US20020020328A1 (en) Composition and method for wall treatment
CN110821101A (en) Construction method for paint outer wall line pressing groove
CN108331278A (en) A kind of construction method of pseudo-classic architecture wall
CN112177262B (en) Method for repairing cracking of latex paint

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180731

RJ01 Rejection of invention patent application after publication