CN109838065B - Floor tile ground paving construction method - Google Patents

Floor tile ground paving construction method Download PDF

Info

Publication number
CN109838065B
CN109838065B CN201910200471.XA CN201910200471A CN109838065B CN 109838065 B CN109838065 B CN 109838065B CN 201910200471 A CN201910200471 A CN 201910200471A CN 109838065 B CN109838065 B CN 109838065B
Authority
CN
China
Prior art keywords
paving
tiles
floor
brick
mortar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910200471.XA
Other languages
Chinese (zh)
Other versions
CN109838065A (en
Inventor
戴旭馗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Infinity Design & Engineering Co ltd
Original Assignee
Beijing Infinity Design & Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Infinity Design & Engineering Co ltd filed Critical Beijing Infinity Design & Engineering Co ltd
Priority to CN201910200471.XA priority Critical patent/CN109838065B/en
Publication of CN109838065A publication Critical patent/CN109838065A/en
Application granted granted Critical
Publication of CN109838065B publication Critical patent/CN109838065B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relates to a floor tile ground paving construction method, which comprises the following steps: first step, construction preparation: firstly, calibrating a horizontal marking line on an inner wall; screening the floor tiles by adopting a prefabricated mold; secondly, base layer treatment; step three, finding elevation and snapping line: fourthly, smearing leveling layer mortar; fifthly, loading files; sixthly, popping and paving a brick control line: determining the width of a gap for paving the floor tile according to design requirements, and starting to bounce the control line of the floor tile when the compressive strength of the screed mortar reaches 1.2 Mpa; the seventh step: paving bricks: and paving the floor tiles according to the control lines of the floor tiles; eighthly, pointing and wiping the seams; ninth, maintaining; tenth step, inlaying skirting boards: the vertical seam of the skirting board is aligned with the ground seam, a brick is respectively inlaid at the internal corners of two ends of the wall surface of a room during laying, and the upper edge of the brick is taken as a standard hanging line to begin laying. The invention has the advantages of meeting the construction requirements, being fast and convenient to be mastered by workers and having obvious construction effect.

Description

Floor tile ground paving construction method
Technical Field
The invention relates to the technical field of building decoration, in particular to a floor tile ground paving construction method.
Background
The floor tile is a ground decorative material, also called floor tile, and is made up by firing clay, and features various specifications, strong quality, pressure-resisting and wear-resisting property, and damp-proofing property, and some floor tiles are glazed to have decorative effect, and can be used for building floor and floor of public building and civil building.
The floor tile should theoretically be laid dry, and floating sand and sundries are removed after the base layer is watered and moistened. And (3) plastering a bonding layer, namely paving and flattening by using one to three dry cement mortar according to a horizontal line, putting the bricks on the mortar, compacting by using a rubber hammer, taking down the floor bricks, pouring cement paste, and putting the floor bricks, compacting and flattening.
However, the floor tile is not adhered in a standard process, which causes poor adhesion quality and often causes the phenomenon of swelling and falling off, so that the owners are not satisfied. In the building construction, a well, standardized and mature construction process is lacked, the construction of laying various existing complex ceramic floor tiles is met, the construction requirement can be met, the ceramic floor tiles can be mastered by workers quickly and conveniently, and the construction effect is obvious.
Disclosure of Invention
The invention aims to provide a floor tile ground paving construction method which meets construction requirements, is fast and convenient to master by workers and has obvious construction effect
The above object of the present invention is achieved by the following technical solutions:
a paving construction method for a floor tile ground comprises the following steps:
first step, construction preparation: firstly, calibrating a horizontal marking line on an inner wall of a building to be constructed; screening the floor tiles by adopting prefabricated moulds matched with the shapes of the floor tiles, and selecting the floor tiles meeting the requirements;
step two, basic layer treatment: cleaning up sundries on the concrete base layer, removing mortar falling ash by using a chisel, and brushing a floating slurry layer by using a steel wire brush;
step three, finding elevation and snapping line: according to a horizontal elevation line calibrated on the inner wall in advance, the elevation of a cement mortar leveling layer on the surface layer is measured downwards, and the cement mortar leveling layer is bounced on the wall body through an elastic line;
fourthly, leveling layer mortar smearing: uniformly spraying water on the bottom base layer on the cleaned base layer by adopting a spray can, then performing plastering operation on the base layer, wherein the distance between adjacent plaster cakes is not more than 1.5m, the top end plane of the plaster cake is flush with the elevation of the cement mortar leveling layer, and then plastering a mark rib from one side of a room;
step five, filing: removing residual slurry of the plastered standard ribs, brushing a cement paste adhesive layer once, paving the mixed cement paste between the standard ribs by using a small flat spade or a wood trowel according to the elevation of the standard ribs, spreading and tamping the cement paste by using the wood trowel, scraping the cement paste by using a small wood bar, rubbing the cement paste by using the wood trowel to level the paved mortar and the standard ribs, checking the flatness of the cement paste by using a large wood bar horizontally and vertically, and watering and maintaining the cement paste after 24 hours;
sixthly, popping and paving a brick control line: determining the width of a gap paved by the floor tiles according to the design requirements and the specification and the size of the floor tiles, and starting to bounce the control line of the tiles when the compressive strength of the screed mortar reaches 1.2 Mpa;
the seventh step: paving bricks: firstly, sprinkling water on a leveling layer for moistening, uniformly coating plain cement paste, and paving and pasting according to a floor tile control line;
eighth step, pointing and seam wiping: the surface layer is paved and adhered for seam wiping and pointing within 24 hours;
ninth step, maintenance: after bricks are paved for 24 hours, watering and curing are carried out, and the time is not less than 7 d;
tenth step, inlaying skirting boards: the vertical seam of the skirting board is aligned with the ground seam, a brick is respectively inlaid at the internal corners of two ends of the wall surface of a room during laying, the upper edge of the brick is taken as a standard hanging line, paving is started, adhesive mortar is smeared on the back surface of the brick upwards, the mortar is preferably fully adhered to the whole brick and is timely adhered to the wall, the upper edge of the brick is required to follow the line and is immediately tamped, then the extruded mortar is scraped off, and the surface layer is cleaned.
Through adopting above-mentioned technical scheme, through carrying out the demarcation of horizontal marking line on the inner wall in advance to when carrying out the laying of screed-coat, use this horizontal marking line to carry out the elevation of screed-coat as the benchmark, thereby ensure the level of screed-coat, laying, bullet brick laying control line of screed-coat afterwards, tile laying according to the line at last, thereby guarantee that the ceramic tile of laying out at last can satisfy the required quality of construction, and this operation method is simple easily learned.
The invention is further configured to: in the step of treating the base layer, when the base layer is greasy, 10% caustic soda is used for cleaning, and clear water is used for timely cleaning the caustic soda on the base layer.
Through adopting above-mentioned technical scheme, clear up the greasy dirt on the basic unit to avoid the ceramic tile when laying, the condition of bonding insecure appears between ceramic tile and the basic unit.
The invention is further configured to: in the construction preparation step, a prefabricated mould matched with the floor tile in shape is customized for the battens.
Through adopting above-mentioned technical scheme, protect the ceramic tile, avoid causing the damage of ceramic tile when the screening ceramic tile.
The invention is further configured to: in the brick paving step, the position and the elevation are well found before brick paving, 2-3 rows of bricks are paved longitudinally from a door, and then the bricks are used as the marking ribs to draw the vertical and horizontal marking lines, and the bricks are paved from the inside to the outside.
By adopting the technical scheme, the condition that people step on the floor tiles which are just paved when paving the floor tiles is avoided, so that the paved floor tiles are uneven.
The invention is further configured to: in the tile paving step, a plurality of exhaust members are placed at positions of tiles to be paved before the tiles are paved, the exhaust members are arranged along the edges of the tiles, at least two exhaust members are arranged on each edge of the tiles, each exhaust member comprises an L-shaped exhaust pipe, each exhaust pipe comprises a horizontal portion and a vertical portion, the horizontal portion is arranged between a base layer and the corresponding tile, the vertical portion extends upwards vertically, a plurality of horizontal plates are arranged at the bottom end of the horizontal portion and distributed along the axial direction of the horizontal portion, when the tiles are paved, the tiles and the base layer extrude the horizontal portion of the exhaust pipe in the middle, the side walls of the vertical portions are attached to the side walls of the tiles, and the vertical portions are small in thickness compared with the height.
Through adopting above-mentioned technical scheme, through setting up the exhaust piece to the steam that makes the position department that is located between ceramic tile and the basic unit, in the middle of being located can discharge through the exhaust piece, both accelerated the bonding speed of ceramic tile, makes steam discharge fast simultaneously, avoids its phenomenon that appears hollowing.
The invention is further configured to: the diameter of the vertical part is matched with the width of a gap paved by the floor tiles.
Through adopting above-mentioned technical scheme, when paving the brick, only need all with adjacent brick all with vertical portion looks butt, can enough guarantee the regularity of the ceramic tile of paving.
The invention is further configured to: the exhaust pipe is made of high polymer materials.
Through adopting above-mentioned technical scheme, it has stand wear and tear, corrosion-resistant advantage to have longer life.
The invention is further configured to: the pipe wall of the horizontal part is provided with a plurality of air holes.
Through adopting above-mentioned technical scheme, do benefit to the discharge of moisture between basic unit and the ceramic tile to accelerate the speed of laying of ceramic tile.
In conclusion, the beneficial technical effects of the invention are as follows:
1. the horizontal marking lines are calibrated on the inner wall in advance, so that the elevation of the leveling layer is increased by taking the horizontal marking lines as a reference when the leveling layer is laid, the horizontal height of the leveling layer is ensured, then the control line of laying and elastic laying of the leveling layer is carried out, and finally brick laying is carried out according to the line, so that the finally laid floor tiles can meet the quality requirement of construction, and the operation method is simple and easy to learn;
2. the air exhaust member is arranged between the floor tile and the base layer, so that air and water vapor lamps between the floor tile and the base layer are exhausted from the air exhaust member, the laying speed of the floor tile is accelerated, and meanwhile, the phenomenon of hollowing caused by excessive water vapor between the floor tile and the base layer is avoided.
Drawings
FIG. 1 is a flow chart of a floor tile paving method;
FIG. 2 is a diagram showing the placement of the vent relative to the tile;
fig. 3 is a schematic view of the structure of the exhaust member.
In the figure, 1, an exhaust pipe; 11. a horizontal portion; 111. air holes are formed; 12. a vertical portion; 2. a horizontal plate.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1, the tile and floor paving construction method disclosed by the invention comprises the following steps:
first step, construction preparation: firstly, the horizontal marking line is calibrated on the inner wall of the building to be constructed. And selecting the floor tiles to be paved, selecting the floor tiles through a prefabricated mould which is customized by battens and is matched with the floor tiles in shape, selecting the floor tiles with the length, the width and the thickness of not more than +/-1 mm, and selecting the floor tiles with cracks and falling angles on the surfaces.
Step two, basic layer treatment: cleaning up the sundries on the concrete base layer, removing the mortar falling ash by using a chisel, and brushing the laitance layer by using a steel wire brush. If the surface of the base layer is adhered with oil stains, 10% caustic soda is used for cleaning, and the caustic soda on the base layer is cleaned in time by using clean water.
Step three, finding elevation and snapping line: according to a horizontal elevation line calibrated on the inner wall in advance, the elevation of the cement mortar leveling layer is carried out on the surface layer of the downward measuring position, and the cement mortar leveling layer is bounced on the wall body through a line snapping.
Fourthly, leveling layer mortar smearing: on the base course that clears up, adopt the watering can evenly to spray bottom surface basic unit once water, then carry out the plastering cake operation on the base course, the interval between the adjacent plastering cake is no longer than 1.5m, and the top plane of plastering cake flushes with the elevation of cement mortar screed-coat, then begins to plaster the mark muscle from one side in room.
Step five, filing: removing residual paddle residues on the smeared mark ribs, and brushing a cement paste bonding layer once, wherein the water cement ratio of the cement paste bonding layer is 0.4-0.5. When the cement paste adhesive layer is coated, mortar is spread along with coating. And paving the mixed cement mortar (the mixing ratio is 1:3-1: 4) between the standard ribs by using a small flat shovel or a wood trowel according to the elevation of the standard ribs, spreading and tamping the cement mortar by using the wood trowel, scraping the cement mortar by using a small wood bar, flattening the cement mortar by using the wood trowel, leveling the paved mortar and the standard ribs, checking the flatness of the mortar by using a large wood bar in a horizontal and vertical mode, and watering and maintaining the mortar after 24 hours.
And a sixth step: b, elastic brick laying control line: and when the compressive strength of the screed-coat mortar reaches 1.2Mpa, the control line for popping the bricks begins to be played. The width of a gap for paving the floor tile is determined in advance according to design requirements and specification and size of floor tiles, when the design is random and fixed, the width of a tight paving gap is not more than 1mm, and the width of a virtual seam paving gap is preferably 5-10 mm.
The seventh step: paving bricks: in order to find the position and elevation, 2-3 rows of bricks are laid longitudinally from the doorway, the horizontal and vertical elevation lines are drawn by using the bricks as the marking ribs, the bricks are withdrawn from the inside to the outside during laying, a person cannot step on the just laid bricks, and each brick is laid and attached along with a floor tile control line.
The specific operation procedures are as follows:
a. before paving, the floor tiles are put into a semi-cutting bucket to be soaked in water and wet until the floor tiles do not generate bubbles and the surface of the floor tiles is free of open water after being dried, and the floor tiles can be used.
b. The leveling layer is sprayed with water to be wet, plain cement paste is uniformly coated, the water-cement ratio of the plain cement paste is 0.4-0.5, the coating area is not too large, and the quantity of the plain cement paste is not too large.
c. Blending combined materials of the bonding layer: when the asphalt cementing material and the adhesive are adopted, the mixing proportion is determined after laboratory tests besides the operation according to the factory specifications, the asphalt cementing material and the adhesive are uniformly mixed during mixing, ash lumps cannot be generated, too much asphalt cement is not required during one-time mixing, and the asphalt cement is required to be used up within the specified time. When the cement mortar bonding layer is used, the mixing ratio is 1:2.5 (cement: sand) dry hard mortar. It should be used with stirring and before initial setting to prevent influence on bonding quality.
d. Referring to fig. 2, prior to paving a tile, a plurality of vents are first placed in the area to be tiled, wherein the vents are located along the edges of the tile. At least two are provided on each edge of the tile.
Referring to fig. 3, the vent element includes an exhaust pipe 1 made of a polymer material in an "L" shape, the exhaust pipe 1 includes a horizontal portion 11 for being placed between a base layer and a floor tile and a vertical portion 12 extending in a vertical direction, and the horizontal portion 11 and the vertical portion 12 are integrally bent. The bottom end of the horizontal part 11 is provided with a horizontal plate 2 which is horizontally arranged, and the rest exhaust pipes 1 of the horizontal plate 2 are fixedly connected. The vertical portion 12 of the exhaust pipe 1 is perpendicular to the surface of the horizontal plate 2. When the air discharge member is placed, the horizontal plate 2 is attached to the base layer so that the vertical portion 12 is vertically oriented upward when the horizontal plate 2 is placed between the floor tile and the base layer. The height dimension of the uprights 12 is small compared to the thickness dimension of the tiles.
The horizontal portion 11 has a plurality of air holes 111 formed on the wall thereof. The diameter of the uprights 12 matches the width of the gap in which the tiles are laid. Before the floor tile is laid, the vent member is first laid on the base layer along the shape of the floor tile, and the horizontal plate 2 of the vent member is attached to the surface of the base layer such that the vertical portion 12 is vertically oriented upward. When the vent is placed, the side walls of the vertical portion 12 of the vent abut the side walls of the tiles already laid, on the side that abuts the tiles already laid.
And after the exhaust member is placed, carrying out brick paving operation, wherein during paving, the back surface of the brick is upwards smeared with bonding mortar and is paved on a brushed cement paste leveling layer, the upper edge of the brick is slightly higher than the horizontal marking line, and after alignment, straightening and square finding are carried out. Then the floor tile is placed on the horizontal part 11 of the exhaust member, the horizontal part 11 is extruded between the floor tile and the base layer, then the relative position of the exhaust member is adjusted, the side wall of the vertical part 12 of the exhaust member is attached to the edge of the floor tile opposite to the side wall, finally the floor tile is padded with a wood board, the wood board is compacted by a rubber hammer, and the wood board is laid from inside to outside in sequence, so that the floor tile is full, tightly and firmly connected with the floor drain, and the floor drain is processed into a shape matched with the floor drain by a grinding wheel saw. When the floor tiles are paved, the floor tiles are preferably paved one time at a time, and when large-area construction is carried out, the floor tiles are paved in a sectional and subsection mode.
Since the diameter of the vertical portion 12 of the air discharge member is matched with the width of the gap between the tiles, when two adjacent tiles are abutted against the vertical portion 12, the width of the gap between the adjacent tiles is determined.
Eighth step, pointing and seam wiping: the surface layer is paved and attached in 24h for joint wiping and jointing, and cement with the same variety, the same label and the same color is adopted.
a. Pointing: jointing with 1:1 cement fine mortar, wherein the depth in the joint is preferably 1/3 of the thickness of a brick, and the mortar in the joint is required to be dense, flat and smooth. The residual cement mortar is cleaned and wiped away along with the hook.
b. Seam wiping: if no gap or small gap is required, the gap is required to be flat and straight, grout is poured into the gap on the paved and finished brick surface layer by using a grout pot, then dry cement is spread on the gap, and then the gap is rubbed and rubbed by using a cotton yarn ball to wipe the gap fully. And finally wiping the cement paste on the surface layer.
Ninth step, maintenance: and after the bricks are paved for 24 hours, watering and curing for no less than 7 days.
Tenth step, inlaying skirting boards: the brick for the skirting board is generally made of materials which are the same in variety, specification and color as ground blocks, the vertical seam of the skirting board is aligned with the ground seam, one brick is inlaid at the internal corners of two ends of a wall surface of a room during laying, the thickness and height of a wall are in accordance with the design requirements, the upper edge of the brick is taken as a standard hanging line and begins to be laid, adhesive mortar (cement mortar with the mixing ratio of 1: 2) is smeared on the back surface of the brick upwards, the mortar is favorably pasted on the whole brick and is timely pasted on the wall, the edge of the brick is immediately compacted along with the line, then the extruded mortar is scraped off, and the surface layer is cleaned. Before the skirting board is pasted, the brick materials are soaked in water and dried, and the wall surface is brushed to be wet.
The embodiments of the present invention are preferred embodiments of the present invention, and the scope of the present invention is not limited by these embodiments, so: all equivalent changes made according to the structure, shape and principle of the invention are covered by the protection scope of the invention.

Claims (7)

1. A floor tile ground paving construction method is characterized in that: the method comprises the following steps:
first step, construction preparation: firstly, calibrating a horizontal marking line on an inner wall of a building to be constructed; screening the floor tiles by adopting prefabricated moulds matched with the shapes of the floor tiles, and selecting the floor tiles meeting the requirements;
step two, basic layer treatment: cleaning up sundries on the concrete base layer, removing mortar falling ash by using a chisel, and brushing a floating slurry layer by using a steel wire brush;
step three, finding elevation and snapping line: according to a horizontal elevation line calibrated on the inner wall in advance, the elevation of a cement mortar leveling layer on the surface layer is measured downwards, and the cement mortar leveling layer is bounced on the wall body through an elastic line;
fourthly, leveling layer mortar smearing: uniformly spraying water on the bottom base layer on the cleaned base layer by adopting a spray can, then performing plastering operation on the base layer, wherein the distance between adjacent plaster cakes is not more than 1.5m, the top end plane of the plaster cake is flush with the elevation of the cement mortar leveling layer, and then plastering a mark rib from one side of a room;
step five, filing: removing residual slurry of the plastered standard ribs, brushing a cement paste adhesive layer once, paving the mixed cement paste between the standard ribs by using a small flat spade or a wood trowel according to the elevation of the standard ribs, spreading and tamping the cement paste by using the wood trowel, scraping the cement paste by using a small wood bar, rubbing the cement paste by using the wood trowel to level the paved mortar and the standard ribs, checking the flatness of the cement paste by using a large wood bar horizontally and vertically, and watering and maintaining the cement paste after 24 hours;
sixthly, popping and paving a brick control line: determining the width of a gap paved by the floor tiles according to the design requirements and the specification and the size of the floor tiles, and starting to bounce the control line of the tiles when the compressive strength of the screed mortar reaches 1.2 Mpa;
the seventh step: paving bricks: firstly, sprinkling water on a leveling layer for moistening, uniformly coating plain cement paste, and paving and pasting according to a floor tile control line; before paving the tiles, placing a plurality of air exhaust members at the positions of the tiles to be paved, wherein the air exhaust members are arranged along the edges of the tiles, at least two air exhaust members are arranged on each edge of the tiles, each air exhaust member comprises an L-shaped air exhaust pipe (1), each air exhaust pipe (1) comprises a horizontal part (11) arranged between a base layer and the tiles and a vertical part (12) extending upwards vertically, a plurality of horizontal plates (2) distributed along the axial direction of the horizontal part (11) are arranged at the bottom end of the horizontal part (11), when the tiles are paved, the tiles and the base layer squeeze the horizontal part (11) of the air exhaust pipe (1) in the middle, the side walls of the vertical part (12) are attached to the side walls of the tiles, and the height size of the vertical part (12) is smaller than the thickness size of the tiles;
eighth step, pointing and seam wiping: the surface layer is paved and adhered for seam wiping and pointing within 24 hours;
ninth step, maintenance: after bricks are paved for 24 hours, watering and curing are carried out, and the time is not less than 7 d;
tenth step, inlaying skirting boards: the vertical seam of the skirting board is aligned with the ground seam, a brick is respectively inlaid at the internal corners of two ends of the wall surface of a room during laying, the upper edge of the brick is taken as a standard hanging line, paving is started, adhesive mortar is smeared on the back surface of the brick upwards, the mortar is preferably fully adhered to the whole brick and is timely adhered to the wall, the upper edge of the brick is required to follow the line and is immediately tamped, then the extruded mortar is scraped off, and the surface layer is cleaned.
2. A tile floor paving construction method as claimed in claim 1, wherein: in the step of treating the base layer, when the base layer is greasy, 10% caustic soda is used for cleaning, and clear water is used for timely cleaning the caustic soda on the base layer.
3. A tile floor paving construction method as claimed in claim 1, wherein: in the construction preparation step, a prefabricated mould matched with the floor tile in shape is customized for the battens.
4. A tile floor paving construction method as claimed in claim 1, wherein: in the brick paving step, the position and the elevation are well found before brick paving, 2-3 rows of bricks are paved longitudinally from a door, and then the bricks are used as the marking ribs to draw the vertical and horizontal marking lines, and the bricks are paved from the inside to the outside.
5. A tile floor paving construction method as claimed in claim 1, wherein: the diameter of the vertical part (12) is matched with the width of a gap paved by the floor tiles.
6. A tile floor paving construction method as claimed in claim 1, wherein: the exhaust pipe (1) is made of high polymer materials.
7. A tile floor paving construction method as claimed in claim 1, wherein: the pipe wall of the horizontal part (11) is provided with a plurality of air holes (111).
CN201910200471.XA 2019-03-16 2019-03-16 Floor tile ground paving construction method Active CN109838065B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910200471.XA CN109838065B (en) 2019-03-16 2019-03-16 Floor tile ground paving construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910200471.XA CN109838065B (en) 2019-03-16 2019-03-16 Floor tile ground paving construction method

Publications (2)

Publication Number Publication Date
CN109838065A CN109838065A (en) 2019-06-04
CN109838065B true CN109838065B (en) 2021-04-20

Family

ID=66885826

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910200471.XA Active CN109838065B (en) 2019-03-16 2019-03-16 Floor tile ground paving construction method

Country Status (1)

Country Link
CN (1) CN109838065B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111172835A (en) * 2020-02-18 2020-05-19 深圳市科建建设集团有限公司 Manufacturing and mounting method of building energy-saving floor tile
CN111335604A (en) * 2020-03-10 2020-06-26 广东博智林机器人有限公司 Working device of leveling robot and leveling robot
CN111550004A (en) * 2020-05-18 2020-08-18 浙江军天建筑装饰工程有限公司 Ground paving method

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101565997A (en) * 2009-05-25 2009-10-28 青岛恒生源集团建设有限公司 Construction method for large-area irregular floor tile
US9487959B2 (en) * 2013-04-09 2016-11-08 Clinton D. Bunch Device for leveling and aligning tiles and method for leveling and aligning tiles
CN103938822B (en) * 2014-04-11 2016-04-13 赵德存 A kind of mounting method of inorganic heat-insulation decoration board
CN108385932A (en) * 2018-03-09 2018-08-10 北京市建筑工程装饰集团有限公司 The laying method of macroplate stone material

Also Published As

Publication number Publication date
CN109838065A (en) 2019-06-04

Similar Documents

Publication Publication Date Title
CN101016759B (en) Fiver cement board grouting wall and construction method therefor
CN102644362B (en) Method for architectural decoration plastering construction
CN1232702C (en) Concrete colour embossing ground floor technology
CN102358693B (en) Levelling mortar and ground construction process based on the same
CN103046709B (en) Building construction method of inner wall surface
CN103740156B (en) A kind of construction technology of low-cost and easy-to construct putty
CN104179263A (en) Building exterior wall external thermal insulation system waterproof and drainage construction method
CN102477797B (en) A kind of construction method preventing infilled wall crack
US3406618A (en) Method of manufacturing bricks, tiles, cobblestones and the like directly on the gorund to be covered
CN101255717B (en) Construction technique for building block and wall board
US20120096803A1 (en) Method of forming surface seeded particulate
US20060251862A1 (en) Composite shaped block
CN201190380Y (en) Thick plastering system of heated board for face brick wall
CN102704635B (en) Paint brushing construction method
Lin Maintainability of facilities: for building professionals
CN101935196A (en) Putty for building external wall
CN107035103A (en) A kind of cement floor construction method
CN102140836A (en) Construction method of large-size floor tile
CN104032930A (en) Press molded concrete ground construction method
CN202990369U (en) Water stop device with bathroom threshold stones
CN102505831B (en) Construction method for paving plasters on ground and manmade stone
CN103572845B (en) A kind of insulation clay reflective heat-insulation paint exterior wall heat-preserving system and construction technology thereof
CN103321442A (en) Self-compensating repair structure and process for internal stress cracking of inner wall heat insulating wall surface
CN104358341A (en) Building brickwork and masonry construction method of building brickwork
CN104047410B (en) Stone material paving construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant