CN106758852B - 横跨基坑围护对撑梁的栈桥施工工艺 - Google Patents
横跨基坑围护对撑梁的栈桥施工工艺 Download PDFInfo
- Publication number
- CN106758852B CN106758852B CN201710092595.1A CN201710092595A CN106758852B CN 106758852 B CN106758852 B CN 106758852B CN 201710092595 A CN201710092595 A CN 201710092595A CN 106758852 B CN106758852 B CN 106758852B
- Authority
- CN
- China
- Prior art keywords
- trestle
- bridge
- construction
- concrete
- support beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 68
- 238000005516 engineering process Methods 0.000 title claims abstract description 33
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 68
- 239000010959 steel Substances 0.000 claims abstract description 68
- 239000004567 concrete Substances 0.000 claims abstract description 51
- 238000005259 measurement Methods 0.000 claims abstract description 12
- 239000002893 slag Substances 0.000 claims abstract description 10
- 238000009434 installation Methods 0.000 claims abstract description 8
- 239000011150 reinforced concrete Substances 0.000 claims abstract description 6
- 238000009415 formwork Methods 0.000 claims description 25
- 239000010410 layer Substances 0.000 claims description 20
- 239000002023 wood Substances 0.000 claims description 16
- 239000002689 soil Substances 0.000 claims description 11
- 238000005266 casting Methods 0.000 claims description 7
- 239000012528 membrane Substances 0.000 claims description 7
- 239000011241 protective layer Substances 0.000 claims description 6
- 238000010408 sweeping Methods 0.000 claims description 6
- 230000002238 attenuated effect Effects 0.000 claims description 5
- 230000002787 reinforcement Effects 0.000 claims description 5
- 238000000034 method Methods 0.000 claims description 4
- 210000003205 muscle Anatomy 0.000 claims description 4
- 239000007787 solid Substances 0.000 claims description 4
- 229910000838 Al alloy Inorganic materials 0.000 claims description 3
- 239000000945 filler Substances 0.000 claims description 3
- 238000007667 floating Methods 0.000 claims description 3
- 230000008520 organization Effects 0.000 claims description 3
- 241000469816 Varus Species 0.000 claims description 2
- 230000015572 biosynthetic process Effects 0.000 abstract description 5
- 230000003014 reinforcing effect Effects 0.000 description 6
- 239000004927 clay Substances 0.000 description 2
- 238000004140 cleaning Methods 0.000 description 2
- 238000005260 corrosion Methods 0.000 description 2
- 230000007797 corrosion Effects 0.000 description 2
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 description 2
- 238000010186 staining Methods 0.000 description 2
- 230000007306 turnover Effects 0.000 description 2
- 241000251468 Actinopterygii Species 0.000 description 1
- 240000002853 Nelumbo nucifera Species 0.000 description 1
- 235000006508 Nelumbo nucifera Nutrition 0.000 description 1
- 235000006510 Nelumbo pentapetala Nutrition 0.000 description 1
- 210000001015 abdomen Anatomy 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 230000015271 coagulation Effects 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000012407 engineering method Methods 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 239000010408 film Substances 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 238000009416 shuttering Methods 0.000 description 1
- 239000000758 substrate Substances 0.000 description 1
- 239000010409 thin film Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
- E02D27/14—Pile framings, i.e. piles assembled to form the substructure
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
- E01D2101/26—Concrete reinforced
Landscapes
- Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Architecture (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
Description
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710092595.1A CN106758852B (zh) | 2017-02-21 | 2017-02-21 | 横跨基坑围护对撑梁的栈桥施工工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710092595.1A CN106758852B (zh) | 2017-02-21 | 2017-02-21 | 横跨基坑围护对撑梁的栈桥施工工艺 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106758852A CN106758852A (zh) | 2017-05-31 |
CN106758852B true CN106758852B (zh) | 2018-10-02 |
Family
ID=58958534
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710092595.1A Active CN106758852B (zh) | 2017-02-21 | 2017-02-21 | 横跨基坑围护对撑梁的栈桥施工工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106758852B (zh) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107299596B (zh) * | 2017-08-22 | 2022-12-09 | 中建八局第三建设有限公司 | 混凝土支撑栈桥板下支撑梁模板系统及其施工方法 |
CN108277777A (zh) * | 2017-12-08 | 2018-07-13 | 中交烟台环保疏浚有限公司 | 挡浪墙分步浇筑施工工艺 |
CN111042150A (zh) * | 2019-12-30 | 2020-04-21 | 上海建工七建集团有限公司 | 基坑挖土阶段跨越支撑平台及其施工方法 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5965006U (ja) * | 1982-10-23 | 1984-04-28 | 丸藤シ−トパイル株式会社 | テ−パ付覆工板 |
JP4050816B2 (ja) * | 1997-12-16 | 2008-02-20 | 株式会社フジタ | 鉄骨鉄筋コンクリート建築物の地下部分の施工方法 |
CN103321231B (zh) * | 2013-06-10 | 2015-11-25 | 叶长青 | 基坑支护施工方法 |
CN104005571A (zh) * | 2014-06-17 | 2014-08-27 | 浙江华展工程研究设计院有限公司 | 一种与内支撑体系结合的斜向施工栈桥 |
CN205062817U (zh) * | 2015-09-01 | 2016-03-02 | 中国建筑第八工程局有限公司 | 与基坑支护体系结合的栈桥 |
-
2017
- 2017-02-21 CN CN201710092595.1A patent/CN106758852B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN106758852A (zh) | 2017-05-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103590602B (zh) | 现浇混凝土空心楼盖的施工方法 | |
CN108678000B (zh) | 一种路基下穿公路u型支挡结构及其施工方法 | |
CN112982181B (zh) | 一种上承式钢箱连续拱桥钢混结合段施工方法 | |
CN108330902B (zh) | 高桩码头现浇下横梁施工方法 | |
CN108166397A (zh) | 铁路框架桥施工方法 | |
CN109505229A (zh) | 公路高陡边坡应力平衡及减振防灾高桥墩结构及施工方法 | |
CN106758852B (zh) | 横跨基坑围护对撑梁的栈桥施工工艺 | |
CN108330835A (zh) | 定型支架的施工方法 | |
CN106436732B (zh) | 一种条形基础置换成筏板基础的加固方法及加固结构 | |
CN103469806A (zh) | 一种预制砼基础承台侧模替代砖胎模的施工方法 | |
CN102392549A (zh) | 无缝预应力混凝土自防水清水池施工工法 | |
CN105951842B (zh) | 筏板下反梁聚苯板胎膜施工方法 | |
CN108505805A (zh) | 膨胀加强带控裂大型现浇水池及其施工方法 | |
JP3010356B1 (ja) | トンネルの構築方法 | |
CN104120736A (zh) | 一种钢筋混凝土挡土墙的施工方法 | |
CN207363251U (zh) | 一种用于控制坡屋面坡度及厚度的导轨装置 | |
CN107905609A (zh) | 地下人防施工方法 | |
CN110106915A (zh) | 一种免支撑逆作地下工程施工方法及地下工程建筑结构 | |
CN111119219B (zh) | 一种加筋基础胎膜结构及其施工方法 | |
CN206245730U (zh) | 一种现浇坡屋面双层模板结构 | |
CN106638610A (zh) | 高差错接结构及其施工方法 | |
CN111593702B (zh) | 一种码头的升级改造方法及码头升级改造结构 | |
CN114457846A (zh) | 一种路站主体结构施工方法 | |
CN113818352A (zh) | 一种软基高墩曲线现浇箱梁桥及其施工方法 | |
CN112176944A (zh) | 一种亲水平台护岸结构的施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Trestle construction technology crossing the supporting beam of foundation pit Effective date of registration: 20220927 Granted publication date: 20181002 Pledgee: Hangzhou joint rural commercial bank Limited by Share Ltd. three pier sub branch Pledgor: ZHEJIANG ZHEYAO CONSTRUCTION GROUP CO.,LTD. Registration number: Y2022330002383 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20240102 Granted publication date: 20181002 Pledgee: Hangzhou joint rural commercial bank Limited by Share Ltd. three pier sub branch Pledgor: ZHEJIANG ZHEYAO CONSTRUCTION GROUP CO.,LTD. Registration number: Y2022330002383 |