CN110656753A - Concrete grindstone terrace - Google Patents

Concrete grindstone terrace Download PDF

Info

Publication number
CN110656753A
CN110656753A CN201910902135.XA CN201910902135A CN110656753A CN 110656753 A CN110656753 A CN 110656753A CN 201910902135 A CN201910902135 A CN 201910902135A CN 110656753 A CN110656753 A CN 110656753A
Authority
CN
China
Prior art keywords
concrete
grinding
terrace
leveling
polishing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910902135.XA
Other languages
Chinese (zh)
Inventor
张浩燃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Junka Industry Co Ltd
Original Assignee
Henan Junka Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Junka Industry Co Ltd filed Critical Henan Junka Industry Co Ltd
Priority to CN201910902135.XA priority Critical patent/CN110656753A/en
Publication of CN110656753A publication Critical patent/CN110656753A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/12Flooring or floor layers made of masses in situ, e.g. seamless magnesite floors, terrazzo gypsum floors

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention relates to a concrete grindstone terrace, which comprises the following steps: s1: construction preparation; s2: pouring concrete; s3: primarily leveling and collecting the dough; s4: primarily solidifying the concrete; s5: hard leveling, pulp extracting and trimming; s6: spreading stones and filing hairs; s7: leveling, rolling, trimming and polishing; s8: cutting and maintaining; s9: coarse grinding for the first time; s10: grouting; s11: fine grinding for the second time; s12: li-based curing; s13: fine grinding for the third time; s14: coating Guard protective agent; s15: fourth 3000-mesh polishing; the invention has high scratch resistance and high strength, is not easy to hollowly and crack, and simultaneously greatly reduces the terrace cost.

Description

Concrete grindstone terrace
Technical Field
The invention belongs to the technical field of concrete grindstone terrace construction processes, and particularly relates to a concrete grindstone terrace.
Background
At present, terrazzo, artificial marble and other spliced grounds are mostly adopted for decoration and fitment of large public buildings such as domestic parking lots, exhibition halls and the like and the terrazzo materials have gaps, are easy to accumulate dirt and have high difficulty in pattern design, the terrazzo comprises epoxy terrazzo and inorganic terrazzo, but the epoxy terrazzo in the current market has the defects of low wear resistance, low scratch resistance, easy aging and the like; inorganic grindstone and traditional terrazzo have the defects of easy hollowing, cracking, higher cost and the like.
In the prior art, the technical scheme of the terrazzo is as follows:
the Chinese patent application 201510488455.7 discloses an inorganic crystal grindstone integral terrace and a construction method thereof, wherein the inorganic crystal grindstone integral terrace is made of high-strength cement; a polymer emulsion; anti-cracking polypropylene fibers. And a liquid water reducing agent; the construction method of the terrace system comprises the following steps: processing a base layer, namely milling and removing the concrete surface layer and various coatings containing the surface layer, wherein the milling depth is 4-6 mm; treating detailed joints such as expansion joints and washing and cleaning ground base layers; coating an interface agent, namely a component B, on the base layer; paving wear-resistant mortar of an inorganic crystal grindstone terrace system, namely the component A, the component B and the component C; spraying a high-quality concrete sealing curing agent; after hardening for 7-10 days, grinding and leveling, additionally spraying a concrete sealing and curing agent for the first time, and polishing; maintaining for 1-2 days. The invention has the advantages of environmental protection, low energy consumption, seamless performance, impact resistance and lower manufacturing cost, and overcomes the defects of low wear resistance, easy aging, cracking during shelling, short service life and the like of the epoxy terrace; has natural anti-leakage and anti-seepage capability, the ground is not easy to be polluted, and a large number of cleaning personnel are saved.
Chinese patent application 201610193750.4 discloses a pandola stone terrace, which is prepared by flatly laying an ultra-flat base layer on the ground, coating a layer of adhesive on the ultra-flat base layer, laying a layer of grindstone on the ultra-flat base layer, then pouring a layer of inorganic adhesive material on the grindstone layer, maintaining, coarsely grinding, roll-coating a crystal brightener and finely grinding; the super-flat base layer and the grindstone layer used for preparing the terrace can be directly laid and installed on site after being prepared in advance in a factory, so that the construction time can be obviously shortened, and the prepared grindstone terrace is flat, seamless, wear-resistant and compression-resistant, has excellent mechanical strength and mechanical property, has the characteristics of diversified textures, environmental protection, greenness, energy conservation, convenience in cleaning and the like, and has a better market prospect.
However, in the prior art, the inorganic crystal grindstone integral terrace and the construction method thereof have the problems of easiness in hollowing, cracking and high cost.
Disclosure of Invention
The invention aims to solve the problems in the background art and provides a construction method of a concrete magic stone terrace, which uses the construction process of a wear-resistant terrace, a curing terrace and a terrazzo terrace for reference, and is a novel terrazzo terrace formed by spreading and matching colorful stones according to requirements after the initial setting of leveling layer concrete and carrying out crystal face treatment after 28 days. The epoxy grinding stone and the inorganic grinding stone have approximate surface effects, and meanwhile, the floor cost is greatly reduced.
The invention provides the following technical scheme:
the concrete grindstone terrace comprises the following steps:
s1: construction preparation, compacting the sandstone cushion layer under the first-layer terrace by using a road roller, wherein the compaction coefficient is more than 0.96; removing all unnecessary sundries and facilities in a construction site, keeping a construction surface clean and tidy and having no cross construction;
s2: pouring concrete, wherein the grade of the concrete is not lower than C30, adopting clean river sand, adding no machine-made sand and surface sand, adding no fly ash and mineral powder, and the field slump is between 140 and 160 millimeters;
s3: primarily leveling and collecting the surface, basically leveling the surface of the concrete after S2, finishing and leveling the uneven parts of the footprint and the vibration of the surface by adopting a wood trowel and a scraping ruler, and primarily leveling by using the wood trowel;
s4: the concrete is initially solidified for half an hour;
s5: hard leveling, slurry extracting and trimming, wherein after the concrete is initially set for half an hour, a wooden trowel is used for first-time trowelling and pressing; the smearing pressure is uniform, and small pits, bubble holes, sand holes, foot prints and the like of the surface layer are polished to ensure that the surface layer is fully dense; simultaneously carrying out slurry extraction and trimming treatment on the concrete;
s6: spreading the stones and filing the wool, wherein the spreading of the stones is carried out twice, one time of longitudinal and transverse spreading is carried out, the stones should fall down uniformly to prevent uneven spreading, the stones are spread and smoothed by a single-disc troweling machine immediately to be combined with the base concrete slurry, the spreading of the stones with the particle size of 6mm-9mm and filing the wool of 6-9mm should be carried out immediately after the last working procedure, and the longitudinal and transverse spreading is carried out twice and smoothed by a hand troweling machine; spreading stones with the particle size of 3mm-6mm and smoothing, after spreading the stones with the particle size of 3mm-6mm, using a driving type troweling machine to trowel, after finishing spreading the stones with the three specifications, using a driving type double-disc machine to mechanically polish in a large area, and manually polishing corners;
s7: leveling, rolling, trimming and polishing, wherein after S6, a second leveling and rolling operation is carried out; the force for the first time of plastering is slightly larger than that for the first time of plastering, an electric trowel is used for calendaring, the trowel grains are leveled and polished, and finally, a manual trowel is used for polishing, and the whole plastering time is controlled to be completed before the concrete is finally set;
s8: cutting seams, maintaining, spraying a maintenance agent for maintenance after 5-6 hours of terrace construction, cutting the seams within 24 hours to prevent cracking, and maintaining the cotton felt for 7 days after the cutting of the seams is finished; cutting dividing joints of the concrete surface layer according to a dividing plane design drawing of a construction site, arranging through expansion joints for every 10-15 m square of concrete, and arranging expansion joints for every 2-5 m square of concrete;
s9: a first coarse grinding, wherein after 28 days from the step S8, a first polishing is carried out, wherein the first polishing is carried out by using a 50-mesh polishing machine, and then the first polishing is carried out by using a 100-mesh polishing machine; washing with clear water along with grinding, and timely sweeping the ground slurry; uniformly grinding, flattening and thoroughly grinding the whole terrazzo surface to expose the stone grain surface and the top surfaces of all the division bars;
s10: grouting, namely performing grouting treatment after primary coarse grinding, after the surface is slightly dried, coating a layer of cement paste with the same color (namely grouting supplement) to fill sand holes and dents, filling up the individual montmorillonite parts, and performing grouting according to the sequence of deep grouting and shallow grouting with different colors;
s11: fine grinding for the second time, maintaining for 3-4 days after slurry supplement, and grinding for the second time by using a 200-plus-300-mesh grinding stone in the same way as the first time; grinding until stone particles are exposed, the surface is flat and smooth and no pinholes exist, and then washing the stone particles clean by using clear water;
s12: li-based curing, after the ground of the grindstone is dried, spraying Li-based curing agent on the ground, pushing the ground uniformly by dust, and drying the ground;
s13: carrying out third fine grinding, and after S12, carrying out third grinding by using a 500-2000-mesh grinding stone in the same way as the first grinding;
s14: brushing Guard protective agent, and after the third fine grinding, uniformly brushing the Guard protective agent on the ground of the grindstone;
s15: polishing for the fourth time with 3000 meshes, and grinding for the third time by using a 3000-mesh grinding stone in the same way as the first time; and meanwhile, a high-speed polishing machine is used for carrying the animal hair pad to dry polish the ground, and construction is finished.
Preferably, the laser leveling method in step S3 includes: a rotating light beam emitted by the laser emitter forms a light plane at the positioning height of the operation land, the light plane is the reference plane of the leveling terrace when the stone grinding slurry paver operates, and the light plane can be horizontal and can also form an inclination angle with the horizontal (used for slope leveling operation); the laser receiver receives the optical signal and feeds back the height difference between the middle optical point and the reference optical plane to an operator of the spreading machine in an acoustic signal mode, and the operator lifts and lowers the spreading cutter by controlling the hydraulic station, so that the purpose of leveling the terrace is achieved.
Preferably, the method has requirements on the site construction environment: the construction temperature is above 5 ℃, and the ground has no open water; the lighting condition of the construction site needs to be sufficient (meeting the construction requirement at night);
preferably: in step S2, the content of each concrete: water: 175kg of cement: 461kg of sand: 512kg of stones: 1252 kg; the corresponding mixing ratio is as follows: 0.38:1:1.11: 2.72; pouring concrete by adopting a pump truck; each tray refers to a construction site, and the once-mixing (one-car) with the concrete mixer is called a tray in the specification.
Preferably: in the step S3, the laser leveling uses a laser level to divide the concrete into a plurality of grids, leveling control points are arranged at the intersection points of the plurality of grids, and a steel wire mesh is laid according to the divided grids to realize the manual surface folding of the concrete.
Preferably: in step S4, the leveling layer concrete of the initial set requires 2m error 3 mm.
Preferably: construction of an old terrace: in the original construction preparation, a grinding and gold steel head adding machine is needed to carry out polishing construction on the old terrace, and the original foundation surface is exposed.
Preferably: the push coating dosage of the concrete Li-based curing agent is 4-8m2Per kg; the push coating dosage of the Guard protective agent is 5-10m2/kg。
In addition, the Li-based curing is adopted for the concrete grindstone terrace, magnesium aluminosilicate, phosphorus fluorosilicate, magnesium aluminum phosphate, zinc fluorosilicate, hydrofluoric acid, sodium silicate and the like are added into the original components, after the improved Li-based curing agent is used, free calcium in concrete rapidly undergoes hydrolysis and polymerization with effective components of a concrete permeation sealing curing agent under the alkaline condition of the sodium silicate, and finally a three-dimensional mesh inorganic polymer taking silica tetrahedrons and aluminum tetrahedrons as structural units is generated, the structural gaps are filled with crystalline colloids, a layer of hard sealing entity consisting of crystalline colloids is generated on the surface of the concrete, the strength and the wear resistance of the surface layer of the concrete structure are greatly improved, and the service life of the terrace is greatly prolonged.
The curing agent comprises the following components:
Figure BDA0002212152880000051
Figure BDA0002212152880000061
compared with the prior art, the invention has the beneficial effects that:
(1) the concrete grindstone terrace has simple construction steps and does not need complex operation, after the improved curing agent is used, free calcium in concrete rapidly undergoes hydrolysis and polymerization with effective components of a concrete permeation sealing curing agent under the alkaline condition of sodium silicate, and finally a three-dimensional mesh inorganic polymer taking silica tetrahedron and aluminum tetrahedron as structural units is generated, the structural gaps are filled with crystalline colloid, a layer of hard sealing entity consisting of crystalline colloid is generated on the surface of the concrete, the strength and the wear resistance of the surface layer of a concrete structure are greatly improved, and the service life of the terrace is greatly prolonged.
(2) The invention relates to a concrete grindstone terrace, which is a novel grindstone terrace formed by spreading and matching colored stones according to requirements after the initial setting of leveling layer concrete and carrying out crystal face treatment after 28 days. The epoxy grinding stone and the inorganic grinding stone have approximate surface effects, and meanwhile, the floor cost is greatly reduced.
(3) According to the concrete grindstone terrace, the curing agent and the protective agent are coated on the surface of the terrace twice and perform chemical reaction with concrete, so that the surface layer of the concrete terrace is reinforced, sealed and hardened to form a high-strength compound which is not expanded, not contracted and stable in performance, the whole structure is bright, clean, compact and high in strength, seamless, anti-skidding, pollution-resistant, friction-resistant and corrosion-resistant, waxing is not needed in the later period, the maintenance is convenient, and the use cost is reduced.
Drawings
FIG. 1 is a flow chart of the concrete grindstone terrace process of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention are clearly and completely described below with reference to the accompanying drawings, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, rather than all embodiments, and all other embodiments obtained by those skilled in the art without any creative work based on the embodiments of the present invention belong to the protection scope of the present invention.
Example 1:
as shown in fig. 1, the concrete grindstone terrace includes the following steps:
s1: construction preparation, compacting the sandstone cushion layer under the first-layer terrace by using a road roller, wherein the compaction coefficient is more than 0.96; removing all unnecessary sundries and facilities in a construction site, keeping a construction surface clean and tidy and having no cross construction;
s2: pouring concrete, wherein the grade of the concrete is not lower than C30, adopting clean river sand, adding no machine-made sand and surface sand, adding no fly ash and mineral powder, and the field slump is between 140 and 160 millimeters;
s3: primarily leveling and collecting the surface, basically leveling the surface of the concrete after S2, finishing and leveling the uneven parts of the footprint and the vibration of the surface by adopting a wood trowel and a scraping ruler, and primarily leveling by using the wood trowel;
s4: the concrete is initially solidified for half an hour;
s5: hard leveling, slurry extracting and trimming, wherein after the concrete is initially set for half an hour, a wooden trowel is used for first-time trowelling and pressing; the smearing pressure is uniform, and small pits, bubble holes, sand holes, foot prints and the like of the surface layer are polished to ensure that the surface layer is fully dense; simultaneously carrying out slurry extraction and trimming treatment on the concrete;
s6: spreading the stones and filing the wool, wherein the spreading of the stones is carried out twice, one time of longitudinal and transverse spreading is carried out, the stones should fall down uniformly to prevent uneven spreading, the stones are spread and smoothed by a single-disc troweling machine immediately to be combined with the base concrete slurry, the spreading of the stones with the particle size of 6mm-9mm and filing the wool of 6-9mm should be carried out immediately after the last working procedure, and the longitudinal and transverse spreading is carried out twice and smoothed by a hand troweling machine; spreading stones with the particle size of 3mm-6mm and smoothing, after spreading the stones with the particle size of 3mm-6mm, using a driving type troweling machine to trowel, after finishing spreading the stones with the three specifications, using a driving type double-disc machine to mechanically polish in a large area, and manually polishing corners;
s7: leveling, rolling, trimming and polishing, wherein after S6, a second leveling and rolling operation is carried out; the force for the first time of plastering is slightly larger than that for the first time of plastering, an electric trowel is used for calendaring, the trowel grains are leveled and polished, and finally, a manual trowel is used for polishing, and the whole plastering time is controlled to be completed before the concrete is finally set;
s8: cutting seams, maintaining, spraying a maintenance agent for maintenance after 5-6 hours of terrace construction, cutting the seams within 24 hours to prevent cracking, and maintaining the cotton felt for 7 days after the cutting of the seams is finished; cutting dividing joints of the concrete surface layer according to a dividing plane design drawing of a construction site, arranging through expansion joints for every 10-15 m square of concrete, and arranging expansion joints for every 2-5 m square of concrete;
s9: a first coarse grinding, wherein after 28 days from the step S8, a first polishing is carried out, wherein the first polishing is carried out by using a 50-mesh polishing machine, and then the first polishing is carried out by using a 100-mesh polishing machine; washing with clear water along with grinding, and timely sweeping the ground slurry; uniformly grinding, flattening and thoroughly grinding the whole terrazzo surface to expose the stone grain surface and the top surfaces of all the division bars;
s10: grouting, namely performing grouting treatment after primary coarse grinding, after the surface is slightly dried, coating a layer of cement paste with the same color (namely grouting supplement) to fill sand holes and dents, filling up the individual montmorillonite parts, and performing grouting according to the sequence of deep grouting and shallow grouting with different colors;
s11: fine grinding for the second time, maintaining for 3-4 days after slurry supplement, and grinding for the second time by using a 200-plus-300-mesh grinding stone in the same way as the first time; grinding until stone particles are exposed, the surface is flat and smooth and no pinholes exist, and then washing the stone particles clean by using clear water;
s12: li-based curing, after the ground of the grindstone is dried, spraying Li-based curing agent on the ground, pushing the ground uniformly by dust, and drying the ground;
s13: carrying out third fine grinding, and after S12, carrying out third grinding by using a 500-2000-mesh grinding stone in the same way as the first grinding;
s14: brushing Guard protective agent, and after the third fine grinding, uniformly brushing the Guard protective agent on the ground of the grindstone;
s15: polishing for the fourth time with 3000 meshes, and grinding for the third time by using a 3000-mesh grinding stone in the same way as the first time; and meanwhile, a high-speed polishing machine is used for carrying the animal hair pad to dry polish the ground, and construction is finished.
Preferably, the laser leveling method in step S3 includes: a rotating light beam emitted by the laser emitter forms a light plane at the positioning height of the operation land, the light plane is the reference plane of the leveling terrace when the stone grinding slurry paver operates, and the light plane can be horizontal and can also form an inclination angle with the horizontal (used for slope leveling operation); the laser receiver receives the optical signal and feeds back the height difference between the middle optical point and the reference optical plane to an operator of the spreading machine in an acoustic signal mode, and the operator lifts and lowers the spreading cutter by controlling the hydraulic station, so that the purpose of leveling the terrace is achieved.
The method has the following requirements on the site construction environment: the construction temperature is above 5 ℃, and the ground has no open water; the lighting condition of the construction site needs to be sufficient (meeting the construction requirement at night);
in step S2, the content of each concrete: water: 175kg of cement: 461kg of sand: 512kg of stones: 1252 kg; the corresponding mixing ratio is as follows: 0.38:1:1.11: 2.72; the concrete pouring adopts pump truck pouring.
In the step S3, the laser leveling uses a laser level to divide the concrete into a plurality of grids, leveling control points are arranged at the intersection points of the plurality of grids, and a steel wire mesh is laid according to the divided grids to realize the manual surface folding of the concrete.
In step S4, the leveling layer concrete of the initial set requires 2m error 3 mm.
Construction of an old terrace: in the original construction preparation, a grinding and gold steel head adding machine is needed to carry out polishing construction on the old terrace, and the original foundation surface is exposed.
The push coating dosage of the concrete Li-based curing agent is 4-8m2Per kg; the push coating dosage of the Guard protective agent is 5-10m2/kg。
In addition, the Li-based curing is adopted for the concrete grindstone terrace, magnesium aluminosilicate, phosphorus fluorosilicate, magnesium aluminum phosphate, zinc fluorosilicate, hydrofluoric acid, sodium silicate and the like are added into the original components, after the improved Li-based curing agent is used, free calcium in concrete rapidly undergoes hydrolysis and polymerization with effective components of a concrete permeation sealing curing agent under the alkaline condition of the sodium silicate, and finally a three-dimensional mesh inorganic polymer taking silica tetrahedrons and aluminum tetrahedrons as structural units is generated, the structural gaps are filled with crystalline colloids, a layer of hard sealing entity consisting of crystalline colloids is generated on the surface of the concrete, the strength and the wear resistance of the surface layer of the concrete structure are greatly improved, and the service life of the terrace is greatly prolonged.
The curing agent comprises the following components:
component (A) Content (wt.)
Magnesium aluminosilicate 10-15kg
Phosphorus fluorosilicate 25-30kg
Magnesium aluminum phosphate 10-15kg
Zinc fluosilicate 25-30kg
Hydrofluoric acid 1-5kg
Sodium silicate 0.5-3kg
Other auxiliaries 5-10kg
Example two
The difference from the first embodiment is that the Li-based curing agent is prepared in the construction process, 1.5g of magnesium aluminosilicate, 3g of phosphorus fluorosilicate, 1.5g of magnesium aluminum phosphate, 3g of zinc fluorosilicate, 0.5g of hydrofluoric acid and 0.3g of sodium silicate are weighed according to the formula, the weighed components are uniformly mixed, 200g of water is added at room temperature and stirred for 20 minutes at a constant speed, and the prepared novel Li-based curing agent solution is uniform, stable and transparent and is used for later use.
The prepared curing agent solution is used for the ground in partial construction, and the ground performance test result after the construction of the novel curing agent is as follows:
level of security First stage
Target reliability (%) 97%
Target reliability index 1.65
Grade of variation level Is low in
Degree of water absorption 90%
Mohs hardness 8.2
Water permeability CRD-C48-73 7.8cm/s
Bending strength ASTMC78-94 640psi
The Li-based curing is adopted for the concrete grindstone terrace, magnesium aluminosilicate, phosphorus fluorosilicate, aluminum magnesium phosphate, zinc fluorosilicate, hydrofluoric acid, sodium silicate and the like are added into the original components, after the improved Li-based curing agent is used, free calcium in concrete rapidly undergoes hydrolysis and polymerization with the effective components of a concrete permeation sealing curing agent under the alkaline condition of the sodium silicate, and finally a three-dimensional mesh inorganic polymer taking silica tetrahedron and aluminum tetrahedron as structural units is generated, the structural gaps are filled with crystalline colloid, a layer of hard sealing entity consisting of crystalline colloid is generated on the surface of the concrete, the strength and the wear resistance of the surface layer of the concrete structure are greatly improved, and the service life of the terrace is greatly prolonged; the technical scheme is that colored stones are spread and matched according to requirements after the initial setting of the leveling layer concrete, and crystal face treatment is carried out after 28 days to form the novel grindstone terrace; the epoxy grinding stone and the inorganic grinding stone have approximate surface effects, and meanwhile, the floor cost is greatly reduced.
The construction method of the concrete magic stone terrace obtained by the technical scheme uses the construction process of a wear-resistant terrace, a curing terrace and a terrazzo terrace for reference, and is a novel terrazzo terrace formed by spreading and matching colorful stones according to requirements after the initial setting of the concrete of the leveling layer and carrying out crystal face treatment after 28 days. The epoxy grinding stone and the inorganic grinding stone have approximate surface effects, and meanwhile, the floor cost is greatly reduced.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the present invention, and it will be apparent to those skilled in the art that various modifications and variations can be made in the present invention; any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The concrete terrazzo floor is characterized by comprising the following steps:
s1: construction preparation, compacting the sandstone cushion layer under the first-layer terrace by using a road roller, wherein the compaction coefficient is more than 0.96; removing all unnecessary sundries and facilities in a construction site, keeping a construction surface clean and tidy and having no cross construction;
s2: pouring concrete, wherein the grade of the concrete is not lower than C30, adopting clean river sand, adding no machine-made sand and surface sand, adding no fly ash and mineral powder, and the field slump is between 140 and 160 millimeters;
s3: primarily leveling and collecting the surface, basically leveling the surface of the concrete after S2, finishing and leveling the uneven parts of the footprint and the vibration of the surface by adopting a wood trowel and a scraping ruler, and primarily leveling by using the wood trowel;
s4: the concrete is initially solidified for half an hour;
s5: hard leveling, slurry extracting and trimming, wherein after the concrete is initially set for half an hour, a wooden trowel is used for first-time trowelling and pressing; the smearing pressure is uniform, and small pits, bubble holes, sand holes, foot prints and the like of the surface layer are polished to ensure that the surface layer is fully dense; simultaneously carrying out slurry extraction and trimming treatment on the concrete;
s6: spreading the stones and filing the wool, wherein the spreading of the stones is carried out twice, one time of longitudinal and transverse spreading is carried out, the stones should fall down uniformly to prevent uneven spreading, the stones are spread and smoothed by a single-disc troweling machine immediately to be combined with the base concrete slurry, the spreading of the stones with the particle size of 6mm-9mm and filing the wool of 6-9mm should be carried out immediately after the last working procedure, and the longitudinal and transverse spreading is carried out twice and smoothed by a hand troweling machine; spreading stones with the particle size of 3mm-6mm and smoothing, after spreading the stones with the particle size of 3mm-6mm, using a driving type troweling machine to trowel, after finishing spreading the stones with the three specifications, using a driving type double-disc machine to mechanically polish in a large area, and manually polishing corners;
s7: leveling, rolling, trimming and polishing, wherein after S6, a second leveling and rolling operation is carried out; the force for the first time of plastering is slightly larger than that for the first time of plastering, an electric trowel is used for calendaring, the trowel grains are leveled and polished, and finally, a manual trowel is used for polishing, and the whole plastering time is controlled to be completed before the concrete is finally set;
s8: cutting seams, maintaining, spraying a maintenance agent for maintenance after 5-6 hours of terrace construction, cutting the seams within 24 hours to prevent cracking, and maintaining the cotton felt for 7 days after the cutting of the seams is finished; cutting dividing joints of the concrete surface layer according to a dividing plane design drawing of a construction site, arranging through expansion joints for every 10-15 m square of concrete, and arranging expansion joints for every 2-5 m square of concrete;
s9: a first coarse grinding, wherein after 28 days from the step S8, a first polishing is carried out, wherein the first polishing is carried out by using a 50-mesh polishing machine, and then the first polishing is carried out by using a 100-mesh polishing machine; washing with clear water along with grinding, and timely sweeping the ground slurry; uniformly grinding, flattening and thoroughly grinding the whole terrazzo surface to expose the stone grain surface and the top surfaces of all the division bars;
s10: grouting, namely performing grouting treatment after primary coarse grinding, after the surface is slightly dried, coating a layer of cement paste with the same color (namely grouting supplement) to fill sand holes and dents, filling up the individual montmorillonite parts, and performing grouting according to the sequence of deep grouting and shallow grouting with different colors;
s11: fine grinding for the second time, maintaining for 3-4 days after slurry supplement, and grinding for the second time by using a 200-plus-300-mesh grinding stone in the same way as the first time; grinding until stone particles are exposed, the surface is flat and smooth and no pinholes exist, and then washing the stone particles clean by using clean water;
s12: li-based curing, after the ground of the grindstone is dried, spraying Li-based curing agent on the ground, pushing the ground uniformly by dust, and drying the ground;
s13: carrying out third fine grinding, and after S12, carrying out third grinding by using a 500-2000-mesh grinding stone in the same way as the first grinding;
s14: brushing Guard protective agent, and after the third fine grinding, uniformly brushing the Guard protective agent on the ground of the grindstone;
s15: polishing for the fourth time with 3000 meshes, and grinding for the third time by using a 3000-mesh grinding stone in the same way as the first time; and meanwhile, a high-speed polishing machine is used for carrying the animal hair pad to dry polish the ground, and construction is finished.
2. The concrete millstone terrace of claim 1, characterized in that: in step S2, the content of each concrete: water: 175kg of cement: 461kg of sand: 512kg of stones: 1252 kg; the corresponding mixing ratio is as follows: 0.38:1:1.11: 2.72; the concrete pouring adopts pump truck pouring.
3. The concrete grindstone terrace according to claim 1 or 2, characterized in that: in the step S3, the laser leveling uses a laser level to divide the concrete into a plurality of grids, leveling control points are arranged at the intersection points of the plurality of grids, and a steel wire mesh is laid according to the divided grids to realize the manual surface folding of the concrete.
4. The concrete millstone terrace of claim 1, characterized in that: in step S4, the leveling layer concrete of the initial set requires 2m error 3 mm.
5. The concrete millstone terrace of claim 1, characterized in that: construction of an old terrace: in the original construction preparation, a grinding and gold steel head adding machine is needed to carry out polishing construction on the old terrace, and the original foundation surface is exposed.
6. The concrete millstone terrace of claim 1, characterized in that: the push coating dosage of the concrete Li-based curing agent is 4-8m2Per kg; the push coating dosage of the Guard protective agent is 5-10m2/kg。
CN201910902135.XA 2019-09-24 2019-09-24 Concrete grindstone terrace Pending CN110656753A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910902135.XA CN110656753A (en) 2019-09-24 2019-09-24 Concrete grindstone terrace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910902135.XA CN110656753A (en) 2019-09-24 2019-09-24 Concrete grindstone terrace

Publications (1)

Publication Number Publication Date
CN110656753A true CN110656753A (en) 2020-01-07

Family

ID=69039173

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910902135.XA Pending CN110656753A (en) 2019-09-24 2019-09-24 Concrete grindstone terrace

Country Status (1)

Country Link
CN (1) CN110656753A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111305509A (en) * 2020-03-31 2020-06-19 唐山仁良地坪工程有限公司 Manufacturing method of super-wear-resistant fireproof industrial terrace
CN111302714A (en) * 2020-03-20 2020-06-19 卢亚涛 Integrated grinding stone and preparation method thereof
CN111962349A (en) * 2020-07-18 2020-11-20 北京住总第一开发建设有限公司 Wear-resistant concrete ground construction process
CN111962348A (en) * 2020-07-18 2020-11-20 北京住总第一开发建设有限公司 Concrete floor construction process
CN112456897A (en) * 2020-09-23 2021-03-09 福建恒尚实业有限公司 Production process of inorganic terrazzo
CN112593671A (en) * 2020-10-30 2021-04-02 华能江阴燃机热电有限责任公司 Inorganic grindstone system toughened terrace and manufacturing method thereof
CN114934651A (en) * 2022-05-27 2022-08-23 善义科技有限公司 Processing technology of high-hardness abrasion-resistant quick-setting crack-free integrated terrazzo

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104712085A (en) * 2015-03-24 2015-06-17 中交一航局第四工程有限公司 Large-area wear-resistant concrete ground construction method
US20170175406A1 (en) * 2014-09-18 2017-06-22 Diamond Tool Supply, Inc. Method for finishing a surface using a grouting pan
CN109208858A (en) * 2018-10-24 2019-01-15 郑州市永威置业有限公司 A kind of colored-stone terrace construction technology
CN109356358A (en) * 2018-10-10 2019-02-19 常州新城万盛商业管理有限公司 A kind of construction method of garage terrazzo terrace
CN109797945A (en) * 2019-01-18 2019-05-24 陕西建工集团有限公司 Abrasion-proof concrete grinding stone construction method of ground
CN110230380A (en) * 2019-06-12 2019-09-13 吉林省圣月班地坪装饰工程有限公司 It is a kind of to pour the construction method for smashing integrated grinding stone terrace

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20170175406A1 (en) * 2014-09-18 2017-06-22 Diamond Tool Supply, Inc. Method for finishing a surface using a grouting pan
CN104712085A (en) * 2015-03-24 2015-06-17 中交一航局第四工程有限公司 Large-area wear-resistant concrete ground construction method
CN109356358A (en) * 2018-10-10 2019-02-19 常州新城万盛商业管理有限公司 A kind of construction method of garage terrazzo terrace
CN109208858A (en) * 2018-10-24 2019-01-15 郑州市永威置业有限公司 A kind of colored-stone terrace construction technology
CN109797945A (en) * 2019-01-18 2019-05-24 陕西建工集团有限公司 Abrasion-proof concrete grinding stone construction method of ground
CN110230380A (en) * 2019-06-12 2019-09-13 吉林省圣月班地坪装饰工程有限公司 It is a kind of to pour the construction method for smashing integrated grinding stone terrace

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111302714A (en) * 2020-03-20 2020-06-19 卢亚涛 Integrated grinding stone and preparation method thereof
CN111305509A (en) * 2020-03-31 2020-06-19 唐山仁良地坪工程有限公司 Manufacturing method of super-wear-resistant fireproof industrial terrace
CN111962349A (en) * 2020-07-18 2020-11-20 北京住总第一开发建设有限公司 Wear-resistant concrete ground construction process
CN111962348A (en) * 2020-07-18 2020-11-20 北京住总第一开发建设有限公司 Concrete floor construction process
CN112456897A (en) * 2020-09-23 2021-03-09 福建恒尚实业有限公司 Production process of inorganic terrazzo
CN112593671A (en) * 2020-10-30 2021-04-02 华能江阴燃机热电有限责任公司 Inorganic grindstone system toughened terrace and manufacturing method thereof
CN114934651A (en) * 2022-05-27 2022-08-23 善义科技有限公司 Processing technology of high-hardness abrasion-resistant quick-setting crack-free integrated terrazzo
CN114934651B (en) * 2022-05-27 2023-12-01 善义科技有限公司 High-hardness abrasion-resistant quick-setting crack-free integrated terrazzo processing technology

Similar Documents

Publication Publication Date Title
CN110656753A (en) Concrete grindstone terrace
US7591967B2 (en) Method for the aesthetic surface treatment of a monolithic concrete floor and product of the method
CN105587102B (en) A kind of wet construction method to the wet type high abrasion terrace that paves
CN109797945A (en) Abrasion-proof concrete grinding stone construction method of ground
CN101886457B (en) Method for constructing wear-resistant and crack-resistant hardened ground
CN107152145A (en) A kind of stone material flooring construction method
CN111608362A (en) Hollowing-proof and cracking-proof process for concrete terrace leveling layer
CN108625252A (en) Urban road laying construction method
CN107060271B (en) A kind of dust-proof hardened artiwear method for constructing terrace
CN103216076B (en) A kind of epoxy color sand construction method of ground
CN109680904A (en) Reconciliation Self-leveling construction method
CN113738082A (en) Epoxy terrazzo wet-paving process
CN111962349A (en) Wear-resistant concrete ground construction process
CN114562087A (en) Cement-based grindstone material, concrete-integrated construction method thereof and grindstone terrace
CN112030665A (en) Construction method of vibration-compacted large-pore permeable concrete pavement
CN104213663B (en) The floor of a kind of band decorative cover protective layer
CN114876155A (en) Construction process for polishing ground by using non-ignition fine stone concrete
KR100858347B1 (en) Method for carrying out floor board of structure andfloor board of structure carried out by its method
CN107448002B (en) Construction process for polishing and repairing glaze surface of ground
CN212266164U (en) Grindstone component
CN107304632B (en) Stone gum construction method
CN214169786U (en) Terrazzo floor used in shopping center
CN108582409A (en) A kind of decoration integrated prefabricated components dry type paved production technology
CN114934651B (en) High-hardness abrasion-resistant quick-setting crack-free integrated terrazzo processing technology
CN110835989A (en) Construction method for stair step and platform cement mortar plastering

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20200107