CN108385932A - The laying method of macroplate stone material - Google Patents

The laying method of macroplate stone material Download PDF

Info

Publication number
CN108385932A
CN108385932A CN201810192237.2A CN201810192237A CN108385932A CN 108385932 A CN108385932 A CN 108385932A CN 201810192237 A CN201810192237 A CN 201810192237A CN 108385932 A CN108385932 A CN 108385932A
Authority
CN
China
Prior art keywords
stone material
plate
plate stone
macroplate
laid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810192237.2A
Other languages
Chinese (zh)
Other versions
CN108385932B (en
Inventor
上官越然
康聪
张磊
韩冬
宫晓鸣
岳晓申
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING CONSTRUCTION ENGINEERING DECORATION Co Ltd
Original Assignee
BEIJING CONSTRUCTION ENGINEERING DECORATION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING CONSTRUCTION ENGINEERING DECORATION Co Ltd filed Critical BEIJING CONSTRUCTION ENGINEERING DECORATION Co Ltd
Priority to CN201810192237.2A priority Critical patent/CN108385932B/en
Publication of CN108385932A publication Critical patent/CN108385932A/en
Application granted granted Critical
Publication of CN108385932B publication Critical patent/CN108385932B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/02Flooring or floor layers composed of a number of similar elements
    • E04F15/08Flooring or floor layers composed of a number of similar elements only of stone or stone-like material, e.g. ceramics, concrete; of glass or with a top layer of stone or stone-like material, e.g. ceramics, concrete or glass
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Abstract

The present invention relates to the ground decoration technical fields of macroplate stone material, disclose a kind of laying method of macroplate stone material.The present invention specifically includes following steps:In the bonding plane of plate stone material, reinforced steel is set;Base treatment;Snap the line;Plate stone material is numbered;The brushing plain-water slurry on concrete cushion is laid with before screed;It according to number paving successively, is tapped with rubber hammer, jolt ramming mortar starts plate stone material, check and fill up screed to after being laid with height, levelling;The setting exhaust rope between plate stone material and screed, then carry out plate stone material and mat formation, and the extraction exhaust rope before cement mortar initial set, to discharge the heat in the bubble and cement mortar below plate stone material;Plate stone laying for 24 hours after, watering maintenance;After maintenance expires, it is in the milk into the gap between stone material plate stitch using jointing agent;Finished product conserves.The present invention is convenient for constructing operation, can effectively avoid hollowing and crack conditions during stone material paving, is suitable for large-sized plates block stone material.

Description

The laying method of macroplate stone material
Technical field
The present invention relates to the ground decoration technical fields of macroplate stone material, more particularly to a kind of paving of macroplate stone material Method.
Background technology
In building trade, stone material is always the construction material being most widely used, and due to its firm quality, is become naturally The decorative pattern and color changed, is also more and more used as ornament materials.
The construction point of traditional stone floor paving includes mainly:Plank soaks dry in the shade in advance, first carries out examination paving, uses rubber Skin hammer taps, and stone material is started and moved on one side to after being laid with height by jolt ramming mortar, check between mortar upper surface and plank whether Coincide, and filled up with it is levelling, plain cement sand syrup binder course is then completely poured on cement mortar screeding layer, repaves stone plate Block taps sheeting caps with rubber hammer, levelling.
This paving mode is easier levelling for general floor tile paving, is not easy to that hollowing phenomenon occurs, but right In super large plate stone material, since plate is excessive, this paving technology construction is reused, the probability that hollowing occurs in plate stone material can be big It is big to improve;And this laying method, any reinforcing, larger plate, in the process of construction are not carried out to stone material plate In be also easily broken.
Invention content
The present invention provides a kind of hollowing and crack conditions be convenient for constructing operation, can effectively avoid during stone material paving, The laying method of macroplate stone material suitable for large-sized plates block stone material.
The technical issues of solution is:Existing stone material plate laying method can not avoid the hollowing of the stone material plate of big specification Situation is not done any reinforcement measure to stone material plate yet, is easily broken during construction.
In order to solve the above technical problems, the present invention adopts the following technical scheme that:
The laying method of macroplate stone material of the present invention, specifically includes following steps:
Step 1: plate stone material is reinforced:In the bonding plane of plate stone material, reinforced steel is set;
Step 2: base treatment:Clear up concrete cushion, and moistening of watering;
Step 3: snap the line:Snap the line is carried out on smooth concrete cushion;
Step 4: number:According to design requirement, plate stone material pattern, color and lines are subjected to examination spelling, and be numbered, code It puts neat;
Step 5: setting screed:The brushing cement mortar binder course on concrete cushion is laid with before screed;
Step 6: examination is laid with:It according to number paving successively, is tapped with rubber hammer, jolt ramming mortar starts plate to after being laid with height Stone material checks and fills up screed, levelling;
Step 7: plate stone material of formally mating formation:The setting exhaust rope between plate stone material and screed, then carry out plate stone material paving Dress, and the extraction exhaust rope before cement mortar initial set is prevented with discharging the heat in the bubble and cement mortar below plate stone material Only hollowing;
Step 8: maintenance:Plate stone laying for 24 hours after, watering maintenance, curing period is no less than 3d,
Step 9: grouting wiping seam:After maintenance expires, it is in the milk into the gap between stone material plate stitch using jointing agent;
Step 10: finished product conserves:The smooth damaged gap of repairing, carries out integral grinding, and do crystal hardened to plate stone surface Processing, finally waxes, and completes pavement construction.
The laying method of macroplate stone material of the present invention, further, the specific operating method reinforced in step 1 are as follows:
(One), in the bonding plane of plate stone material open up groove;Length direction of the groove along plate stone material, elongated setting;
(Two), reinforced steel is buried in groove, the diameter of reinforced steel is consistent with the depth of groove;
(Three), plate stone material bonding plane be laid with the back of the body net;
(Four), in the bonding plane brushing plucking glue of plate stone material.
The laying method of macroplate stone material of the present invention, further, step(One)The long side side of further groove and plate stone material The distance between edge is not less than the 1/6 of plate stone material width.
The laying method of macroplate stone material of the present invention, further, step(Two)Middle reinforced steel is bonded solid by AB glue It is scheduled in groove.
The laying method of macroplate stone material of the present invention, further, step(Four)The thickness of middle plucking glue is not less than 3mm.
The laying method of macroplate stone material of the present invention, further, the setting method of screed, specifically includes in step 5 Following steps:
Step A, concrete cushion, water spray moistening are cleared up;
Step B, the brushing cement mortar binder course on concrete cushion, cement mortar binder course are the plain cement of the ratio of mud 0.5 Slurry;
Step C, with the brushing of cement mortar binder course, and then it is laid with screed.
The laying method of macroplate stone material of the present invention, the method for plate stone material of further, in step 7 formally mating formation, tool Body includes the following steps:
Step a, two exhaust ropes, laid out in parallel, length of the exhaust rope along plate stone material are placed below plate stone material to be laid Spend direction, elongated setting;
Step b, in the bonding plane brushing adhesive layer of plate stone material, adhesive layer is the plain-water slurry that the ratio of mud is 0.5;
Step c, good position, plate stone material of mating formation are adjusted;The quadrangle of plate stone material is fallen simultaneously, plank is touched with rubber hammer, It is levelling;
Step d, before adhesive layer initial set, quickly extraction exhaust is restricted;
Step e, after the completion of plate stone material is mated formation, weight is placed in corner location;
Step f, mat formation after first block of plank, sequentially mat formation to side or direction of retreat;Ensure the seam between adjacent plate stone material Gap is tightly smooth.
The laying method of macroplate stone material of the present invention, further, the long side edge of exhaust rope and plate stone material in step a The distance between be plate stone material width 1/4-1/3.
The laying method of macroplate stone material of the present invention, further, one end back bending that rope is vented in step a form back bending Portion is arranged below plate stone material, and bent back portion is arranged towards plate stone material long side edge direction, and the length of bent back portion is not less than plate The 1/5 of block stone material length;Bent back portion and the minimum range on plate stone material width edge edge are not more than 70mm;It is vented the other end edge of rope The length direction of plate stone material extends outward to form the exposed operation portion on the outside of plate stone material.
The laying method of macroplate stone material of the present invention, further, exhaust rope is the Buddhist nun that diameter is not less than 4mm in step a Long Sheng.
The laying method of macroplate stone material of the present invention compared with prior art, has the advantages that:
The laying method of macroplate stone material of the present invention reinforces macroplate stone material, embedded in the bonding plane of plate stone material Reinforced steel not only increases the fastness of large-sized plates block stone material, and reinforced steel is embedded in groove, does not influence plank The flatness of bonding plane will not have any impact to mating formation, and the globality of plank is effectively improved.
The present invention has mated formation back of the body net in the bonding plane of plate stone material, it is ensured that between the globality and metaling of plate stone material Fastness, and in bonding plane brushing plucking glue, not only increase the intensity of plate stone material, effectively prevent the disconnected of plank Split, and substantially reduce the influence of back of the body net cohesive force between plank and cement mortar, improve plank and cement mortar it Between cohesive force.
The present invention is provided with exhaust rope, after the completion of mating formation, at the beginning of cement mortar before formally mating formation below plate stone material Extraction exhaust rope before solidifying, to discharge the heat in the bubble and cement mortar below plate stone material;Due to the plate of big specification Stone material area is larger, during mating formation, can have certain air between plate stone material center and cement mortar, cause plate Material hollowing;And it is vented the setting of rope, during extraction, friction is generated with the air in the plain-water slurry and bubble of surrounding Power, the air being present between plate stone material and cement mortar generate the opposite frictional force in direction simultaneously, with the pumping of exhaust rope Go out, air is also discharged therewith, can effectively prevent plank hollowing;The material used is simple, also allows for operating, and avoids hollowing effect aobvious It writes.
The laying method of the macroplate stone material of the present invention is described further below in conjunction with the accompanying drawings.
Description of the drawings
Fig. 1 is the Construction State schematic diagram in step a;
Fig. 2 is Y-Y schematic cross-sections in Fig. 1.
Reference numeral:
1- plate stone materials;2- reinforced steels;3- exhaust ropes;31- bent back portions;32- operation portions;4- concrete cushions;5- cement bonded sands Starch binder course;6- screeds;7- plucking glue;8- adhesive layers.
Specific implementation mode
The laying method of macroplate stone material of the present invention, reinforces macroplate stone material, and improve construction method, is had The hollowing for solving the problems, such as to occur during stone material paving of effect.
Specifically include following steps:
Step 1: plate stone material is reinforced:In the bonding plane of plate stone material 1, reinforced steel 2 is set;
The plate stone material of selection separates fritter abnormal shape parquets and macroplate stone material in processing separately machined, it is necessary to be polished Processing, then be pasted together and to form " monoblock " stone material, it is ensured that it is smooth;
The specific operating method reinforced is as follows:
(One), in the bonding plane of plate stone material 1 open up groove;Length direction of the groove along plate stone material 1, elongated setting, groove Long side edge apart from plate stone material 1 is not less than the 1/6 of 1 width of plate stone material;The width of groove is not less than 6mm;
(Two), reinforced steel 2 is buried in groove, the diameter of reinforced steel 2 is not more than 6mm, is bonded and fixed at by AB glue recessed In slot, the diameter of reinforced steel 2 is consistent with the depth of groove;
(Three), plate stone material 1 bonding plane be laid with the back of the body net;
(Four), in the bonding plane brushing plucking glue 7 of plate stone material 1, the thickness of plucking glue 7 is not less than 3mm.
Step 2: base treatment:Sundries on concrete cushion 4 is peace and quiet, it is brushed off and is bonded on bed course with wire brush Mortar simultaneously cleans up, watering moistening.
Step 3: snap the line:Snap the line is carried out on smooth concrete cushion;
The orthogonal control cross hairs of main portions bullet in room, check and control stone material plate position, cross hairs by Metope bottom is led in base, according to metope ± 1000mm lines, is found out the face layer absolute altitude good horizontal line of bullet on the wall, is paid attention to the buildings Yao Yu Road face layer absolute altitude is consistent.
Step 4: number:According to design requirement, plate stone material pattern, color and lines are subjected to examination spelling, and compiled Number, it is neatly packed.
Step 5: setting screed:The brushing cement mortar binder course 5 on concrete cushion 4 is laid with before screed 6;
Specific operating method, includes the following steps:
Step A, concrete cushion 4, water spray moistening are cleared up;
Step B, the brushing cement mortar binder course 5 on concrete cushion 4, cement mortar binder course 5 are the plain water of the ratio of mud 0.5 Mud;
Step C, with the brushing of cement mortar binder course 5, and then it is laid with screed 6;
Mortar is laid with from inner to doorway, is struck off with big thick stick after completing, then is made real with trowel levelling;The thickness of screed 6 is preferably higher by Stone material bottom surface absolute altitude 3-4mm;Mortar is dry cement mortar, and stiff degree is pinched with hand agglomerating not to be advisable loosely.
Step 6: examination is laid with:Doorway is gradually retreated to, to good plate according to number paving successively along control line from the inside to the outside The T-joining of stone material, is tapped with rubber hammer, and jolt ramming mortar starts stone material to after being laid with height, checks mortar upper surface and plate Whether it coincide between material, if found in place of having inanition, is filled up using dry mortar, it is levelling.
Step 7: plate stone material of formally mating formation:The setting exhaust rope 3 between plate stone material 1 and screed 6, then into andante Block stone material 1 is mated formation, and the extraction exhaust rope 3 before 8 initial set of adhesive layer, to discharge the bubble and cement mortar of 1 lower section of plate stone material In heat, prevent hollowing;
Specifically include following steps:
Step a, two exhaust ropes 3 are placed below plate stone material 1 to be laid, laid out in parallel, exhaust rope 3 is along plate stone material 1 Length direction, elongated setting, the distance between exhaust rope 3 and long side edge of plate stone material 1 are the 1/ of 1 width of plate stone material 4-1/3;One end back bending of exhaust rope 3 forms bent back portion 31, is arranged below plate stone material 1, and bent back portion 31 is towards plate stone material 1 Long side edge direction is arranged, and the length of bent back portion 31 is not less than the 1/5 of 1 length of plate stone material;Bent back portion 31 and plate stone material 1 are wide The minimum range for spending edge is not more than 70mm;The other end of exhaust rope 3 extends outward to form naked along the length direction of plate stone material 1 It is exposed at the operation portion 32 in 1 outside of plate stone material;Exhaust rope 3 is not less than the nylon rope of 4mm for diameter;As depicted in figs. 1 and 2;
Step b, in the bonding plane brushing adhesive layer 8 of plate stone material 1, adhesive layer 8 is the plain-water slurry that the ratio of mud is 0.5;
Step c, good position, plate stone material 1 of mating formation are adjusted;By glass holder active plate stone material 1, by the four of plate stone material 1 Angle is fallen simultaneously, and plank is touched with rubber hammer, levelling according to horizontal line horizon rule;
Step d, before plain-water slurry initial set, the operation portion 32 for pulling exhaust rope 3 quickly extracts exhaust rope 3 out;Exhaust rope 3 is being extracted out During, generate frictional force with the air in the plain-water slurry and bubble of surrounding, be present in plate stone material 1 and cement mortar it Between air also generate the opposite frictional force in direction, with the extraction of exhaust rope 3, air is also discharged therewith, effectively prevent plank Hollowing;
Step e, after the completion of plate stone material is mated formation, corner location place weight, prevent plate stone material generated because larger alice, Deformation;
Step f, mat formation after first block of plank, sequentially mat formation to side or direction of retreat;Ensure the seam between adjacent plate stone material Gap is tightly smooth.
Step 8: maintenance:Plate stone laying for 24 hours after, watering maintenance, ensure plank and mortar bonding it is secured;It supports The shield phase is no less than 3d, forbids upper people within curing period, prevents from trampling.
Step 9: grouting wiping seam:After maintenance expires, according to stone material color, the jointing agent of same color is selected, and using special It with pointer, daubs into three times in the gap between stone material plate stitch, length is used in combination that scraper plate feeds the cement mortar of outflow into gap Ash;After grouting 1-2 hours, former thin cement slurry wiping seam is dipped in staple group, wipes and puts down with plate face, while the cement mortar in plate face being wiped Only, it then with covered rearing with plastic film and protects.
Step 10: finished product conserves:The smooth damaged gap of repairing, carries out integral grinding, and crystallize to 1 surface of plate stone material Cure process is finally waxed, and pavement construction is completed.
Embodiment described above is only that the preferred embodiment of the present invention is described, not to the model of the present invention It encloses and is defined, under the premise of not departing from design spirit of the present invention, technical side of the those of ordinary skill in the art to the present invention The various modifications and improvement that case is made should all be fallen into the protection domain of claims of the present invention determination.

Claims (10)

1. the laying method of macroplate stone material, it is characterised in that:Specifically include following steps:
Step 1: plate stone material is reinforced:In plate stone material(1)Bonding plane be arranged reinforced steel(2);
Step 2: base treatment:Clear up concrete cushion(4), and moistening of watering;
Step 3: snap the line:In smooth concrete cushion(4)Upper carry out snap the line;
Step 4: number:According to design requirement, plate stone material pattern, color and lines are subjected to examination spelling, and be numbered, code It puts neat;
Step 5: setting screed:It is laid with screed(6)Before in concrete cushion(4)Upper brushing cement mortar binder course (5);
Step 6: examination is laid with:It according to number paving successively, is tapped with rubber hammer, jolt ramming mortar starts plate to after being laid with height Stone material checks and fills up screed(6), levelling;
Step 7: plate stone material of formally mating formation:In plate stone material(1)With screed(6)Between setting exhaust rope(3), then carry out Plate stone material(1)Mat formation, and in adhesive layer(8)Extraction exhaust rope before pre-hardening(3), to discharge plate stone material(1)The bubble of lower section And adhesive layer(8)In heat, prevent hollowing;
Step 8: maintenance:In plate stone material(1)After being laid with for 24 hours, watering maintenance, curing period, is no less than 3d,
Step 9: grouting wiping seam:After maintenance expires, it is in the milk into the gap between stone material plate stitch using jointing agent;
Step 10: finished product conserves:The smooth damaged gap of repairing, to plate stone material(1)Surface carries out integral grinding, and it is hard to do crystallization Change is handled, and is finally waxed, and pavement construction is completed.
2. the laying method of macroplate stone material according to claim 1, it is characterised in that:That is reinforced in step 1 is specific Operating method is as follows:
(One), in plate stone material(1)Bonding plane open up groove;Groove is along plate stone material(1)Length direction, elongated setting;
(Two), in groove bury reinforced steel(2), reinforced steel(2)Diameter it is consistent with the depth of groove;
(Three), in plate stone material(1)Bonding plane be laid with the back of the body net;
(Four), in plate stone material(1)Bonding plane brushing plucking glue(7).
3. the laying method of macroplate stone material according to claim 2, it is characterised in that:Step(One)Further groove and plate Stone material(1)The distance between long side edge be not less than plate stone material(1)The 1/6 of width.
4. the laying method of macroplate stone material according to claim 2, it is characterised in that:Step(Two)Middle reinforced steel (2)It is bonded and fixed in groove by AB glue.
5. the laying method of macroplate stone material according to claim 2, it is characterised in that:Step(Four)Middle plucking glue(7) Thickness be not less than 3mm.
6. the laying method of macroplate stone material according to claim 1, it is characterised in that:Screed in step 5(6)'s Setting method specifically includes following steps:
Step A, concrete cushion is cleared up(4), water spray moistening;
Step B, in concrete cushion(4)Upper brushing cement mortar binder course(5), cement mortar binder course(5)For the ratio of mud 0.5 Plain-water slurry;
Step C, with cement mortar binder course(5)Brushing, be and then laid with screed(6).
7. the laying method of macroplate stone material according to claim 1, it is characterised in that:Formally mat formation in step 7 plate The method of stone material, specifically includes following steps:
Step a, in plate stone material to be laid(1)Place two exhaust ropes in lower section(3), laid out in parallel, exhaust rope(3)Along plate Stone material(1)Length direction, elongated setting;
Step b, in plate stone material(1)Bonding plane brushing adhesive layer(8), adhesive layer(8)The plain cement for being 0.5 for the ratio of mud Slurry;
Step c, good position, plate stone material of mating formation are adjusted(1);By plate stone material(1)Quadrangle fall simultaneously, touched with rubber hammer Plank, it is levelling;
Step d, in adhesive layer(8)Before initial set, quickly extraction exhaust is restricted(3);
Step e, plate stone material(1)After the completion of mating formation, weight is placed in corner location;
Step f, mat formation after first block of plank, sequentially mat formation to side or direction of retreat;Ensure adjacent plate stone material(1)Between Gap is tightly smooth.
8. the laying method of macroplate stone material according to claim 7, it is characterised in that:Rope is vented in step a(3)With plate Block stone material(1)The distance between long side edge be plate stone material(1)The 1/4-1/3 of width.
9. the laying method of macroplate stone material according to claim 7, it is characterised in that:Rope is vented in step a(3)One Back bending is held to form bent back portion(31), be arranged in plate stone material(1)Lower section, bent back portion(31)Towards plate stone material(1)Long side edge Direction is arranged, bent back portion(31)Length be not less than plate stone material(1)The 1/5 of length;Bent back portion(31)With plate stone material(1)It is wide The minimum range for spending edge is not more than 70mm;Exhaust rope(3)The other end along plate stone material(1)Length direction extend outwardly shape At exposed in plate stone material(1)The operation portion in outside(32).
10. the laying method of macroplate stone material according to claim 7, it is characterised in that:Rope is vented in step a(3)For Diameter is not less than the nylon rope of 4mm.
CN201810192237.2A 2018-03-09 2018-03-09 Paving method for large plate stone Active CN108385932B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810192237.2A CN108385932B (en) 2018-03-09 2018-03-09 Paving method for large plate stone

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810192237.2A CN108385932B (en) 2018-03-09 2018-03-09 Paving method for large plate stone

Publications (2)

Publication Number Publication Date
CN108385932A true CN108385932A (en) 2018-08-10
CN108385932B CN108385932B (en) 2023-08-25

Family

ID=63066725

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810192237.2A Active CN108385932B (en) 2018-03-09 2018-03-09 Paving method for large plate stone

Country Status (1)

Country Link
CN (1) CN108385932B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109441078A (en) * 2018-11-30 2019-03-08 大红点商业装饰工程(深圳)有限公司 A kind of thermal-insulating type stone material or ceramic tile paste mosaic technology
CN109838065A (en) * 2019-03-16 2019-06-04 北京金碧合力建筑设计工程有限公司 A kind of ground brick flooring paving construction method
CN110017025A (en) * 2019-04-24 2019-07-16 佛山市顺德区海瑞斯装饰工程有限公司 A kind of passageway stone floor paving technique
CN111622450A (en) * 2020-06-05 2020-09-04 陕西福磊建设集团有限公司 Stone ground construction process

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100949252B1 (en) * 2009-08-07 2010-03-25 대림산업 주식회사 Method of paving road using stone
CN102003055A (en) * 2010-11-08 2011-04-06 郭卫康 Ceramic tile or decorative stone with convex strips, convex blocks or concave holes on back side
CN103321393A (en) * 2013-07-01 2013-09-25 中冶交通(沈阳)建设工程有限公司 Interior wall plastering construction method
CN104047410A (en) * 2014-06-11 2014-09-17 江南园林有限公司 Stone paving construction method
CN105178559A (en) * 2015-10-08 2015-12-23 哈尔滨世纪天诚装饰工程有限公司 Novel construction method for granite ground
CN205918047U (en) * 2016-06-30 2017-02-01 浙江亚厦装饰股份有限公司 Base plate, ground plaque and ground assembly
CN107152145A (en) * 2017-06-07 2017-09-12 天津市源泉市政工程有限公司 A kind of stone material flooring construction method
CN107254954A (en) * 2017-06-09 2017-10-17 北京家装云网络科技有限公司 Ground paving ceramic tile construction technology

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100949252B1 (en) * 2009-08-07 2010-03-25 대림산업 주식회사 Method of paving road using stone
CN102003055A (en) * 2010-11-08 2011-04-06 郭卫康 Ceramic tile or decorative stone with convex strips, convex blocks or concave holes on back side
CN103321393A (en) * 2013-07-01 2013-09-25 中冶交通(沈阳)建设工程有限公司 Interior wall plastering construction method
CN104047410A (en) * 2014-06-11 2014-09-17 江南园林有限公司 Stone paving construction method
CN105178559A (en) * 2015-10-08 2015-12-23 哈尔滨世纪天诚装饰工程有限公司 Novel construction method for granite ground
CN205918047U (en) * 2016-06-30 2017-02-01 浙江亚厦装饰股份有限公司 Base plate, ground plaque and ground assembly
CN107152145A (en) * 2017-06-07 2017-09-12 天津市源泉市政工程有限公司 A kind of stone material flooring construction method
CN107254954A (en) * 2017-06-09 2017-10-17 北京家装云网络科技有限公司 Ground paving ceramic tile construction technology

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109441078A (en) * 2018-11-30 2019-03-08 大红点商业装饰工程(深圳)有限公司 A kind of thermal-insulating type stone material or ceramic tile paste mosaic technology
CN109838065A (en) * 2019-03-16 2019-06-04 北京金碧合力建筑设计工程有限公司 A kind of ground brick flooring paving construction method
CN110017025A (en) * 2019-04-24 2019-07-16 佛山市顺德区海瑞斯装饰工程有限公司 A kind of passageway stone floor paving technique
CN111622450A (en) * 2020-06-05 2020-09-04 陕西福磊建设集团有限公司 Stone ground construction process

Also Published As

Publication number Publication date
CN108385932B (en) 2023-08-25

Similar Documents

Publication Publication Date Title
CN108385932A (en) The laying method of macroplate stone material
CN105587102B (en) A kind of wet construction method to the wet type high abrasion terrace that paves
US20090272068A1 (en) Non-slick surface-seeded aggregate concrete and method of forming
CN107989401A (en) A kind of existing building external wall reconstruction structure and construction method
CN107152145A (en) A kind of stone material flooring construction method
CN102140836A (en) Construction method of large-size floor tile
CN106836815A (en) Large area diamond dust floor structure plate and surface layer one-off construction method
US20140000214A1 (en) Decorative aggregate concrete surface preparation process
CN108625252A (en) Urban road laying construction method
CN110656753A (en) Concrete grindstone terrace
CN105178559A (en) Novel construction method for granite ground
US10202773B2 (en) Flexible cladding wrap, system and methods
CN104120855A (en) Construction method for paving ground tile floor
CN107060171A (en) The super flat reinforced concrete flooring of large area and colored diamond dust surface layer one-step moulding method
CN106381980A (en) Floor tile paving process
CN106150032A (en) A kind of construction method of the type high-wear-resistant alloy terrace that paves
CN102277967A (en) Construction method for eliminating leveling layer by adopting primary floor concrete grout for leveling
CN111255191A (en) Semi-pre-pasted ceramic tile and paving method thereof
CN111962348A (en) Concrete floor construction process
CN107489255B (en) Large-size stone ground paving structure and construction method
CN201809928U (en) Texture planning module unit for sealing ice flaws
CN114876155A (en) Construction process for polishing ground by using non-ignition fine stone concrete
CN211949245U (en) Roof stone flashing structure
WO2015142203A1 (en) Paving slab, paving slabs production method and paving slab obtained using the method
CN112031326A (en) Marble paving design process and structure of office building raised floor

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant