CN103572845B - A kind of insulation clay reflective heat-insulation paint exterior wall heat-preserving system and construction technology thereof - Google Patents

A kind of insulation clay reflective heat-insulation paint exterior wall heat-preserving system and construction technology thereof Download PDF

Info

Publication number
CN103572845B
CN103572845B CN201310576896.3A CN201310576896A CN103572845B CN 103572845 B CN103572845 B CN 103572845B CN 201310576896 A CN201310576896 A CN 201310576896A CN 103572845 B CN103572845 B CN 103572845B
Authority
CN
China
Prior art keywords
heat
insulation
construction
layer
coat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310576896.3A
Other languages
Chinese (zh)
Other versions
CN103572845A (en
Inventor
蒋字平
唐翠红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Tianjinyun Energy Saving and Waterproof Technology Co., Ltd.
Original Assignee
Anhui Tianjinyun Paint Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Tianjinyun Paint Industry Co Ltd filed Critical Anhui Tianjinyun Paint Industry Co Ltd
Priority to CN201310576896.3A priority Critical patent/CN103572845B/en
Publication of CN103572845A publication Critical patent/CN103572845A/en
Application granted granted Critical
Publication of CN103572845B publication Critical patent/CN103572845B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of insulation clay reflective heat-insulation paint exterior wall heat-preserving system and production technology thereof, including heat-insulation layer and coat system, described coat system is made up of priming coat, putty layer and reflective heat-insulation paint finish coat, construction technology includes preparing and two stages of construction, the coating system cost of manufacture of the present invention is low, having good weatherability, in the use standard that water absorption, impact strength, freeze-thawing resistant and mar proof are satisfied by exterior wall, and durability is the most excellent.

Description

A kind of insulation clay reflective heat-insulation paint exterior-wall heat insulation System and construction technology thereof
Technical field
The invention belongs to building material field, it is more particularly related to a kind of insulation clay reflective heat-insulation paint exterior wall heat-preserving system and construction technology thereof.
Background technology
When current architectural reflective heat-insulation paint is applied in the Energy Conservation Project in Construction of hot-summer and cold-winter area, need to configure heat-insulation layer, to meet the needs of insulation.Such as, with expansion polyphenyl plate, extruded polystyrene board or building heat-insulating mortar etc. as heat-insulation layer.The external thermal insulation system so formed is poor due to the cracking resistance of anti-cracking protective layer, or the poor dimensional stability of heat-insulation layer, frequently results in external thermal insulation system cracking, infiltration.
In external thermal insulation system, owing to insulation is placed in the outside of exterior wall, directly bearing the various factors from nature affects.Owing to heat-insulation layer has the biggest thermal resistance, therefore in the case of heat is identical, exterior wall surface temperature changing speed improves 8~30 times than during without insulation situation.Such as, for using polyphenyl plate thin plastering exterior wall heat-insulation system, summer metope temperature can reach 80 DEG C, the surface temperature continuing summer to suddenly rain cats and dogs caused after fine day changes up to 50 DEG C.Therefore External Wall coating and matching putty thereof propose new, tightened up cracking resistance, waterproof requirement, use common exterior wall putty necessarily can not meet this requirement.
Summary of the invention
Problem to be solved by this invention is to provide a kind of need not under heat-insulation layer situation within 30mm and uses anti-cracking protective layer, to simplify operational procedure, shorten the construction period and reduce there is reliable crack resistance and constructing safety insulation clay reflective heat-insulation paint exterior wall heat-preserving system of system cost.
To achieve these goals, the technical scheme that the present invention takes is: a kind of insulation clay reflective heat-insulation paint exterior wall heat-preserving system, including heat-insulation layer and coat system, described coat system is made up of priming coat, putty layer and reflective heat-insulation paint finish coat.
Preferably, described putty layer is water-proof putty, polymer glue powder, portland cement, ground calcium carbonate, silica flour, Pulvis Talci, defoamer and hydroxypropyl methyl cellulose prepare.
Preferably, described hydroxypropyl methyl cellulose is 100000Pa S.
Preferably, the addition of described polymer glue powder is not less than 25%.
The cementitious matter of Thermal insulation waterproof daub is styrene-polyacrylic acid copolymerized resin and Ludox; this is the cementing material extensively being proved to have good durability at building coating and other industry; the durability of the polystyrene that the expansion polyphenyl plate in the expansion joints bellows external thermal insulation system of ratio uses is the most excellent; and the expanded and vitrified small ball that Thermal insulation waterproof daub uses is inorganic material; also there is good durability; and the amount of granular polystyrene is less, it is fully able to be wrapped up by inorganic hollow glass bead or hollow glass micropearl, aluminium silicate.
The high-performance flexible anti-cracking waterproof putty used in exterior wall heat preservation water proof clay-insulating moulding coating energy conserving system has adhesion strength and the pliability of excellence.
Use the technical program, the elastic architectural reflective heat-insulation paint of use be polyacrylate resin be film forming matter, there is crack resistance, water proofing property, there is the durability of more than 10 years.
A kind of construction technology being incubated clay reflective heat-insulation paint exterior wall heat-preserving system, comprises the steps:
(1) preparation of construction: the dust of base course wall, dirt, oil stain and residual ash block etc. being cleaned out, the high convex place of substrate surface picks flat;Honeycomb, pitted skin, dew muscle, loose part to be dug firm place, is layered filling-in with 1: 2.5 cement mortar or pea gravel concreten, disposes first-class to exposed steel bar head and galvanized wire;Pocket cement mortar is layered filling-in;Construction hole, scaffold eye are repaired complete;
(2) construction technology:
1. hang vertical line, set side: at external wall big angle, outer door and window, deformation joint hang vertical reference line, eject level, orthogonal control lines at metope;
2. ash cake, floating screed are done: heat-insulation layer should be used to do standard thickness ash cake, then floating screed, its thickness is on the basis of metope highest point, and insulation layer thickness is not less than design thickness, and carry out perpendicularity inspection, preferably set special-purpose metal corner protector at door and window mouth and at the external corner of bottom wall;
3. construction interface agent: basic unit interface uses spraying or roller applications uniform full coat interfacial agents, at the body of wall joint part of different materials composition, lays galvanizing electrowelding net and reinforces, and electrowelding net is no less than 100mm along joint part every edge lap width;
4. basic unit interface should use spraying or roller applications uniform full coat interfacial agents, at the body of wall joint part of different materials composition, should lay galvanizing electrowelding net and reinforce, and electrowelding net is no less than 100mm along joint part every edge lap width;
5. construction heat-insulating layer: heat-insulation layer should be constructed after interfacial agents dry solidification, construction in layer, construction thickness is no more than 10mm, and should be compacted to catch up with flat, twice construction should not be less than 24h interval time, it is finally reached floating screed thickness and puts down with darby compacting, stranding, allow between heat-insulation layer and basic unit and be firmly bonded between each layer of heat-insulation layer, not delamination, hollowing and cracking;
6. play frame bar, separation trough is installed: use alkali-resisting glass fiber screen cloth to carry out local enhancement at the position easy to crack that door, window hole and stress are concentrated, by the alkali-resisting glass fiber screen cloth paving that cuts in putty layer, smear pressure with spatula edge and sprawl fixing, by alkali-resisting glass fiber screen cloth press-in bottom putty layer;
7. putty layer is constructed priming coat after drying, and brushes uniformly;
8. construction building reflective heat-insulation paint facing: use the method construction reflective heat-insulation paint finish coat of spraying or roller coating.
Use the technical program, combine insulation clay reflective heat-insulation paint exterior wall heat-preserving system and simplify operational procedure, shorten the construction period and and can effectively reduce system cost, be effectively increased the adhesion between each layer, therefore body of wall has excellent barrier propterty.
Accompanying drawing explanation
Fig. 1 is a kind of structural representation being incubated clay reflective heat-insulation paint exterior wall heat-preserving system of the present invention.
Detailed description of the invention
Embodiment 1 :
A kind of insulation clay reflective heat-insulation paint exterior wall heat-preserving system, including heat-insulation layer 1 and coat system 5, described coat system 5 is made up of priming coat 2, putty layer 3 and reflective heat-insulation paint finish coat 7, constructing in basic unit 6 by insulation clay reflective heat-insulation paint exterior wall heat-preserving system, heat-insulation layer 1 and basic unit 6 connect.
Wherein heat-insulation layer 1 is Thermal insulation waterproof daub, and its formula is: styrene-acrylic emulsion 18.0% ~ 19.0%, Ludox 15.5% ~ 16%.; ester alcohol 0.9% ~ 1.0%, thickening agent 0.2% ~ 0.3%, antifungus agent 0.1% ~ 0.2%; ammonia 0.1% ~ 0.2%; dispersant 0.2% ~ 0.3%, granular polystyrene 1.5% ~ 2.2%, glass bead 12 ~ 19%, aluminium silicate 15% ~ 26%; functional fibre 0.7% ~ 0.9%; coupling agent 0.1% ~ 0.3%, wetting agent 0.1% ~ 0.3%, water 35% ~ 40%.
A kind of construction technology being incubated clay reflective heat-insulation paint exterior wall heat-preserving system:
(1) preparation of construction
1. unit in charge of construction should be according to establishment coating engineering arrangement and method for construction such as project situation, basic unit's condition, the selected pattern of design, color, gloss, material category, covering with paint pass, unit dose, job platform and application machineries.
2. cover with paint, lacquer, colour wash, etc. job platform should meet the following requirements:
A. the regulation of " construction high-rise working technical specification of security " JGJ80 should be met;
B. construction surface should take into full account the kind of coating, style with the distance of operation platform, it is simple to operation;
C. setting up scaffold by construction height requirement, scaffold should be stablized, firmly, reliably;
3. the material used by the construction of insulation clay reflective heat-insulation paint exterior wall heat-preserving system should have name of product, execution standard, kind, color, date of manufacture, shelf-life, manufacturing enterprise address, operation instruction and work certificate, and has Delivery Inspection Report, type inspection report.
4. coating is got the raw materials ready and is deposited and should meet the following requirements by unit in charge of construction:
A. in conjunction with real area and material unit dose and loss, the amount of getting the raw materials ready should be determined according to selected kind, technological requirement;
B. should order goods according to selected colour atla color.When surmounting colour atla scope, color sample plate should be provided by designer, and obtain order after Construction Party's accreditation;
C. material should leave the special warehouse specified in, and stacks respectively by kind, lot number, color, and special warehouse should be deposited and shady and cool be dried and ventilate, and temperature is between (5~40) to a certain degree DEG C.
5. should be carried out " model " or " model room " by workmen by procedure calls before construction, and remain into completion.
6. cover with paint, lacquer, colour wash, etc. and following qualified instrument, utensil before constructing, should be prepared:
A. brushing and the metering outfit such as brushing spread pen, bucket, balance, platform scale.
B. the roller coating instrument such as Pilus Caprae seu Ovis roller, sponge roller, supporting special roller and refining plate.
C. plastics roller, irony pressing plate rolling tools.
D. the spraying such as airless spraying equipment, air compressor, pistol, spray bucket, the nozzle of all size bore, high-pressure rubber pipe facility.
(2) operating condition
1. the construction of insulation clay reflective heat-insulation paint exterior wall heat-preserving system engineering should work out arrangement and method for construction, and workmen can on duty should operate after training.
2. the construction of insulation clay reflective heat-insulation paint exterior wall heat-preserving system engineering should meet following condition:
A. road base construction quality acceptance(check);
B. externally door and window housing or auxiliary frame should install, and dimension of opening, position should carry out an acceptance inspection, and its quality and index should meet design and related specifications requirement;
C. stretch out built-in fitting, the connectors such as the fire-fighting rack of outdoor wall surface, downpipe, various house-service pipeline and air-conditioner should install.
3. renovation of building engineering uses exterior-wall heat insulation clay reflective heat-insulation paint exterior wall heat-preserving system basic unit should meet following condition:
The most solid, smooth;
B. clean out. former coating architectural surface, the metope of pollution.Root out loosen, the position of hollowing, cracking, and use rigidity anti-crack mastic repair, levelling;
C. covering with paint, lacquer, colour wash, etc. construction temperature should be more than 5 DEG C, and relative air humidity is preferably less than 85%.Construction should be stopped when meeting dense fog strong wind and raining.
(3) construction technology and requirement
1. insulation clay reflective heat-insulation paint exterior wall heat-preserving system should be carried out to bottom from top of building, and construction segmentation should be with metope dividing joint, metope negative and positive angle or downpipe as demarcation line;
2. the construction of insulation clay reflective heat-insulation paint exterior wall heat-preserving system is carried out by follow procedure:
A. hang vertical line, set side: at external wall big angle, outer door and window, deformation joint hang vertical reference line, eject level, orthogonal control lines at metope;
B. ash cake, floating screed are done: heat-insulation layer should be used to do standard thickness ash cake, then floating screed, its thickness is on the basis of metope highest point, and insulation layer thickness is not less than design thickness, and carry out perpendicularity inspection, preferably set special-purpose metal corner protector at door and window mouth and at the external corner of bottom wall;
C. construction interface agent: basic unit interface uses spraying or roller applications uniform full coat interfacial agents, at the body of wall joint part of different materials composition, lays galvanizing electrowelding net and reinforces, and electrowelding net is no less than 100mm along joint part every edge lap width;
D. basic unit interface should use spraying or roller applications uniform full coat interfacial agents, at the body of wall joint part of different materials composition, should lay galvanizing electrowelding net and reinforce, and electrowelding net is no less than 100mm along joint part every edge lap width;
E. construction heat-insulating layer: heat-insulation layer should be constructed after interfacial agents dry solidification, construction in layer, construction thickness is no more than 10mm, and should be compacted to catch up with flat, twice construction should not be less than 24h interval time, it is finally reached floating screed thickness and puts down with darby compacting, stranding, allow between heat-insulation layer and basic unit and be firmly bonded between each layer of heat-insulation layer, not delamination, hollowing and cracking;
F. frame bar, installation separation trough: use alkali-resisting glass fiber screen cloth to carry out local enhancement at the position easy to crack that door, window hole and stress are concentrated, by the alkali-resisting glass fiber screen cloth paving that cuts in putty layer, smear pressure with spatula edge and sprawl fixing, by alkali-resisting glass fiber screen cloth press-in bottom putty layer;
G. layer is constructed priming coat after drying, and brushes uniformly;
H. architectural reflective heat-insulation paint facing: use the method construction reflective heat-insulation paint finish coat of spraying or roller coating.
(4) requirement on " two sides, the end " is constructed.The construction of a rear coating material must be carried out after coating material dry tack free previous;Each time coating material should be brushed uniformly, and each layer coating material must be firmly combined with.The engineering having particular/special requirement can be increased topcoat number of times.Primer coating thickness is no less than 60 μm.
(5), in work progress, coating material strictly should control according to conditions such as construction method, construction seasons, temperature, and has special messenger's by specification to be responsible for allotment, must not arbitrarily add water.It is clean and tidy that dispensing and operationlocation should often clear up holding, keeps good ventilation condition.Unspent coating material should seal preservation, must not reveal or overflow.
(6) the same color of same metope applies the coating material of identical lot number, when same color lot number difference, should mix in advance to ensure that same metope does not produce aberration.
(7) when old metope overcoating makes new advances, old metope material coating should be removed, root out loose part of flaking, remove old film, use different program construction processing depending on basic unit's feature.
(8) effective rainproof measure should be taked during Pluvial construction;Sun-proof cloth etc. should be set up during hot weather construction and avoid exposure in sunshine.
(9) Thermal insulation waterproof daub construction and requirement
1. base cleaning and process
A. dirt is cleared up: the contaminant that should thoroughly clear up in basic unit, including lime-ash, laitance, greasy dirt, mineral acid and organic acid etc.;With broom, the floating ash on metope, surface dust etc. are cleaned up;
B. local is levelling: fill up pit, polishes protuberance, rib etc. and the honeycomb existed, pitted skin are carried out pretreatment etc.;
C. repairing putty: be incubated clay with flexible break resistant and basic unit is carried out the repairing at the indentation injustice of local, polish with sand paper after drying.
2. criticize and scrape first Thermal insulation waterproof daub
Insulation clay is paste, if viscosity is excessive, adds clear water dilution, uses mechanical agitation, makes viscosity be easy to construction.It is finished in the operable time of Thermal insulation waterproof daub.Criticizing and scrape Thermal insulation waterproof daub, should criticize flat, compacting, the rendering thickness of first Thermal insulation waterproof daub is not preferably greater than 15mm, and later per pass is criticized and scraped thickness preferably greater than 10mm.
3. criticize and scrape second Thermal insulation waterproof daub
Second Thermal insulation waterproof daub should be criticized after first Thermal insulation waterproof daub dry solidification and scrape, and the construction between twice is no less than 24h interval time.If second Thermal insulation waterproof daub is criticized is not met by design thickness requirement after scraping, should continue to criticize by the method for second Thermal insulation waterproof daub and requirement and scrape the 3rd road, the 4th road, to meeting thickness requirement.Thermal insulation waterproof daub layer surface quality tolerance see table:
Item Project Tolerance (mm) Inspection method
1 Surfacing 3.0 With 2 meters of guiding rulers and wedge-shaped feeler gauge inspection
2 Facade is vertical 3.0 With 2 meters of cable inlet bracket inspections
3 Yin, yang angle is vertical 3.0 With 2 meters of cable inlet bracket inspections
4 External corner is upright 3.0 With 200 millimeters of square chi and wedge-shaped feeler gauge inspection
5 Connect a batch discrepancy in elevation 1.0 With ruler and wedge-shaped feeler gauge inspection
Embodiment 2 :
Remaining is identical with described embodiment 1, difference is, described putty layer is water-proof putty, and is prepared by polymer glue powder, portland cement, ground calcium carbonate, silica flour, Pulvis Talci, defoamer and hydroxypropyl methyl cellulose, and the addition of described polymer glue powder is 25%
Embodiment 3 :
Remaining is identical with described embodiment 2, and difference is, described hydroxypropyl methyl cellulose is 100000Pa S, and the addition of described polymer glue powder is not less than 35%.
Obviously the present invention implements and is not subject to the restrictions described above; if the improvement of the various unsubstantialities that the method design that have employed the present invention is carried out with technical scheme; or the most improved design by the present invention and technical scheme directly apply to other occasion, all within protection scope of the present invention.

Claims (2)

1. an insulation clay reflective heat-insulation paint exterior wall heat-preserving system, including heat-insulation layer and coat system, described coat system is made up of priming coat, putty layer and reflective heat-insulation paint finish coat;It is characterized in that: described putty layer is water-proof putty, polymer glue powder, portland cement, ground calcium carbonate, silica flour, Pulvis Talci, defoamer and hydroxypropyl methyl cellulose prepare;Described hydroxypropyl methyl cellulose is 100000Pa S;The addition of described polymer glue powder is not less than 25%.
2. the construction technology being incubated clay reflective heat-insulation paint exterior wall heat-preserving system according to claim 1, it is characterised in that comprise the steps:
(1) preparation of construction: the dust of base course wall, dirt, oil stain and residual ash block etc. being cleaned out, the high convex place of substrate surface picks flat;Honeycomb, pitted skin, dew muscle, loose part to be dug firm place, is layered filling-in with 1: 2.5 cement mortar or pea gravel concreten, disposes first-class to exposed steel bar head and galvanized wire;Pocket cement mortar is layered filling-in;Construction hole, scaffold eye are repaired complete;
(2) construction technology:
1. hang vertical line, set side: at external wall big angle, outer door and window, deformation joint hang vertical reference line, eject level, orthogonal control lines at metope;
2. ash cake, floating screed are done: heat-insulation layer should be used to do standard thickness ash cake, then floating screed, its thickness is on the basis of metope highest point, and insulation layer thickness is not less than design thickness, and carry out perpendicularity inspection, preferably set special-purpose metal corner protector at door and window mouth and at the external corner of bottom wall;
3. construction interface agent: basic unit interface uses spraying or roller applications uniform full coat interfacial agents, at the body of wall joint part of different materials composition, lays galvanizing electrowelding net and reinforces, and electrowelding net is no less than 100mm along joint part every edge lap width;
4. basic unit interface should use spraying or roller applications uniform full coat interfacial agents, at the body of wall joint part of different materials composition, should lay galvanizing electrowelding net and reinforce, and electrowelding net is no less than 100mm along joint part every edge lap width;
5. construction heat-insulating layer: heat-insulation layer should be constructed after interfacial agents dry solidification, construction in layer, construction thickness is no more than 10mm, and should be compacted to catch up with flat, twice construction should not be less than 24h interval time, it is finally reached floating screed thickness and puts down with darby compacting, stranding, allow between heat-insulation layer and basic unit and be firmly bonded between each layer of heat-insulation layer, not delamination, hollowing and cracking;
6. play frame bar, separation trough is installed: use alkali-resisting glass fiber screen cloth to carry out local enhancement at the position easy to crack that door, window hole and stress are concentrated, by the alkali-resisting glass fiber screen cloth paving that cuts in putty layer, smear pressure with spatula edge and sprawl fixing, by alkali-resisting glass fiber screen cloth press-in bottom putty layer;
7. putty layer is constructed priming coat after drying, and brushes uniformly;
8. construction building reflective heat-insulation paint facing: use the method construction reflective heat-insulation paint finish coat of spraying or roller coating.
CN201310576896.3A 2013-11-19 2013-11-19 A kind of insulation clay reflective heat-insulation paint exterior wall heat-preserving system and construction technology thereof Active CN103572845B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310576896.3A CN103572845B (en) 2013-11-19 2013-11-19 A kind of insulation clay reflective heat-insulation paint exterior wall heat-preserving system and construction technology thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310576896.3A CN103572845B (en) 2013-11-19 2013-11-19 A kind of insulation clay reflective heat-insulation paint exterior wall heat-preserving system and construction technology thereof

Publications (2)

Publication Number Publication Date
CN103572845A CN103572845A (en) 2014-02-12
CN103572845B true CN103572845B (en) 2016-08-17

Family

ID=50045499

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310576896.3A Active CN103572845B (en) 2013-11-19 2013-11-19 A kind of insulation clay reflective heat-insulation paint exterior wall heat-preserving system and construction technology thereof

Country Status (1)

Country Link
CN (1) CN103572845B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104129968B (en) * 2014-07-18 2016-06-22 安徽千和新材料科技发展有限公司 Organic-inorganic compoiste used for building exterior wall insulation clay and preparation method thereof
CN105781048B (en) * 2016-01-27 2018-11-13 天长市安德丽节能建材有限公司 Fireproof heat insulating water-proofing anticracking reflective insulation material system and its construction technology
CN105625588B (en) * 2016-01-27 2018-06-26 中国十七冶集团有限公司 A kind of building heat insulating exterior wall construction method
CN107060285B (en) * 2017-01-03 2019-02-15 广西绿地涂装工程有限公司 A kind of external wall spraying construction technology
CN110952735A (en) * 2019-12-23 2020-04-03 苏州海戈斯环保科技有限公司 Efficient and convenient wall surface leveling construction process
CN111113655A (en) * 2019-12-27 2020-05-08 中铁十八局集团北京工程有限公司 Heat preservation and moisture preservation device for concrete
CN111206732A (en) * 2020-01-15 2020-05-29 中国十七冶集团有限公司 Nondestructive reinforcement method for external thermal insulation system of thermal insulation daub reflective thermal insulation coating
CN111255193A (en) * 2020-03-11 2020-06-09 广西壮族自治区建筑科学研究设计院 Construction process of heat-preservation daub reflective heat-insulation coating exterior wall
CN111962694A (en) * 2020-08-24 2020-11-20 天长市杜邦涂料有限公司 Building heat preservation daub system based on reflective insulation coating

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101016430A (en) * 2007-02-09 2007-08-15 上海大学 Method of preparing environment-friendly type slag based dried powder coating
CN201531066U (en) * 2009-04-09 2010-07-21 福建欧诺漆科技有限公司 Multifunctional micro-air ultra-fiber building heat insulation paint heat preservation system
CN102010628A (en) * 2010-10-26 2011-04-13 严惠洲 Novel mortar putty powder
CN102561535A (en) * 2011-12-19 2012-07-11 福建欧诺漆科技有限公司 Composite heat insulating plate insulation coating structure and construction method thereof
CN102619310A (en) * 2012-03-08 2012-08-01 上海天补建筑科技有限公司 Coating system dedicated for outer wall reflecting and heat-insulating paint and construction method of coating system
CN102628311A (en) * 2012-05-02 2012-08-08 上海威德沃涂料有限公司 Reflective insulation waterproof self-cleaning coating outer wall member
CN202595930U (en) * 2012-05-16 2012-12-12 周晓锋 Nanometer high-reflection solar radiation self-heat-insulation heat isolation energy-saving building surface layer function micro board
CN202742740U (en) * 2012-06-29 2013-02-20 福建立恒涂料有限公司 Heat-insulation coating for outer wall
CN203097002U (en) * 2013-02-20 2013-07-31 苏州大乘环保建材有限公司 Reflective heat insulation external wall thermal insulation system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT495467T (en) * 2002-07-17 2011-01-15 Univ California Method and devices for analysis of sealed containers

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101016430A (en) * 2007-02-09 2007-08-15 上海大学 Method of preparing environment-friendly type slag based dried powder coating
CN201531066U (en) * 2009-04-09 2010-07-21 福建欧诺漆科技有限公司 Multifunctional micro-air ultra-fiber building heat insulation paint heat preservation system
CN102010628A (en) * 2010-10-26 2011-04-13 严惠洲 Novel mortar putty powder
CN102561535A (en) * 2011-12-19 2012-07-11 福建欧诺漆科技有限公司 Composite heat insulating plate insulation coating structure and construction method thereof
CN102619310A (en) * 2012-03-08 2012-08-01 上海天补建筑科技有限公司 Coating system dedicated for outer wall reflecting and heat-insulating paint and construction method of coating system
CN102628311A (en) * 2012-05-02 2012-08-08 上海威德沃涂料有限公司 Reflective insulation waterproof self-cleaning coating outer wall member
CN202595930U (en) * 2012-05-16 2012-12-12 周晓锋 Nanometer high-reflection solar radiation self-heat-insulation heat isolation energy-saving building surface layer function micro board
CN202742740U (en) * 2012-06-29 2013-02-20 福建立恒涂料有限公司 Heat-insulation coating for outer wall
CN203097002U (en) * 2013-02-20 2013-07-31 苏州大乘环保建材有限公司 Reflective heat insulation external wall thermal insulation system

Also Published As

Publication number Publication date
CN103572845A (en) 2014-02-12

Similar Documents

Publication Publication Date Title
CN103572845B (en) A kind of insulation clay reflective heat-insulation paint exterior wall heat-preserving system and construction technology thereof
CN104775575B (en) Real stone paint construction process
CN101832015B (en) Construction process for outer wall metal fluorocarbon coating
CN103952052A (en) Travertine-like elastic texture coating and preparation method thereof
CN102400525B (en) Thin-layer plastering method for autoclaved aerated concrete block wall bodies
CN109797920B (en) Indoor decoration construction method
CN105399389A (en) Building inner wall whitewashing gypsum and process flow thereof
CN103938656A (en) Building wall surface underground waterproof construction method
CN108952041A (en) A kind of external wall Stucco finish structure and its method for repairing and constructing
CN106884535A (en) A kind of construction technology of imitative stone material Self-leveling waterproof mortar
CN101886460A (en) Press polishing method of plastered mesh cloth of inner wall
CN107489251A (en) A kind of insulation and fire-proof paint exterior wall and its construction method
CN102094496A (en) Method for manufacturing imitation brick wall
CN104652623A (en) Construction method for composite insulation mortar
CN104790619A (en) Thin-plastering thermal insulation and decoration integrated board and production system and method
CN105888084A (en) Whole outer wall internal thermal insulation system construction method by using enhanced composite thermal insulation material
CN103964771A (en) Waterproof surface mortar for thermal insulation system outside building outer wall and application method thereof
KR100906565B1 (en) The remodeling method of structure with tiles
CN105820637A (en) Reflective thermal insulation coating system
CN105178518A (en) Energy-saving environment-friendly waterproof heat-insulating construction method for existing roof
CN105133855A (en) Energy-saving and environment-friendly waterproof warming construction method for existing roof surface
CN105089213A (en) Water-proof construction method with advantages of energy conservation and environment protection for conventional roof
CN108083740A (en) Mortar and the two-in-one compound material of putty and preparation method thereof
CN108005321A (en) A kind of method that exterior wall bulk finish coat adds stone-like coating layer
CN104453131A (en) Building external wall heat insulation coating construction process

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 243000 Taibai Town Street, Dangtu County, Ma'anshan City, Anhui Province

Patentee after: Anhui Tianjinyun Energy Saving and Waterproof Technology Co., Ltd.

Address before: 241000 Dangtu Chamber of Commerce Building, Ma'anshan City, Anhui Province, 1802

Patentee before: Anhui Tianjinyun Paint Industry Co., Ltd.